3-03 Form 2 Cost Sheet.pdf
PDF 111 KB Posted
- Attached to
- 3202600160 MLK Warehouse Gate Renovation
- Solicitation number
- 3202600160
- Issued by
- Texas
About this file
This is a Cost Sheet form for IFB #3202600160, a gate renovation project issued by the Texas Workforce Commission (TWC) for the MLK Warehouse facility. The project encompasses four primary line items: conversion of an existing slide gate to a V-track system with new guide rollers, power wheels, guide rollers, steel V-track, and a concrete mow-strip with reinforcement; installation of a Trilogy DL2700 alarm lock on an existing personnel gate with custom hand guard; installation of a new Liftmaster CSL24UL slide gate operator with associated components including safety bump edges, wireless bump edge kit, loop detectors, gooseneck pedestal, wired keypad, wireless remotes, and external antenna; and electrical work consisting of 30 feet of asphalt saw cutting and patching, 75 feet of trenching with backfill, 75 feet of electrical conduit with wiring and breaker installation, and 75 feet of communications conduit with pull string from the building to the operator and pedestal. Bidders are required to submit pricing for all line items to be considered responsive.
The cost sheet requires bidders to provide total pricing that includes all equipment, materials, labor, and associated costs for the complete contract term. A fourth line item for delivery, setup, installation, and other fees not included in the preceding line items must also be priced. The form does not specify response deadlines, award dates, contract term length, or renewal options, nor does it indicate any set-asides, funding sources, or budget constraints.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORM 2 – COST SHEET
IFB #3202600160 – MLK Warehouse Gate Renovation
1. The Cost below reflects proposed pricing for all equipment rendered during the course of the Contract resulting from this Solicitation, inclusive of any and all costs involved during the Contract Term.
2. The Total Cost must include pricing for all line items. i.e. To be considered responsive, the Bidder must bid on all line items listed below.
Line Item No.
Description Price
1 Fence and Gates
- Convert Existing Slide Gate to a V-Track System Includes: 1 - New Guide Rollers Post 2 - 4” Power Wheel Weld-On Boxes 2 - 4” Power Wheels 2 - 6” Non-Marring Guide Rollers 54’ - Steel VTrack 54’ - 10” Wide x 8” Deep Concrete Mow-Strip w/ Reinforcement 1 - Add Trilogy DL2700 Alarm Lock to Existing Personnel Gate w/ Free Egress Includes: 1 - Weld-In Box 1 - Custom Hand Guard
Gate Operator
- New Liftmaster CSL24UL Slide Gate Operator Includes: 1 - Operating Stand 2 - Safety Bump Edges 1 - Wireless Bump Edge Kit 2 - Loop Detectors 2 - Loops w/ Saw Cutting and Sealant 1 - Gooseneck Pedestal 1 - Wired Keypad (Stand-Alone) 2 - Wireless Remotes 1 - External Antenna
3 Electrical -30’ - Asphalt Saw Cutting and Patching
FORM 2 – COST SHEET
Line Item No.
Description Price
-75’ - Trenching w/ Backfill -75’ - 1” Electrical Conduit, Wiring and Breaker (From Bldg. to Operator) -75’ - 2” Communications Conduit w/ Pull String (From Bldg. to Operator and Pedestal)
4 Delivery/Setup/Installation/Fees Not Included in Line Items
TOTAL COST: