This is a Maintenance Bond document for the City of Fort Worth, Texas, related to the 2026 CDBG Campbell Street Improvement Project (City Project No. 107033). The project encompasses approximately 2,500 linear feet of 7-inch curb and gutter, 3,800 square feet of 6-inch concrete driveway, 12,000 square feet of 4-inch concrete sidewalk, 4,700 square yards of 3-inch asphalt pavement (Superpave SP-D), 4,700 square yards of 11-inch pavement pulverization, 76 tons of cemlime, and 18 barrier-free ADA ramps. The bond requires the Principal (contractor) to furnish all materials, equipment, labor, and accessories necessary for the Work in accordance with the contract plans, specifications, and documents, including any work resulting from authorized Change Orders.
The Principal must ensure that the Work remains free from defects in materials or workmanship for a two-year Maintenance Period following Final Acceptance by the City. The Principal is obligated to repair or reconstruct any defective Work upon timely notice from the City during the Maintenance Period. If the Principal fails to remedy defective Work to the City's satisfaction, the City may perform the repairs and charge all associated costs to both the Principal and the Surety under this bond. The bond is continuous in nature, allowing for successive recoveries for successive breaches. Venue for any legal action is established in Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. The bond date shall not be prior to the Contract award date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 11-00 35 13 Conflict of Interest Statement.pdf | ||
| 10-00 61 14 Payment Bond.doc | DOC document | |
| 7-00 61 13 Performance Bond.doc | DOC document | |
| 5-00 21 13 Instruction to Bidders.docx | DOCX document | |
| 2-00 45 11 Bidders Prequalifications.doc | DOC document | |
| 12-Project Manual 2026 CDBG Cambell St Improvement Project CPN 107033.pdf | ||
| 13-Submission Instructions - 26-0338.docx | DOCX document | |
| 8-00 45 26 Contractor Compliance.doc | DOC document | |
| 1-00 41 00 Bid Proposal Workbook.xlsx | XLSX spreadsheet | |
| 4-00 11 13 Invitation to Bidders.docx | DOCX document | |
| 6-00 45 13 Prequalification Application.doc | DOC document | |
| 9-00 52 43 Agreement.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 61 19 - 1
MAINTENANCE BOND
SECTION 00 61 19
MAINTENANCE BOND
THE STATE OF TEXAS
KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT
That we_____________________________________________________, known as “Principal” herein and ____________________________________________, a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as “Surety” herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of the State of Texas, known as “City” herein, in the sum of_________________________________________ Dollars ($_______________________), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the City awarded the_____ day of , 20 , which Contract is hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories as defined by law, in the prosecution of the Work, including any Work resulting from a duly authorized Change Order (collectively herein, the “Work”) as provided for in said contract and designated as 2026 CDBG CAMPBELL STREET IMPROVEMENT PROJECT. City Project No. 107033; and
WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance with the plans, specifications and Contract Documents that the Work is and will remain free from defects in materials or workmanship for and during the period of two (2) years after the date of Final Acceptance of the Work by the City (“Maintenance Period”); and
WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the City of the need therefor at any time within the Maintenance Period.
NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect.
PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches.
IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the day of
, 20 __.
PRINCIPAL:
BY: ________________________________
Signature
ATTEST:
(Principal) Secretary
Name and Title
Address: ____________________________
Witness as to Principal
SURETY:
BY: ________________________________
Signature
ATTEST:
Name and Title
Address: ____________________________
(Surety) Secretary
Witness as to Surety
Telephone Number: ___________________
Email Address:
*Note:
If signed by an officer of the Surety Company, there must be on file a certified extract from the by‑laws showing that this person has authority to sign such obligation. If Surety’s physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH
2026 CDBG Campbell Street Improvement Project
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
City Project No. 107033 Revised September 19, 2025
File details come from the government source that posted it. Updated .