About this file
This document is a Notice to Contractors for a State Aid Bridge Program (SABP) project issued by the Bolivar County Board of Supervisors and the Office of State Aid Road Construction (OSARC) in Mississippi. The project involves constructing 0.103 miles of bridge and approaches on Litton Road, designated as Project No. SABP-06(01), with sealed bids to be received until 10:00 AM on June 26, 2025, at the Bolivar County Courthouse Annex. The contract includes multiple roadway, erosion control, and bridge items such as mobilization, clearing and grubbing, excavation, hot mix asphalt, guardrails, traffic markers, seeding, riprap, and precast concrete slab units. The contract time is specified as 120 working days.
The project will be awarded to the lowest qualified bidder based on published quantities, with a 5% bid bond or certified check required. The Board of Supervisors affirms a commitment to minority business enterprise opportunities and non-discrimination. Plans and specifications are available electronically and at specified offices, and the project will be constructed according to the latest edition of Mississippi Standard Specifications for State Aid Road and Bridge Construction. Electronic bids must be submitted through www.centralbidding.com in PDF format, with bidders advised that proposals accompanied by qualifying letters will be considered irregular and may be disqualified.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 5.5.25
NOTICE TO CONTRACTORS:
ROADWAY ITEMS:
1.000 LS
1.000 LS
1.000 UN
512.000 CY
260.000 CY
732.000 TON
120.000 TON
221.000 TON
40.000 LF
425.000 LF
4.000 EA
4.000 EA
4.000 EA
1.000 LS
0.000 SF
0.206 MI
0.103 MI
7.000 EA
4.000 EA
EROSION CONTROL ITEMS:
0.338 TON
0.901 AC
1.802 TON
1,759.000 LF
120.000 LF
84.000 TON
133.000 SY
BRIDGE ITEMS:
2.000 EA
0.000 EA
SECTION 900
OFFICE OF STATE AID ROAD CONSTRUCTION (OSARC)
AND
COUNTY BOARD OF SUPERVISORS
Sealed bids will be received by the Board of Supervisors of Bolivar County, Mississippi at the Bolivar County Courthouse Annex, 200 South Court Street Cleveland, Mississippi 38732 until 10:00 AM on the 26th day of June 2025 and shortly thereafter publicly opened for the construction of
0.103 miles of BRIDGE and APPROACHES on the Litton Road being known as State Aid Bridge Program (SABP) Project No. SABP-06(01) in Bolivar County Mississippi.
MOBILIZATION
CLEARING AND GRUBBING
REMOVAL OF PRECAST BRIDGE @ STA. 81+11.82
UNCLASSIFIED EXCAVATION (FM)
EXCESS EXCAVATION
CRUSHED STONE, SIZE #610
HOT MIX ASPHALT, ST 12.5mm HOT MIX ASPHALT, ST 19mm
18" REINFORCED CONCRETE PIPE, CLASS III
GUARD RAIL, W-BEAM
GUARD RAIL, BRIDGE END SECTION, TYPE "I" THRIE
GUARD RAIL, TERMINAL END SECTION
RIGHT-OF-WAY MARKERS (TYPE II)
MAINTENANCE OF TRAFFIC
ADDITIONAL CONSTRUCTION SIGNS
4" WIDE THERMOPLASTIC EDGE STRIPE (CONTINUOUS WHITE) (60 MILS)
4" WIDE THERMOPLASTIC TRAFFIC STRIPE (SKIP YELLOW) (90 MILS)
TWO-WAY YELLOW REFLECTIVE HIGH PERFORMANCE RAISED MARKERS
REFLECTORIZED TRAFFIC OBJECT MARKER (ENCAPSULATED LENS) (TYPE III)
COMMERCIAL FERTILIZER (13:13:13)
SEEDING
VEGETATIVE MATERIALS FOR MULCH
TEMPORARY SILT FENCE (TYPE II) (AOS 0.15-0.84)
WATTLES, 20"
LOOSE RIPRAP, 300 LB.
GEOTEXTILE UNDER RIPRAP, TYPE V, AOS <0.43, NON-WOVEN
TEST PILE
CONVENTIONAL STATIC PILE LOAD TEST
Printed 5/21/2025 @ 4:57 PM Page 1 of 3 SABP-06(01)
800.000 LF
200.000 LF
49.400 CY
9,258.000 LB
8.000 EA
4.000 EA
4.000 EA
2.000 EA
4.000 EA
2.000 EA
156.000 LF
88.000 TON
140.000 SY
SABP-06(01)
COUNTY
NOTICE TO CONTRACTORS:
CONTRACT TIME: 120 Working Days
18" PRESTRESSED CONCRETE PILING
24" PRE-FORMED PILE HOLES
BRIDGE CONCRETE, CLASS A
REINFORCEMENT
19 ' PRECAST CONCRETE SLAB UNIT, 3.5' INTERIOR
19 ' PRECAST CONCRETE SLAB UNIT, 4.5' INTERIOR
40' PRECAST CONCRETE SLAB UNIT, 3.5' INTERIOR
40' PRECAST CONCRETE SLAB UNIT, 4.5' INTERIOR
19 ' PRECAST CONCRETE SLAB UNIT, 3.5' EXTERIOR
40' PRECAST CONCRETE SLAB UNIT, 3.5' EXTERIOR
PRECAST CONCRETE BARRIER RAIL
LOOSE RIPRAP, 300 LB.
GEOTEXTILE UNDER RIPRAP, TYPE V, AOS <0.43, NON-WOVEN
PROJECT NO.
Bolivar
The award, if made, will be made to the lowest qualified bidder on the basis of published quantities.
The Board of Supervisors hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement; minority business enterprise will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
PLANS AND SPECIFICATIONS are on file in the Office of the Chancery Clerk of Bolivar County, Tri Vaughan , the LSBP Engineer's office and the Office of the State Aid Engineer, 412 E. Woodrow Wilson Avenue, Jackson, Mississippi. This project shall be constructed in accordance with the latest edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction.
For electronic delivery, bids must be submitted at www.centralbidding.com. All electronic bids must be submitted in portable electronic format (PDF) and must contain the same information, forms, and bid security as required for paper bids. For any questions relating to the electronic bidding process, please call Central Bidding 225-810-4814.
Certified check or bid bond for five percent (5%) of the total bid, made payable to Bolivar County and the State of Mississippi must accompany each proposal.
Bidders are hereby notified that any proposal accompanied by letters qualifying in any manner the condition under which the proposal is tendered will be considered an irregular bid and such proposal will not be considered in making the award.
Printed 5/21/2025 @ 4:57 PM Page 2 of 3 SABP-06(01)
Larry King, President Bolivar County Board of Supervisors
Printed 5/21/2025 @ 4:57 PM Page 3 of 3 SABP-06(01)