2a. 52-D-6907_Engineering Change Order_21 Sheets.pdf
PDF 8 MB Posted
- Attached to
- Heavy Weight Fairlead Beam Assemblies
- Solicitation number
- FA481925Q0017
About this file
This is an Engineering Change Order (ECO) document for the Arresting Gear Fairlead Beam 3-Sheaves, consisting of 21 detailed technical drawing sheets. The ECO covers modifications to the fairlead beam design, including changes to various components such as plates, stiffeners, hand hole covers, and gussets. Key changes include:
The document provides detailed technical specifications for multiple parts, with precise dimensional changes and material requirements. Specific modifications include adjustments to plate thicknesses, hole configurations, and structural elements of the fairlead beam assembly. The drawings use ASTM A36 hot-rolled steel plate for various components and include detailed geometric specifications for each part, with notes on welding requirements, component orientations, and structural details.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FairleadBeamDrawings
File details come from the government source that posted it. Updated .