1-Solomon Creek Stream Side Cleanup - Plan Set.pdf

PDF 4 MB Posted

Attached to
Solomon Creek Stream Side Cleanup
Solicitation number
US.191457
Issued by
Luzerne County, Arona Borough, Pennsylvania

View the file

Other files

File Type Posted
3-Bid Tab Pennbid.pdf PDF
2-Project Manual 2025-07-09.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING TITLE & PROJECT NAME DRAWN BY

DATE

PROJECT NUMBER

DRAWING NUMBER

Z:\Project Files\GA-HZ\HANTWP\31749 - 2025 Hanover Twp General Engineering\200-001 Solomon Creek Debris Cleanup\02-CADD\SHEET\Location Map.dwg C100

31749 / 200-001

4/4/2025

EDT

HANOVER TOWNSHIP, LUZERNE COUNTY

SOLOMON CREEK VEGETATION

TRIMMING AND CLEARING PROJECT

LOCATION MAP

PROJECT

LOCATION

FELLOWS AVE

SANS SOUCI PKWY

ST MARY'S WAY

ST MARY'S W

AY

SANS SOUCI P

ARKWAY

0+00 1+00

2+00 3+00

4+00 5+00

6+00 7+00

8+00

9+

+00

+00

+00

+00

+00

+00

+00

+00

+00

+00

+00

+0021

+39

PROJECT NUMBER

DRAWN BY

DR

AW

IN

G

TI

TL

E

PR

OJ

EC

T

NA

ME

CHECKED BY

DATE

DRAWING NUMBER

Z:

\P ro je ct F ile s\

G A

-H Z\

H A

N

TW

P\

- 2

H an ov er T w p

G en er al

E ng in ee rin g\

0-

So lo m on

C re ek D eb ris

C le an up

\0 2-

C A

D D

\S H

EE

T\

C -B

A

SE

.d w g

- 9

/1 3/

:0

PM

C201 31749

5/25/2025

LSS

EDT

HA

NO

VE

R

TO

W

NS

HI

P, L

UZ

ER

NE

C

OU

NT

Y

SO

LO

M

ON

C

RE

EK

S

TR

EA

M

SI

DE

CL

EA

NU

P

PR

OJ

EC

T

PL

AN

0' 200' 400' 600'

APPROX STREAM SIDE

CLEANUP EXTENTS

GENERAL NOTES

1. SEE DETAIL FOR MORE INFORMATION ON THE TYPE OF

THE TYPE OF WORK INCLUDED IN THE STREAMSIDE

CLEANUP.

2. THE GENERAL PLAN AND TYPICAL SECTIONS

DEPICT THE GENERAL LAYOUT, LENGTH, SCOPE

AND LIMITS OF WORK. THEY MAY NOT INDICATE

ALL SITE SPECIFIC CONDITIONS THAT WILL NEED

TO BE ADDRESSED ON AN INDIVIDUAL BASIS

DURING CONSTRUCTION. CONTRACTOR SHALL BE

RESPONSIBLE TO THOROUGHLY EXAMINE ALL

EXISTING CONDITIONS OF THE VARIOUS SITES

PRIOR TO SUBMITTING A BID SO AS TO IDENTIFY

ANY SITE SPECIFIC CONDITIONS THAT MAY AFFECT

HIS BID.

3. CONTRACTOR SHALL BRING TO THE ATTENTION OF

THE ENGINEER ANY SITE SPECIFIC CONDITION

THAT MAY REQUIRE SPECIAL ATTENTION DURING

CONSTRUCTION PRIOR TO THE COMMENCEMENT

OF WORK.

4. THE CONTRACTOR WILL BE RESPONSIBLE TO

CONTACT THE PENNSYLVANIA ONE-CALL NUMBER

AT 1-800-242-1776 NOT LESS THAN THREE (3), NOR

MORE THAN TEN (10) WORKING DAYS PRIOR TO

THE START OF WORK TO HAVE ALL UTILITIES

MARKED IN THE AREAS OF WORK.

5. IN ADDITION TO THE CONTRACT DOCUMENTS, THIS

PROJECT SHALL BE CONSTRUCTED IN

ACCORDANCE WITH PENNDOT SPECIFICATIONS

PUBLICATION 408 AND PENNDOT STANDARDS FOR

ROADWAY CONSTRUCTION, LATEST EDITIONS,

UNLESS OTHERWISE NOTED, SPECIFIED, OR

DIRECTED.

6. MAINTENANCE AND PROTECTION OF TRAFFIC

SHALL BE IN ACCORDANCE WITH PENNDOT

PUBLICATIONS 212, 213 AND 236, LATEST EDITION.

7. TRAFFIC CONTROL DEVICES SHALL BE IN

ACCORDANCE WITH PENNDOT PUBLICATION 212,

OFFICIAL TRAFFIC CONTROL DEVICES, LATEST

EDITION.

8. DISTURBANCE IS NOT ANTICIPATED FOR THIS

PROJECT. HOWEVER, IF THE CONTRACTOR DOES

DISTURBED A PORTION OF THE STREAM AIDE THEN

THE CONTRACTOR SHALL STABILIZE ANY

DISTURBED PORTIONS OF THE STREAM BANK

WITH:

- SEED MIXTURE:ERNMX-137, SPECIALIZED

WETLAND MIX FOR SHADED OBL-FACW AREAS

- EROSION FABRIC: COCONUT COIR MATTING,

SC-125BN OR EQUIVALENT

C900 31749 / 200-001

5/5/2025

EDT

HANOVER TOWNSHIP, LUZERNE COUNTY

STREAMSIDE CLEANUP

CONSTRUCTION DETAIL

STREAM SIDE CLEANUP DETAIL

STREAM SIDE CLEANUP SEE

NOTES BELOW

TOP OF BANK

DRAWING TITLE & PROJECT NAME DRAWN BY

DATE

PROJECT NUMBER

DRAWING NUMBER

Z:\Project Files\GA-HZ\HANTWP\31749 - 2025 Hanover Twp General Engineering\200-001 Solomon Creek Debris Cleanup\02-CADD\SHEET\Construction Details.dwg

WATER ELEVATION

Notes:

1. Remove all sediment, sticks, logs and all dead organic debris

2. Remove all deadwood within living trees and remove dead trees in their entirety (stumps to be left in place).

3. Properly dispose of all removed material off-site in accordance with applicable regulations. Leave the site clean and stable.

4. All herbaceous vegetation, shrubbery and existing ground cover vegetation to be left in place.

SOLOMON CREEK

4 Location Map-Layout1
Sheets and Views
Layout1
5 C-BASE-C201
Sheets and Views
C201
6 Construction Details-C900
Sheets and Views
C900

File details come from the government source that posted it. Updated .