2nd_Main_Electirc_Panal.jpeg

JPEG file 355 KB Posted

Attached to
Fountain Pool Pump House Renovation - Rebid
Solicitation number
2026-11
Issued by
Hidalgo County, Texas

About this file

This is an image file depicting an electrical panel labeled "2nd Main Electric Panel" related to the Fountain Pool Pump House Renovation project in Edinburg, Texas. The image shows the electrical infrastructure of the existing pump house structure located at 1227 E McIntyre Street, Edinburg, TX 78541. The photograph documents the current electrical system that will remain in place or require modification as part of the renovation scope, which includes new roofing, structural expansion, demolition work, and updates to both electrical and plumbing systems.

The City of Edinburg is soliciting bids for the Fountain Pool Pump House renovation project and has designated Nicholus Villarreal, Aquatics Manager, as the primary contact for coordinating on-site meetings and obtaining additional project details. Interested bidders should contact Mr. Villarreal at 956-607-2828 or nicvillarreal@cityofedinburg.com to schedule a site visit and review the existing conditions, including the electrical panel and associated infrastructure documented in this image.

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .