3-03- (2026-03-11) ARPA Park Improvements.pdf

PDF 23 MB Posted

Attached to
Abington Township American Rescue Plan Act (ARPA) Park Improvements
Solicitation number
US.226100
Issued by
Montgomery County, Aaronsburg CDP, Pennsylvania

About this file

File Summary

This document is a project drawing and technical specification set prepared by Carroll Engineering Corporation for Abington Township, Montgomery County, Pennsylvania, detailing American Rescue Plan Act (ARPA) Park Improvements. The project encompasses three distinct improvement sites: Ardsley Park and Roslyn Park walking trail rehabilitation, and Alverthorpe Park pavilion improvements. The scope of work includes mill and overlay operations for asphalt walking trails, installation of mulch barriers, full-depth pavement restoration where needed, topsoil and seeding in disturbed areas, and electrical upgrades including power and lighting installations at the pavilion. The project consists of seven sheets of construction documents including cover sheets, index plans, detailed construction drawings, erosion and sediment control details, and erosion control notes. Sealed bids are to be submitted electronically through PennBid by Friday, April 3, 2026, at 11:00 AM, with the Responsible Contractor Ordinance qualification document due by Friday, March 20, 2026. Each bid must be accompanied by a certified check or bid bond equal to 10% of the total bid price. The work constitutes public works subject to Pennsylvania's Prevailing Wage Act requirements.

The project is funded in whole or in part through the American Rescue Plan Act administered by the U.S. Department of the Treasury's Coronavirus State and Local Fiscal Recovery Funds. Contractors must be licensed to do business in Pennsylvania and comply with Abington Township Responsible Contractor Ordinance No. 2193. The documents include comprehensive erosion and sediment control requirements, construction sequencing protocols, soil testing and amendment procedures, and maintenance and inspection protocols that contractors must follow during implementation. All earth disturbance activities require notification to the Pennsylvania One Call System at 1-800-242-1776 and compliance with Act 287 underground utility location requirements. The specifications mandate weekly inspections of erosion and sediment control best management practices throughout construction and until site stabilization is achieved, with detailed documentation on DEP Form 3150-FM-BWEW0083.

View the file

Other files

File Type Posted
2-04- 260306 - IFB Drawings.pdf PDF
4-02 - 25-1036 Technical Specs.pdf PDF
1-01 - 25-1036 Front End Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .