3-03 Plan Set.pdf

PDF 24 MB Posted

Attached to
Construction of Redbud Blvd Illumination (Phase 1)
Solicitation number
25-50ITB
Issued by
Collin County, Texas

About this file

The document is a comprehensive plan set for the City of McKinney's Redbud Boulevard Illumination Phase 1 project (Project No. TR2313), prepared by Lee Engineering, L.L.C. The project involves constructing roadway illumination infrastructure along Redbud Boulevard from Wilmeth Road to University Drive (US 380), spanning approximately 51,100 linear feet across multiple roadways including Redbud Boulevard, Bray Central Drive, Corporate Drive, Commerce Drive, Central Circle, and Graves Street. The illumination plan includes installing 56 roadway illumination poles with various mounting details, conduit runs totaling approximately 17,836 linear feet, electrical conductors, ground boxes, and associated electrical infrastructure. The project documents include detailed photometric layouts, electrical service specifications, and technical installation requirements.

The project is funded through the City of McKinney's Capital Improvement Program (CIP) and involves comprehensive electrical infrastructure installation, including 480V electrical services, conduit systems, grounding infrastructure, and LED luminaire installations. The illumination design meets specific roadway classification illuminance standards, with average foot-candle measurements ranging between 0.61 and 1.59 across different roadway segments. The technical specifications require use of specific materials listed on the Material Producers List, compliance with National Electrical Code standards, and adherence to TxDOT electrical installation guidelines. The project aims to enhance roadway lighting and safety across multiple municipal thoroughfares, with precise engineering specifications for pole placement, electrical connections, and photometric performance.

View the file

Other files

File Type Posted
5-05 Bid Bond.pdf PDF
4-04 Required Forms.pdf PDF
2-02 Bid Proposal.pdf PDF
6-06 Construction Agreement and Bonds.pdf PDF
1-01 Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEY MAP

PHOTOMETRIC LAYOUT PHASE 1 (8 OF 13)

ED(3)-14

ED(4)-14

ED(5)-14

ED(6)-14

RID(1)-20

RID(2)-20

RIP(1)-19

ED(10)-14

ILLUMINATION LAYOUT PHASE 1 (1 OF 13)

ILLUMINATION LAYOUT PHASE 1 (2 OF 13)

ILLUMINATION LAYOUT PHASE 1 (3 OF 13)

ILLUMINATION LAYOUT PHASE 1 (4 OF 13)

ILLUMINATION LAYOUT PHASE 1 (5 OF 13)

ILLUMINATION LAYOUT PHASE 1 (6 OF 13)

ILLUMINATION LAYOUT PHASE 1 (7 OF 13)

ILLUMINATION LAYOUT PHASE 1 (8 OF 13)

ILLUMINATION LAYOUT PHASE 1 (9 OF 13)

ILLUMINATION LAYOUT PHASE 1 (10 OF 13)

ILLUMINATION LAYOUT PHASE 1 (11 OF 13)

ILLUMINATION LAYOUT PHASE 1 (12 OF 13)

ILLUMINATION LAYOUT PHASE 1 (13 OF 13)

ELECTRICAL DATA (1 OF 2)

ELECTRICAL DATA (2 OF 2)

POLE ANCHOR DETAIL (1 OF 3)

POLE ANCHOR DETAIL (2 OF 3)

POLE ANCHOR DETAIL (3 OF 3)

LIGHTING STANDARD DETAIL (7004M) (1 OF 2)

LIGHTING STANDARD DETAIL (7005M) (1 OF 2)

(7005M) (2 OF 2)LIGHTING STANDARD DETAIL

PHOTOMETRIC LAYOUT PHASE 1 (1 OF 13)

PHOTOMETRIC LAYOUT PHASE 1 (2 OF 13)

PHOTOMETRIC LAYOUT PHASE 1 (3 OF 13)

PHOTOMETRIC LAYOUT PHASE 1 (4 OF 13)

PHOTOMETRIC LAYOUT PHASE 1 (5 OF 13)

PHOTOMETRIC LAYOUT PHASE 1 (6 OF 13)

PHOTOMETRIC LAYOUT PHASE 1 (7 OF 13)

PHOTOMETRIC LAYOUT PHASE 1 (9 OF 13)

PHOTOMETRIC LAYOUT PHASE 1 (10 OF 13)

PHOTOMETRIC LAYOUT PHASE 1 (11 OF 13)

PHOTOMETRIC LAYOUT PHASE 1 (12 OF 13)

PHOTOMETRIC LAYOUT PHASE 1 (13 OF 13)

ED(1)-14

PROJECT END

(UNIVERSITY DR (US 380))

PROJECT BEGIN

(WILMETH RD)

Prepared By:

MAYOR

CITY COUNCIL

CITY MANAGER

N

BILL COX

JUSTIN BELLER, DIST. 1

GERE FELTUS, DIST. 3

RICK FRANKLIN, DIST. 4

ERNEST LYNCH, AT LARGE 1

PAUL GRIMES

TBPE FIRM #F-450

972.248.3006

DALLAS, TX 75234

3030 LBJ FREEWAY, SUITE 1660

MICHAEL JONES, AT LARGE 2

PATRICK CLOUTIER, DIST. 2

QUANTITY SUMMARY

COVER SHEET

SAXET FO ETAT

S

DESNECI

L

R E

E

N

IGNE LANOI

SS

E

F

O R

P 90295

DHARMESH M. SHAH

ILLUMINATION PLANS

CITY OF MCKINNEY, TEXAS

INDEX OF SHEETS

DESCRIPTIONSHEET NO.

DESCRIPTIONSHEET NO.

PROJECT LIMITS: WILMETH RD TO UNIVERSITY DR (US 380)

CIP TR2313

REDBUD BOULEVARD - PHASE 1

Dharmesh M. Shah, P.E.

to this project.

selected by me or under my responsible supervision as being applicable

Standard sheets specifically identified as sheet nos. 32-46 have been

JULY 2025

LEE ENGINEERING, L.L.C., REGISTRATION NO. F-450

DHARMESH M. SHAH, P.E.

dshah Typewriter 7/30/2025

CITY

MCKINNEY

REDBUD BLVD ILLUMINATION

REDBUD

STATE COUNTY

SHEET

NO.

HIGHWAY

NO.

TEXAS COLLIN

90295

DHARMESH M. SHAH

SAXET FO ETAT

S

DESNECI

L

R E

E

N

IGNE LANOI

SS

E

F

O R

P

LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450

DHARMESH M. SHAH, P.E.

QUANTITY SUMMARY

PHASE 1

ITEMBID 70400416 70010500 70010502 70010503 70300618 70310618 70070620 70080620 70010624 70020624 70470628 70016022 70026022 71270690 70130104 70010531

SHEETILLUMINATION

(30IN) POLE)ILL

(RDWY SHAFTDRILL

MOBILIZATION

HANDLING

TRAFFIC SIGNS,BARR,

SIGNMESSAGE

CHANGEABLE

PORTABLE

(2") 40)(SCH

(PVC)CONDT

(BORE) (2") 40)(SCH

(PVC)CONDT

BARE

(NO.8) CONDRELEC

INSULATED

(NO.8) CONDRELEC

(122311)

A TY BOXGROUND

W/APRON(122311)

A TY BOXGROUND

(NS)SS(E)PS(U)060

240/480 A TY SRVELC

1) (TYASSEMBLY

LIGHTINGROADWAY

2) (TYASSEMBLY

LIGHTINGROADWAY

POLE

LUMINAIREREMOVE

SUP)

OR RAMP(SIDEWALK,

CONC OFREMOVAL

(4")

SIDEWALKSCONC

UNIT LF LS MO DAY LF LF LF LF EA EA EA EA EA EA LF LF

GENERAL 1 1 20

13) OF (1 LAYOUTILLUMINATION 56 1120 235 1421 2842 1 3 7 5

13) OF (2 LAYOUTILLUMINATION 56 540 870 1494 2988 5 3 7 5

13) OF (3 LAYOUTILLUMINATION 72 1405 415 1940 5696 1 7 1 3 7 5

13) OF (4 LAYOUTILLUMINATION 56 930 405 1407 2814 2 3 7 5

13) OF (5 LAYOUTILLUMINATION 72 1265 420 1805 3734 5 1 8 1 4

13) OF (6 LAYOUTILLUMINATION 64 1065 435 1602 3204 2 8 2

13) OF (7 LAYOUTILLUMINATION 48 520 290 870 1740 2 6

13) OF (8 LAYOUTILLUMINATION 40 825 305 1208 2416 3 5

13) OF (9 LAYOUTILLUMINATION 56 1135 110 1311 2622 3 6 1

13) OF (10 LAYOUTILLUMINATION 56 1035 360 1491 2982 2 7 2 61 61

13) OF (11 LAYOUTILLUMINATION 56 1095 140 1313 2626 2 7 2 46 46

13) OF (12 LAYOUTILLUMINATION 32 330 235 601 1202 1 4 1 27 27

13) OF (13 LAYOUTILLUMINATION 56 940 355 1373 2746 3 7 1

TOTAL 1PHASE 720 1 1 20 12205 4575 17836 37612 9 39 2 61 30 32 134 134

SEPARATELY FOR PAID BE NOT WILL AND ASSEMBLY, LIGHTING ROADWAY TO SUBSIDIARY ARE POLES LUMINAIRE THE INSIDE WIRES ALL*

ASSEMBLY LIGHTING PEDESTRIAN 15'##

POLE. LUMINAIRE REMOVE - 7127 0690 ITEM TO SUBSIDIARY A AS FOR PAID BE WILL CONTRACTOR THE BY REMOVED BE TO BASES CONCRETE ANDHOUSINGS

WILMETH RD TO UNIVERSITY DR (US 380)

dgurusamy

07/30/2025

REDBUD BLVD ILLUMINATION

REDBUD

STATE COUNTY

SHEET

NO.

HIGHWAY

NO.

TEXAS COLLIN

90295

DHARMESH M. SHAH

SAXET FO ETAT

S

DESNECI

L

R E

E

N

IGNE LANOI

SS

E

F

O R

P

LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450

DHARMESH M. SHAH, P.E.

University Drive

ICV

WV

FH

WV

WVFH

ICV

WV

WM

WV

WVFH

WV

ICV

GM

ICV

F H

W V

T P

S T

M H

S T

M H

WM

IC

V

EV

FH

WV

W V

F H

W M

SSMH

S T

M H

WV

F H

F H

WV

WV

W V F

H S S

M H

S S

M H

S T

M H

S T

M H

T P

W V

F H

S T

M H

A T

T

E V

C V

S S

M H

E V

S W

B T M

H

T F

W V

SW

BT

E V

SS

M

H

W M

IC

V

IC

V

STM

H

T F

TS

V

STMH

TSV

CABINET

ELEC.

EV

TSV TSC

W M

IC

V

CABINET

ELEC.

WV

S T

M H

AT&T

M G

SSMH

Sign

Cable

Buried

S T

M H

W V

FH

IC

V

WV

IC

V

IC

V

IC

V

S T

M H

ICV WM

S T

M H

WV

SSMH

AT&T

ICV

S T

M H

SSMH

SWBT MH

S W

B T

M H

S T

M H

W V

W V

F H

T F

TF

S T

M H

STM

H

FH

W

V

SSMH

F H

WV

WM

GM

co

SWBT MH

WV

ICV

T P

W V

ICV

S T

M H

W V

W M

IC

V

SW

BT

M H

EV

STM

H

GM

GV

SW

BT

M H

IC

V

IC

V

W V

F

HW

V

TP TW

C

FH

W V

FCV

S S

M H

IC

V

IC

V

E V

S

TA

N D P

IP

E

2" M

E

TA

L

SLV

C V

FH

W

V

S T

M H

W V

AT&T

E M

H

FH

W V

FH W

V

STM

H

W V

SIG

N

W V

F H

S T

M H

C V

W V

(3 4" P

V C S

T A N

D P

IP

E

2" P

V C S

T A N

D P

IP

E

ICV

WV

FH

F C

V

STMH

GV

W V

AT&T

WV

ICV

WM

WV

FH

WV

STMH

ICV

WVTWC

WV

FH

AT&T

SPECTRUM

AT&T

AT&T

(6) 4" P V C S

TA

N

D P

IP

E

2" P V C S

TA

N

D P

IP

E

(3) 4" P V C S

TA

N

D P

IP

E

FH

W V

W V

GAS TEST STATION

WV

ICV

W V

STMH

4" PVC

STANDPIPE

SPECTRUM

W V

STMH

W

V

STMH

FH

AT&T

TWC

EV

S T

M H

4" PVC

STANDPIPE

STANDPIPE

4" PVC

WV

F H

S T

M H

W V

ICV

WV

WV WV

WM

CV

AT&T

S T

M H

AT&T

S T

M H

T W

C

WV

WV

WV

STMH

CV

WM

WV

WV

AT&T

WV

F H

TP

EV

TWC

WV

WV

SSMH

SSMH

co

WM

WM

ICV

CV

WV

WV

WV

ICV

co

WV

SSMH

AT&T

EM

Vault

Communications

Standpipe

4" PVC

Line Post

Gas Pipe

WM

ICV

FH

STMH

Gas Post

Atmos

SSMH SSMH

WM

FH

STMH

ICV

ICV

STMH

WVWM

ICV

WV

SIGN

ICV

Cabinet

Traffic

SSMH

FH

WV

ICV ICVICV

STMH AT&T

TP

WV

SSMH

GV

Station

Gas Test

SWBT MH

TF

TSV

S T

M H

W V

WV

ICVT

P

WV F

H

WV

WV

WV

ICV

WM

IC

V

S T

M H

IC

V

IC

V

S S

M H

IC

V

IC

V

IC

V

IC

V

M E

T A

L S

T A

N D

P

IP

E

F H

W V

S T

M H

G C

E C

S tation

G as Test

S T

M H

S W

B T M

H

F H

W V

S T

M H

SWBT MH

WV

STMH

STMH

F H

W V

FHWV

VAULT

ONCOR

TWC

STMH

TF

STMH

ICV

WV

FH

GM

ICVWM

ICV

TF

STMHAT&T

WV

STMH

WV WV

WV

AT&T

EV

WV

FH

G A

S G

A

SEV

Vault

Fiber

Silt Fence

SWBT MH

Silt Fence

TF

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

G A S

G A S

G A

S

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

G A

S

G A

S

WV

S T

M H

WV

SSMH

IC

V

T S

V

S T

M H

WV

WV

STMH

STMH

ICV

EV

EV

Vault

Cable

WV

FH

SSMH

WV

WV

Line Post

Gas Pipe

STMH

TP

Vault

Cable

GM

TF

TP

EMH

STMH FH

S T

M H

IC

V

W V F H

W V

T

FIC

V

IC

V

S T

M H

IC

V

ICV

IC

V

W M

IC

V

ICV

ICV

F H

W V

W V

SSMH

E M

H

TP

IC

V

WV

WV

WV

WV

F H

S T

M H

GM

GM

T S

V co

EV

ICV

WV

S T

M H

W V

FH

co

S T

M H

S T

M H

S T

M H

F H

WV

W V

T F

W V

W V

A T T

SWBT MH

S W

B T M

H

W V

W V

F H

S T

M H

G M

W V

F H

W V

A T T

STM

H

W V

FH

W V

STMH

FH

W V

W V

IC

V

W V

IC

V

IC

V co

STMH

AT&T

STMH

FH W

V

EV

STMH

S T

M H

STMH

FHW

V

WM

W V

IC

V

STMH

FH

WV

IC

V

WV EV

SS

MH

EV

E V

SWBT M

H

Signal

Traffic

TWC

TSV

TF

EV

T W

C

CV

E V

ICV

S W

B T

M H

ICV

FH

W

V

F H

WV

IC

V

G A

S G

A S

G A

S G

A S

G A

S G

A S

G A

S G

A S

ICV

WM

WM

F H

W V

W

V WATER

VAULT

WM

Fiber

Cable

T W

C

EV

S T

M H

FH

W

V S

T M

H

S T

M H

WV

FH

WV

VAULT

VALVE

WATER

WV

SWBT MH

S T

M H

W V

W V

F H

W V

F

HSWBT

FIBERCABLE

AT&TICV

WM

W V

S T

M H

WV

St at ionGa s Te st

GPP

S T

M H

TF

SWBT MH

AT&T

WV

W

VF

H

IC

V

WM

A T

T

G C

E C

F H

W V

S T

M H

SWBT MH

STMH

F H

W V

IC

V

ICV

SSMH

WM

S T

M H

G C

E C

SSMH

G C

E C

S W

B T

M H

AT&T

AT&T

WV

WV

Wilmeth Road

R e d b u d B o u le v a rd

Br ay C en tra l C irc le

B ra y

C en tr al C irc le

B ra y C e n tr a l

C ir c le

Bray Central Drive Bray Central Drive

C B

L /F

B R

Bray Central Drive

C o m m e rc e D ri v e

Corporate Drive

Corporate Drive

B ra y C e n tra l C irc le

B ra y C e n tr a l

C ir c le

R e d b u d B o u le v a rd

R e d b u d B o u le v a rd

R ed bu d

B ou le va rd

R e d b u d B o u le v a rd

G ra v e s S tre e t

G ra v e s S tr e e t

Inwood Drive

Woodleigh Drive

II

II

II

II

II

II

II

II

University Drive (U.S. Highway 380)

U .S

H ig h w a y

F O

F F

O F

F O

F

Signal

Crossing

F O

F

SIGN

F O

F

FOF

FOF

FOF

F O F

A T

T

T W

C

F O

F

A t m o s

F la g

F O F

F O F

FO

F

F la g

O n c o r

F la g

O n c o r

F la g

O n c o r

FO

F

FO

F

Fl agO nc or

Fl agO nc or

Fl agO nc or

Fl agO nc or

Fl agO nc or

Fl agO nc or Fl agO nc or TF

FO

F

FO

F

FO

F

FO

F

FO

F

FO

F

Va ul t

Fi be r/

Ca bl e

2" M

ETAL

STANDPI

PE

F O F

FOF

Fl a g

A tm o s

B C S

F O F

F O F

F la g

A T

T

B C S

S ta n d p ip e

P

V C

A T

T

A T

T

A T

T

A T

T

S P

E C

T R

U M

S P

E C

T R

U M

SIGNAL

TRAFFIC

FIBER

POST

Spectrum

AT&T

Flags

AT&T

AT&T

AT&T

Spectrum

AT&T

AT&T

FO

F

F O

F

F O

F

F O

F

Cable Post

AT&T

Spectrum

S p e c t r u m

A T

T

O n c o r

A T

T

F O

F F

O F

F O

F

Flags

Spectrum

Standpipe

4" PVC

Flags

Spectrum

Flag

Spectrum

Atmos Flag

Oncor Flag

F O

P

B C

S

CABINET

AT&T

F O

P

SWBT PEDESTAL

St an dp ip e

4" P

VC

FIB

ER

CABLE

VAULT

WATER V

AULT

SPECTRUM V

AULT

Fiber Fiber

Flag

AT&T

Flag

AT&T GAS

FOF

FOF

FOF

Vault

Fiber/Cable

FOF FOF

AT&TFOF

Flag

AT&T

Flag

AT&T

FOF

FOF

FOF

FOF

F O

F F

O F

SPECTRUM

Sil t

Fe nc e xx x xx x xx x xx x xx x xx x xx x xx x xx x xx x xx x xx x x x x

S ilt

F e n c e

M e ta l

R a il

M e ta l

R a il

M e t a l

R a il

S il t

F e n c e

M e t a l

R a il

S il t

F e n c e

Silt Fence

C o m m e rc e D ri v e

29+00

27+00

28+00

26+00

20+00

21+00

18+00

19+00

24+00

25+00

22+00

23+00

47+00

48+00

45+00

46+00

51+00

51+10

49+00

50+00

44+00

42+00

43+00

17+00

+0

+0

9+0

+0

15+00

16+00

+0

14+00

8+0

2+00

3+00

0+00

1+00

6+00

7+00

4+00

5+00

15+00

16+00

13+00

14+00

7+00

8+00

5+00

6+00

10+48

9+00

10+00

4+00

12+82

2+00

3+00

0+00

1+00

12+00

+0

+0

26+00

27+00

+0

+0

25+00

19+00

20+00

17+00

18+00

23+00

24+00

21+00

22+00

6+00

7+00

4+00

5+00

10+00

11+00

8+00

9+00

3+00

1+0

2+0

0+0

OF 13

SHEET 1

OF 13

SHEET 1

OF 13

SHEET 2

OF 13

SHEET 2

OF 13

SHEET 3

OF 13

SHEET 3

OF 13

SHEET 9

OF 13

SHEET 9

OF 13

SHEET 8

OF 13

SHEET 8

OF 13

SHEET 6

OF 13

SHEET 5

OF 13

SHEET 11

OF 13

SHEET 10

OF 13

SHEET 10

OF 13

SHEET 12

OF 13

SHEET 11

OF 13

SHEET 13

OF 13

SHEET 13

OF 13

SHEET 4

OF 13

SHEET 4

OF 13

SHEET 7

SCALE IN FEET

500250

OF 13

SHEET 5

BRAY CENTRAL DRIVEBRAY CENTRAL DRIVE

CORPORATE DRIVE

CENTRAL

CIR

CLE

C E

N T

R A L

C

IR

C L E

G R

A V

E S

T

R E

E T

R E

D B

U D

B O

U L

E V

A R

D

R E

D B

U L

E V

A R

D

C O

M M

E R

C E

D R

IV

E

R E

D B

U D

B O

U L

E V

A R

D

WILMETH ROAD

OF 13

SHEET 6

PHASE 1

PHASE 1

KEY MAPUNIVERSITY DRIVE (US HIGHWAY 380)

F R

O N

T A

G

R

A D

H

IG

H W

Y

N

R T

H B

O U

N D

WILMETH RD TO UNIVERSITY DR (US 380)

ES 1

ES 2

dgurusamy

REDBUD BLVD ILLUMINATION

REDBUD

STATE COUNTY

SHEET

NO.

HIGHWAY

NO.

TEXAS COLLIN

90295

DHARMESH M. SHAH

SAXET FO ETAT

S

DESNECI

L

R E

E

N

IGNE LANOI

SS

E

F

O R

P

LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450

DHARMESH M. SHAH, P.E.

IC

V

W V

W V

W V

F H

GCEC

FH

WV

STMH

S W

B T M

HS

T

M H

FH

WV

ICV

IC

V

S S

M H

W

MSTMH

GCEC

S S

M H

GCEC

SWBT MH

A T

T

A T

T

W V

W V

B P

.0

P C

.1

D E

S

IG

N S

P E

E D m i/ h

S T

A

.0

S T

M H

S T

M H

F

HW

V

W V

E V

S S

M H

E V

EV

S W

B T

M H

STMH

WV

WV

FHWV

STMH

W V

S t a t io n

G a s e s t

G P

P

STMH

T F

S W

B T M

HA

T

T

W V

WV

FH

ICV

W M

AT&T

GCEC

0+00

1+00

M i d

P T

.7

P C

.3

BP: 0+00.00

M A

T C

H L

IN

E

S

T A

M A

T C

H L

IN

E

S

T A

SCALE IN FEET

M A

T C

H L

I N

E

S T

A

(SEE SHEET 10)

MATCHLINE - STA 0+97

REDBUD BLVD

REDBUD BLVD

W

IL

M E

REDBUD BOULEVARD

C E

N T

R A

L C

IR

1-29

1A - 16 1A - 15

1A - 14

1A - 13

1A - 12

1A - 11

1A - 10

1-28

1-26

1-25

1-27

1-19

1-20

1-21

1-22

1-23

1-24

NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.

PHASE 1

ILLUMINATION LAYOUT

PROTECT IN PLACE

CONTRACTOR TO

UTILITY LINES.

CAUTION FOR

BELOW GRADE.

8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET

DIVISION (972) 547-7428.

TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL

COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES

STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.

REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED

CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.

ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.

RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.

LUMINAIRE FIXTURES ARE TO BE 5.

VERIFY WITH THE CITY OR ENGINEER.

THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO

SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF

THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.

BY THE CONTRACTOR.

OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED

DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED

SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE

CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.

POLE FOUNDATIONS.

MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY

CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF

AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.

UTILITIES.

(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING

THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY

FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO

CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES

COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE

THE LOCATION OF ALL UTILITIES, NOTIFYING ALL UTILITY

THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING 1.

NOTES

LEGEND OF SYMBOLS

PROP. TY 2 STREET LIGHT(DOUBLE)

PROPOSED CONDUIT RUN NUMBER

PROP. TY 1 STREET LIGHT(SINGLE)

GROUND BOX (TY A)

X - X

(TRENCHED)

PROPOSED ILLUMINATION CONDUIT

(BORE)

PROPOSED ILLUMINATION CONDUIT

PROPOSED ELECTRICAL SERVICE

EX. WATERLINE

EX. SEWER MAIN

EX. STORM DRAIN

EX. FIBER CABLE-NTX BROADBAND

EX. FIBER CABLE-SPECTRUM

EX. GAS PIPELINE-ATMOS

GROUND BOX (TY A W/ APRON)

1-24

RUN CONDUCTOR ANDCONDUIT

NO.RUN

(FEET)

LENGTH ANDNO.

GROUND

(FEET)

LENGTH ANDNO.

CONDUCTOR

(FEET)

TRENCHED

CONDUIT

(FEET)

BORED

CONDUIT

COMMENTS

BARE#8 XHHW#8

40SCH

PVC IN.2

40SCH

PVC IN.2

1-29 186 372 180

1-28 176 352 170

1-27 41 82 35

1-26 81 162 75

1-25 106 212 100

1-24 211 422 205

1-23 56 112 50

1-22 111 222 105

1-21 31 62 25

1-20 216 432 180 30

1-19 206 412 200

TOTALS

SHEET

1421 2842 1120 235

ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE

DESCRIPTION

NUMBER

POLE

CL

ALIGNMENT

(FEET)

STATION

(FEET)

OFFSET

TYPE

MOUNTING

LENGTH

/DIAMETER

SHAFTDRILL

NO.CKT

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-16 BOULEVARDREDBUD 0+17.02 R4.4 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-15 BOULEVARDREDBUD 1+91.87 L3.0 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-14 BOULEVARDREDBUD 3+60.75 L5.8 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-13 BOULEVARDREDBUD 5+61.29 R3.0 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-12 BOULEVARDREDBUD 7+56.19 L4.2 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-11 BOULEVARDREDBUD 9+26.38 R4.1 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-10 BOULEVARDREDBUD 11+30.86 R3.0 G 8' /30" 1A

QUANTITIES ESTIMATED OF SUMMARYSHEET

#ITEM DESCRIPTION UNIT QTY

70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 56

70300618 (2") 40) (SCH (PVC)CONDT LF 1120

70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 235

70070620 BARE (NO.8) CONDRELEC LF 1421

70080620 INSULATED (NO.8) CONDRELEC LF 2842

70010624 (122311) A TY BOXGROUND EA 1

70020624 W/APRON (122311) A TY BOXGROUND EA 3

70026022 2) (TY ASSEMBLY LIGHTINGROADWAY EA 7

71270690 POLE LUMINAIREREMOVE EA 5

SUCH CROSSING TAKE PLACE

CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO

CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,

MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET

THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A

WILMETH RD TO UNIVERSITY DR (US 380)

LIGHT POLE ASSEMBLY

REMOVE EXISTING LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

WITH UPDATED BLOCK NUMBERS

NAME SIGNS ABOVE STOP SIGN

CITY TO INSTALL NEW STREET

dgurusamy

REDBUD BLVD ILLUMINATION

REDBUD

STATE COUNTY

SHEET

NO.

HIGHWAY

NO.

TEXAS COLLIN

90295

DHARMESH M. SHAH

SAXET FO ETAT

S

DESNECI

L

R E

E

N

IGNE LANOI

SS

E

F

O R

P

LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450

DHARMESH M. SHAH, P.E.

IC

V

GAS GAS

W M

F ib e r

C a b le

TWC

E V

STMH

FH

WVSTMH

STMH

W V

FHW

V

V A

U L

T

V A

L V

E

W A

T E

R

W V

S W

B T M

H

WV

FH

S W

B T

F

IB

E R

C A

B L E

A T

T

IC

V

W M

S P

E C

T R

U M

P T

.2

M i d

FH

TPW

V

S S

M H

T

SV

STMH

WV

W V

IC

V

TP

W V

FH

W V

W V

W V

IC

VW

MICV

STMH

ICV

S W

B T

M H

W V

S T

M H

S T

M H

T W

C

S T

M H

S W

B T

M H

EV

IC

V

SWBT MH

IC

V

FHWV

FH

W V

ICV

GAS GAS GAS GAS GAS GAS

IC

V

W M

W M

FH

WV WV

W A

T E

R V

A U

L T

AT&T

AT&T

SPECTRUMSPECTRUM

FOP

BCS

C A

B

IN

E T

A T

T

FOP

S W

B T

P E

D E

S T

A L

F O

FF

O

F

F O

F

F O

F

FOFFOF

20+00

21+00

P C

.4

M A

T C

H L

IN

E

S

T A

M A

T C

H L

IN

E

S

T A

M A

T C

H L

IN

E

S

T A

M A T

C H

L

IN

E

S

T A

MATCHLINE - STA 21+81

(SEE SHEET 6)

(SEE SHEET 6)

MATCHLINE - STA 19+87

REDBUD BLVD

REDBUD BLVD

1A - 08

1A - 09

1A - 07

1A - 06

1A - 05 1A - 04

1A - 03

1-18

1-17

1-15 1-13

1-8

1-9

1-11 1-10

1-7

1-6

1-16

1-14

1-12

7-15

NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.

REDBUD BOULEVARD

PHASE 1

ILLUMINATION LAYOUT

SCALE IN FEET

PROTECT IN PLACE

CONTRACTOR TO

UTILITY LINES.

CAUTION FOR

D R

IV

E

B R

A Y

C E

N T

R A

L

LEGEND OF SYMBOLS

PROP. TY 2 STREET LIGHT(DOUBLE)

PROPOSED CONDUIT RUN NUMBER

PROP. TY 1 STREET LIGHT(SINGLE)

GROUND BOX (TY A)

X - X

(TRENCHED)

PROPOSED ILLUMINATION CONDUIT

(BORE)

PROPOSED ILLUMINATION CONDUIT

PROPOSED ELECTRICAL SERVICE

EX. WATERLINE

EX. SEWER MAIN

EX. STORM DRAIN

EX. FIBER CABLE-NTX BROADBAND

EX. FIBER CABLE-SPECTRUM

EX. GAS PIPELINE-ATMOS

GROUND BOX (TY A W/ APRON)

BELOW GRADE.

8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET

DIVISION (972) 547-7428.

TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL

COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES

STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.

REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED

CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.

ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.

RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.

LUMINAIRE FIXTURES ARE TO BE 5.

VERIFY WITH THE CITY OR ENGINEER.

THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO

SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF

THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.

BY THE CONTRACTOR.

OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED

DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED

SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE

CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.

POLE FOUNDATIONS.

MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY

CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF

AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.

UTILITIES.

(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING

THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY

FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO

CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES

COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE

1-19

1-13

7-16

7-14

ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE

DESCRIPTION

NUMBER

POLE

CL

ALIGNMENT

(FEET)

STATION

(FEET)

OFFSET

TYPE

MOUNTING

LENGTH

/DIAMETER

SHAFTDRILL

NO.CKT NOTES

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-09 BOULEVARDREDBUD 13+20.47 L6.4 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-08 BOULEVARDREDBUD 15+30.32 R6.4 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-07 BOULEVARDREDBUD 17+30.44 L3.5 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-06 BOULEVARDREDBUD 19+45.94 R5.4 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-05 BOULEVARDREDBUD 20+90.91 L3.0 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-04 BOULEVARDREDBUD 22+44.21 L5.7 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-03 BOULEVARDREDBUD 24+15.62 R5.1 G 8' /30" 1A

RUN CONDUCTOR ANDCONDUIT

NO.RUN

(FEET)

LENGTH ANDNO.

GROUND

(FEET)

LENGTH ANDNO.

CONDUCTOR

(FEET)

TRENCHED

CONDUIT

(FEET)

BORED

CONDUIT

COMMENTS

BARE#8 XHHW#8

40SCH

PVC IN.2

40SCH

PVC IN.2

1-18 31 62 25

1-17 96 192 90

1-16 111 222 105

1-15 211 422 150 55

1-14 86 172 50 30

1-13 131 262 125

1-12 21 42 15

1-11 156 312 115 35

1-10 166 332 85 75

1-9 16 32 10

1-8 151 302 145

1-7 26 52 20

1-6 171 342 115 50

7-15 121 242 115

TOTALS

SHEET

1494 2988 540 870

QUANTITIES ESTIMATED OF SUMMARYSHEET

#ITEM DESCRIPTION UNIT QTY

70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 56

70300618 (2") 40) (SCH (PVC)CONDT LF 540

70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 870

70070620 BARE (NO.8) CONDRELEC LF 1494

70080620 INSULATED (NO.8) CONDRELEC LF 2988

70010624 (122311) A TY BOXGROUND EA 5

70020624 W/APRON (122311) A TY BOXGROUND EA 3

70026022 2) (TY ASSEMBLY LIGHTINGROADWAY EA 7

71270690 POLE LUMINAIREREMOVE EA 5

SUCH CROSSING TAKE PLACE

CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO

CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,

MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET

THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A

WILMETH RD TO UNIVERSITY DR (US 380)

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

ASSEMBLY

LIGHT POLE

EXISTING

REMOVE

dgurusamy

REDBUD BLVD ILLUMINATION

REDBUD

STATE COUNTY

SHEET

NO.

HIGHWAY

NO.

TEXAS COLLIN

90295

DHARMESH M. SHAH

SAXET FO ETAT

S

DESNECI

L

R E

E

N

IGNE LANOI

SS

E

F

O R

P

LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450

DHARMESH M. SHAH, P.E.

ICV

WV

FH

WV

SSMH

ICV

ICV

EV

STANDPIP

E

2" M

ETAL

WV

FH

STMH

CV

(3) 4

" PVC S

TANDPIP

E

2" P

VC S

TANDPIP

E

FCV

(6 P

V C S

T A

N D

P

IP

E

P

V C S

T A

N D

P

IP

E

(3 P

V C S

T A

N D

P

IP

E

ICV

SSMH

ICV

ICV

ICV

ICV

2" METAL

STANDPIPE

FH

WVSTMH

GCEC

STMH

SWBT MHFH

WV

STMH

FH

W V

G A

S

GAS

Fla g

Atm os

BCS

FOF

FOF

Flag

AT&T

BCS

Standpipe

4" PVC

AT&T

AT&T

0 2

M i d

0+00

1+00

BP: 0+00.00

PC: 0

+74.

WM

ICV

ICV

STMH

S T

M H

STMH

FH

WV

SS

M

H

S T

M H

WV

W M

IC

V

SWBT MH

EV

STMH

GM

GV

ICV

TP

TWC FH

WV

FCV

SLV

FH

WVFH

WV

STMH

WV

SIGN

Flag

Oncor

Flag Oncor

Flag Oncor

Flag Oncor

Flag Oncor

Flag Oncor

TF

Vault Fiber/Cable

2" METAL

STANDPIPE

F O

F

FOF

P T

.3

1+00

0+00 BP: 0+00.00

STM

H

1.

BH

2.

TH5

ATM

OS

6I

N

POLY

3.

GM

3.

FH

3.

M A

T C

H L

I N

E

S T

A

M A

T C

H L

IN

E

S

T A

M A

T C

H L

IN

E

S

T A

M A

T C

H L

IN

E

S

T A

C O

R P

O R

A

MATCHLINE - STA 1+50

(SEE SHEET 13)

MATCHLINE - STA 1+00

(SEE SHEET 9)

REDBUD BLVD

G R

A V

REDBUD BLVD

REDBUD BOULEVARD

1B - 04

1B - 03

1A - 02

1A - 01

1B - 01

1B - 02

1B - 05

1D - 01

2-1

1-1

1-3 1-2

3-1

1-5 1-4

2-2

2-3

2-4

2-5

4-3

4-2

4-1

2-102-9

2-5 2-11

NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.

PHASE 1

ILLUMINATION LAYOUT

2-8

SCALE IN FEET

PROTECT IN PLACE

CONTRACTOR TO

UTILITY LINES.

CAUTION FOR

LEGEND OF SYMBOLS

PROP. TY 2 STREET LIGHT(DOUBLE)

PROPOSED CONDUIT RUN NUMBER

PROP. TY 1 STREET LIGHT(SINGLE)

GROUND BOX (TY A)

X - X

(TRENCHED)

PROPOSED ILLUMINATION CONDUIT

(BORE)

PROPOSED ILLUMINATION CONDUIT

PROPOSED ELECTRICAL SERVICE

EX. WATERLINE

EX. SEWER MAIN

EX. STORM DRAIN

EX. FIBER CABLE-NTX BROADBAND

EX. FIBER CABLE-SPECTRUM

EX. GAS PIPELINE-ATMOS

GROUND BOX (TY A W/ APRON)

BELOW GRADE.

8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET

DIVISION (972) 547-7428.

TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL

COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES

STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.

REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED

CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.

ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.

RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.

LUMINAIRE FIXTURES ARE TO BE 5.

VERIFY WITH THE CITY OR ENGINEER.

THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO

SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF

THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.

BY THE CONTRACTOR.

OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED

DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED

SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE

CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.

POLE FOUNDATIONS.

MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY

CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF

AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.

UTILITIES.

(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING

THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY

FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO

CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES

COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE

1-6

4-4

2-12

CAUTION

ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE

DESCRIPTION

NUMBER

POLE

CL

ALIGNMENT

(FEET)

STATION

(FEET)

OFFSET

TYPE

MOUNTING

LENGTH

/DIAMETER

SHAFTDRILL

NO.CKT NOTES

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-02 BOULEVARDREDBUD 25+80.26 R0.0 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1A-01 BOULEVARDREDBUD 27+57.35 L4.0 G 8' /30" 1A

2) (TY ASSEMBLY LIGHTINGROADWAY 1B-01 BOULEVARDREDBUD 29+40.59 L5.3 G 8' /30" 1B

2) (TY ASSEMBLY LIGHTINGROADWAY 1B-02 BOULEVARDREDBUD 31+30.57 R5.5 G 8' /30" 1B

2) (TY ASSEMBLY LIGHTINGROADWAY 1B-03 BOULEVARDREDBUD 33+23.02 L4.9 G 8' /30" 1B

1) (TY ASSEMBLY LIGHTINGROADWAY 1B-03A BOULEVARDREDBUD 33+23.27 L36.4 G 8' /30" 1B ALT 6 SHEET TOREFER

1) (TY ASSEMBLY LIGHTINGROADWAY 1B-03B BOULEVARDREDBUD 33+23.32 R37.5 G 8' /30" 1B ALT 6 SHEET TOREFER

2) (TY ASSEMBLY LIGHTINGROADWAY 1B-04 BOULEVARDREDBUD 35+32.36 R6.0 G 8' /30" 1B

2) (TY ASSEMBLY LIGHTINGROADWAY 1B-05 BOULEVARDREDBUD 37+37.34 R3.3 G 8' /30" 1B

1) (TY ASSEMBLY LIGHTINGROADWAY 1D-01 STREETGRAVES 0+95.68 R22.3 G 8' /30" 1D

RUN CONDUCTOR ANDCONDUIT

NO.RUN

(FEET)

LENGTH ANDNO.

GROUND

(FEET)

LENGTH ANDNO.

CONDUCTOR

(FEET)

TRENCHED

CONDUIT

(FEET)

BORED

CONDUIT

COMMENTS

BARE#8 XHHW#8

40SCH

PVC IN.2

40SCH

PVC IN.2

1-5 186 372 180

1-4 171 342 165

1-3 46 276 40

1-2 31 186 25

1-1 306 612 300 1) (ES SERVICE PROPOSED TOTRANSFORMER

2-1 31 124 25

2-2 31 124 25

2-3 91 364 85

2-4 91 364 85

2-5 206 824 200

2-6 41 164 35 ALT 6 SHEET TOREFER

2-7 51 204 45 ALT 6 SHEET TOREFER

2-8 91 364 85

2-9 121 484 115

2-10 21 42 15

2-11 206 412 200

3-1 91 182 80 5

4-1 56 112 50

4-2 46 92 40

4-3 26 52 20

TOTALS

SHEET

1940 5696 1405 415

QUANTITIES ESTIMATED OF SUMMARYSHEET

#ITEM DESCRIPTION UNIT QTY NOTES

70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 72

ALT" 6 "SHEET FROM QUANTITIES INCLUDES ALSO

70300618 (2") 40) (SCH (PVC)CONDT LF 1405

70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 415

70070620 BARE (NO.8) CONDRELEC LF 1940

70080620 INSULATED (NO.8) CONDRELEC LF 5696

70010624 (122311) A TY BOXGROUND EA 1

70020624 W/APRON (122311) A TY BOXGROUND EA 7 ALT" 6 "SHEET FROM QUANTITIES INCLUDES ALSO

70470628 (NS)SS(E)PS(U) 060 240/480 A TY SRVELC EA 1

70016022 1) (TY ASSEMBLY LIGHTINGROADWAY EA 3 ALT" 6 "SHEET FROM QUANTITIES INCLUDES ALSO

70026022 2) (TY ASSEMBLY LIGHTINGROADWAY EA 7

71270690 POLE LUMINAIREREMOVE EA 5

SUCH CROSSING TAKE PLACE

CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO

CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,

MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET

THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A

WILMETH RD TO UNIVERSITY DR (US 380)

LIGHT POLE ASSEMBLY

REMOVE EXISTING

ASSEMBLY

LIGHT POLE

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

(POWER SOURCE NOT SHOWN)

TO POWER SOURCE

TY A 240/480 060 (NS)SS(E)PS(U)

INSTALL ELECTRIC SERVICE (ES 1)

REFER TO "SHEET 6 ALT" FOR OPTION-2

INCASE OF STORM SEWER CONFLICT

BEFORE DRILLING.

AND OBTAIN THE CITY OF MCKINNEY APPROVAL

CONTRACTOR SHALL LOCATE THE STORM SEWER

PROPOSED LIGHT POLE LOCATION 1B-03.

POTENTIAL STORM SEWER CONFLICT AT THE

OPTION-1

OPTION-1

dgurusamy

REDBUD BLVD ILLUMINATION

REDBUD

STATE COUNTY

SHEET

NO.

HIGHWAY

NO.

TEXAS COLLIN

90295

DHARMESH M. SHAH

SAXET FO ETAT

S

DESNECI

L

R E

E

N

IGNE LANOI

SS

E

F

O R

P

LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450

DHARMESH M. SHAH, P.E.

ICV

WV

FH

WV

SSMH

ICV

ICV

EV

STANDPIP

E

2" M

ETAL

WV

FH

STMH

CV

(3) 4

" PVC S

TANDPIP

E

2" P

VC S

TANDPIP

E

FCV

(6 P

V C S

T A

N D

P

IP

E

P

V C S

T A

N D

P

IP

E

(3 P

V C S

T A

N D

P

IP

E

ICV

SSMH

ICV

ICV

ICV

ICV

2" METAL

STANDPIPE

FH

WVSTMH

GCEC

STMH

SWBT MHFH

WV

STMH

FH

W V

G A

S

GAS

Fla g

Atm os

BCS

FOF

FOF

Flag

AT&T

BCS

Standpipe

4" PVC

AT&T

AT&T

0 2

M i d

0+00

1+00

BP: 0+00.00

PC: 0

+74.

WM

ICV

ICV

STMH

S T

M H

STMH

FH

WV

SS

M

H

S T

M H

WV

W M

IC

V

SWBT MH

EV

STMH

GM

GV

ICV

TP

TWC FH

WV

FCV

SLV

FH

WVFH

WV

STMH

WV

SIGN

Flag

Oncor

Flag Oncor

Flag Oncor

Flag Oncor

Flag Oncor

Flag Oncor

TF

Vault Fiber/Cable

2" METAL

STANDPIPE

F O

F

FOF

P T

.3

1+00

0+00 BP: 0+00.00

STM

H

1.

BH

2.

TH5

ATM

OS

6I

N

POLY

3.

GM

3.

FH

3.

M A

T C

H L

I N

E

S T

A

M A

T C

H L

IN

E

S

T A

M A

T C

H L

IN

E

S

T A

M A

T C

H L

IN

E

S

T A

C O

R P

O R

A

MATCHLINE - STA 1+50

(SEE SHEET 13)

MATCHLINE - STA 1+00

(SEE SHEET 9)

REDBUD BLVD

G R

A V

REDBUD BLVD

REDBUD BOULEVARD

1B - 04

1B - 03A

1A - 02

1A - 01

1B - 01

1B - 02

1B - 05

1D - 01

2-1

1-1

1-3 1-2

3-1

1-5 1-4

2-2

2-3

2-4

2-5

4-3

4-2

4-1

2-102-9

2-7

2-5 2-11

PHASE 1

ILLUMINATION LAYOUT

2-8

2-6

1B - 03B

6 ALT

SCALE IN FEET

PROTECT IN PLACE

CONTRACTOR TO

UTILITY LINES.

CAUTION FOR

LEGEND OF SYMBOLS

PROP. TY 2 STREET LIGHT(DOUBLE)

PROPOSED CONDUIT RUN NUMBER

PROP. TY 1 STREET LIGHT(SINGLE)

GROUND BOX (TY A)

X - X

(TRENCHED)

PROPOSED ILLUMINATION CONDUIT

(BORE)

PROPOSED ILLUMINATION CONDUIT

PROPOSED ELECTRICAL SERVICE

EX. WATERLINE

EX. SEWER MAIN

EX. STORM DRAIN

EX. FIBER CABLE-NTX BROADBAND

EX. FIBER CABLE-SPECTRUM

EX. GAS PIPELINE-ATMOS

GROUND BOX (TY A W/ APRON)

BELOW GRADE.

8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET

DIVISION (972) 547-7428.

TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL

COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES

STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.

REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED

CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.

ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.

RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.

LUMINAIRE FIXTURES ARE TO BE 5.

VERIFY WITH THE CITY OR ENGINEER.

THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO

SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF

THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.

BY THE CONTRACTOR.

OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED

DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED

SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE

CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.

POLE FOUNDATIONS.

MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY

CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF

AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.

UTILITIES.

(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING

THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY

FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO

CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES

COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE

1-6

4-4

2-12

CAUTION

SUCH CROSSING TAKE PLACE

CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO

CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,

MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET

THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A

WILMETH RD TO UNIVERSITY DR (US 380)

LIGHT POLE ASSEMBLY

REMOVE EXISTING

ASSEMBLY

LIGHT POLE

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

(POWER SOURCE NOT SHOWN)

TO POWER SOURCE

TY A 240/480 060 (NS)SS(E)PS(U)

INSTALL ELECTRIC SERVICE (ES 1)

OPTION -2

OPTION -2

OPTION-1 (SHEET 6) IS NOT FEASIBLE

OPTION 2 IS ONLY APPLICABLE IF

dgurusamy

REDBUD BLVD ILLUMINATION

REDBUD

STATE COUNTY

SHEET

NO.

HIGHWAY

NO.

TEXAS COLLIN

90295

DHARMESH M. SHAH

SAXET FO ETAT

S

DESNECI

L

R E

E

N

IGNE LANOI

SS

E

F

O R

P

LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450

DHARMESH M. SHAH, P.E.

WV

FH

SSMH

SSMH

STMH

STMH

TP

W V

FH

STM

H

AT&T

EV

CV

SSMH

EV

SW

BT M

H

TF

WV

SWBT

EV

SSMH

TF

SWBT MH

CV

F H

WV

A T T

E M

H

F O F

F O F

F O F

FOF

AT&T

TWC

FOF

Atmos Flag

FOFFOF

FOF

F la g

O n c o r

Flag

Oncor

Flag

Oncor

FOF

FOFFlag

Oncor

Flag

Oncor

FOF

FOF

FOF

FOF

FOFFOF

Vaul t

Fibe r/Cabl e

M i d

P C

33+00

33+81

EP: 33+81.45

S

TM

H

.9

F H

H

S K J

.7

F H

H

S K J

.2

TP

E D

.1

B H

.2

9 TH

TM

IN

P

O

.0

S S

M H

.5

GM

IC

V

FH

WV

TP

STMH

STMH

W M

ICV

E V

FH

W V

WV

FH

WM

S S

M H

STMH

W V

FH

FH

W V

W V

AT&T

S W

B T M

H S ig n a l

T r a f f ic

T W

C

T S

VT

F

E V

TW

C C

V

FOF

FOFFOF

S ig n a l

C r o s s in g

FOF

S

IG

N

FOF

P T

.0

E P

.7

.1

C H

K

.6

W V

.6

T P

E D

S T

M H

.1

B H

.6

T

M O

S

.7

IN

P

.0

M A

T C

H L

IN

E

S

T A

M A

T C

H L

I N

E

S T

A

M A T C

H L

IN

E

S T

A

(SEE SHEET 12)

MATCHLINE - STA 32+93

REDBUD

BLVD

REDBUD BLVD

U N

I V

E R

S I T

Y D

R

U S

REDBUD BOULEVARD

C E

N T

R

C

IR

1B - 06

1B - 07

1B - 08

1B - 09

1B - 10

1B - 11 1B - 12

2-14

2-15

2-12

2-13

2-18

2-17

2-16

2-19

2-20 2-21

2-23

NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.

2-22

PHASE 1

ILLUMINATION LAYOUT

SCALE IN FEET

PROTECT IN PLACE

CONTRACTOR TO

UTILITY LINES.

CAUTION FOR

LEGEND OF SYMBOLS

PROP. TY 2 STREET LIGHT(DOUBLE)

PROPOSED CONDUIT RUN NUMBER

PROP. TY 1 STREET LIGHT(SINGLE)

GROUND BOX (TY A)

X - X

(TRENCHED)

PROPOSED ILLUMINATION CONDUIT

(BORE)

PROPOSED ILLUMINATION CONDUIT

PROPOSED ELECTRICAL SERVICE

EX. WATERLINE

EX. SEWER MAIN

EX. STORM DRAIN

EX. FIBER CABLE-NTX BROADBAND

EX. FIBER CABLE-SPECTRUM

EX. GAS PIPELINE-ATMOS

GROUND BOX (TY A W/ APRON)

BELOW GRADE.

8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET

DIVISION (972) 547-7428.

TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL

COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES

STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.

REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED

CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.

ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.

RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.

LUMINAIRE FIXTURES ARE TO BE 5.

VERIFY WITH THE CITY OR ENGINEER.

THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO

SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF

THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.

BY THE CONTRACTOR.

OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED

DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED

SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE

CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.

POLE FOUNDATIONS.

MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY

CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF

AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.

UTILITIES.

(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING

THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY

FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO

CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES

COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE

2-18

ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE

DESCRIPTION

NUMBER

POLE

CL

ALIGNMENT

(FEET)

STATION

(FEET)

OFFSET

TYPE

MOUNTING

LENGTH

/DIAMETER

SHAFTDRILL

NO.CKT NOTES

2) (TY ASSEMBLY LIGHTINGROADWAY 1B-06 BOULEVARDREDBUD 39+21.43 L5.6 G 8' /30" 1B

2) (TY ASSEMBLY LIGHTINGROADWAY 1B-07 BOULEVARDREDBUD 40+97.28 R7.7 G 8' /30" 1B

2) (TY ASSEMBLY LIGHTINGROADWAY 1B-08 BOULEVARDREDBUD 42+76.36 R2.9 G 8' /30" 1B

2) (TY ASSEMBLY LIGHTINGROADWAY 1B-09 BOULEVARDREDBUD 44+52.73 L5.9 G 8' /30" 1B

2) (TY ASSEMBLY LIGHTINGROADWAY 1B-10 BOULEVARDREDBUD 46+38.33 R5.1 G 8' /30" 1B

2) (TY ASSEMBLY LIGHTINGROADWAY 1B-11 BOULEVARDREDBUD 48+18.02 L3.5 G 8' /30" 1B

2) (TY ASSEMBLY LIGHTINGROADWAY 1B-12 BOULEVARDREDBUD 50+18.09 L4.9 G 8' /30" 1B

RUN CONDUCTOR ANDCONDUIT

NO.RUN

(FEET)

LENGTH ANDNO.

GROUND

(FEET)

LENGTH ANDNO.

CONDUCTOR

(FEET)

TRENCHED

CONDUIT

(FEET)

BORED

CONDUIT

COMMENTS

BARE#8 XHHW#8

40SCH

PVC IN.2

40SCH

PVC IN.2

2-12 196 392 190

2-13 56 112 50

2-14 121 242 115

2-15 26 52 20

2-16 191 382 140 45

2-17 186 372 180

2-18 31 62 25

2-19 121 242 115

2-20 61 122 55

2-21 196 392 170 20

2-22 56 112 15 35

2-23 166 332 160

TOTALS

SHEET

1407 2814 930 405

QUANTITIES ESTIMATED OF SUMMARYSHEET

#ITEM DESCRIPTION UNIT QTY

70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 56

70300618 (2") 40) (SCH (PVC)CONDT LF 930

70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 405

70070620 BARE (NO.8) CONDRELEC LF 1407

70080620 INSULATED (NO.8) CONDRELEC LF 2814

70010624 (122311) A TY BOXGROUND EA 2

70020624 W/APRON (122311) A TY BOXGROUND EA 3

70026022 2) (TY ASSEMBLY LIGHTINGROADWAY EA 7

71270690 POLE LUMINAIREREMOVE EA 5

SUCH CROSSING TAKE PLACE

CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO

CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,

MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET

THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A

WILMETH RD TO UNIVERSITY DR (US 380)

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

PROTECT IN PLACE

FOC3

TRAFFIC SIGNAL POLE

EXISTING LUMINAIRE ON

dgurusamy

REDBUD BLVD ILLUMINATION

REDBUD

STATE COUNTY

SHEET

NO.

HIGHWAY

NO.

TEXAS COLLIN

90295

DHARMESH M. SHAH

SAXET FO ETAT

S

DESNECI

L

R E

E

N

IGNE LANOI

SS

E

F

O R

P

LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450

DHARMESH M. SHAH, P.E.

WV

STMH

WV WV

WV

AT&T

EV

WV

FH EV

Vault

Fiber

Silt Fence

TF

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

WV

WV

WV

ICV

EV

Vault

Cable

EMH

STMH FH

Fiber Fiber

Silt Fence

21+00

CHK

647.861

200218

100001

U S

N

F R

M A

T C

H L

IN

E

S

T A

(SEE SHEET 11)

MATCHLINE - STA 21+50

M A

T C

H L

I N

E

S T

A

M

A T

C H

L I N

E

S T

A

MATCHLINE - STA 20+15

(SEE SHEET 11)

BRAY CENTRAL DR

BRAY CENTRAL DR

BRAY CENTRAL DRIVE

7-2 7-3 7-4 7-5 7-67-1

5-1

2D - 05

2D - 03 2D - 02 2D - 01

2C - 01 2C - 02 2C - 03

8-10

8-4

8-3 8-2

6-1

6-2

8-1

NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.

CI

R

C E

N T

R A

L

PHASE 1

ILLUMINATION LAYOUT

8-5

8-68-7 8-8

8-9

2C - 04

SCALE IN FEET

PROTECT IN PLACE

CONTRACTOR TO

UTILITY LINES.

CAUTION FOR

LEGEND OF SYMBOLS

PROP. TY 2 STREET LIGHT(DOUBLE)

PROPOSED CONDUIT RUN NUMBER

PROP. TY 1 STREET LIGHT(SINGLE)

GROUND BOX (TY A W/ APRON)

X - X

(TRENCHED)

PROPOSED ILLUMINATION CONDUIT

(BORE)

PROPOSED ILLUMINATION CONDUIT

PROPOSED ELECTRICAL SERVICE

EX. WATERLINE

EX. SEWER MAIN

EX. STORM DRAIN

EX. FIBER CABLE-NTX BROADBAND

EX. FIBER CABLE-SPECTRUM

EX. GAS PIPELINE-ATMOS

ITEM 0690 7127 - REMOVE LUMINAIRE POLE.

CONTRACTOR WILL BE PAID FOR AS A SUBSIDIARY TO

9. HOUSINGS AND CONCRETE BASES TO BE REMOVED BY THE

BELOW GRADE.

8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET

DIVISION (972) 547-7428.

TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL

COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES

STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.

REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED

CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.

ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.

RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.

LUMINAIRE FIXTURES ARE TO BE 5.

VERIFY WITH THE CITY OR ENGINEER.

THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO

SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF

THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.

BY THE CONTRACTOR.

OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED

DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED

SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE

CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.

POLE FOUNDATIONS.

MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY

CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF

AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.

UTILITIES.

(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING

THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY

FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO

CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES

COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE

8-11

2D - 04

ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE

DESCRIPTION

NUMBER

POLE

CL

ALIGNMENT

(FEET)

STATION

(FEET)

OFFSET

TYPE

MOUNTING

LENGTH

/DIAMETER

SHAFTDRILL

NO.CKT NOTES

2) (TY ASSEMBLY LIGHTINGROADWAY 2D-05 DRIVE CENTRALBRAY 0+04.91 0.0 G 8' /30" 2D

1) (TY ASSEMBLY LIGHTINGROADWAY 2D-04 DRIVE CENTRALBRAY 1+37.93 L26.5 G 8' /30" 2D

1) (TY ASSEMBLY LIGHTINGROADWAY 2D-03 DRIVE CENTRALBRAY 2+90.48 26.5L G 8' /30" 2D

1) (TY ASSEMBLY LIGHTINGROADWAY 2D-02 DRIVE CENTRALBRAY 4+35.45 L26.5 G 8' /30" 2D

1) (TY ASSEMBLY LIGHTINGROADWAY 2D-01 DRIVE CENTRALBRAY 5+80.41 L26.6 G 8' /30" 2D

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-01 DRIVE CENTRALBRAY 7+57.32 L26.4 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-02 DRIVE CENTRALBRAY 9+22.30 L26.6 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-03 DRIVE CENTRALBRAY 10+97.37 L26.6 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-04 DRIVE CENTRALBRAY 12+77.47 L26.4 G 8' /30" 2C

8-1

7-7

5-2

6-3

RUN CONDUCTOR ANDCONDUIT

NO.RUN

(FEET)

LENGTH ANDNO.

GROUND

(FEET)

LENGTH ANDNO.

CONDUCTOR

(FEET)

TRENCHED

CONDUIT

(FEET)

BORED

CONDUIT

COMMENTS

BARE#8 XHHW#8

40SCH

PVC IN.2

40SCH

PVC IN.2

8-11 46 92 40

8-10 126 252 120

8-9 41 82 35

8-8 56 112 50

8-7 81 162 75

8-6 86 172 80

8-5 56 112 50

8-4 31 62 25

8-3 86 172 80

8-2 71 142 65

8-1 76 152 70

5-1 256 512 250 2) (ES SERVICE PROPOSED TOTRANSFORMER

6-1 31 186 25

6-2 76 152 70

7-1 66 132 60

7-2 61 122 55

7-3 176 352 170

7-4 186 372 180

7-5 106 212 100

7-6 91 182 85

TOTALS

SHEET

1805 3734 1265 420

QUANTITIES ESTIMATED OF SUMMARYSHEET

#ITEM DESCRIPTION UNIT QTY

70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 72

70300618 (2") 40) (SCH (PVC)CONDT LF 1265

70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 420

70070620 BARE (NO.8) CONDRELEC LF 1805

70080620 INSULATED (NO.8) CONDRELEC LF 3734

70020624 W/APRON (122311) A TY BOXGROUND EA 5

70470628 (NS)SS(E)PS(U) 060 240/480 A TY SRVELC EA 1

70016022 1) (TY ASSEMBLY LIGHTINGROADWAY EA 8

70026022 2) (TY ASSEMBLY LIGHTINGROADWAY EA 1

71270690 POLE LUMINAIREREMOVE EA 4

SUCH CROSSING TAKE PLACE

CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO

CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,

MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET

THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A

WILMETH RD TO UNIVERSITY DR (US 380)

LIGHT POLE ASSEMBLY

REMOVE EXISTING

ASSEMBLY

LIGHT POLE

EXISTING

REMOVE

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

TY A 240/480 060 (NS)SS(E)PS(U)

INSTALL ELECTRIC SERVICE (ES 2)

IN PLACE

PROTECT

FOC3

NOT SHOWN)

(POWER SOURCE

TO POWER SOURCE

METER TO BE REMOVED BY ONCOR.

TO BE REMOVED BY THE CONTRACTOR.

HOUSING AND CONCRETE BASE

WV

STMH

STMH

WV

FH

SSMH

WV

WV

Line Post Gas Pipe

STMH

TP Vault Cable

GM

TF

TP

B P

.0 dgurusamy

REDBUD BLVD ILLUMINATION

REDBUD

STATE COUNTY

SHEET

NO.

HIGHWAY

NO.

TEXAS COLLIN

90295

DHARMESH M. SHAH

SAXET FO ETAT

S

DESNECI

L

R E

E

N

IGNE LANOI

SS

E

F

O R

P

LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450

DHARMESH M. SHAH, P.E.

SSMH

AT&T

EM

FH

STMH

Gas Post

Atmos

SSMH SSMH

WM

FH

STMH

ICV

ICV

STMH

WVWM

ICV

WV

SIGN

ICV

Cabinet

Traffic

SSMH

FH

WV

ICV ICVICV

STMH AT&T

GV

Station

Gas Test

SWBT MH

TF

Flags

Spectrum

Flag

Spectrum

Atmos Flag

Oncor Flag

M A

T C

H L

I N

E

S T

A

M A

T C

H L

I N

E

S T

A

S

E E

S H

E E

T

M A

T C

H L

IN

E

S

T A

M A

T C

H L

I N

E

S T

A

S

E E

S H

E E

T

BRAY CENTRAL DR

BRAY CENTRAL DR

BRAY CENTRAL DRIVE

2C - 05

2C - 06

2C - 07 2C - 08

2C - 09 2C - 10 2C - 11 2C - 12

7-7 7-8

7-9

7-11 7-12 7-13

7-17 7-18 7-19

7-10

7-14

7-16 7-20 7-21 7-22

7-24 7-23

NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.

PHASE 1

ILLUMINATION LAYOUT

SCALE IN FEET

PROTECT IN PLACE

CONTRACTOR TO

UTILITY LINES.

CAUTION FOR

LEGEND OF SYMBOLS

PROP. TY 2 STREET LIGHT(DOUBLE)

PROPOSED CONDUIT RUN NUMBER

PROP. TY 1 STREET LIGHT(SINGLE)

GROUND BOX (TY A W/ APRON)

X - X

(TRENCHED)

PROPOSED ILLUMINATION CONDUIT

(BORE)

PROPOSED ILLUMINATION CONDUIT

PROPOSED ELECTRICAL SERVICE

EX. WATERLINE

EX. SEWER MAIN

EX. STORM DRAIN

EX. FIBER CABLE-NTX BROADBAND

EX. FIBER CABLE-SPECTRUM

EX. GAS PIPELINE-ATMOS

ITEM 0690 7127 - REMOVE LUMINAIRE POLE.

CONTRACTOR WILL BE PAID FOR AS A SUBSIDIARY TO

9. HOUSINGS AND CONCRETE BASES TO BE REMOVED BY THE

BELOW GRADE.

8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET

DIVISION (972) 547-7428.

TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL

COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES

STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.

REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED

CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.

ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.

RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.

LUMINAIRE FIXTURES ARE TO BE 5.

VERIFY WITH THE CITY OR ENGINEER.

THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO

SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF

THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.

BY THE CONTRACTOR.

OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED

DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED

SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE

CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.

POLE FOUNDATIONS.

MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY

CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF

AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.

UTILITIES.

(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING

THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY

FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO

CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES

COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE

ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE

DESCRIPTION

NUMBER

POLE

CL

ALIGNMENT

(FEET)

STATION

(FEET)

OFFSET

TYPE

MOUNTING

LENGTH

/DIAMETER

SHAFTDRILL

NO.CKT NOTES

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-05 DRIVE CENTRALBRAY 14+67.37 L26.0 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-06 DRIVE CENTRALBRAY 16+22.37 L26.5 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-07 DRIVE CENTRALBRAY 17+82.36 L26.6 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-08 DRIVE CENTRALBRAY 19+62.25 L26.4 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-09 DRIVE CENTRALBRAY 22+07.24 L26.5 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-10 DRIVE CENTRALBRAY 23+72.18 L26.4 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-11 DRIVE CENTRALBRAY 25+31.88 L26.5 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-12 DRIVE CENTRALBRAY 27+26.84 R26.7 G 8' /30" 2C

7-25

QUANTITIES ESTIMATED OF SUMMARYSHEET

#ITEM DESCRIPTION UNIT QTY

70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 64

70300618 (2") 40) (SCH (PVC)CONDT LF 1065

70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 435

70070620 BARE (NO.8) CONDRELEC LF 1602

70080620 INSULATED (NO.8) CONDRELEC LF 3204

70020624 W/APRON (122311) A TY BOXGROUND EA 2

70016022 1) (TY ASSEMBLY LIGHTINGROADWAY EA 8

71270690 POLE LUMINAIREREMOVE EA 2

RUN CONDUCTOR ANDCONDUIT

NO.RUN

(FEET)

LENGTH ANDNO.

GROUND

(FEET)

LENGTH ANDNO.

CONDUCTOR

(FEET)

TRENCHED

CONDUIT

(FEET)

BORED

CONDUIT

COMMENTS

BARE#8 XHHW#8

40SCH

PVC IN.2

40SCH

PVC IN.2

7-7 106 212 100

7-8 101 202 95

7-9 161 322 155

7-10 41 82 35

7-11 136 272 130

7-12 81 162 75

7-13 116 232 110

7-14 76 152 70

7-16 76 152 70

7-17 86 172 80

7-18 96 192 90

7-19 41 82 35

7-20 96 192 90

7-21 46 92 40

7-22 91 182 85

7-23 121 242 115

7-24 131 262 125

TOTALS

SHEET

1602 3204 1065 435

SUCH CROSSING TAKE PLACE

CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO

CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,

MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET

THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A

WILMETH RD TO UNIVERSITY DR (US 380)

LIGHT POLE ASSEMBLY

REMOVE EXISTING

LIGHT POLE ASSEMBLY

REMOVE EXISTING

METER TO BE REMOVED BY ONCOR.

TO BE REMOVED BY THE CONTRACTOR.

HOUSING AND CONCRETE BASE

FHWV

VAULT

ONCOR

TF

STMH

ICV

WV

FH

GM

ICVWM

ICV

TF

STMHAT&T

WV

G A

S G

A S

Silt Fence

SWBT MH

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

C B

L /F

B R

Flag

AT&T

Flag

AT&T GAS

FOF

FOF

FOF

Vault Fiber/Cable

FOF FOF

AT&TFOF

Flag

AT&T

Flag

AT&T

dgurusamy

REDBUD BLVD ILLUMINATION

REDBUD

STATE COUNTY

SHEET

NO.

HIGHWAY

NO.

TEXAS COLLIN

90295

DHARMESH M. SHAH

SAXET FO ETAT

S

DESNECI

L

R E

E

N

IGNE LANOI

SS

E

F

O R

P

LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450

DHARMESH M. SHAH, P.E.

WV

AT&T

WV

F H

TP

EV

TWC

WV

WV

SSMH

SSMH

co

WM

WM

ICV

CV

WV

WV

WV

ICV

co

WV

Vault

Communications

Standpipe

4" PVC

Line Post

Gas Pipe

WM

ICV

SSMH

Standpipe

4" PVC

0+00

1+00

E P

.0

BP: 0+00.00

M A

T C

H L

I N

E

S T

A

(SEE SHEET 8)

MATCHLINE - STA 1+00

C O

M M

E R

C E

D R

BRAY CENTRAL DR

BRAY CENTRAL DRIVE

2C - 13

7-26

2C - 14

2C - 15 2C - 16

1C - 14

3-26

7-29 7-31 7-25 7-28 7-30 7-32

3-25

NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.

PHASE 1

ILLUMINATION LAYOUT

7-27

1C - 13

SCALE IN FEET

PROTECT IN PLACE

CONTRACTOR TO

UTILITY LINES.

CAUTION FOR

LEGEND OF SYMBOLS

PROP. TY 2 STREET LIGHT(DOUBLE)

PROPOSED CONDUIT RUN NUMBER

PROP. TY 1 STREET LIGHT(SINGLE)

GROUND BOX (TY A W/ APRON)

X - X

(TRENCHED)

PROPOSED ILLUMINATION CONDUIT

(BORE)

PROPOSED ILLUMINATION CONDUIT

PROPOSED ELECTRICAL SERVICE

EX. WATERLINE

EX. SEWER MAIN

EX. STORM DRAIN

EX. FIBER CABLE-NTX BROADBAND

EX. FIBER CABLE-SPECTRUM

EX. GAS PIPELINE-ATMOS

BELOW GRADE.

8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET

DIVISION (972) 547-7428.

TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL

COORDINATE WITH THE CITY ON EXISTING LUMINAIRE POLES

STREET LIGHTS AND ABANDON EMPTY CONDUITS IN PLACE.

REMOVE ANY WIRING FROM CONDUITS BETWEEN REMOVED

CONTRACTOR TO LOCATE EXISTING ELECTRICAL SERVICE AND 7.

ILLUMINATION CIRCUIT VOLTAGE TO BE 480 V.6.

RFM-108W48LED4K-G2-R2M-HVU-DMG-PH9-RCD7-BK.

LUMINAIRE FIXTURES ARE TO BE 5.

VERIFY WITH THE CITY OR ENGINEER.

THE ADJUSTMENT IS MORE THAN 10 FEET, CONTRACTOR TO

SLIGHTLY ADJUSTED TO ACCOMMODATE FIELD CONDITIONS. IF

THE PROPOSED ILLUMINATION POLE LOCATIONS MAY BE 4.

BY THE CONTRACTOR.

OR DAMAGED DURING CONSTRCUTION SHALL BE REPLACED

DURING CONSTRUCTION. ANY INFRASTRUCTURE REMOVED

SIGNAGE, AND ANY OTHER EXISTING INFRASTRUCTURE

CONTRACTOR TO PROTECT IRRIGATION SYSTEM, TREES, 3.

POLE FOUNDATIONS.

MCKINNEY ENGINEERING DEPARTMENT BEFORE DRILLING ANY

CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY OF

AND STAKING OPTIMUM LOCATIONS FOR THE POLES. THE

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING 2.

UTILITIES.

(ENGINEER) OF ALL CONFLICTS THE WORK HAS WITH EXISTING

THE CONTRACTOR’S OPERATIONS, AND NOTIFYING THE CITY

FROM DAMAGE, REPAIRING ALL UTILITIES DAMAGED DUE TO

CONTRACTOR’S OPERATIONS, PROTECTING ALL UTILITIES

COMPANIES INCLUDING THE CITY OF MCKINNEY OF THE

3-24

RUN CONDUCTOR ANDCONDUIT

NO.RUN

(FEET)

LENGTH ANDNO.

GROUND

(FEET)

LENGTH ANDNO.

CONDUCTOR

(FEET)

TRENCHED

CONDUIT

(FEET)

BORED

CONDUIT

COMMENTS

BARE#8 XHHW#8

40SCH

PVC IN.2

40SCH

PVC IN.2

7-25 81 162 75

7-26 176 352 170

7-27 16 32 10

7-28 86 172 80

7-29 96 192 90

7-30 51 102 45

7-31 86 172 80

7-32 81 162 75

3-25 61 122 55

3-26 136 272 130

TOTALS

SHEET

870 1740 520 290

QUANTITIES ESTIMATED OF SUMMARYSHEET

#ITEM DESCRIPTION UNIT QTY

70400416 (30IN) POLE) ILL (RDWY SHAFTDRILL LF 48

70300618 (2") 40) (SCH (PVC)CONDT LF 520

70310618 (BORE) (2") 40) (SCH (PVC)CONDT LF 290

70070620 BARE (NO.8) CONDRELEC LF 870

70080620 INSULATED (NO.8) CONDRELEC LF 1740

70020624 W/APRON (122311) A TY BOXGROUND EA 2

70016022 1) (TY ASSEMBLY LIGHTINGROADWAY EA 6

ASSEMBLIES ILLUMINATION ROADWAY OFSCHEDULE

DESCRIPTION

NUMBER

POLE

CL

ALIGNMENT

(FEET)

STATION

(FEET)

OFFSET

TYPE

MOUNTING

LENGTH

/DIAMETER

SHAFTDRILL

NO.CKT NOTES

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-13 DRIVE CENTRALBRAY 29+21.97 L26.5 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-14 DRIVE CENTRALBRAY 30+86.87 L25.8 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-15 DRIVE CENTRALBRAY 32+56.78 L24.5 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 2C-16 DRIVE CENTRALBRAY 34+47.42 L24.2 G 8' /30" 2C

1) (TY ASSEMBLY LIGHTINGROADWAY 1C-14 DRIVE CENTRALBRAY 35+19.38 R53.2 G 8' /30" 1C

1) (TY ASSEMBLY LIGHTINGROADWAY 1C-13 DRIVECOMMERCE 0+72.79 L23.9 G 8' /30" 1C

SUCH CROSSING TAKE PLACE

CHRIS THOMAS (214) 250-7231, FOR FURTHER REVIEW AND COMMENT PRIOR TO

CROSSING, PLEASE CONTACT ATMOS FIELD CONSTRUCTION REPRESENTATIVE,

MINIMUM OF 2 FEET VERTICAL CLEARANCE. IN THE EVENT OF LESS THAN 2 FEET

THE PROPOSED ELECTRICAL CONDUITS TO CROSS THE ATMOS GAS LINE WITH A

WILMETH RD TO UNIVERSITY DR (US 380)

dgurusamy

REDBUD BLVD ILLUMINATION

REDBUD

STATE COUNTY

SHEET

NO.

HIGHWAY

NO.

TEXAS COLLIN

90295

DHARMESH M. SHAH

SAXET FO ETAT

S

DESNECI

L

R E

E

N

IGNE LANOI

SS

E

F

O R

P

LEE ENGINEERING, L.L.C. - REGISTRATION NO. - F-450

DHARMESH M. SHAH, P.E.

W

VFH

W V

STMH

STMH

IC

V

W V

W V

W V

W

MC

VA

T

T

STMH

A T

T

STMH

TWC

W V

W V

W V

S T

M H

CV

W M

W V

AT&TOncor

AT&TFOF FOF

FOF

F la g s

S p e c tr u m

P C

.2

WV

W V

S T

M H

W V

S T

M H

F H

A T

T

T W

C

E V

P

V C

S T

A N

D P

IP

E

S T

A N

D P

IP

E

P

V C

W V

FH

WV

FOF

FOF

FOFFOF

C a b le

P o s t

A T

T

S p e c tr u m

Spectrum

14+24

14+00

EP: 14+23.79

P T

.9

E P

.0

M A

T C

H L

IN

E

S

T A

M A

T C

H L

I N

E

S T

A

M A

T C

H L

IN

E

S

T A

S

E E

T

(SEE PAGE 9)

MATCHLINE - STA 13+24

C O

R P

O R

A T

E D

R

COMMERCE DR

COMMERCE DR

COMMERCE DRIVE

3-16

3-14

3-13

3-24 3-23 3-22 3-20 3-18

3-12

1C - 12 1C - 11 1C - 10

1C - 08

1C - 09

3-193-21

3-15

NOTE: CONDUCTOR QUANTITIES INCLUDE 6 FEET ADDITIONAL LENGTH TO ALLOW FOR SWEEP, SLACK, ETC.

PHASE 1

ILLUMINATION LAYOUT

3-17

SCALE IN FEET

PROTECT IN PLACE

CONTRACTOR TO

UTILITY LINES.

CAUTION FOR

LEGEND OF SYMBOLS

PROP. TY 2 STREET LIGHT(DOUBLE)

PROPOSED CONDUIT RUN NUMBER

PROP. TY 1 STREET LIGHT(SINGLE)

GROUND BOX (TY A W/ APRON)

X - X

(TRENCHED)

PROPOSED ILLUMINATION CONDUIT

(BORE)

PROPOSED ILLUMINATION CONDUIT

PROPOSED ELECTRICAL SERVICE

EX. WATERLINE

EX. SEWER MAIN

EX. STORM DRAIN

EX. FIBER CABLE-NTX BROADBAND

EX. FIBER CABLE-SPECTRUM

EX. GAS PIPELINE-ATMOS

BELOW GRADE.

8. EXISTING LIGHT POLE FOUNDATIONS TO BE REMOVED 2 FEET

DIVISION (972) 547-7428.

TO BE SALVAGED. CONTACT THE CITY OF MCKINNEY SIGNAL

COORDINATE WITH THE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .