The document is a comprehensive plan set for the City of McKinney's Redbud Boulevard Illumination Phase 1 project (Project No. TR2313), prepared by Lee Engineering, L.L.C. The project involves constructing roadway illumination infrastructure along Redbud Boulevard from Wilmeth Road to University Drive (US 380), spanning approximately 51,100 linear feet across multiple roadways including Redbud Boulevard, Bray Central Drive, Corporate Drive, Commerce Drive, Central Circle, and Graves Street. The illumination plan includes installing 56 roadway illumination poles with various mounting details, conduit runs totaling approximately 17,836 linear feet, electrical conductors, ground boxes, and associated electrical infrastructure. The project documents include detailed photometric layouts, electrical service specifications, and technical installation requirements.
The project is funded through the City of McKinney's Capital Improvement Program (CIP) and involves comprehensive electrical infrastructure installation, including 480V electrical services, conduit systems, grounding infrastructure, and LED luminaire installations. The illumination design meets specific roadway classification illuminance standards, with average foot-candle measurements ranging between 0.61 and 1.59 across different roadway segments. The technical specifications require use of specific materials listed on the Material Producers List, compliance with National Electrical Code standards, and adherence to TxDOT electrical installation guidelines. The project aims to enhance roadway lighting and safety across multiple municipal thoroughfares, with precise engineering specifications for pole placement, electrical connections, and photometric performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-05 Bid Bond.pdf | ||
| 4-04 Required Forms.pdf | ||
| 2-02 Bid Proposal.pdf | ||
| 6-06 Construction Agreement and Bonds.pdf | ||
| 1-01 Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEY MAP
PHOTOMETRIC LAYOUT PHASE 1 (8 OF 13)
ED(3)-14
ED(4)-14
ED(5)-14
ED(6)-14
RID(1)-20
RID(2)-20
RIP(1)-19
ED(10)-14
ILLUMINATION LAYOUT PHASE 1 (1 OF 13)
ILLUMINATION LAYOUT PHASE 1 (2 OF 13)
ILLUMINATION LAYOUT PHASE 1 (3 OF 13)
ILLUMINATION LAYOUT PHASE 1 (4 OF 13)
ILLUMINATION LAYOUT PHASE 1 (5 OF 13)
ILLUMINATION LAYOUT PHASE 1 (6 OF 13)
ILLUMINATION LAYOUT PHASE 1 (7 OF 13)
ILLUMINATION LAYOUT PHASE 1 (8 OF 13)
ILLUMINATION LAYOUT PHASE 1 (9 OF 13)
ILLUMINATION LAYOUT PHASE 1 (10 OF 13)
ILLUMINATION LAYOUT PHASE 1 (11 OF 13)
ILLUMINATION LAYOUT PHASE 1 (12 OF 13)
ILLUMINATION LAYOUT PHASE 1 (13 OF 13)
ELECTRICAL DATA (1 OF 2)
ELECTRICAL DATA (2 OF 2)
POLE ANCHOR DETAIL (1 OF 3)
POLE ANCHOR DETAIL (2 OF 3)
POLE ANCHOR DETAIL (3 OF 3)
LIGHTING STANDARD DETAIL (7004M) (1 OF 2)
LIGHTING STANDARD DETAIL (7005M) (1 OF 2)
(7005M) (2 OF 2)LIGHTING STANDARD DETAIL
PHOTOMETRIC LAYOUT PHASE 1 (1 OF 13)
PHOTOMETRIC LAYOUT PHASE 1 (2 OF 13)
PHOTOMETRIC LAYOUT PHASE 1 (3 OF 13)
PHOTOMETRIC LAYOUT PHASE 1 (4 OF 13)
PHOTOMETRIC LAYOUT PHASE 1 (5 OF 13)
PHOTOMETRIC LAYOUT PHASE 1 (6 OF 13)
PHOTOMETRIC LAYOUT PHASE 1 (7 OF 13)
PHOTOMETRIC LAYOUT PHASE 1 (9 OF 13)
PHOTOMETRIC LAYOUT PHASE 1 (10 OF 13)
PHOTOMETRIC LAYOUT PHASE 1 (11 OF 13)
PHOTOMETRIC LAYOUT PHASE 1 (12 OF 13)
PHOTOMETRIC LAYOUT PHASE 1 (13 OF 13)
ED(1)-14
PROJECT END
(UNIVERSITY DR (US 380))
PROJECT BEGIN
(WILMETH RD)
Prepared By:
MAYOR
CITY COUNCIL
CITY MANAGER
N
BILL COX
JUSTIN BELLER, DIST. 1
GERE FELTUS, DIST. 3
RICK FRANKLIN, DIST. 4
ERNEST LYNCH, AT LARGE 1
PAUL GRIMES
TBPE FIRM #F-450
972.248.3006
DALLAS, TX 75234
3030 LBJ FREEWAY, SUITE 1660
MICHAEL JONES, AT LARGE 2
PATRICK CLOUTIER, DIST. 2
QUANTITY SUMMARY
COVER SHEET
SAXET FO ETAT
S
DESNECI
L
R E
E
N
IGNE LANOI
SS
E
F
O R
P 90295
DHARMESH M. SHAH
ILLUMINATION PLANS
CITY OF MCKINNEY, TEXAS
INDEX OF SHEETS
DESCRIPTIONSHEET NO.
DESCRIPTIONSHEET NO.
PROJECT LIMITS: WILMETH RD TO UNIVERSITY DR (US 380)
CIP TR2313
REDBUD BOULEVARD - PHASE 1
Dharmesh M. Shah, P.E.
to this project.
selected by me or under my responsible supervision as being applicable
Standard sheets specifically identified as sheet nos. 32-46 have been
JULY 2025
LEE ENGINEERING, L.L.C., REGISTRATION NO. F-450
DHARMESH M. SHAH, P.E.
dshah Typewriter 7/30/2025
CITY
MCKINNEY
REDBUD BLVD ILLUMINATION
REDBUD
STATE COUNTY
SHEET
NO.
HIGHWAY
NO.
TEXAS COLLIN
90295
DHARMESH M. SHAH
SAXET FO ETAT
S
DESNECI
L
R E
E
N
IGNE LANOI
SS
E
F
O R
P
LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450
DHARMESH M. SHAH, P.E.
QUANTITY SUMMARY
PHASE 1
ITEMBID 70400416 70010500 70010502 70010503 70300618 70310618 70070620 70080620 70010624 70020624 70470628 70016022 70026022 71270690 70130104 70010531
SHEETILLUMINATION
(30IN) POLE)ILL
(RDWY SHAFTDRILL
MOBILIZATION
HANDLING
TRAFFIC SIGNS,BARR,
SIGNMESSAGE
CHANGEABLE
PORTABLE
(2") 40)(SCH
(PVC)CONDT
(BORE) (2") 40)(SCH
(PVC)CONDT
BARE
(NO.8) CONDRELEC
INSULATED
(NO.8) CONDRELEC
(122311)
A TY BOXGROUND
W/APRON(122311)
A TY BOXGROUND
(NS)SS(E)PS(U)060
240/480 A TY SRVELC
1) (TYASSEMBLY
LIGHTINGROADWAY
2) (TYASSEMBLY
LIGHTINGROADWAY
POLE
LUMINAIREREMOVE
SUP)
OR RAMP(SIDEWALK,
CONC OFREMOVAL
(4")
SIDEWALKSCONC
UNIT LF LS MO DAY LF LF LF LF EA EA EA EA EA EA LF LF
GENERAL 1 1 20
13) OF (1 LAYOUTILLUMINATION 56 1120 235 1421 2842 1 3 7 5
13) OF (2 LAYOUTILLUMINATION 56 540 870 1494 2988 5 3 7 5
13) OF (3 LAYOUTILLUMINATION 72 1405 415 1940 5696 1 7 1 3 7 5
13) OF (4 LAYOUTILLUMINATION 56 930 405 1407 2814 2 3 7 5
13) OF (5 LAYOUTILLUMINATION 72 1265 420 1805 3734 5 1 8 1 4
13) OF (6 LAYOUTILLUMINATION 64 1065 435 1602 3204 2 8 2
13) OF (7 LAYOUTILLUMINATION 48 520 290 870 1740 2 6
13) OF (8 LAYOUTILLUMINATION 40 825 305 1208 2416 3 5
13) OF (9 LAYOUTILLUMINATION 56 1135 110 1311 2622 3 6 1
13) OF (10 LAYOUTILLUMINATION 56 1035 360 1491 2982 2 7 2 61 61
13) OF (11 LAYOUTILLUMINATION 56 1095 140 1313 2626 2 7 2 46 46
13) OF (12 LAYOUTILLUMINATION 32 330 235 601 1202 1 4 1 27 27
13) OF (13 LAYOUTILLUMINATION 56 940 355 1373 2746 3 7 1
TOTAL 1PHASE 720 1 1 20 12205 4575 17836 37612 9 39 2 61 30 32 134 134
SEPARATELY FOR PAID BE NOT WILL AND ASSEMBLY, LIGHTING ROADWAY TO SUBSIDIARY ARE POLES LUMINAIRE THE INSIDE WIRES ALL*
ASSEMBLY LIGHTING PEDESTRIAN 15'##
POLE. LUMINAIRE REMOVE - 7127 0690 ITEM TO SUBSIDIARY A AS FOR PAID BE WILL CONTRACTOR THE BY REMOVED BE TO BASES CONCRETE ANDHOUSINGS
WILMETH RD TO UNIVERSITY DR (US 380)
dgurusamy
07/30/2025
REDBUD BLVD ILLUMINATION
REDBUD
STATE COUNTY
SHEET
NO.
HIGHWAY
NO.
TEXAS COLLIN
90295
DHARMESH M. SHAH
SAXET FO ETAT
S
DESNECI
L
R E
E
N
IGNE LANOI
SS
E
F
O R
P
LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450
DHARMESH M. SHAH, P.E.
University Drive
ICV
WV
FH
WV
WVFH
ICV
WV
WM
WV
WVFH
WV
ICV
GM
ICV
F H
W V
T P
S T
M H
S T
M H
WM
IC
V
EV
FH
WV
W V
F H
W M
SSMH
S T
M H
WV
F H
F H
WV
WV
W V F
H S S
M H
S S
M H
S T
M H
S T
M H
T P
W V
F H
S T
M H
A T
T
E V
C V
S S
M H
E V
S W
B T M
H
T F
W V
SW
BT
E V
SS
M
H
W M
IC
V
IC
V
STM
H
T F
TS
V
STMH
TSV
CABINET
ELEC.
EV
TSV TSC
W M
IC
V
CABINET
ELEC.
WV
S T
M H
AT&T
M G
SSMH
Sign
Cable
Buried
S T
M H
W V
FH
IC
V
WV
IC
V
IC
V
IC
V
S T
M H
ICV WM
S T
M H
WV
SSMH
AT&T
ICV
S T
M H
SSMH
SWBT MH
S W
B T
M H
S T
M H
W V
W V
F H
T F
TF
S T
M H
STM
H
FH
W
V
SSMH
F H
WV
WM
GM
co
SWBT MH
WV
ICV
T P
W V
ICV
S T
M H
W V
W M
IC
V
SW
BT
M H
EV
STM
H
GM
GV
SW
BT
M H
IC
V
IC
V
W V
F
HW
V
TP TW
C
FH
W V
FCV
S S
M H
IC
V
IC
V
E V
S
TA
N D P
IP
E
2" M
E
TA
L
SLV
C V
FH
W
V
S T
M H
W V
AT&T
E M
H
FH
W V
FH W
V
STM
H
W V
SIG
N
W V
F H
S T
M H
C V
W V
(3 4" P
V C S
T A N
D P
IP
E
2" P
V C S
T A N
D P
IP
E
ICV
WV
FH
F C
V
STMH
GV
W V
AT&T
WV
ICV
WM
WV
FH
WV
STMH
ICV
WVTWC
WV
FH
AT&T
SPECTRUM
AT&T
AT&T
(6) 4" P V C S
TA
N
D P
IP
E
2" P V C S
TA
N
D P
IP
E
(3) 4" P V C S
TA
N
D P
IP
E
FH
W V
W V
GAS TEST STATION
WV
ICV
W V
STMH
4" PVC
STANDPIPE
SPECTRUM
W V
STMH
W
V
STMH
FH
AT&T
TWC
EV
S T
M H
4" PVC
STANDPIPE
STANDPIPE
4" PVC
WV
F H
S T
M H
W V
ICV
WV
WV WV
WM
CV
AT&T
S T
M H
AT&T
S T
M H
T W
C
WV
WV
WV
STMH
CV
WM
WV
WV
AT&T
WV
F H
TP
EV
TWC
WV
WV
SSMH
SSMH
co
WM
WM
ICV
CV
WV
WV
WV
ICV
co
WV
SSMH
AT&T
EM
Vault
Communications
Standpipe
4" PVC
Line Post
Gas Pipe
WM
ICV
FH
STMH
Gas Post
Atmos
SSMH SSMH
WM
FH
STMH
ICV
ICV
STMH
WVWM
ICV
WV
SIGN
ICV
Cabinet
Traffic
SSMH
FH
WV
ICV ICVICV
STMH AT&T
TP
WV
SSMH
GV
Station
Gas Test
SWBT MH
TF
TSV
S T
M H
W V
WV
ICVT
P
WV F
H
WV
WV
WV
ICV
WM
IC
V
S T
M H
IC
V
IC
V
S S
M H
IC
V
IC
V
IC
V
IC
V
M E
T A
L S
T A
N D
P
IP
E
F H
W V
S T
M H
G C
E C
S tation
G as Test
S T
M H
S W
B T M
H
F H
W V
S T
M H
SWBT MH
WV
STMH
STMH
F H
W V
FHWV
VAULT
ONCOR
TWC
STMH
TF
STMH
ICV
WV
FH
GM
ICVWM
ICV
TF
STMHAT&T
WV
STMH
WV WV
WV
AT&T
EV
WV
FH
G A
S G
A
SEV
Vault
Fiber
Silt Fence
SWBT MH
Silt Fence
TF
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G A S
G A S
G A
S
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G A
S
G A
S
WV
S T
M H
WV
SSMH
IC
V
T S
V
S T
M H
WV
WV
STMH
STMH
ICV
EV
EV
Vault
Cable
WV
FH
SSMH
WV
WV
Line Post
Gas Pipe
STMH
TP
Vault
Cable
GM
TF
TP
EMH
STMH FH
S T
M H
IC
V
W V F H
W V
T
FIC
V
IC
V
S T
M H
IC
V
ICV
IC
V
W M
IC
V
ICV
ICV
F H
W V
W V
SSMH
E M
H
TP
IC
V
WV
WV
WV
WV
F H
S T
M H
GM
GM
T S
V co
EV
ICV
WV
S T
M H
W V
FH
co
S T
M H
S T
M H
S T
M H
F H
WV
W V
T F
W V
W V
A T T
SWBT MH
S W
B T M
H
W V
W V
F H
S T
M H
G M
W V
F H
W V
A T T
STM
H
W V
FH
W V
STMH
FH
W V
W V
IC
V
W V
IC
V
IC
V co
STMH
AT&T
STMH
FH W
V
EV
STMH
S T
M H
STMH
FHW
V
WM
W V
IC
V
STMH
FH
WV
IC
V
WV EV
SS
MH
EV
E V
SWBT M
H
Signal
Traffic
TWC
TSV
TF
EV
T W
C
CV
E V
ICV
S W
B T
M H
ICV
FH
W
V
F H
WV
IC
V
G A
S G
A S
G A
S G
A S
G A
S G
A S
G A
S G
A S
ICV
WM
WM
F H
W V
W
V WATER
VAULT
WM
Fiber
Cable
T W
C
EV
S T
M H
FH
W
V S
T M
H
S T
M H
WV
FH
WV
VAULT
VALVE
WATER
WV
SWBT MH
S T
M H
W V
W V
F H
W V
F
HSWBT
FIBERCABLE
AT&TICV
WM
W V
S T
M H
WV
St at ionGa s Te st
GPP
S T
M H
TF
SWBT MH
AT&T
WV
W
VF
H
IC
V
WM
A T
T
G C
E C
F H
W V
S T
M H
SWBT MH
STMH
F H
W V
IC
V
ICV
SSMH
WM
S T
M H
G C
E C
SSMH
G C
E C
S W
B T
M H
AT&T
AT&T
WV
WV
Wilmeth Road
R e d b u d B o u le v a rd
Br ay C en tra l C irc le
B ra y
C en tr al C irc le
B ra y C e n tr a l
C ir c le
Bray Central Drive Bray Central Drive
C B
L /F
B R
Bray Central Drive
C o m m e rc e D ri v e
Corporate Drive
Corporate Drive
B ra y C e n tra l C irc le
B ra y C e n tr a l
C ir c le
R e d b u d B o u le v a rd
R e d b u d B o u le v a rd
R ed bu d
B ou le va rd
R e d b u d B o u le v a rd
G ra v e s S tre e t
G ra v e s S tr e e t
Inwood Drive
Woodleigh Drive
II
II
II
II
II
II
II
II
University Drive (U.S. Highway 380)
U .S
H ig h w a y
F O
F F
O F
F O
F
Signal
Crossing
F O
F
SIGN
F O
F
FOF
FOF
FOF
F O F
A T
T
T W
C
F O
F
A t m o s
F la g
F O F
F O F
FO
F
F la g
O n c o r
F la g
O n c o r
F la g
O n c o r
FO
F
FO
F
Fl agO nc or
Fl agO nc or
Fl agO nc or
Fl agO nc or
Fl agO nc or
Fl agO nc or Fl agO nc or TF
FO
F
FO
F
FO
F
FO
F
FO
F
FO
F
Va ul t
Fi be r/
Ca bl e
2" M
ETAL
STANDPI
PE
F O F
FOF
Fl a g
A tm o s
B C S
F O F
F O F
F la g
A T
T
B C S
S ta n d p ip e
P
V C
A T
T
A T
T
A T
T
A T
T
S P
E C
T R
U M
S P
E C
T R
U M
SIGNAL
TRAFFIC
FIBER
POST
Spectrum
AT&T
Flags
AT&T
AT&T
AT&T
Spectrum
AT&T
AT&T
FO
F
F O
F
F O
F
F O
F
Cable Post
AT&T
Spectrum
S p e c t r u m
A T
T
O n c o r
A T
T
F O
F F
O F
F O
F
Flags
Spectrum
Standpipe
4" PVC
Flags
Spectrum
Flag
Spectrum
Atmos Flag
Oncor Flag
F O
P
B C
S
CABINET
AT&T
F O
P
SWBT PEDESTAL
St an dp ip e
4" P
VC
FIB
ER
CABLE
VAULT
WATER V
AULT
SPECTRUM V
AULT
Fiber Fiber
Flag
AT&T
Flag
AT&T GAS
FOF
FOF
FOF
Vault
Fiber/Cable
FOF FOF
AT&TFOF
Flag
AT&T
Flag
AT&T
FOF
FOF
FOF
FOF
F O
F F
O F
SPECTRUM
Sil t
Fe nc e xx x xx x xx x xx x xx x xx x xx x xx x xx x xx x xx x xx x x x x
S ilt
F e n c e
M e ta l
R a il
M e ta l
R a il
M e t a l
R a il
S il t
F e n c e
M e t a l
R a il
S il t
F e n c e
Silt Fence
C o m m e rc e D ri v e
29+00
27+00
28+00
26+00
20+00
21+00
18+00
19+00
24+00
25+00
22+00
23+00
47+00
48+00
45+00
46+00
51+00
51+10
49+00
50+00
44+00
42+00
43+00
17+00
+0
+0
9+0
+0
15+00
16+00
+0
14+00
8+0
2+00
3+00
0+00
1+00
6+00
7+00
4+00
5+00
15+00
16+00
13+00
14+00
7+00
8+00
5+00
6+00
10+48
9+00
10+00
4+00
12+82
2+00
3+00
0+00
1+00
12+00
+0
+0
26+00
27+00
+0
+0
25+00
19+00
20+00
17+00
18+00
23+00
24+00
21+00
22+00
6+00
7+00
4+00
5+00
10+00
11+00
8+00
9+00
3+00
1+0
2+0
0+0
OF 13
SHEET 1
OF 13
SHEET 1
OF 13
SHEET 2
OF 13
SHEET 2
OF 13
SHEET 3
OF 13
SHEET 3
OF 13
SHEET 9
OF 13
SHEET 9
OF 13
SHEET 8
OF 13
SHEET 8
OF 13
SHEET 6
OF 13
SHEET 5
OF 13
SHEET 11
OF 13
SHEET 10
OF 13
SHEET 10
OF 13
SHEET 12
OF 13
SHEET 11
OF 13
SHEET 13
OF 13
SHEET 13
OF 13
SHEET 4
OF 13
SHEET 4
OF 13
SHEET 7
SCALE IN FEET
500250
OF 13
SHEET 5
BRAY CENTRAL DRIVEBRAY CENTRAL DRIVE
CORPORATE DRIVE
CENTRAL
CIR
CLE
C E
N T
R A L
C
IR
C L E
G R
A V
E S
T
R E
E T
R E
D B
U D
B O
U L
E V
A R
D
R E
D B
U L
E V
A R
D
C O
M M
E R
C E
D R
IV
E
R E
D B
U D
B O
U L
E V
A R
D
WILMETH ROAD
OF 13
SHEET 6
PHASE 1
PHASE 1
KEY MAPUNIVERSITY DRIVE (US HIGHWAY 380)
F R
O N
T A
G
R
A D
H
IG
H W
Y
N
R T
H B
O U
N D
WILMETH RD TO UNIVERSITY DR (US 380)
ES 1
ES 2
dgurusamy
REDBUD BLVD ILLUMINATION
REDBUD
STATE COUNTY
SHEET
NO.
HIGHWAY
NO.
TEXAS COLLIN
90295
DHARMESH M. SHAH
SAXET FO ETAT
S
DESNECI
L
R E
E
N
IGNE LANOI
SS
E
F
O R
P
LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450
DHARMESH M. SHAH, P.E.
IC
V
W V
W V
W V
F H
GCEC
FH
WV
STMH
S W
B T M
HS
T
M H
FH
WV
ICV
IC
V
S S
M H
W
MSTMH
GCEC
S S
M H
GCEC
SWBT MH
A T
T
A T
T
W V
W V
B P
.0
P C
.1
D E
S
IG
N S
P E
E D m i/ h
S T
A
.0
S T
M H
S T
M H
F
HW
V
W V
E V
S S
M H
E V
EV
S W
B T
M H
STMH
WV
WV
FHWV
STMH
W V
S t a t io n
G a s e s t
G P
P
STMH
T F
S W
B T M
HA
T
T
W V
WV
FH
ICV
W M
AT&T
GCEC
0+00
1+00
M i d
P T
.7
P C
.3
BP: 0+00.00
M A
T C
H L
IN
E
S
T A
M A
T C
H L
IN
E
S
T A
SCALE IN FEET
M A
T C
H L
I N
E
S T
A
(SEE SHEET 10)
MATCHLINE - STA 0+97
REDBUD BLVD
REDBUD BLVD
W
IL
M E
REDBUD BOULEVARD
C E
N T
R A
L C
IR
1-29
1A - 16 1A - 15
1A - 14
1A - 13
1A - 12
1A - 11
1A - 10
1-28
1-26
1-25
1-27
1-19
1-20
1-21
1-22
1-23
1-24
NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.
PHASE 1
ILLUMINATION LAYOUT
PROTECT IN PLACE
CONTRACTOR TO
UTILITY LINES.
CAUTION FOR
BELOW GRADE.
8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET
DIVISION (972) 547-7428.
TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL
COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES
STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.
REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED
CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.
ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.
RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.
LUMINAIRE FIXTURES ARE TO BE 5.
VERIFY WITH THE CITY OR ENGINEER.
THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO
SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF
THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.
BY THE CONTRACTOR.
OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED
DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED
SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE
CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.
POLE FOUNDATIONS.
MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY
CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF
AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.
UTILITIES.
(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING
THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY
FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO
CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES
COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE
THE LOCATION OF ALL UTILITIES, NOTIFYING ALL UTILITY
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING 1.
NOTES
LEGEND OF SYMBOLS
PROP. TY 2 STREET LIGHT(DOUBLE)
PROPOSED CONDUIT RUN NUMBER
PROP. TY 1 STREET LIGHT(SINGLE)
GROUND BOX (TY A)
X - X
(TRENCHED)
PROPOSED ILLUMINATION CONDUIT
(BORE)
PROPOSED ILLUMINATION CONDUIT
PROPOSED ELECTRICAL SERVICE
EX. WATERLINE
EX. SEWER MAIN
EX. STORM DRAIN
EX. FIBER CABLE-NTX BROADBAND
EX. FIBER CABLE-SPECTRUM
EX. GAS PIPELINE-ATMOS
GROUND BOX (TY A W/ APRON)
1-24
RUN CONDUCTOR ANDCONDUIT
NO.RUN
(FEET)
LENGTH ANDNO.
GROUND
(FEET)
LENGTH ANDNO.
CONDUCTOR
(FEET)
TRENCHED
CONDUIT
(FEET)
BORED
CONDUIT
COMMENTS
BARE#8 XHHW#8
40SCH
PVC IN.2
40SCH
PVC IN.2
1-29 186 372 180
1-28 176 352 170
1-27 41 82 35
1-26 81 162 75
1-25 106 212 100
1-24 211 422 205
1-23 56 112 50
1-22 111 222 105
1-21 31 62 25
1-20 216 432 180 30
1-19 206 412 200
TOTALS
SHEET
1421 2842 1120 235
ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE
DESCRIPTION
NUMBER
POLE
CL
ALIGNMENT
(FEET)
STATION
(FEET)
OFFSET
TYPE
MOUNTING
LENGTH
/DIAMETER
SHAFTDRILL
NO.CKT
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-16 BOULEVARDREDBUD 0+17.02 R4.4 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-15 BOULEVARDREDBUD 1+91.87 L3.0 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-14 BOULEVARDREDBUD 3+60.75 L5.8 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-13 BOULEVARDREDBUD 5+61.29 R3.0 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-12 BOULEVARDREDBUD 7+56.19 L4.2 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-11 BOULEVARDREDBUD 9+26.38 R4.1 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-10 BOULEVARDREDBUD 11+30.86 R3.0 G 8' /30" 1A
QUANTITIES ESTIMATED OF SUMMARYSHEET
#ITEM DESCRIPTION UNIT QTY
70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 56
70300618 (2") 40) (SCH (PVC)CONDT LF 1120
70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 235
70070620 BARE (NO.8) CONDRELEC LF 1421
70080620 INSULATED (NO.8) CONDRELEC LF 2842
70010624 (122311) A TY BOXGROUND EA 1
70020624 W/APRON (122311) A TY BOXGROUND EA 3
70026022 2) (TY ASSEMBLY LIGHTINGROADWAY EA 7
71270690 POLE LUMINAIREREMOVE EA 5
SUCH CROSSING TAKE PLACE
CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO
CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,
MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET
THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A
WILMETH RD TO UNIVERSITY DR (US 380)
LIGHT POLE ASSEMBLY
REMOVE EXISTING LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
WITH UPDATED BLOCK NUMBERS
NAME SIGNS ABOVE STOP SIGN
CITY TO INSTALL NEW STREET
dgurusamy
REDBUD BLVD ILLUMINATION
REDBUD
STATE COUNTY
SHEET
NO.
HIGHWAY
NO.
TEXAS COLLIN
90295
DHARMESH M. SHAH
SAXET FO ETAT
S
DESNECI
L
R E
E
N
IGNE LANOI
SS
E
F
O R
P
LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450
DHARMESH M. SHAH, P.E.
IC
V
GAS GAS
W M
F ib e r
C a b le
TWC
E V
STMH
FH
WVSTMH
STMH
W V
FHW
V
V A
U L
T
V A
L V
E
W A
T E
R
W V
S W
B T M
H
WV
FH
S W
B T
F
IB
E R
C A
B L E
A T
T
IC
V
W M
S P
E C
T R
U M
P T
.2
M i d
FH
TPW
V
S S
M H
T
SV
STMH
WV
W V
IC
V
TP
W V
FH
W V
W V
W V
IC
VW
MICV
STMH
ICV
S W
B T
M H
W V
S T
M H
S T
M H
T W
C
S T
M H
S W
B T
M H
EV
IC
V
SWBT MH
IC
V
FHWV
FH
W V
ICV
GAS GAS GAS GAS GAS GAS
IC
V
W M
W M
FH
WV WV
W A
T E
R V
A U
L T
AT&T
AT&T
SPECTRUMSPECTRUM
FOP
BCS
C A
B
IN
E T
A T
T
FOP
S W
B T
P E
D E
S T
A L
F O
FF
O
F
F O
F
F O
F
FOFFOF
20+00
21+00
P C
.4
M A
T C
H L
IN
E
S
T A
M A
T C
H L
IN
E
S
T A
M A
T C
H L
IN
E
S
T A
M A T
C H
L
IN
E
S
T A
MATCHLINE - STA 21+81
(SEE SHEET 6)
(SEE SHEET 6)
MATCHLINE - STA 19+87
REDBUD BLVD
REDBUD BLVD
1A - 08
1A - 09
1A - 07
1A - 06
1A - 05 1A - 04
1A - 03
1-18
1-17
1-15 1-13
1-8
1-9
1-11 1-10
1-7
1-6
1-16
1-14
1-12
7-15
NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.
REDBUD BOULEVARD
PHASE 1
ILLUMINATION LAYOUT
SCALE IN FEET
PROTECT IN PLACE
CONTRACTOR TO
UTILITY LINES.
CAUTION FOR
D R
IV
E
B R
A Y
C E
N T
R A
L
LEGEND OF SYMBOLS
PROP. TY 2 STREET LIGHT(DOUBLE)
PROPOSED CONDUIT RUN NUMBER
PROP. TY 1 STREET LIGHT(SINGLE)
GROUND BOX (TY A)
X - X
(TRENCHED)
PROPOSED ILLUMINATION CONDUIT
(BORE)
PROPOSED ILLUMINATION CONDUIT
PROPOSED ELECTRICAL SERVICE
EX. WATERLINE
EX. SEWER MAIN
EX. STORM DRAIN
EX. FIBER CABLE-NTX BROADBAND
EX. FIBER CABLE-SPECTRUM
EX. GAS PIPELINE-ATMOS
GROUND BOX (TY A W/ APRON)
BELOW GRADE.
8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET
DIVISION (972) 547-7428.
TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL
COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES
STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.
REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED
CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.
ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.
RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.
LUMINAIRE FIXTURES ARE TO BE 5.
VERIFY WITH THE CITY OR ENGINEER.
THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO
SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF
THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.
BY THE CONTRACTOR.
OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED
DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED
SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE
CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.
POLE FOUNDATIONS.
MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY
CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF
AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.
UTILITIES.
(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING
THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY
FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO
CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES
COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE
1-19
1-13
7-16
7-14
ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE
DESCRIPTION
NUMBER
POLE
CL
ALIGNMENT
(FEET)
STATION
(FEET)
OFFSET
TYPE
MOUNTING
LENGTH
/DIAMETER
SHAFTDRILL
NO.CKT NOTES
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-09 BOULEVARDREDBUD 13+20.47 L6.4 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-08 BOULEVARDREDBUD 15+30.32 R6.4 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-07 BOULEVARDREDBUD 17+30.44 L3.5 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-06 BOULEVARDREDBUD 19+45.94 R5.4 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-05 BOULEVARDREDBUD 20+90.91 L3.0 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-04 BOULEVARDREDBUD 22+44.21 L5.7 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-03 BOULEVARDREDBUD 24+15.62 R5.1 G 8' /30" 1A
RUN CONDUCTOR ANDCONDUIT
NO.RUN
(FEET)
LENGTH ANDNO.
GROUND
(FEET)
LENGTH ANDNO.
CONDUCTOR
(FEET)
TRENCHED
CONDUIT
(FEET)
BORED
CONDUIT
COMMENTS
BARE#8 XHHW#8
40SCH
PVC IN.2
40SCH
PVC IN.2
1-18 31 62 25
1-17 96 192 90
1-16 111 222 105
1-15 211 422 150 55
1-14 86 172 50 30
1-13 131 262 125
1-12 21 42 15
1-11 156 312 115 35
1-10 166 332 85 75
1-9 16 32 10
1-8 151 302 145
1-7 26 52 20
1-6 171 342 115 50
7-15 121 242 115
TOTALS
SHEET
1494 2988 540 870
QUANTITIES ESTIMATED OF SUMMARYSHEET
#ITEM DESCRIPTION UNIT QTY
70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 56
70300618 (2") 40) (SCH (PVC)CONDT LF 540
70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 870
70070620 BARE (NO.8) CONDRELEC LF 1494
70080620 INSULATED (NO.8) CONDRELEC LF 2988
70010624 (122311) A TY BOXGROUND EA 5
70020624 W/APRON (122311) A TY BOXGROUND EA 3
70026022 2) (TY ASSEMBLY LIGHTINGROADWAY EA 7
71270690 POLE LUMINAIREREMOVE EA 5
SUCH CROSSING TAKE PLACE
CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO
CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,
MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET
THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A
WILMETH RD TO UNIVERSITY DR (US 380)
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
ASSEMBLY
LIGHT POLE
EXISTING
REMOVE
dgurusamy
REDBUD BLVD ILLUMINATION
REDBUD
STATE COUNTY
SHEET
NO.
HIGHWAY
NO.
TEXAS COLLIN
90295
DHARMESH M. SHAH
SAXET FO ETAT
S
DESNECI
L
R E
E
N
IGNE LANOI
SS
E
F
O R
P
LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450
DHARMESH M. SHAH, P.E.
ICV
WV
FH
WV
SSMH
ICV
ICV
EV
STANDPIP
E
2" M
ETAL
WV
FH
STMH
CV
(3) 4
" PVC S
TANDPIP
E
2" P
VC S
TANDPIP
E
FCV
(6 P
V C S
T A
N D
P
IP
E
P
V C S
T A
N D
P
IP
E
(3 P
V C S
T A
N D
P
IP
E
ICV
SSMH
ICV
ICV
ICV
ICV
2" METAL
STANDPIPE
FH
WVSTMH
GCEC
STMH
SWBT MHFH
WV
STMH
FH
W V
G A
S
GAS
Fla g
Atm os
BCS
FOF
FOF
Flag
AT&T
BCS
Standpipe
4" PVC
AT&T
AT&T
0 2
M i d
0+00
1+00
BP: 0+00.00
PC: 0
+74.
WM
ICV
ICV
STMH
S T
M H
STMH
FH
WV
SS
M
H
S T
M H
WV
W M
IC
V
SWBT MH
EV
STMH
GM
GV
ICV
TP
TWC FH
WV
FCV
SLV
FH
WVFH
WV
STMH
WV
SIGN
Flag
Oncor
Flag Oncor
Flag Oncor
Flag Oncor
Flag Oncor
Flag Oncor
TF
Vault Fiber/Cable
2" METAL
STANDPIPE
F O
F
FOF
P T
.3
1+00
0+00 BP: 0+00.00
STM
H
1.
BH
2.
TH5
ATM
OS
6I
N
POLY
3.
GM
3.
FH
3.
M A
T C
H L
I N
E
S T
A
M A
T C
H L
IN
E
S
T A
M A
T C
H L
IN
E
S
T A
M A
T C
H L
IN
E
S
T A
C O
R P
O R
A
MATCHLINE - STA 1+50
(SEE SHEET 13)
MATCHLINE - STA 1+00
(SEE SHEET 9)
REDBUD BLVD
G R
A V
REDBUD BLVD
REDBUD BOULEVARD
1B - 04
1B - 03
1A - 02
1A - 01
1B - 01
1B - 02
1B - 05
1D - 01
2-1
1-1
1-3 1-2
3-1
1-5 1-4
2-2
2-3
2-4
2-5
4-3
4-2
4-1
2-102-9
2-5 2-11
NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.
PHASE 1
ILLUMINATION LAYOUT
2-8
SCALE IN FEET
PROTECT IN PLACE
CONTRACTOR TO
UTILITY LINES.
CAUTION FOR
LEGEND OF SYMBOLS
PROP. TY 2 STREET LIGHT(DOUBLE)
PROPOSED CONDUIT RUN NUMBER
PROP. TY 1 STREET LIGHT(SINGLE)
GROUND BOX (TY A)
X - X
(TRENCHED)
PROPOSED ILLUMINATION CONDUIT
(BORE)
PROPOSED ILLUMINATION CONDUIT
PROPOSED ELECTRICAL SERVICE
EX. WATERLINE
EX. SEWER MAIN
EX. STORM DRAIN
EX. FIBER CABLE-NTX BROADBAND
EX. FIBER CABLE-SPECTRUM
EX. GAS PIPELINE-ATMOS
GROUND BOX (TY A W/ APRON)
BELOW GRADE.
8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET
DIVISION (972) 547-7428.
TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL
COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES
STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.
REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED
CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.
ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.
RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.
LUMINAIRE FIXTURES ARE TO BE 5.
VERIFY WITH THE CITY OR ENGINEER.
THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO
SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF
THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.
BY THE CONTRACTOR.
OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED
DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED
SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE
CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.
POLE FOUNDATIONS.
MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY
CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF
AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.
UTILITIES.
(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING
THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY
FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO
CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES
COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE
1-6
4-4
2-12
CAUTION
ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE
DESCRIPTION
NUMBER
POLE
CL
ALIGNMENT
(FEET)
STATION
(FEET)
OFFSET
TYPE
MOUNTING
LENGTH
/DIAMETER
SHAFTDRILL
NO.CKT NOTES
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-02 BOULEVARDREDBUD 25+80.26 R0.0 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1A-01 BOULEVARDREDBUD 27+57.35 L4.0 G 8' /30" 1A
2) (TY ASSEMBLY LIGHTINGROADWAY 1B-01 BOULEVARDREDBUD 29+40.59 L5.3 G 8' /30" 1B
2) (TY ASSEMBLY LIGHTINGROADWAY 1B-02 BOULEVARDREDBUD 31+30.57 R5.5 G 8' /30" 1B
2) (TY ASSEMBLY LIGHTINGROADWAY 1B-03 BOULEVARDREDBUD 33+23.02 L4.9 G 8' /30" 1B
1) (TY ASSEMBLY LIGHTINGROADWAY 1B-03A BOULEVARDREDBUD 33+23.27 L36.4 G 8' /30" 1B ALT 6 SHEET TOREFER
1) (TY ASSEMBLY LIGHTINGROADWAY 1B-03B BOULEVARDREDBUD 33+23.32 R37.5 G 8' /30" 1B ALT 6 SHEET TOREFER
2) (TY ASSEMBLY LIGHTINGROADWAY 1B-04 BOULEVARDREDBUD 35+32.36 R6.0 G 8' /30" 1B
2) (TY ASSEMBLY LIGHTINGROADWAY 1B-05 BOULEVARDREDBUD 37+37.34 R3.3 G 8' /30" 1B
1) (TY ASSEMBLY LIGHTINGROADWAY 1D-01 STREETGRAVES 0+95.68 R22.3 G 8' /30" 1D
RUN CONDUCTOR ANDCONDUIT
NO.RUN
(FEET)
LENGTH ANDNO.
GROUND
(FEET)
LENGTH ANDNO.
CONDUCTOR
(FEET)
TRENCHED
CONDUIT
(FEET)
BORED
CONDUIT
COMMENTS
BARE#8 XHHW#8
40SCH
PVC IN.2
40SCH
PVC IN.2
1-5 186 372 180
1-4 171 342 165
1-3 46 276 40
1-2 31 186 25
1-1 306 612 300 1) (ES SERVICE PROPOSED TOTRANSFORMER
2-1 31 124 25
2-2 31 124 25
2-3 91 364 85
2-4 91 364 85
2-5 206 824 200
2-6 41 164 35 ALT 6 SHEET TOREFER
2-7 51 204 45 ALT 6 SHEET TOREFER
2-8 91 364 85
2-9 121 484 115
2-10 21 42 15
2-11 206 412 200
3-1 91 182 80 5
4-1 56 112 50
4-2 46 92 40
4-3 26 52 20
TOTALS
SHEET
1940 5696 1405 415
QUANTITIES ESTIMATED OF SUMMARYSHEET
#ITEM DESCRIPTION UNIT QTY NOTES
70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 72
ALT" 6 "SHEET FROM QUANTITIES INCLUDES ALSO
70300618 (2") 40) (SCH (PVC)CONDT LF 1405
70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 415
70070620 BARE (NO.8) CONDRELEC LF 1940
70080620 INSULATED (NO.8) CONDRELEC LF 5696
70010624 (122311) A TY BOXGROUND EA 1
70020624 W/APRON (122311) A TY BOXGROUND EA 7 ALT" 6 "SHEET FROM QUANTITIES INCLUDES ALSO
70470628 (NS)SS(E)PS(U) 060 240/480 A TY SRVELC EA 1
70016022 1) (TY ASSEMBLY LIGHTINGROADWAY EA 3 ALT" 6 "SHEET FROM QUANTITIES INCLUDES ALSO
70026022 2) (TY ASSEMBLY LIGHTINGROADWAY EA 7
71270690 POLE LUMINAIREREMOVE EA 5
SUCH CROSSING TAKE PLACE
CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO
CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,
MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET
THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A
WILMETH RD TO UNIVERSITY DR (US 380)
LIGHT POLE ASSEMBLY
REMOVE EXISTING
ASSEMBLY
LIGHT POLE
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
(POWER SOURCE NOT SHOWN)
TO POWER SOURCE
TY A 240/480 060 (NS)SS(E)PS(U)
INSTALL ELECTRIC SERVICE (ES 1)
REFER TO "SHEET 6 ALT" FOR OPTION-2
INCASE OF STORM SEWER CONFLICT
BEFORE DRILLING.
AND OBTAIN THE CITY OF MCKINNEY APPROVAL
CONTRACTOR SHALL LOCATE THE STORM SEWER
PROPOSED LIGHT POLE LOCATION 1B-03.
POTENTIAL STORM SEWER CONFLICT AT THE
OPTION-1
OPTION-1
dgurusamy
REDBUD BLVD ILLUMINATION
REDBUD
STATE COUNTY
SHEET
NO.
HIGHWAY
NO.
TEXAS COLLIN
90295
DHARMESH M. SHAH
SAXET FO ETAT
S
DESNECI
L
R E
E
N
IGNE LANOI
SS
E
F
O R
P
LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450
DHARMESH M. SHAH, P.E.
ICV
WV
FH
WV
SSMH
ICV
ICV
EV
STANDPIP
E
2" M
ETAL
WV
FH
STMH
CV
(3) 4
" PVC S
TANDPIP
E
2" P
VC S
TANDPIP
E
FCV
(6 P
V C S
T A
N D
P
IP
E
P
V C S
T A
N D
P
IP
E
(3 P
V C S
T A
N D
P
IP
E
ICV
SSMH
ICV
ICV
ICV
ICV
2" METAL
STANDPIPE
FH
WVSTMH
GCEC
STMH
SWBT MHFH
WV
STMH
FH
W V
G A
S
GAS
Fla g
Atm os
BCS
FOF
FOF
Flag
AT&T
BCS
Standpipe
4" PVC
AT&T
AT&T
0 2
M i d
0+00
1+00
BP: 0+00.00
PC: 0
+74.
WM
ICV
ICV
STMH
S T
M H
STMH
FH
WV
SS
M
H
S T
M H
WV
W M
IC
V
SWBT MH
EV
STMH
GM
GV
ICV
TP
TWC FH
WV
FCV
SLV
FH
WVFH
WV
STMH
WV
SIGN
Flag
Oncor
Flag Oncor
Flag Oncor
Flag Oncor
Flag Oncor
Flag Oncor
TF
Vault Fiber/Cable
2" METAL
STANDPIPE
F O
F
FOF
P T
.3
1+00
0+00 BP: 0+00.00
STM
H
1.
BH
2.
TH5
ATM
OS
6I
N
POLY
3.
GM
3.
FH
3.
M A
T C
H L
I N
E
S T
A
M A
T C
H L
IN
E
S
T A
M A
T C
H L
IN
E
S
T A
M A
T C
H L
IN
E
S
T A
C O
R P
O R
A
MATCHLINE - STA 1+50
(SEE SHEET 13)
MATCHLINE - STA 1+00
(SEE SHEET 9)
REDBUD BLVD
G R
A V
REDBUD BLVD
REDBUD BOULEVARD
1B - 04
1B - 03A
1A - 02
1A - 01
1B - 01
1B - 02
1B - 05
1D - 01
2-1
1-1
1-3 1-2
3-1
1-5 1-4
2-2
2-3
2-4
2-5
4-3
4-2
4-1
2-102-9
2-7
2-5 2-11
PHASE 1
ILLUMINATION LAYOUT
2-8
2-6
1B - 03B
6 ALT
SCALE IN FEET
PROTECT IN PLACE
CONTRACTOR TO
UTILITY LINES.
CAUTION FOR
LEGEND OF SYMBOLS
PROP. TY 2 STREET LIGHT(DOUBLE)
PROPOSED CONDUIT RUN NUMBER
PROP. TY 1 STREET LIGHT(SINGLE)
GROUND BOX (TY A)
X - X
(TRENCHED)
PROPOSED ILLUMINATION CONDUIT
(BORE)
PROPOSED ILLUMINATION CONDUIT
PROPOSED ELECTRICAL SERVICE
EX. WATERLINE
EX. SEWER MAIN
EX. STORM DRAIN
EX. FIBER CABLE-NTX BROADBAND
EX. FIBER CABLE-SPECTRUM
EX. GAS PIPELINE-ATMOS
GROUND BOX (TY A W/ APRON)
BELOW GRADE.
8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET
DIVISION (972) 547-7428.
TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL
COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES
STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.
REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED
CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.
ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.
RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.
LUMINAIRE FIXTURES ARE TO BE 5.
VERIFY WITH THE CITY OR ENGINEER.
THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO
SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF
THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.
BY THE CONTRACTOR.
OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED
DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED
SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE
CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.
POLE FOUNDATIONS.
MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY
CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF
AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.
UTILITIES.
(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING
THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY
FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO
CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES
COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE
1-6
4-4
2-12
CAUTION
SUCH CROSSING TAKE PLACE
CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO
CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,
MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET
THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A
WILMETH RD TO UNIVERSITY DR (US 380)
LIGHT POLE ASSEMBLY
REMOVE EXISTING
ASSEMBLY
LIGHT POLE
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
(POWER SOURCE NOT SHOWN)
TO POWER SOURCE
TY A 240/480 060 (NS)SS(E)PS(U)
INSTALL ELECTRIC SERVICE (ES 1)
OPTION -2
OPTION -2
OPTION-1 (SHEET 6) IS NOT FEASIBLE
OPTION 2 IS ONLY APPLICABLE IF
dgurusamy
REDBUD BLVD ILLUMINATION
REDBUD
STATE COUNTY
SHEET
NO.
HIGHWAY
NO.
TEXAS COLLIN
90295
DHARMESH M. SHAH
SAXET FO ETAT
S
DESNECI
L
R E
E
N
IGNE LANOI
SS
E
F
O R
P
LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450
DHARMESH M. SHAH, P.E.
WV
FH
SSMH
SSMH
STMH
STMH
TP
W V
FH
STM
H
AT&T
EV
CV
SSMH
EV
SW
BT M
H
TF
WV
SWBT
EV
SSMH
TF
SWBT MH
CV
F H
WV
A T T
E M
H
F O F
F O F
F O F
FOF
AT&T
TWC
FOF
Atmos Flag
FOFFOF
FOF
F la g
O n c o r
Flag
Oncor
Flag
Oncor
FOF
FOFFlag
Oncor
Flag
Oncor
FOF
FOF
FOF
FOF
FOFFOF
Vaul t
Fibe r/Cabl e
M i d
P C
33+00
33+81
EP: 33+81.45
S
TM
H
.9
F H
H
S K J
.7
F H
H
S K J
.2
TP
E D
.1
B H
.2
9 TH
TM
IN
P
O
.0
S S
M H
.5
GM
IC
V
FH
WV
TP
STMH
STMH
W M
ICV
E V
FH
W V
WV
FH
WM
S S
M H
STMH
W V
FH
FH
W V
W V
AT&T
S W
B T M
H S ig n a l
T r a f f ic
T W
C
T S
VT
F
E V
TW
C C
V
FOF
FOFFOF
S ig n a l
C r o s s in g
FOF
S
IG
N
FOF
P T
.0
E P
.7
.1
C H
K
.6
W V
.6
T P
E D
S T
M H
.1
B H
.6
T
M O
S
.7
IN
P
.0
M A
T C
H L
IN
E
S
T A
M A
T C
H L
I N
E
S T
A
M A T C
H L
IN
E
S T
A
(SEE SHEET 12)
MATCHLINE - STA 32+93
REDBUD
BLVD
REDBUD BLVD
U N
I V
E R
S I T
Y D
R
U S
REDBUD BOULEVARD
C E
N T
R
C
IR
1B - 06
1B - 07
1B - 08
1B - 09
1B - 10
1B - 11 1B - 12
2-14
2-15
2-12
2-13
2-18
2-17
2-16
2-19
2-20 2-21
2-23
NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.
2-22
PHASE 1
ILLUMINATION LAYOUT
SCALE IN FEET
PROTECT IN PLACE
CONTRACTOR TO
UTILITY LINES.
CAUTION FOR
LEGEND OF SYMBOLS
PROP. TY 2 STREET LIGHT(DOUBLE)
PROPOSED CONDUIT RUN NUMBER
PROP. TY 1 STREET LIGHT(SINGLE)
GROUND BOX (TY A)
X - X
(TRENCHED)
PROPOSED ILLUMINATION CONDUIT
(BORE)
PROPOSED ILLUMINATION CONDUIT
PROPOSED ELECTRICAL SERVICE
EX. WATERLINE
EX. SEWER MAIN
EX. STORM DRAIN
EX. FIBER CABLE-NTX BROADBAND
EX. FIBER CABLE-SPECTRUM
EX. GAS PIPELINE-ATMOS
GROUND BOX (TY A W/ APRON)
BELOW GRADE.
8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET
DIVISION (972) 547-7428.
TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL
COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES
STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.
REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED
CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.
ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.
RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.
LUMINAIRE FIXTURES ARE TO BE 5.
VERIFY WITH THE CITY OR ENGINEER.
THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO
SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF
THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.
BY THE CONTRACTOR.
OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED
DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED
SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE
CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.
POLE FOUNDATIONS.
MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY
CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF
AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.
UTILITIES.
(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING
THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY
FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO
CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES
COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE
2-18
ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE
DESCRIPTION
NUMBER
POLE
CL
ALIGNMENT
(FEET)
STATION
(FEET)
OFFSET
TYPE
MOUNTING
LENGTH
/DIAMETER
SHAFTDRILL
NO.CKT NOTES
2) (TY ASSEMBLY LIGHTINGROADWAY 1B-06 BOULEVARDREDBUD 39+21.43 L5.6 G 8' /30" 1B
2) (TY ASSEMBLY LIGHTINGROADWAY 1B-07 BOULEVARDREDBUD 40+97.28 R7.7 G 8' /30" 1B
2) (TY ASSEMBLY LIGHTINGROADWAY 1B-08 BOULEVARDREDBUD 42+76.36 R2.9 G 8' /30" 1B
2) (TY ASSEMBLY LIGHTINGROADWAY 1B-09 BOULEVARDREDBUD 44+52.73 L5.9 G 8' /30" 1B
2) (TY ASSEMBLY LIGHTINGROADWAY 1B-10 BOULEVARDREDBUD 46+38.33 R5.1 G 8' /30" 1B
2) (TY ASSEMBLY LIGHTINGROADWAY 1B-11 BOULEVARDREDBUD 48+18.02 L3.5 G 8' /30" 1B
2) (TY ASSEMBLY LIGHTINGROADWAY 1B-12 BOULEVARDREDBUD 50+18.09 L4.9 G 8' /30" 1B
RUN CONDUCTOR ANDCONDUIT
NO.RUN
(FEET)
LENGTH ANDNO.
GROUND
(FEET)
LENGTH ANDNO.
CONDUCTOR
(FEET)
TRENCHED
CONDUIT
(FEET)
BORED
CONDUIT
COMMENTS
BARE#8 XHHW#8
40SCH
PVC IN.2
40SCH
PVC IN.2
2-12 196 392 190
2-13 56 112 50
2-14 121 242 115
2-15 26 52 20
2-16 191 382 140 45
2-17 186 372 180
2-18 31 62 25
2-19 121 242 115
2-20 61 122 55
2-21 196 392 170 20
2-22 56 112 15 35
2-23 166 332 160
TOTALS
SHEET
1407 2814 930 405
QUANTITIES ESTIMATED OF SUMMARYSHEET
#ITEM DESCRIPTION UNIT QTY
70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 56
70300618 (2") 40) (SCH (PVC)CONDT LF 930
70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 405
70070620 BARE (NO.8) CONDRELEC LF 1407
70080620 INSULATED (NO.8) CONDRELEC LF 2814
70010624 (122311) A TY BOXGROUND EA 2
70020624 W/APRON (122311) A TY BOXGROUND EA 3
70026022 2) (TY ASSEMBLY LIGHTINGROADWAY EA 7
71270690 POLE LUMINAIREREMOVE EA 5
SUCH CROSSING TAKE PLACE
CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO
CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,
MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET
THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A
WILMETH RD TO UNIVERSITY DR (US 380)
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
PROTECT IN PLACE
FOC3
TRAFFIC SIGNAL POLE
EXISTING LUMINAIRE ON
dgurusamy
REDBUD BLVD ILLUMINATION
REDBUD
STATE COUNTY
SHEET
NO.
HIGHWAY
NO.
TEXAS COLLIN
90295
DHARMESH M. SHAH
SAXET FO ETAT
S
DESNECI
L
R E
E
N
IGNE LANOI
SS
E
F
O R
P
LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450
DHARMESH M. SHAH, P.E.
WV
STMH
WV WV
WV
AT&T
EV
WV
FH EV
Vault
Fiber
Silt Fence
TF
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
WV
WV
WV
ICV
EV
Vault
Cable
EMH
STMH FH
Fiber Fiber
Silt Fence
21+00
CHK
647.861
200218
100001
U S
N
F R
M A
T C
H L
IN
E
S
T A
(SEE SHEET 11)
MATCHLINE - STA 21+50
M A
T C
H L
I N
E
S T
A
M
A T
C H
L I N
E
S T
A
MATCHLINE - STA 20+15
(SEE SHEET 11)
BRAY CENTRAL DR
BRAY CENTRAL DR
BRAY CENTRAL DRIVE
7-2 7-3 7-4 7-5 7-67-1
5-1
2D - 05
2D - 03 2D - 02 2D - 01
2C - 01 2C - 02 2C - 03
8-10
8-4
8-3 8-2
6-1
6-2
8-1
NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.
CI
R
C E
N T
R A
L
PHASE 1
ILLUMINATION LAYOUT
8-5
8-68-7 8-8
8-9
2C - 04
SCALE IN FEET
PROTECT IN PLACE
CONTRACTOR TO
UTILITY LINES.
CAUTION FOR
LEGEND OF SYMBOLS
PROP. TY 2 STREET LIGHT(DOUBLE)
PROPOSED CONDUIT RUN NUMBER
PROP. TY 1 STREET LIGHT(SINGLE)
GROUND BOX (TY A W/ APRON)
X - X
(TRENCHED)
PROPOSED ILLUMINATION CONDUIT
(BORE)
PROPOSED ILLUMINATION CONDUIT
PROPOSED ELECTRICAL SERVICE
EX. WATERLINE
EX. SEWER MAIN
EX. STORM DRAIN
EX. FIBER CABLE-NTX BROADBAND
EX. FIBER CABLE-SPECTRUM
EX. GAS PIPELINE-ATMOS
ITEM 0690 7127 - REMOVE LUMINAIRE POLE.
CONTRACTOR WILL BE PAID FOR AS A SUBSIDIARY TO
9. HOUSINGS AND CONCRETE BASES TO BE REMOVED BY THE
BELOW GRADE.
8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET
DIVISION (972) 547-7428.
TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL
COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES
STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.
REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED
CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.
ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.
RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.
LUMINAIRE FIXTURES ARE TO BE 5.
VERIFY WITH THE CITY OR ENGINEER.
THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO
SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF
THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.
BY THE CONTRACTOR.
OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED
DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED
SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE
CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.
POLE FOUNDATIONS.
MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY
CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF
AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.
UTILITIES.
(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING
THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY
FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO
CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES
COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE
8-11
2D - 04
ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE
DESCRIPTION
NUMBER
POLE
CL
ALIGNMENT
(FEET)
STATION
(FEET)
OFFSET
TYPE
MOUNTING
LENGTH
/DIAMETER
SHAFTDRILL
NO.CKT NOTES
2) (TY ASSEMBLY LIGHTINGROADWAY 2D-05 DRIVE CENTRALBRAY 0+04.91 0.0 G 8' /30" 2D
1) (TY ASSEMBLY LIGHTINGROADWAY 2D-04 DRIVE CENTRALBRAY 1+37.93 L26.5 G 8' /30" 2D
1) (TY ASSEMBLY LIGHTINGROADWAY 2D-03 DRIVE CENTRALBRAY 2+90.48 26.5L G 8' /30" 2D
1) (TY ASSEMBLY LIGHTINGROADWAY 2D-02 DRIVE CENTRALBRAY 4+35.45 L26.5 G 8' /30" 2D
1) (TY ASSEMBLY LIGHTINGROADWAY 2D-01 DRIVE CENTRALBRAY 5+80.41 L26.6 G 8' /30" 2D
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-01 DRIVE CENTRALBRAY 7+57.32 L26.4 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-02 DRIVE CENTRALBRAY 9+22.30 L26.6 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-03 DRIVE CENTRALBRAY 10+97.37 L26.6 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-04 DRIVE CENTRALBRAY 12+77.47 L26.4 G 8' /30" 2C
8-1
7-7
5-2
6-3
RUN CONDUCTOR ANDCONDUIT
NO.RUN
(FEET)
LENGTH ANDNO.
GROUND
(FEET)
LENGTH ANDNO.
CONDUCTOR
(FEET)
TRENCHED
CONDUIT
(FEET)
BORED
CONDUIT
COMMENTS
BARE#8 XHHW#8
40SCH
PVC IN.2
40SCH
PVC IN.2
8-11 46 92 40
8-10 126 252 120
8-9 41 82 35
8-8 56 112 50
8-7 81 162 75
8-6 86 172 80
8-5 56 112 50
8-4 31 62 25
8-3 86 172 80
8-2 71 142 65
8-1 76 152 70
5-1 256 512 250 2) (ES SERVICE PROPOSED TOTRANSFORMER
6-1 31 186 25
6-2 76 152 70
7-1 66 132 60
7-2 61 122 55
7-3 176 352 170
7-4 186 372 180
7-5 106 212 100
7-6 91 182 85
TOTALS
SHEET
1805 3734 1265 420
QUANTITIES ESTIMATED OF SUMMARYSHEET
#ITEM DESCRIPTION UNIT QTY
70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 72
70300618 (2") 40) (SCH (PVC)CONDT LF 1265
70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 420
70070620 BARE (NO.8) CONDRELEC LF 1805
70080620 INSULATED (NO.8) CONDRELEC LF 3734
70020624 W/APRON (122311) A TY BOXGROUND EA 5
70470628 (NS)SS(E)PS(U) 060 240/480 A TY SRVELC EA 1
70016022 1) (TY ASSEMBLY LIGHTINGROADWAY EA 8
70026022 2) (TY ASSEMBLY LIGHTINGROADWAY EA 1
71270690 POLE LUMINAIREREMOVE EA 4
SUCH CROSSING TAKE PLACE
CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO
CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,
MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET
THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A
WILMETH RD TO UNIVERSITY DR (US 380)
LIGHT POLE ASSEMBLY
REMOVE EXISTING
ASSEMBLY
LIGHT POLE
EXISTING
REMOVE
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
TY A 240/480 060 (NS)SS(E)PS(U)
INSTALL ELECTRIC SERVICE (ES 2)
IN PLACE
PROTECT
FOC3
NOT SHOWN)
(POWER SOURCE
TO POWER SOURCE
METER TO BE REMOVED BY ONCOR.
TO BE REMOVED BY THE CONTRACTOR.
HOUSING AND CONCRETE BASE
WV
STMH
STMH
WV
FH
SSMH
WV
WV
Line Post Gas Pipe
STMH
TP Vault Cable
GM
TF
TP
B P
.0 dgurusamy
REDBUD BLVD ILLUMINATION
REDBUD
STATE COUNTY
SHEET
NO.
HIGHWAY
NO.
TEXAS COLLIN
90295
DHARMESH M. SHAH
SAXET FO ETAT
S
DESNECI
L
R E
E
N
IGNE LANOI
SS
E
F
O R
P
LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450
DHARMESH M. SHAH, P.E.
SSMH
AT&T
EM
FH
STMH
Gas Post
Atmos
SSMH SSMH
WM
FH
STMH
ICV
ICV
STMH
WVWM
ICV
WV
SIGN
ICV
Cabinet
Traffic
SSMH
FH
WV
ICV ICVICV
STMH AT&T
GV
Station
Gas Test
SWBT MH
TF
Flags
Spectrum
Flag
Spectrum
Atmos Flag
Oncor Flag
M A
T C
H L
I N
E
S T
A
M A
T C
H L
I N
E
S T
A
S
E E
S H
E E
T
M A
T C
H L
IN
E
S
T A
M A
T C
H L
I N
E
S T
A
S
E E
S H
E E
T
BRAY CENTRAL DR
BRAY CENTRAL DR
BRAY CENTRAL DRIVE
2C - 05
2C - 06
2C - 07 2C - 08
2C - 09 2C - 10 2C - 11 2C - 12
7-7 7-8
7-9
7-11 7-12 7-13
7-17 7-18 7-19
7-10
7-14
7-16 7-20 7-21 7-22
7-24 7-23
NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.
PHASE 1
ILLUMINATION LAYOUT
SCALE IN FEET
PROTECT IN PLACE
CONTRACTOR TO
UTILITY LINES.
CAUTION FOR
LEGEND OF SYMBOLS
PROP. TY 2 STREET LIGHT(DOUBLE)
PROPOSED CONDUIT RUN NUMBER
PROP. TY 1 STREET LIGHT(SINGLE)
GROUND BOX (TY A W/ APRON)
X - X
(TRENCHED)
PROPOSED ILLUMINATION CONDUIT
(BORE)
PROPOSED ILLUMINATION CONDUIT
PROPOSED ELECTRICAL SERVICE
EX. WATERLINE
EX. SEWER MAIN
EX. STORM DRAIN
EX. FIBER CABLE-NTX BROADBAND
EX. FIBER CABLE-SPECTRUM
EX. GAS PIPELINE-ATMOS
ITEM 0690 7127 - REMOVE LUMINAIRE POLE.
CONTRACTOR WILL BE PAID FOR AS A SUBSIDIARY TO
9. HOUSINGS AND CONCRETE BASES TO BE REMOVED BY THE
BELOW GRADE.
8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET
DIVISION (972) 547-7428.
TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL
COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES
STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.
REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED
CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.
ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.
RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.
LUMINAIRE FIXTURES ARE TO BE 5.
VERIFY WITH THE CITY OR ENGINEER.
THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO
SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF
THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.
BY THE CONTRACTOR.
OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED
DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED
SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE
CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.
POLE FOUNDATIONS.
MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY
CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF
AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.
UTILITIES.
(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING
THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY
FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO
CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES
COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE
ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE
DESCRIPTION
NUMBER
POLE
CL
ALIGNMENT
(FEET)
STATION
(FEET)
OFFSET
TYPE
MOUNTING
LENGTH
/DIAMETER
SHAFTDRILL
NO.CKT NOTES
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-05 DRIVE CENTRALBRAY 14+67.37 L26.0 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-06 DRIVE CENTRALBRAY 16+22.37 L26.5 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-07 DRIVE CENTRALBRAY 17+82.36 L26.6 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-08 DRIVE CENTRALBRAY 19+62.25 L26.4 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-09 DRIVE CENTRALBRAY 22+07.24 L26.5 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-10 DRIVE CENTRALBRAY 23+72.18 L26.4 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-11 DRIVE CENTRALBRAY 25+31.88 L26.5 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-12 DRIVE CENTRALBRAY 27+26.84 R26.7 G 8' /30" 2C
7-25
QUANTITIES ESTIMATED OF SUMMARYSHEET
#ITEM DESCRIPTION UNIT QTY
70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 64
70300618 (2") 40) (SCH (PVC)CONDT LF 1065
70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 435
70070620 BARE (NO.8) CONDRELEC LF 1602
70080620 INSULATED (NO.8) CONDRELEC LF 3204
70020624 W/APRON (122311) A TY BOXGROUND EA 2
70016022 1) (TY ASSEMBLY LIGHTINGROADWAY EA 8
71270690 POLE LUMINAIREREMOVE EA 2
RUN CONDUCTOR ANDCONDUIT
NO.RUN
(FEET)
LENGTH ANDNO.
GROUND
(FEET)
LENGTH ANDNO.
CONDUCTOR
(FEET)
TRENCHED
CONDUIT
(FEET)
BORED
CONDUIT
COMMENTS
BARE#8 XHHW#8
40SCH
PVC IN.2
40SCH
PVC IN.2
7-7 106 212 100
7-8 101 202 95
7-9 161 322 155
7-10 41 82 35
7-11 136 272 130
7-12 81 162 75
7-13 116 232 110
7-14 76 152 70
7-16 76 152 70
7-17 86 172 80
7-18 96 192 90
7-19 41 82 35
7-20 96 192 90
7-21 46 92 40
7-22 91 182 85
7-23 121 242 115
7-24 131 262 125
TOTALS
SHEET
1602 3204 1065 435
SUCH CROSSING TAKE PLACE
CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO
CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,
MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET
THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A
WILMETH RD TO UNIVERSITY DR (US 380)
LIGHT POLE ASSEMBLY
REMOVE EXISTING
LIGHT POLE ASSEMBLY
REMOVE EXISTING
METER TO BE REMOVED BY ONCOR.
TO BE REMOVED BY THE CONTRACTOR.
HOUSING AND CONCRETE BASE
FHWV
VAULT
ONCOR
TF
STMH
ICV
WV
FH
GM
ICVWM
ICV
TF
STMHAT&T
WV
G A
S G
A S
Silt Fence
SWBT MH
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
C B
L /F
B R
Flag
AT&T
Flag
AT&T GAS
FOF
FOF
FOF
Vault Fiber/Cable
FOF FOF
AT&TFOF
Flag
AT&T
Flag
AT&T
dgurusamy
REDBUD BLVD ILLUMINATION
REDBUD
STATE COUNTY
SHEET
NO.
HIGHWAY
NO.
TEXAS COLLIN
90295
DHARMESH M. SHAH
SAXET FO ETAT
S
DESNECI
L
R E
E
N
IGNE LANOI
SS
E
F
O R
P
LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450
DHARMESH M. SHAH, P.E.
WV
AT&T
WV
F H
TP
EV
TWC
WV
WV
SSMH
SSMH
co
WM
WM
ICV
CV
WV
WV
WV
ICV
co
WV
Vault
Communications
Standpipe
4" PVC
Line Post
Gas Pipe
WM
ICV
SSMH
Standpipe
4" PVC
0+00
1+00
E P
.0
BP: 0+00.00
M A
T C
H L
I N
E
S T
A
(SEE SHEET 8)
MATCHLINE - STA 1+00
C O
M M
E R
C E
D R
BRAY CENTRAL DR
BRAY CENTRAL DRIVE
2C - 13
7-26
2C - 14
2C - 15 2C - 16
1C - 14
3-26
7-29 7-31 7-25 7-28 7-30 7-32
3-25
NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.
PHASE 1
ILLUMINATION LAYOUT
7-27
1C - 13
SCALE IN FEET
PROTECT IN PLACE
CONTRACTOR TO
UTILITY LINES.
CAUTION FOR
LEGEND OF SYMBOLS
PROP. TY 2 STREET LIGHT(DOUBLE)
PROPOSED CONDUIT RUN NUMBER
PROP. TY 1 STREET LIGHT(SINGLE)
GROUND BOX (TY A W/ APRON)
X - X
(TRENCHED)
PROPOSED ILLUMINATION CONDUIT
(BORE)
PROPOSED ILLUMINATION CONDUIT
PROPOSED ELECTRICAL SERVICE
EX. WATERLINE
EX. SEWER MAIN
EX. STORM DRAIN
EX. FIBER CABLE-NTX BROADBAND
EX. FIBER CABLE-SPECTRUM
EX. GAS PIPELINE-ATMOS
BELOW GRADE.
8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET
DIVISION (972) 547-7428.
TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL
COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES
STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.
REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED
CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.
ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.
RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.
LUMINAIRE FIXTURES ARE TO BE 5.
VERIFY WITH THE CITY OR ENGINEER.
THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO
SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF
THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.
BY THE CONTRACTOR.
OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED
DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED
SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE
CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.
POLE FOUNDATIONS.
MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY
CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF
AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.
UTILITIES.
(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING
THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY
FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO
CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES
COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE
3-24
RUN CONDUCTOR ANDCONDUIT
NO.RUN
(FEET)
LENGTH ANDNO.
GROUND
(FEET)
LENGTH ANDNO.
CONDUCTOR
(FEET)
TRENCHED
CONDUIT
(FEET)
BORED
CONDUIT
COMMENTS
BARE#8 XHHW#8
40SCH
PVC IN.2
40SCH
PVC IN.2
7-25 81 162 75
7-26 176 352 170
7-27 16 32 10
7-28 86 172 80
7-29 96 192 90
7-30 51 102 45
7-31 86 172 80
7-32 81 162 75
3-25 61 122 55
3-26 136 272 130
TOTALS
SHEET
870 1740 520 290
QUANTITIES ESTIMATED OF SUMMARYSHEET
#ITEM DESCRIPTION UNIT QTY
70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 48
70300618 (2") 40) (SCH (PVC)CONDT LF 520
70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 290
70070620 BARE (NO.8) CONDRELEC LF 870
70080620 INSULATED (NO.8) CONDRELEC LF 1740
70020624 W/APRON (122311) A TY BOXGROUND EA 2
70016022 1) (TY ASSEMBLY LIGHTINGROADWAY EA 6
ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE
DESCRIPTION
NUMBER
POLE
CL
ALIGNMENT
(FEET)
STATION
(FEET)
OFFSET
TYPE
MOUNTING
LENGTH
/DIAMETER
SHAFTDRILL
NO.CKT NOTES
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-13 DRIVE CENTRALBRAY 29+21.97 L26.5 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-14 DRIVE CENTRALBRAY 30+86.87 L25.8 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-15 DRIVE CENTRALBRAY 32+56.78 L24.5 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 2C-16 DRIVE CENTRALBRAY 34+47.42 L24.2 G 8' /30" 2C
1) (TY ASSEMBLY LIGHTINGROADWAY 1C-14 DRIVE CENTRALBRAY 35+19.38 R53.2 G 8' /30" 1C
1) (TY ASSEMBLY LIGHTINGROADWAY 1C-13 DRIVECOMMERCE 0+72.79 L23.9 G 8' /30" 1C
SUCH CROSSING TAKE PLACE
CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO
CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,
MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET
THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A
WILMETH RD TO UNIVERSITY DR (US 380)
dgurusamy
REDBUD BLVD ILLUMINATION
REDBUD
STATE COUNTY
SHEET
NO.
HIGHWAY
NO.
TEXAS COLLIN
90295
DHARMESH M. SHAH
SAXET FO ETAT
S
DESNECI
L
R E
E
N
IGNE LANOI
SS
E
F
O R
P
LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450
DHARMESH M. SHAH, P.E.
W
VFH
W V
STMH
STMH
IC
V
W V
W V
W V
W
MC
VA
T
T
STMH
A T
T
STMH
TWC
W V
W V
W V
S T
M H
CV
W M
W V
AT&TOncor
AT&TFOF FOF
FOF
F la g s
S p e c tr u m
P C
.2
WV
W V
S T
M H
W V
S T
M H
F H
A T
T
T W
C
E V
P
V C
S T
A N
D P
IP
E
S T
A N
D P
IP
E
P
V C
W V
FH
WV
FOF
FOF
FOFFOF
C a b le
P o s t
A T
T
S p e c tr u m
Spectrum
14+24
14+00
EP: 14+23.79
P T
.9
E P
.0
M A
T C
H L
IN
E
S
T A
M A
T C
H L
I N
E
S T
A
M A
T C
H L
IN
E
S
T A
S
E E
T
(SEE PAGE 9)
MATCHLINE - STA 13+24
C O
R P
O R
A T
E D
R
COMMERCE DR
COMMERCE DR
COMMERCE DRIVE
3-16
3-14
3-13
3-24 3-23 3-22 3-20 3-18
3-12
1C - 12 1C - 11 1C - 10
1C - 08
1C - 09
3-193-21
3-15
NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.
PHASE 1
ILLUMINATION LAYOUT
3-17
SCALE IN FEET
PROTECT IN PLACE
CONTRACTOR TO
UTILITY LINES.
CAUTION FOR
LEGEND OF SYMBOLS
PROP. TY 2 STREET LIGHT(DOUBLE)
PROPOSED CONDUIT RUN NUMBER
PROP. TY 1 STREET LIGHT(SINGLE)
GROUND BOX (TY A W/ APRON)
X - X
(TRENCHED)
PROPOSED ILLUMINATION CONDUIT
(BORE)
PROPOSED ILLUMINATION CONDUIT
PROPOSED ELECTRICAL SERVICE
EX. WATERLINE
EX. SEWER MAIN
EX. STORM DRAIN
EX. FIBER CABLE-NTX BROADBAND
EX. FIBER CABLE-SPECTRUM
EX. GAS PIPELINE-ATMOS
BELOW GRADE.
8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET
DIVISION (972) 547-7428.
TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL
COORDINATE WITH THE…