This document contains the Questions and Answers from a Request for Information (RFI) related to the FCC Columbia Facility Repairs contract opportunity, Solicitation Number 273FCC25Q0003.

The key details are: The RFI addressed a leak from the HVAC system, which has been addressed by the HVAC vendor, and the scope of work is for ceiling repair in several offices at the FCC's Columbia, Maryland campus. The RFI confirms the number of offices with visible ceiling damage and unsecured/unstable ceiling grid that require repair, but notes that window blinds are out of scope and will be replaced once the ceiling work is complete. The associated federal contract opportunity is a firm-fixed price contract for Facility Repairs services, with a 2-month period of performance and an evaluation based on past performance and price.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

273FCC25Q0003 - FCC Columbia Facility Repairs- RFI

Request for Information Questions and Answers:

1. Please confirm the leak from the HVAC, as shown in Figure 7, has been stopped/repaired. The

SOW notes to repair the ceiling, but is silent on the repair of the leak.

2.

Answer: Leak has been addressed by HVAC vendor. Scope of work is ceiling only.

3. The SOW notes to repair ceiling gridwork in several offices in the lab. Can you confirm the quantity of offices? And are the window blinds to be repaired in these offices as well?

Answer: Offices pointed out during the walk through. They include one office with visible damage and four offices that have unsecure/unstable ceiling grid. Blinds are out of scope. Note that the blinds will be replaced once ceiling work is completed. The FCC asks that work activity not alter any mounting hardware that currently exists for the blinds.