2F - Prototype Toilet Shower Bldg Brimley SP 50% Specs Part 2.pdf

PDF 3 MB Posted

Attached to
751/21069. JBB; Twin Lakes SP - Rplc T/S Bldg & Sewage Disp
Solicitation number
RFP 171 210000001707 2
Issued by
Gratiot County, Michigan

About this file

This document is a comprehensive specification manual for the 2020 Brimley State Park Toilet Shower Building Improvements project, prepared by NFE Engineers and TDG Architects for construction in Michigan under local jurisdiction. The project encompasses the design and construction of a new toilet and shower building facility at Brimley State Park, including detailed specifications for site work, utilities, concrete construction, masonry, metals, carpentry, and finish materials. The specifications cover temporary tree and plant protection, structure demolition, facility water distribution piping, sanitary sewers, site clearing, earth moving, asphalt and concrete paving, landscape finishing, cast-in-place concrete with polished finishing, unit masonry with stone veneer, metal fabrications, rough and finish carpentry, and solid surface fabrications such as lavatory tops. The project is identified as project number 751/19154.TAP 5422 and includes detailed technical requirements, material standards, quality assurance procedures, and execution guidelines for all construction components.

The specifications establish comprehensive material requirements aligned with industry standards including ASTM, ACI, AWS, and various state and federal codes. All materials specified are current industry-standard products with quality assurance provisions requiring independent testing agencies, inspector certification, field mock-ups for critical finishes such as polished concrete, and detailed submittals including product data, shop drawings, and sample verification. The document mandates contractor and subcontractor qualifications across multiple trades, with specific certifications required for specialty work such as polished concrete finishing and solid surface fabrications. Environmental and weather-related provisions are integrated throughout, requiring compliance with cold and hot weather construction protocols. Pricing, funding sources, and contract award information are not included in this specification document, as these specifications function as the technical baseline for bidding and construction execution rather than procurement authorization or financial documents.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NFE Engineers - 2020 Brimley State Park Toilet Shower Building Improvements

751/19154.TAP

SECTION 015639 - TEMPORARY TREE AND PLANT PROTECTION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes general protection and pruning of existing trees and plants that are affected by execution of the Work, whether temporary or permanent construction.

B. Related Requirements:

1. Section 015000 "Temporary Facilities and Controls" for temporary site fencing.

2. Section 311000 "Site Clearing" for removing existing trees and shrubs.

1.3 DEFINITIONS

A. Caliper: Diameter of a trunk measured by a diameter tape at a height 6 inches above the ground for trees up to and including 4-inch size at this height and as measured at a height of 12 inches above the ground for trees larger than 4-inch size.

B. Caliper (DBH): Diameter breast height; diameter of a trunk as measured by a diameter tape at a height 54 inches above the ground line for trees with caliper of 8 inches or greater as measured at a height of 12 inches above the ground.

C. Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other vegetation to be protected during construction and indicated on Drawings.

D. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction and defined by a circle concentric with each tree with a radius 1.5 times the diameter of the drip line unless otherwise indicated.

E. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.

1.4 ACTION SUBMITTALS

A. Shop Drawings:

1. Include plans, elevations, sections, and locations of protection-zone fencing and signage, showing relation of equipment-movement routes and material storage locations with protection zones.

% r tree

: Diameter b: Diameter ches above tches above t f 12 inches 12 inches

Des ign r remorem nk measured bnk measured ding 4-inch sding 4-inch larger thlarge

Rev iew ng trees andtrees and nt constructt constru and Contrand Cont ving ving

1/2 6/2 y a diametery a diamete ze at this hee at this he an 4-inch sin 4-inch si t; dd

751/19154.TAP

2. Detail fabrication and assembly of protection-zone fencing and signage.

3. Indicate extent of trenching by hand or with air spade within protection zones.

B. Tree Pruning Schedule: Written schedule detailing scope and extent of pruning of trees to remain that interfere with or are affected by construction.

1. Species and size of tree.

2. Location on site plan. Include unique identifier for each.

3. Reason for pruning.

4. Description of pruning to be performed.

5. Description of maintenance following pruning.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For arborist and tree service firm.

B. Quality-control program.

1.6 QUALITY ASSURANCE

A. Tree Service Firm Qualifications: An experienced tree service firm that has successfully completed temporary tree and plant protection work similar to that required for this Project and that will assign an experienced, qualified arborist to Project site during execution of the Work.

B. Quality-Control Program: Prepare a written program to systematically demonstrate the ability of personnel to properly follow procedures and handle materials and equipment during the Work without damaging trees and plantings. Include dimensioned diagrams for placement of protection zone fencing and signage, the arborist's and tree-service firm's responsibilities, instructions given to workers on the use and care of protection zones, and enforcement of requirements for protection zones.

1.7 FIELD CONDITIONS

A. The following practices are prohibited within protection zones:

1. Storage of construction materials, debris, or excavated material.

2. Moving or parking vehicles or equipment.

3. Foot traffic.

4. Erection of sheds or structures.

5. Impoundment of water.

6. Excavation or other digging unless otherwise indicated.

7. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.

B. Do not direct vehicle or equipment exhaust toward protection zones.

ees aee signage, thsignage, the use and che use and c

Des ign

An experien exper nt protection wt protectio qualified arboualified arb

Prepare a wriPrepare a llow procedullow proc d plantind plan a

1/2 6/2

0ed treed tre work similarork simila rist to Projest to Proje ten programten program ures and hanes and han

gs. Include s. Include st's and st's and i

751/19154.TAP

C. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones and organic mulch.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Protection-Zone Fencing: Fencing fixed in position and meeting one of the following requirements: Previously used materials may be used when approved by Engineer.

1. Plastic Protection-Zone Fencing: Plastic construction fencing constructed of high-density extruded and stretched polyethylene fabric with 2-inch maximum opening in pattern and weighing a minimum of 0.4 lb/ft.; remaining flexible from minus 60 to plus 200 deg F;

inert to most chemicals and acids; minimum tensile yield strength of 2000 psi and ultimate tensile strength of 2680 psi; secured with plastic bands or galvanized-steel or stainless-steel wire ties; and supported by tubular or T-shape galvanized-steel posts spaced not more than 96 inches apart.

a. Height: 48 inches.

b. Color: High-visibility orange, nonfading.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Erosion and Sedimentation Control: Examine the site to verify that temporary erosion- and sedimentation-control measures are in place. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones.

B. Prepare written report, endorsed by arborist, listing conditions detrimental to tree and plant protection.

3.2 PREPARATION

A. Locate and clearly identify trees, shrubs, and other vegetation to remain. Flag each tree trunk at 54 inches above the ground.

B. Protect tree root systems from damage caused by runoff or spillage of noxious materials while mixing, placing, or storing construction materials. Protect root systems from ponding, eroding, or excessive wetting caused by dewatering operations.

3.3 PROTECTION ZONES

A. Protection-Zone Fencing: Install protection-zone fencing along edges of protection zones before materials or equipment are brought on the site and construction operations begin in a manner that

%imentationmentatio

-control mecontrol me n areas or gen areas or ge tten rten r

Des ign ge, non, no

Co

Rev iew maxiax e from mifrom m e yield strenield stren bands or gaands or g e galvanizedalvaniz adinadi

1/2 6/2 l: Examl: Exam in

751/19154.TAP

will prevent people from easily entering protected areas except by entrance gates. Construct fencing so as not to obstruct safe passage or visibility at vehicle intersections where fencing is located adjacent to pedestrian walkways or in close proximity to street intersections, drives, or other vehicular circulation.

1. Posts: Set or drive posts into ground one-third the total height of the fence without concrete footings. Where a post is located on existing paving or concrete to remain, provide appropriate means of post support acceptable to Engineer.

2. Access Gates: Install; adjust to operate smoothly, easily, and quietly; free of binding, warp, excessive deflection, distortion, nonalignment, misplacement, disruption, or malfunction throughout entire operational range. Confirm that latches and locks engage accurately and securely without forcing or binding.

B. Maintain protection zones free of weeds and trash.

C. Maintain protection-zone fencing and signage in good condition as acceptable to Engineer and remove when construction operations are complete and equipment has been removed from the site.

1. Do not remove protection-zone fencing, even temporarily, to allow deliveries or equipment access through the protection zone.

2. Temporary access is permitted subject to preapproval in writing by arborist if a root buffer effective against soil compaction is constructed as directed by arborist. Maintain root buffer so long as access is permitted.

3.4 EXCAVATION

A. General: Excavate at edge of protection zones and for trenches indicated within protection zones according to requirements in Section 312000 "Earth Moving" unless otherwise indicated.

B. Trenching within Protection Zones: Where utility trenches are required within protection zones, excavate under or around tree roots by hand or with air spade, or tunnel under the roots by drilling, auger boring, or pipe jacking. Do not cut main lateral tree roots or taproots; cut only smaller roots that interfere with installation of utilities. Cut roots as required for root pruning. If excavating by hand, use narrow-tine spading forks to comb soil and expose roots.

C. Redirect roots in backfill areas where possible. If encountering large, main lateral roots, expose roots beyond excavation limits as required to bend and redirect them without breaking. If encountered immediately adjacent to location of new construction and redirection is not practical, cut roots approximately 3 inches back from new construction and as required for root pruning.

D. Do not allow exposed roots to dry out before placing permanent backfill. Provide temporary earth cover or pack with peat moss and wrap with burlap. Water and maintain in a moist condition.

Temporarily support and protect roots from damage until they are permanently relocated and covered with soil.

at edget e uirements iirements within Protewithin Pro nder or arnder or ar or por p

Des ign ubject toect to on is construn is constr

ed. d of protof pr S condition ascondition a and equipmeequipm

, even temp, even temp rere

1/2 6/2 pro ed as dird as dir ction zonesion zones 3120031200

751/19154.TAP

3.5 ROOT PRUNING

A. Prune tree roots that are affected by temporary and permanent construction. Prune roots as follows:

1. Cut roots manually by digging a trench and cutting exposed roots with sharp pruning instruments; do not break, tear, chop, or slant the cuts. Do not use a backhoe or other equipment that rips, tears, or pulls roots.

2. Cut Ends: Coat cut ends of roots more than 1-1/2 inches in diameter with an emulsified asphalt or other coating formulated for use on damaged plant tissues and that is acceptable to arborist.

3. Temporarily support and protect roots from damage until they are permanently redirected and covered with soil.

4. Cover exposed roots with burlap and water regularly.

5. Backfill as soon as possible according to requirements in Section 312000 "Earth Moving."

B. Root Pruning at Edge of Protection Zone: Prune tree roots 12 inches outside of the protection zone by cleanly cutting all roots to the depth of the required excavation.

C. Root Pruning within Protection Zone: Clear and excavate by hand or with air spade to the depth of the required excavation to minimize damage to tree root systems. If excavating by hand, use narrow-tine spading forks to comb soil to expose roots. Cleanly cut roots as close to excavation as possible.

3.6 REGRADING

A. Raising Grade: Where new finish grade is indicated above existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone.

3.7 REPAIR AND REPLACEMENT

A. General: Repair or replace trees, shrubs, and other vegetation indicated to remain or to be relocated that are damaged by construction operations, in a manner approved by Engineer.

1. Submit details of proposed pruning and repairs.

2. Perform repairs of damaged trunks, branches, and roots within 24 hours according to arborist's written instructions.

3. Replace trees and other plants that cannot be repaired and restored to full-growth status, as determined by Engineer.

B. Trees: Remove and replace trees indicated to remain that are more than [25] 66 percent dead or in an unhealthy condition before the end of the corrections period or are damaged during construction operations that Engineer determines are incapable of restoring to normal growth pattern.

1. Small Trees: Provide new trees of same size and species as those being replaced for each tree that measures 6 inches or smaller in caliper size.

% on zonn

ND REPLAND REPL

pair air

Des ign m to expoexpo ew finish graw finish . Main. Ma

Rev iew ts in Section Secti e roots 12 inoots 12 required exquired e and excavatand excavat ge to trege to tre e re r

1/2 6/2 ts.

de is indicateis indica in existingn existing

751/19154.TAP

2. Large Trees: Provide two new tree(s) of 6-inch caliper size for each tree being replaced that measures more than 6 inches in caliper size.

a. Species: As selected by Engineer that closely matches the removed tree.

3.8 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Disposal: Remove excess excavated material, displaced trees, trash, and debris and legally dispose of them off Owner's property.

END OF SECTION 015639

% D es ign

R ev

751/19154.TAP

024116 - 1 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

SECTION 024116 - STRUCTURE DEMOLITION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Demolition and removal of buildings and site improvements.

2. Removing below-grade construction.

3. Disconnecting, capping or sealing, and abandoning in-place removing site utilities.

B. Related Requirements:

1. Section 311000 "Site Clearing" for site clearing and removal of above- and below-grade site improvements not part of building demolition.

1.3 DEFINITIONS

A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged.

B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse. Include fasteners or brackets needed for reattachment elsewhere.

1.4 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

% items fromitems fro nd Salvagend Salvage to Owto O

Des ign ng" for site clng" for site rt of building dof building exi improvememproveme abandoningabandonin

1/2 6/2

0earing and earing and demolition. molition.

ng constrg const

751/19154.TAP

024116 - 2 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

1.5 INFORMATIONAL SUBMITTALS

A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection. Indicate proposed locations and construction of barriers.

1. Adjacent Buildings: Detail special measures proposed to protect adjacent buildings to remain.

B. Schedule of Building Demolition Activities: Indicate the following:

1. Detailed sequence of demolition work, with starting and ending dates for each activity.

2. Temporary interruption of utility services.

3. Shutoff and capping or re-routing of utility services.

C. Predemolition Photographs or Video: Show existing conditions of adjoining construction and site improvements, including finish surfaces, that might be misconstrued as damage caused by salvage and demolition operations. Comply with Section 013233 "Photographic Documentation." Submit before the Work begins.

1.6 FIELD CONDITIONS

A. Buildings to be demolished will be vacated and their use discontinued before start of the Work.

B. Buildings immediately adjacent to demolition area will be occupied. Conduct building demolition so operations of occupied buildings will not be disrupted.

1. Provide not less than 72 hours' notice of activities that will affect operations of adjacent occupied buildings.

2. Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.

a. Do not close or obstruct walkways, exits, or other facilities used by occupants of adjacent buildings without written permission from authorities having jurisdiction.

C. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

1. Before building demolition, Owner will remove the following items In subparagraph below, include list of items that will be removed by Owner.

D. Hazardous Materials: Present in buildings and structures to be demolished. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.

1. Hazardous material remediation is specified elsewhere in the Contract Documents.

2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.

% ess thes buildings. uildings.

n access to n access to cent buildingent building

Do nDo n e vacated and vacated an ent to demolitit to dem buildings willbuildings n 72 hon 72 ditions of adjons of ad misconstrueisconstru 3233 "Phot33 "Pho

1/2 6/2

0heir use disheir use di on area will n area will not be disrunot be disru urs' notice os' notice o k

751/19154.TAP

024116 - 3 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

E. On-site storage or sale of removed items or materials is not permitted.

1.7 COORDINATION

A. Arrange demolition schedule so as not to interfere with.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.

2.2 SOIL MATERIALS

A. Satisfactory Soils: Comply with requirements in Section 312000 "Earth Moving."

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting demolition operations.

B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.

C. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during building demolition operations.

D. Steel Tendons: Locate tensioned steel tendons and include recommendations for de-tensioning.

E. Verify that hazardous materials have been remediated before proceeding with building demolition operations.

F. Inventory and record the condition of items to be removed and salvaged.

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Utilities to be Disconnected: Locate, identify, disconnect, and seal or cap off utilities serving buildings and structures to be demolished.

1. Arrange to shut off utilities with utility companies.

% ord al informal inform same as thossame as tho n engineerin engineer ght resught res een disconnecteen disconn

DocumenDocum tionti

Section 312ction 31

6/2 ed and capped and capp s of existinof existin ovided bvided in

751/19154.TAP

024116 - 4 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

2. If removal, relocation, or abandonment of utility services will affect adjacent occupied buildings, then provide temporary utilities that bypass buildings and structures to be demolished and that maintain continuity of service to other buildings and structures.

3. Cut off pipe or conduit a minimum of 24 inches below grade. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing according to requirements of authorities having jurisdiction.

4. Do not start demolition work until utility disconnecting and sealing have been completed and verified in writing.

3.3 PROTECTION

A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilities during demolition operations. Maintain exits from existing buildings.

B. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent unexpected movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of demolition.

C. Existing Utilities to Remain: Maintain utility services to remain and protect from damage during demolition operations.

1. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by Owner and authorities having jurisdiction.

2. Provide temporary services during interruptions to existing utilities, as acceptable to Owner and authorities having jurisdiction.

a. Provide at least 72 hours' notice to occupants of affected buildings if shutdown of service is required during changeover.

D. Temporary Protection: Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction and as indicated. Comply with requirements in Section 015000 "Temporary Facilities and Controls."

1. Protect adjacent buildings and facilities from damage due to demolition activities.

2. Protect existing site improvements, appurtenances, and landscaping to remain.

3. Erect a plainly visible fence around drip line of individual trees or around perimeter drip line of groups of trees to remain.

4. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

5. Provide protection to ensure safe passage of people around building demolition area and to and from occupied portions of adjacent buildings and structures.

E. Remove temporary barriers and protections where hazards no longer exist. Where open excavations or other hazardous conditions remain, leave temporary barriers and protections in place.

%vide at leaide at lea ervice is reqervice is req y ProtectioProtectio agewgew

Des ign utility seity s g utilities servitilities serv by Owner andOwner a services durinservices du ving jurisdicving jur

Rev iew isting ng exterior shexterior s movement orvement o required durrequired du vicvic

1/2 6/2 to ng adjacent g adjacen authorities huthorities h g interruptiointerruptio tion. n.

rs' notirs' noti

751/19154.TAP

024116 - 5 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

3.4 DEMOLITION, GENERAL

A. General: Demolish indicated buildings and site improvements completely. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Do not use cutting torches until work area is cleared of flammable materials. Maintain portable fire-suppression devices during flame-cutting operations.

2. Maintain adequate ventilation when using cutting torches.

3. Locate building demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

B. Site Access and Temporary Controls: Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed trafficways if required by authorities having jurisdiction.

2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations. Do not use water when it may damage adjacent construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.

C. Explosives: Use of explosives is not permitted.

3.5 DEMOLITION BY MECHANICAL MEANS

A. Proceed with demolition of structural framing members systematically, from higher to lower level. Complete building demolition operations above each floor or tier before disturbing supporting members on the next lower level.

B. Remove debris from elevated portions of the building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

1. Remove structural framing members and lower to ground by method suitable to minimize ground impact and dust generation.

C. Salvage: Items to be removed and salvaged are indicated on Drawings.

D. Below-Grade Construction: Demolish foundation walls and other below-grade construction.

1. Remove below-grade construction, including basements, foundation walls, and footings, completely.

E. Existing Utilities: Abandon existing utilities and below-grade utility structures. Cut utilities flush with grade.

F. Existing Utilities: Demolish and remove existing utilities and below-grade utility structures.

%molition omolition ete buildingte building members onmembers ris fris fr

Des ign n r zardousrdou is not permittenot permitte

CHANICALCHANI

t ys, or otherys, or othe d authoritieauthoriti trafficwaysafficway hods to limhods to lim gulationgulation r or o

1/2 6/2 ec d.

MEANS MEANS

al framal fram

751/19154.TAP

024116 - 6 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

3.6 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Do not burn demolished materials.

3.7 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demolition operations. Return adjacent areas to condition existing before building demolition operations began.

1. Clean roadways of debris caused by debris transport.

END OF SECTION 024116

% D es ign

R ev iew irt, and dand on existing existing s transport. ansport.

1/2

751/19154.TAP

221113 - 1 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

SECTION 221113 - FACILITY WATER DISTRIBUTION PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes water-distribution piping and related components outside the building for water service.

B. Utility-furnished products include water meters that will be furnished to the site, ready for installation.

1.3 DEFINITIONS

A. EPDM: Ethylene propylene diene terpolymer rubber.

B. LLDPE: Linear, low-density polyethylene plastic.

C. PA: Polyamide (nylon) plastic.

D. PE: Polyethylene plastic.

E. PP: Polypropylene plastic.

F. PVC: Polyvinyl chloride plastic.

G. RTRF: Reinforced thermosetting resin (fiberglass) fittings.

H. RTRP: Reinforced thermosetting resin (fiberglass) pipe.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings: Detail precast concrete vault assemblies and indicate dimensions, method of field assembly, and components.

1. Wiring Diagrams: Power, signal, and control wiring for alarms.

% on) p ne plastic. ne plastic.

ropylene plopylene p l ne terpolymer terpolyme ty polyethylenty polyethy astic. astic.

ed componecompone s that will hat will

1/2 6/2

0rubber. ubber.

e plastic. e plastic.

751/19154.TAP

221113 - 2 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

1.5 INFORMATIONAL SUBMITTALS

A. Field quality-control test reports.

1.6 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For water valves and specialties to include in emergency, operation, and maintenance manuals.

1.7 QUALITY ASSURANCE

A. Regulatory Requirements:

1. Comply with requirements of utility company supplying water. Include tapping of water mains and backflow prevention.

2. Comply with standards of authorities having jurisdiction for potable-water-service piping, including materials, installation, testing, and disinfection.

3. Comply with standards of authorities having jurisdiction for fire-suppression water-service piping, including materials, hose threads, installation, and testing.

B. Piping materials shall bear label, stamp, or other markings of specified testing agency.

C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

D. Comply with ASTM F 645 for selection, design, and installation of thermoplastic water piping.

E. Comply with FMG's "Approval Guide" or UL's "Fire Protection Equipment Directory" for fire-service-main products.

F. NFPA Compliance: Comply with NFPA 24 for materials, installations, tests, flushing, and valve and hydrant supervision for fire-service-main piping for fire suppression.

1. Potable-water piping and components shall comply with NSF 14, NSF 61, and NSF

372. Include marking "NSF-pw" on piping..

1.8 DELIVERY, STORAGE, AND HANDLING

A. Preparation for Transport: Prepare valves, including fire hydrants, according to the following:

1. Ensure that valves are dry and internally protected against rust and corrosion.

2. Protect valves against damage to threaded ends and flange faces.

3. Set valves in best position for handling. Set valves closed to prevent rattling.

B. During Storage: Use precautions for valves, including fire hydrants, according to the following:

1. Do not remove end protectors unless necessary for inspection; then reinstall for storage.

% M F 64F

FMG's "AppFMG's "App n products. n product pliancplianc

Des ign mp, or other m or othe s, and Accessand Acces ency acceptabcy accept

5 for sel5 for s plying wateying wate jurisdictionrisdiction nd disinfectdisinfec aving jurisdiaving jurisd ds, installds, instal

1/2 6/2

0arkingskings ories: Listedies: Listed e to authorito author ction, desigtion, desig

" o

751/19154.TAP

221113 - 3 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

2. Protect from weather. Store indoors and maintain temperature higher than ambient dew-point temperature. Support off the ground or pavement in watertight enclosures when outdoor storage is necessary.

C. Handling: Use sling to handle valves and fire hydrants if size requires handling by crane or lift.

Rig valves to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.

D. Deliver piping with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe-end damage and to prevent entrance of dirt, debris, and moisture.

E. Protect stored piping from moisture and dirt. Elevate above grade. Do not exceed structural capacity of floor when storing inside.

F. Protect flanges, fittings, and specialties from moisture and dirt.

G. Store plastic piping protected from direct sunlight. Support to prevent sagging and bending.

1.9 PROJECT CONDITIONS

A. Interruption of Existing Water-Distribution Service: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary water-distribution service according to requirements indicated:

1. Notify Engineer Owner no fewer than Insert number days in advance of proposed interruption of service.

2. Do not proceed with interruption of water-distribution service without Engineer's written permission.

1.10 COORDINATION

A. Coordinate connection to water main with utility company.

PART 2 - PRODUCTS

2.1 PIPING MATERIALS

A. Comply with requirements in "Piping Application" Article for applications of pipe, tube, fitting materials, and joining methods for specific services, service locations, and pipe sizes.

B. Potable-water piping and components shall comply with NSF 14, NSF 61, and NSF 372. Include marking "NSF-pw" on piping.

2.2 COPPER TUBE AND FITTINGS

A. Soft Copper Tube: ASTM B 88, Type K and ASTM B 88, Type L, water tube, annealed temper.

ATION ATION

onneonne

Des ign ion Sern Se under the folder the f bution service ution servic ner no fewer r no few ice. ice.

ith interruptith inte

Rev iew dirt.

pport to preort to pr ce:ce

1/2 6/2

0wing cowing c according toccording t than Inserthan Insert on of watern of wate

751/19154.TAP

221113 - 4 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

1. Copper, Solder-Joint Fittings: ASME B16.18, cast-copper-alloy or ASME B16.22, wrought-copper, solder-joint pressure type. Furnish only wrought-copper fittings if indicated.

B. Hard Copper Tube: ASTM B 88, Type K and ASTM B 88, Type L, water tube, drawn temper.

1. Copper, Solder-Joint Fittings: ASME B16.18, cast-copper-alloy or ASME B16.22, wrought-copper, solder-joint pressure type. Furnish only wrought-copper fittings if indicated.

C. Bronze Flanges: ASME B16.24, Class 150, with solder-joint end. Furnish Class 300 flanges if required to match piping.

D. Copper Unions:

1. MSS SP-123.

2. Cast-copper-alloy, hexagonal-stock body.

3. Ball-and-socket, metal-to-metal seating surfaces.

4. Solder-joint or threaded ends.

E. Copper, Brass or Bronze, Pressure-Seal-Joint Fittings:

1. Fittings: Cast-brass, cast-bronze, or wrought-copper with EPDM O-ring seal in each end.

Sizes NPS 2-1/2 and larger with stainless steel grip ring and EPDM O-ring seal.

2. Minimum 200-psig working-pressure rating at 250 deg F .

2.3 PE PIPE AND FITTINGS

A. PE, ASTM Pipe: ASTM D 2239, SIDR No. 5.3, 7, or 9; with PE compound number required to give pressure rating not less than 160 psig.

1. Insert Fittings for PE Pipe: ASTM D 2609, made of PA, PP, or PVC with serrated male insert ends matching inside of pipe. Include bands or crimp rings.

2. Molded PE Fittings: ASTM D 3350, PE resin, socket- or butt-fusion type, made to match PE pipe dimensions and class.

2.4 JOINING MATERIALS

A. Refer to Section 330500 "Common Work Results for Utilities" for commonly used joining materials.

B. Brazing Filler Metals: AWS A5.8, BCuP Series.

C. Bonding Adhesive for Fiberglass Piping: As recommended by fiberglass piping manufacturer.

D. Plastic Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated.

%ASTM D ASTM D

rating not leating not le ert Fittingsrt Fittings ends nds

Des ign in ze, or wroug or wrou with stainless with stainle king-pressure rg-pressure

GS GS

aces. s.

Fittings:Fittings:

1/2 6/2

0-coppercopper steel grip riteel grip r ating at 250ng at 25

DR NoDR No i

751/19154.TAP

221113 - 5 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

2.5 CURB VALVES

A. Curb Valves: Comply with AWWA C800. Include bronze body, ground-key plug or ball, and wide tee head, with inlet and outlet matching service piping material.

B. Service Boxes for Curb Valves: Similar to AWWA M44 requirements for cast-iron valve boxes.

Include cast-iron telescoping top section of length required for depth of burial of valve, plug with lettering "WATER," and bottom section with base that fits over curb valve and with a barrel approximately 3 inches in diameter.

1. Shutoff Rods: Steel, tee-handle with one pointed end, stem of length to operate deepest buried valve, and slotted end matching curb valve.

PART 3 - EXECUTION

3.1 EARTHWORK

A. Refer to Section 312000 "Earth Moving" for excavating, trenching, and backfilling.

3.2 PIPING APPLICATIONS

A. General: Use pipe, fittings, and joining methods for piping systems according to the following applications.

B. Transition couplings and special fittings with pressure ratings at least equal to piping pressure rating may be used, unless otherwise indicated.

C. Do not use flanges or unions for underground piping.

D. Flanges, unions, grooved-end-pipe couplings, and special fittings may be used, instead of joints indicated, on aboveground piping and piping in vaults.

E. Underground water-service piping NPS 3/4 to NPS 3 shall be any of the following:

1. Soft copper tube, ASTM B 88, Type K ASTM B 88, Type L; wrought-copper, solder-joint fittings; and brazed copper, pressure-seal fittings; and pressure-sealed joints.

2. PE, ASTM pipe; molded PE fittings; and heat-fusion joints.

3.3 VALVE APPLICATIONS

A. General Application: Use mechanical-joint-end valves for NPS 3 and larger underground installation. Use threaded- or flanged-end valves for installation in vaults. Use UL/FMG, nonrising-stem gate valves for installation with indicator posts. Use corporation valves and curb valves with ends compatible with piping, for NPS 2 and smaller installation.

B. Drawings indicate valve types to be used. Where specific valve types are not indicated, the following requirements apply:

% unlesun nges or unionges or unio nions, groonions, gro n abovn abo d joining methoining meth d special fittid special f otherwiother excavating, excavating, 6/2

0ods for pipinds for pipin ngs with pregs with pre se indicatedindicated gro

751/19154.TAP

221113 - 6 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

1. Underground Valves, NPS 3 and Larger: AWWA, cast-iron, nonrising-stem, metal-seated gate valves with valve box.

3.4 PIPING INSTALLATION

A. Water-Main Connection: Arrange with utility company for tap of size and in location indicated in water main.

B. Water-Main Connection: Tap water main according to requirements of water utility company and of size and in location indicated.

C. Make connections larger than NPS 2 with tapping machine according to the following:

1. Install tapping sleeve and tapping valve according to MSS SP-60.

2. Install tapping sleeve on pipe to be tapped. Position flanged outlet for gate valve.

3. Use tapping machine compatible with valve and tapping sleeve; cut hole in main. Remove tapping machine and connect water-service piping.

4. Install gate valve onto tapping sleeve. Comply with MSS SP-60. Install valve with stem pointing up and with valve box.

D. Make connections NPS 2 and smaller with drilling machine according to the following:

1. Install service-saddle assemblies and corporation valves in size, quantity, and arrangement required by utility company standards.

2. Install service-saddle assemblies on water-service pipe to be tapped. Position outlets for corporation valves.

3. Use drilling machine compatible with service-saddle assemblies and corporation valves.

Drill hole in main. Remove drilling machine and connect water-service piping.

4. Install corporation valves into service-saddle assemblies.

5. Install manifold for multiple taps in water main.

6. Install curb valve in water-service piping with head pointing up and with service box.

E. Install PE pipe according to ASTM D 2774 and ASTM F 645.

F. Install piping by tunneling or jacking, or combination of both, under streets and other obstructions that cannot be disturbed.

G. Extend water-service piping and connect to water-supply source and building-water-piping systems at outside face of building wall in locations and pipe sizes indicated.

1. Terminate water-service piping at building wall until building-water-piping systems are installed. Terminate piping with caps, plugs, or flanges as required for piping material.

Make connections to building-water-piping systems when those systems are installed.

H. Install underground piping with restrained joints at horizontal and vertical changes in direction.

Use restrained-joint piping, thrust blocks, anchors, tie-rods and clamps, and other supports.

main. ma poration vaoration v manifold formanifold for all curb valvll curb va pe ace ac

Des ign ith drilh dri blies and corplies and co any standards. y standards assemblies onsemblies hine compatihine com RemoveRemo

Rev iew

MSS SP-6SS SP

n flanged ouflanged ou d tapping sleapping s piping. ing.

omply with ply with ngng

1/2 6/2

0oration valvration val water-serviwater-servi ble with sere with se drilling macilling mac servicservic

751/19154.TAP

221113 - 7 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

3.5 JOINT CONSTRUCTION

A. See Section 330500 "Common Work Results for Utilities" for basic piping joint construction.

B. Make pipe joints according to the following:

1. Copper-Tubing, Pressure-Sealed Joints: Join copper tube and pressure-seal fittings with tools and procedures recommended by pressure-seal-fitting manufacturer. Leave insertion marks on pipe after assembly.

2. PE Piping Insert-Fitting Joints: Use plastic insert fittings and fasteners according to fitting manufacturer's written instructions.

3. Install dielectric fittings in piping at connections of dissimilar metal piping and tubing.

a. Dielectric Fittings for NPS 2 and Smaller: Use dielectric nipples unions.

b. Dielectric Fittings for NPS 2-1/2 to NPS 4: Use dielectric flanges flange kits nipples.

3.6 ANCHORAGE INSTALLATION

A. Anchorage, General: Install water-distribution piping with restrained joints. Anchorages and restrained-joint types that may be used include the following:

1. Concrete thrust blocks.

2. Locking mechanical joints.

3. Set-screw mechanical retainer glands.

4. Bolted flanged joints.

5. Heat-fused joints.

6. Pipe clamps and tie rods.

B. Install anchorages for tees, plugs and caps, bends, crosses, valves, and hydrant branches. Include anchorages for the following piping systems:

3.7 VALVE INSTALLATION

A. AWWA Gate Valves: Comply with AWWA C600 and AWWA M44. Install each underground valve with stem pointing up and with valve box.

B. AWWA Valves Other Than Gate Valves: Comply with AWWA C600 and AWWA M44.

C. UL/FMG, Valves Other Than Gate Valves: Comply with NFPA 24.

D. MSS Valves: Install as component of connected piping system.

3.8 WATER METER INSTALLATION

A. Install water meters, piping, and specialties according to utility company's written instructions.

%s for tees, s for tees r the followithe followi

STALTAL

Des ign u tainer glands. ner glands.

ie rods. ie rods.

Rev iew electrctr e dielectricielectri on piping won piping w e the folle the foll

1/2 6/2 d caps, d caps, t

751/19154.TAP

221113 - 8 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

3.9 ROUGHING-IN FOR WATER METERS

A. Rough-in piping and specialties for water meter installation according to utility company's written instructions.

3.10 CONNECTIONS

A. Connect water-distribution piping to existing water main.

B. Connect water-distribution piping to interior domestic water piping.

C. Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems."

D. Connect wiring according to Section 260519 "Low-Voltage Electrical Power Conductors and Cables."

3.11 FIELD QUALITY CONTROL

A. Piping Tests: Conduct piping tests before joints are covered and after concrete thrust blocks have hardened sufficiently. Fill pipeline 24 hours before testing and apply test pressure to stabilize system. Use only potable water.

B. Hydrostatic Tests: Test at not less than one-and-one-half times working pressure for two hours.

1. Increase pressure in 50-psig increments and inspect each joint between increments. Hold at test pressure for 1 hour; decrease to 0 psig . Slowly increase again to test pressure and hold for 1 more hour. Maximum allowable leakage is 2 quarts per hour per 100 joints.

Remake leaking joints with new materials and repeat test until leakage is within allowed limits.

C. Prepare reports of testing activities.

3.12 IDENTIFICATION

A. Install continuous underground detectable warning tape during backfilling of trench for underground water-distribution piping. Locate below finished grade, directly over piping.

Underground warning tapes are specified in Section 312000 "Earth Moving."

3.13 CLEANING

A. Clean and disinfect water-distribution piping as follows:

1. Purge new water-distribution piping systems and parts of existing systems that have been altered, extended, or repaired before use.

2. Use purging and disinfecting procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described in re fore more houmore ho leaking joileaking joi orts ofrts o

Des ign e jointoin 4 hours befhours b t less than oneess than o in 50-psig inin 50-psig 1 hour; d1 hou

M tage Electrge Electr are care

1/2 6/2

0e testintestin

-and-one-haand-one-ha crements anrements an ecrease to 0crease to 0 mum allmum all m

751/19154.TAP

221113 - 9 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any other project.(4931)

NFPA 24 for flushing of piping. Flush piping system with clean, potable water until dirty water does not appear at points of outlet.

3. Use purging and disinfecting procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described in AWWA C651 or do as follows:

a. Fill system or part of system with water/chlorine solution containing at least 50 ppm of chlorine; isolate and allow to stand for 24 hours.

b. Drain system or part of system of previous solution and refill with water/chlorine solution containing at least 200 ppm of chlorine; isolate and allow to stand for 3 hours.

c. After standing time, flush system with clean, potable water until no chlorine remains in water coming from system.

d. Submit water samples in sterile bottles to authorities having jurisdiction. Repeat procedure if biological examination shows evidence of contamination.

B. Prepare reports of purging and disinfecting activities.

END OF SECTION 221113

% D es ign

R ev iew orities es idence of cnce of

1/2

751/19154.TAP

221313 - 1 Copyright © 2018 by the American Institute of Engineers. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Nowak & Fraus Enginneers" for "Brimley State Park TS Buildings". A valid, current MasterSpec license is required for editing: and use of this document for any…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .