2-00 45 11 Bidders Prequalifications.doc

DOC document 271 KB Posted

Attached to
PW 2026 CDBG Campbell Street Improvement Project, City Project No. 107033
Solicitation number
26-0338
Issued by
Tarrant County, Texas

About this file

This is a Bidders Prequalification specification document for the City of Fort Worth's 2026 CDBG Campbell Street Improvement Project (City Project No. 107033). The project involves approximately 2,500 linear feet of 7-inch curb and gutter, 3,800 square feet of 6-inch concrete driveway, 12,000 square feet of 4-inch concrete sidewalk, 4,700 square yards of 3-inch asphalt pavement (Superpave SP-D), 4,700 square yards of 11-inch pavement pulverization, 76 tons of cemlime, and 18 barrier-free ADA ramps. Bidders and their designated subcontractors must be prequalified or have applied for prequalification by the City prior to submitting bids. Prequalification applications must be submitted seven (7) days prior to the bid opening date; for example, applications for bids opening on April 7th must be filed by March 31st. Bidders who fail to meet prequalification requirements at bid opening may have their bids rejected.

The prequalification process establishes a bid limit based on technical evaluation and financial analysis. Applicants must submit audited or reviewed financial statements (including classified balance sheet, income statement, statement of cash flows, statement of retained earnings, and notes), certified organizational documents, a completed prequalification application, the firm's Texas Taxpayer Identification Number, DUNS number, email and fax contact information, and resumes reflecting construction experience of firm principals for initial applicants. Financial statements must be from an independent certified public accounting firm registered with the Texas State Board of Public Accountancy, prepared in U.S. dollars, no more than one year old, and must reflect positive net working capital. Bidding capacity is determined by multiplying positive net working capital by a factor of 10. Applicants must also provide a minimum of five references related to the work and an equipment schedule detailing equipment under contractor control. The City reserves the right to reject, suspend, or modify any prequalification for failure to demonstrate acceptable financial ability or performance.

View the file

Other files

File Type Posted
3-00 61 19 Maintenance Bond.doc DOC document
11-00 35 13 Conflict of Interest Statement.pdf PDF
10-00 61 14 Payment Bond.doc DOC document
7-00 61 13 Performance Bond.doc DOC document
5-00 21 13 Instruction to Bidders.docx DOCX document
12-Project Manual 2026 CDBG Cambell St Improvement Project CPN 107033.pdf PDF
13-Submission Instructions - 26-0338.docx DOCX document
8-00 45 26 Contractor Compliance.doc DOC document
1-00 41 00 Bid Proposal Workbook.xlsx XLSX spreadsheet
4-00 11 13 Invitation to Bidders.docx DOCX document
6-00 45 13 Prequalification Application.doc DOC document
9-00 52 43 Agreement.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 45 11 - 1

BIDDERS PREQUALIFICATIONS

2026 CDBG Campbell Street Improvement Project City Project No. 107033

CITY OF FORT WORTH

STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS

Revised August 13, 2021

1 SECTION 00 45 11

BIDDERS PREQUALIFICATIONS

1. Summary. A Bidder or their designated subcontractors are required to be prequalified or
have applied for prequalification by the City for the work types requiring prequalification
prior to submitting bids. To be considered for award of contract the Bidder must submit
Section 00 45 12, PREQUALIFICATION STATEMENT for the work type(s) listed with
their Bid. Any contractor or subcontractor who is not prequalified for the work type(s) listed
must submit Section 00 45 13, PREQUALIFICATION APPLICATION in accordance with
the requirements below. The information must be submitted seven (7) days prior to the

date of the opening of bids. Subcontractors must follow the same timelines as contractors

for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at
the time bids are opened and reviewed may cause the bid to be rejected.
The prequalification process will establish a bid limit based on a technical evaluation and
financial analysis of the contractor. For example, a contractor wishing to submit bids on
projects to be opened on the 7th of April must file the information by the 31st day of March
in order to eligible to work on these projects. In order to facilitate the approval of a Bidder’s
Prequalification Application, the following must accompany the submission.
a.A complete set of audited or reviewed financial statements.
(1)Classified Balance Sheet
(2)Income Statement
(3)Statement of Cash Flows
(4)Statement of Retained Earnings
(5)Notes to the Financial Statements, if any
b. A certified copy of the firm’s organizational documents (Corporate Charter, Articles
of Incorporation, Articles of Organization, Certificate of Formation, LLC
Regulations, and Certificate of Limited Partnership Agreement).
c.A completed Bidder Prequalification Application.
(1)The firm’s Texas Taxpayer Identification Number as issued by the Texas
Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification
number visit the Texas Comptroller of Public Accounts online at the
following web address www.window.state.tx.us/taxpermit/ and fill out the
application to apply for your Texas tax ID.
(2)The firm’s e-mail address and fax number.
(3)The firm’s DUNS number as issued by Dun & Bradstreet. This number
is used by the City for required reporting on Federal Aid projects. The DUNS
number may be obtained at www.dnb.com.
d. Resumes reflecting the construction experience of the principles of the firm for firms
submitting their initial prequalification. These resumes should include the size and
scope of the work performed.
e.Other information as requested by the City.
2. Prequalification Requirements
a.Financial Statements. Financial statement submission must be provided in
accordance with the following:
(1)The City requires that the original Financial Statement or a certified copy
be submitted for consideration.
(2)To be satisfactory, the financial statements must be audited or reviewed
by an independent, certified public accounting firm registered and in
good standing in any state. Current Texas statues also require that
accounting firms performing audits or reviews on business entities within
the State of Texas be properly licensed or registered with the Texas State
Board of Public Accountancy.
(3)The accounting firm should state in the audit report or review whether
the contractor is an individual, corporation, or limited liability company.
(4)Financial Statements must be presented in U.S. dollars at the current rate
of exchange of the Balance Sheet date.
(5)The City will not recognize any certified public accountant as
independent who is not, in fact, independent.
(6)The accountant’s opinion on the financial statements of the contracting
company should state that the audit or review has been conducted in
accordance with auditing standards generally accepted in the United
States of America. This must be stated in the accounting firm’s opinion.
It should: (1) express an unqualified opinion, or (2) express a qualified
opinion on the statements taken as a whole.
(7)The City reserves the right to require a new statement at any time.
(8)The financial statement must be prepared as of the last day of any month,
not more than one year old and must be on file with the City 16 months
thereafter, in accordance with Paragraph 1.
(9)The City will determine a contractor’s bidding capacity for the purposes
of awarding contracts. Bidding capacity is determined by multiplying the
positive net working capital (working capital = current assets – current
liabilities) by a factor of 10. Only those statements reflecting a positive
net working capital position will be considered satisfactory for
prequalification purposes.
(10) In the case that a bidding date falls within the time a new financial
statement is being prepared, the previous statement shall be updated with
proper verification.
b. Bidder Prequalification Application. A Bidder Prequalification Application must be
submitted along with audited or reviewed financial statements by firms wishing to be
eligible to bid on all classes of construction and maintenance projects. Incomplete

Applications will be rejected.

(1)In those schedules where there is nothing to report, the notation of
“None” or “N/A” should be inserted.
(2)A minimum of five (5) references of related work must be provided.
(3)Submission of an equipment schedule which indicates equipment under
the control of the Contractor and which is related to the type of work for
which the Contactor is seeking prequalification. The schedule must
include the manufacturer, model and general common description of
each piece of equipment. Abbreviations or means of describing
equipment other than provided above will not be accepted.
3. Eligibility for Award of Contract
a.The City shall be the sole judge as to a contractor’s prequalification.
b. The City may reject, suspend, or modify any prequalification for failure by the
contractor to demonstrate acceptable financial ability or performance.
c.The City will issue a letter as to the status of the prequalification approval.
d. If a contractor has a valid prequalification letter, the contractor will be eligible to
perform the prequalified work types until the expiration date stated in the letter.

8 END OF SECTION