296-20251029162543 BSPC.pdf
PDF 92 KB Posted
- Attached to
- 296-20251029162543 BSPC
- Solicitation number
- 3170034201
- Issued by
- Bolivar County, Mississippi
About this file
Contract Opportunity Summary
This is a Notice to Contractors issued jointly by the Office of State Aid Road Construction (OSARC) and the Panola County Board of Supervisors for a roadway and bridge construction project. The project involves construction of 0.029 miles of box bridge and approaches on Tocowa Road (Muggy Hill Road) as Local System Bridge Program (LSBP) Project No. LSBP-54(33) in Panola County, Mississippi. The scope includes roadway items such as mobilization, clearing and grubbing, removal of a precast bridge, asphalt removal, excavation work, geotextile fabric stabilization, temporary stream diversion, and crushed stone placement; erosion control items including commercial fertilizer, seeding, vegetative mulch, excelsior blankets, temporary silt fence, wattles, loose riprap, and geotextile materials; and box bridge items consisting of 322 cubic yards of box bridge concrete and 54,299 pounds of reinforcement. Sealed bids will be received at the Panola County Courthouse, 151 Public Square, Batesville, Mississippi 38606 until 10:30 AM on December 5, 2025, with bids to be publicly opened shortly thereafter. The contract term is 120 working days, and award will be made to the lowest qualified bidder based on published quantities.
Bidders must submit either paper bids or electronic bids through www.centralbidding.com in portable document format (PDF), with each proposal accompanied by a certified check or bid bond equal to five percent of the total bid amount, payable to Panola County and the State of Mississippi. Proposals accompanied by qualifying letters regarding bid conditions will be considered irregular and rejected. Plans and specifications are available in the Office of the Chancery Clerk of Panola County (contact: Tri Vaughan), the LSBP Engineer's office, and the Office of the State Aid Engineer at 412 E. Woodrow Wilson Avenue, Jackson, Mississippi. The project shall be constructed in accordance with the latest edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction. The Board of Supervisors affirms its commitment to affirmative action, ensuring that minority business enterprises receive full opportunity to submit bids without discrimination based on race, color, or national origin. The notice was published on November 5, 2025 and November 12, 2025.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 6.24.25
NOTICE TO CONTRACTORS:
ROADWAY ITEMS:
1.000 LS
1.000 LS
1.000 UN
127.000 SY
956.000 CY
328.000 CY
1,119.000 CY
474.000 SY
1.000 EA
133.000 TON
320.000 TON
10.000 EA
1.000 LS
0.000 SF
EROSION CONTROL ITEMS:
0.071 TON
0.188 AC
0.376 TON
666.000 SY
801.000 LF
40.000 LF
294.000 TON
465.000 SY
BOX BRIDGE ITEMS:
322.000 CY
54,299.000 LB
LSBP-54(33)
COUNTY
PROJECT NO.
Panola
WATTLES, 20"
LOOSE RIPRAP, 300 LB.
GEOTEXTILE UNDER RIPRAP, TYPE V, NON-WOVEN, AOS < 0.43mm
BOX BRIDGE CONCRETE, CLASS BB
REINFORCEMENT
COMMERCIAL FERTILIZER (13:13:13)
SEEDING
VEGETATIVE MATERIALS FOR MULCH
EXCELSIOR BLANKET
TEMPORARY SILT FENCE (TYPE I) (AOS 0.15mm - 0.84mm)
CRUSHED STONE (SIZE 610)
CRUSHED STONE (SIZE 57)
RIGHT-OF-WAY MARKERS (TYPE II)
MAINTENANCE OF TRAFFIC
ADDITIONAL CONSTRUCTION SIGNS
UNCLASSIFIED EXCAVATION (F.M.)
BORROW EXCAVATION (F.M.E.) (CONTRACTOR FURNISHED) (CLASS 9)
STRUCTURE EXCAVATION
GEOTEXTILE FABRIC STABILIZATION, TYPE III, NON-WOVEN, AOS < 0.43mm
TEMPORARY STREAM DIVERSION
Sealed bids will be received by the Board of Supervisors of Panola County Mississippi at the Panola County Courthouse, 151 Public Square Batesville, Mississippi 38606 until 10:30 AM on the 5th day of December 2025 and shortly thereafter publicly opened for the construction of
0.029 miles of BOX BRIDGE and APPROACHES on the Tocowa Road A.K.A Muggy Hill Road being known as Local System Bridge Program (LSBP) Project No. LSBP-54(33) in Panola County Mississippi.
MOBILIZATION
CLEARING AND GRUBBING
REMOVAL OF PRECAST BRIDGE @ STA. 49+43.00
REMOVAL OF ASPHALT (ALL DEPTHS)
SECTION 900
OFFICE OF STATE AID ROAD CONSTRUCTION (OSARC)
AND
COUNTY BOARD OF SUPERVISORS
Printed 10/29/2025 @ 4:26 PM Page 1 of 2 LSBP-54(33)
Version 6.24.25
NOTICE TO CONTRACTORS:
CONTRACT TIME: 120 Working Days
For electronic delivery, bids must be submitted at www.centralbidding.com. All electronic bids must be submitted in portable delivery format (PDF) and must contain the same information, forms and bid security as required for paper bids. For any questions regarding the electronic bidding process, please call Central Bidding at 225-810-4814.
Certified check or bid bond for five percent (5%) of the total bid, made payable to Panola County and the State of Mississippi must accompany each proposal.
Bidders are hereby notified that any proposal accompanied by letters qualifying in any manner the condition under which the proposal is tendered will be considered an irregular bid and such proposal will not be considered in making the award.
Cole Flint, President Panola County Board of Supervisors
The award, if made, will be made to the lowest qualified bidder on the basis of published quantities.
The Board of Supervisors hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement; minority business enterprise will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
PLANS AND SPECIFICATIONS are on file in the Office of the Chancery Clerk of Panola County, Tri Vaughan , the LSBP Engineer's office and the Office of the State Aid Engineer, 412 E. Woodrow Wilson Avenue, Jackson, Mississippi. This project shall be constructed in accordance with the latest edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction.
Printed 10/29/2025 @ 4:26 PM Page 2 of 2 LSBP-54(33)
Published: November 5, 2025 November 12, 2025
File details come from the government source that posted it. Updated .