2898313_CDRL1_REPORT.pdf

PDF 103 KB Posted

Attached to
B1-B Ejection Seat Load Arrestor
Solicitation number
SPRWA1
Issued by

View the file

Other files

File Type Posted
2979213_PKGRQMT_REPORT.pdf PDF
2979212_TRNSPDATA_REPORT.pdf PDF
SPRWA120R0018.pdf PDF
1006481291_SOW.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20602000141

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Inspection and Test Plan

3. SUBTITLE

NONE

4. AUTHORITY

DI-QCIC-81110

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para. 2.2

6. REQUIRING OFFICE

410 SCMS/GULB

7. DD 250 REQ

DD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

WEKLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fazzini, Steven JNAME: 06 SEP 2019DATE:

Block 7: The engineer will be responsible for acceptance at the destination.

Block 10-13: The contractor shall submit a complete Inspection and Test Plan within 45 days after contract award. The Government will review and determine acceptance or rejection and notify contractor within 15 business days of receipt.

If rejected, the contractor shall have 15 business days to correct any error and return a corrected Inspection and Test Plan to the Government for review.

Block 14:

The contractor shall submit the receiving report through WAWF upon final submission to DODAAC SPRWA1, Attn:

tonett.pendleton@us.af.mil to account for data previously submitted by letters of transmittal. The Government will approve/disapprove within 30 calendar days after receipt. When notification is submitted in WAWF the contractor shall provide email notification to tonett.pendleton@us.af.mil or steven.fazzini.1@us.af.mil.

Document submission shall be provided electronically via Microsoft Office word format (doc) or Portable Document Format (PDF). Changes to office symbols and/or e-mail addresses, shall be made by letter to the PCO & ACO without further revision to this Contract Data Requirements List (CDRL).

Contract Data Requirements List (CDRL) POC information for Distribution List is in Block 16 below:

CDRL POC Distribution List:

410 SCMS/GUEA

ATTN: Program Engineer steven.fazzini.1@us.af.mil

410 SCMS/GULB

ATTN: Program Manager Tonett.pendleton@us.af.mil

COORDINATORS:

410 SCMS/GUEA

ATTN: Steven Fazzini Program Engineer 235 Byron Street, Suite 19A Robins AFB, GA 31098

0 1 0

410 SCMS/GULB

Tonett Pendleton Program Manager 235 Byron Street, suite 19A Robins AFB, GA 31098

0 1 0

0 2 015. TOTAL

G. PREPARED BY

Crosby, Justin G

410 SCMS / GULB

478-222-8588

H. DATE

15 NOV 2019

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-222-2114 / 472-2114

J. DATE

07 OCT 2019

Page 1 of 3DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 25 Feb 2020

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20602000141

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Item Unique Identification (IUID) Marking Plan

3. SUBTITLE

None

4. AUTHORITY

DI-MGMT-81803

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para. 5.1

6. REQUIRING OFFICE

410 SCMS/GULB

7. DD 250 REQ

DD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fazzini, Steven JNAME: 06 SEP 2019DATE:

Block 7: The engineer will be responsible for acceptance at the destination.

Block 10-13: The contractor shall submit a complete IUID Marking Plan within 30 days after contract award. The Government will review and determine acceptance or rejection and notify contractor within 10 business days of receipt.

If rejected, the contractor shall have 10 business days to correct any error and return a corrected IUID Marking Plan to the Government for review.

Block 14:

The contractor shall submit the receiving report through WAWF upon final submission to DODAAC SPRWA1, Attn:

tonett.pendleton@us.af.mil to account for data previously submitted by letters of transmittal. The Government will approve/disapprove within 30 calendar days after receipt. When notification is submitted in WAWF the contractor shall provide email notification to tonett.pendleton@us.af.mil or steven.fazzini.1@us.af.mil.

Document submission shall be provided electronically via Microsoft Office word format (doc) or Portable Document Format (PDF). Changes to office symbols and/or e-mail addresses, shall be made by letter to the PCO & ACO without further revision to this Contract Data Requirements List (CDRL).

Contract Data Requirements List (CDRL) POC information for Distribution List is in Block 16 below:

CDRL POC Distribution List:

410 SCMS/GUEA

ATTN: Program Engineer steven.fazzini.1@us.af.mil

410 SCMS/GULB

ATTN: Program Manager Tonett.pendleton@us.af.mil

COORDINATORS:

410 SCMS/GUEA

ATTN: Steven Fazzini Program Engineer 235 Byron Street, Suite 19A Robins AFB, GA 31098

0 1 0

410 SCMS/GULB

Tonett Pendleton Program Manager 235 Byron Street, suite 19A Robins AFB, GA 31098

0 1 0

0 2 015. TOTAL

G. PREPARED BY

Crosby, Justin G

410 SCMS / GULB

478-222-8588

H. DATE

15 NOV 2019

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-222-2114 / 472-2114

J. DATE

07 OCT 2019

Page 2 of 3DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 25 Feb 2020

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20602000141

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Item Unique Identification (IUID) Marking Activity, Validation and Verification Report

3. SUBTITLE

None

4. AUTHORITY

DI-MGMT-81804A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para. 5.1.2

6. REQUIRING OFFICE

410 SCMS/GULB

7. DD 250 REQ

DD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

SEMIA

11. AS OF DATE

See Blk 16

12. DATE OF FIRST

SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fazzini, Steven JNAME: 06 SEP 2019DATE:

Block 7: The engineer will be responsible for acceptance at the destination.

Block 10-13: The contractor shall submit a complete IUID Marking Activity, Validation and Verification Report 90 days after the first NSN has been marked. The Government will review and determine acceptance or rejection and notify contractor within 10 business days of receipt. If rejected, the contractor shall have 10 business days to correct any error and return a corrected IUID Marking Activity, Validation and Verification Report to the Government for review.

Block 14:

The contractor shall submit the receiving report through WAWF upon final submission to DODAAC SPRWA1, Attn:

tonett.pendleton@us.af.mil to account for data previously submitted by letters of transmittal. The Government will approve/disapprove within 30 calendar days after receipt. When notification is submitted in WAWF the contractor shall provide email notification to tonett.pendleton@us.af.mil or steven.fazzini.1@us.af.mil.

Document submission shall be provided electronically via Microsoft Office word format (doc) or Portable Document Format (PDF). Changes to office symbols and/or e-mail addresses, shall be made by letter to the PCO & ACO without further revision to this Contract Data Requirements List (CDRL).

Contract Data Requirements List (CDRL) POC information for Distribution List is in Block 16 below:

CDRL POC Distribution List:

410 SCMS/GUEA

ATTN: Program Engineer steven.fazzini.1@us.af.mil

410 SCMS/GULB

ATTN: Program Manager Tonett.pendleton@us.af.mil

COORDINATORS:

410 SCMS/GUEA

ATTN: Steven Fazzini Program Engineer 235 Byron Street, Suite 19A Robins AFB, GA 31098

0 1 0

410 SCMS/GULB

Tonett Pendleton Program Manager 235 Byron Street, suite 19A Robins AFB, GA 31098

0 1 0

0 2 015. TOTAL

G. PREPARED BY

Crosby, Justin G

410 SCMS / GULB

478-222-8588

H. DATE

15 NOV 2019

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-222-2114 / 472-2114

J. DATE

07 OCT 2019

Page 3 of 3DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 25 Feb 2020

File details come from the government source that posted it. Updated .