This is an Addendum 4 to RFP C27-03 issued by the Savannah-Chatham County Public School System (Georgia) for Construction Management at Risk (CMR) Services related to the Garden City Elementary School Renovation Project located at 4037 Kessler Ave, Savannah, GA 31408. The project is funded through ESPLOST (Education Special Purpose Local Option Sales Tax) and seeks qualified firms to provide CMR services under an AIA Document A133 - 2019 Agreement. The selected firm will serve as Construction Manager as Constructor with payment structured as Cost of the Work Plus a Fee with a Guaranteed Maximum Price, as established by the District and reflected in the original solicitation and subsequent amendments.

The addendum document serves to modify, clarify, or supplement the original RFP specifications and requirements. Prospective bidders must carefully review this addendum in conjunction with the base RFP and all previous addenda to ensure full compliance with current solicitation terms. All responses must address the requirements outlined in the original RFP C27-03, as amended by all issued addenda, with sealed proposals submitted according to the deadlines and procedures specified in the solicitation documents.

View the file

Other files

File Type Posted
8-RFP C27-03 - Solicitation Form 1 - Offeror Information Form.pdf PDF
11-RFP C27-03 - Solicitation Form 4 - Lobbying.pdf PDF
5-RFP C27-03 - Phasing Option 4.1 reduced 2026-07-30.pdf PDF
18-SECTION 012100 - ALLOWANCES.pdf PDF
13-RFP C27-03 - Solicitation Form 6 - Performance Bond Form.pdf PDF
23-RFP C27-03 - Solicitation Document - Pages 25-27.pdf PDF
21-RFP C27-03 - Pre-Proposal Register.pdf PDF
19-SECTION 012300 - ALTERNATES.pdf PDF
15-RFP C27-03 - Solicitation Form 8 - GMP Proposal Form.pdf PDF
16-RFP C27-03 - Addendum 1.pdf PDF
1-RFP C27-03 - A133-2019 Sample Contract.pdf PDF
22-RFP C27-03 - Addendum 3.pdf PDF
24-Garden City Updated Spec Sections Addendum 4.pdf PDF
6-RFP C27-03 - Project Manual 082826.pdf PDF
2-RFP C27-03 - A133-2019 Sample Exhibit A - GMP Amendment.pdf PDF
14-RFP C27-03 - Solicitation Form 7 - Payment Bond Form.pdf PDF
7-RFP C27-03 - Solicitation Document.pdf PDF
4-RFP C27-03 - DRAWINGS 100 CD R2 Add-0.pdf PDF
10-RFP C27-03 - Solicitation Form 3 - Debarment.pdf PDF
26-Garden City Elementary Parking Lot Geotech Report - WSP.pdf PDF
20-RFP C27-03 - Addendum 2.pdf PDF
12-RFP C27-03 - Solicitation Form 5 - Bid Security Form.pdf PDF
25-Garden City Elementary BDA Signal Survey 12-1-2025.pdf PDF
9-RFP C27-03 - Solicitation Form 2 - Contractor Affidavit.pdf PDF
3-RFP C27-03 - A201-2017 Sample Contract.pdf PDF
17-SECTION 012200 - UNIT PRICES.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 1 | 23

CMR Services for Garden City Elementary School Renovation Project Number: RFP C27-03

Posting Date: 08-30-2026

Closing Date: 09-29-2026 REVISED CLOSING DATE: 10-08-2026

Addendum: #4

Posting Date: 09-30-2026

The information contained in this document shall become an official part of the original document and shall be acknowledged as noted on the Certification Form (Form 1) of Solicitation Document in the space provided. Failure to acknowledge receipt of an addendum may result in a status of non-responsive. Firms are encouraged to review the contents of this document and to respond accordingly.

Addendum No. 4 is being issued to make the following clarification and answer the following questions:

Clarification Statement #1:

Existing wiring and conduit may be reused for installation of the new fire alarm system where the approved fire alarm design allows. All new cabling and raceway shall be installed per specifications.

Information Statement #1:

A133-2019 Sample Contract – DELETE 6.1.7.1

Documents Added for Addendum #4

• Garden City Elementary Parking Lot Geotech Report – WSP

• Garden City Elementary BDA Signal Survey 12-1-2025

• Garden City Updated Spec Sections Addendum 4

• RFP C27-03 – Solicitation Document – Pages 25-27

QUESTIONS and ANSWERS

Question #1:

I would like to submit the following light fixtures for prior approval on the Garden City Elementary School Renovations project.

Type - Manufacturer - Series BL - Luxxbox - Waffle Downlit LS4 - Starfire Lighting - PH4-L SC - ILP Lighting - VS4 SC8 - ILP Lighting - VS8 TH - Green Creative - ORBIT XB - Evenlite - TLX XC - Evenlite – TLX

Answer #1:

The fixtures are reviewed and not determined to be an equal.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 2 | 23

Question #2:

The Architectural drawings require installation of a BDA system based on the Owner’s BDA signal evaluation. Please provide the Owner’s signal evaluation and confirm the required system manufacturer, design responsibility, testing requirements, permitting requirements, and whether the contractor is responsible for furnishing and installing the complete system. The drawings also separately reference installation of a cellular booster system; please confirm whether this is part of the BDA scope or a separate system.

Answer #2:

BDA testing was completed by owner, testing failed, BDA is required, BDA Test Attached. BDA / ERRC System: The Contractor shall provide a complete bi-directional antenna (BDA) system for emergency responder radio coverage (ERRC) for the entire building. The BDA/ERRC system shall be designed and installed by an FCC certified technician trained on the system being installed. The system shall comply with UL 2524, NFPA 72, NFPA 1221 and IFC. The system shall be of the same manufacturer as the fire alarm system. BDA system design shall be submitted with the fire alarm system shop drawings for Engineer’s review. Provide roof penetration as required for roof mounted antenna. Roof penetration shall be performed by roofing contractor.

Coordinate with Architect for location. Critical areas shall be provided with 100% floor area radio coverage. General building areas shall be provided with 95% radio coverage or as specified by AHJ. Do not include in base bid, all cost with this work will be paid out of owner allowance.

Question #3:

Please confirm shadesail height

Answer #3:

Assume 16’ min. height over each play structure, heights will vary. Final design to be coordinated with selected manufacturer. Play sets may be modified by owner to reduce height necessary. Basis of design is USA SHADE, 4-Point Shade sail with columns, approved equals are encouraged.

Question #4:

Card readers, access-control power supplies, electrified hardware and security-door rough-in are shown throughout the electrical drawings. Please confirm the required/existing access-control system manufacturer and identify the division of responsibility between SCCPSS/Owner and the contractor for equipment furnishing, cabling, device installation, head-end equipment, programming and final system integration.

Answer #4:

The existing SCCPSS access-control system shall remain the basis of design. Provide all door-related access-control infrastructure shown in the Contract Documents, including conduit, raceways, backboxes, door-position switches (DPS), power supplies, electrified hardware, power-transfer devices, and required rough-in. The Contractor shall furnish and install all field devices and hardware indicated in the documents and coordinate with SCCPSS for final system integration. SCCPSS/Owner will provide head-end software, system programming, credential management, and final integration into the existing district-wide access-control platform. All equipment shall be compatible with the Owner's existing system and SCCPSS plug-and-play wiring standards. Access-control submittals shall clearly identify division of responsibility and system compatibility requirements.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 3 | 23

Question #5:

The documents reference existing/new data, telephone and other classroom technology items, but a complete structured-cabling scope is not clearly defined. Please confirm whether the contractor is responsible for furnishing and installing a complete voice/data structured-cabling system or only pathways/rough-in and support for Owner-furnished technology equipment. If a complete system is required, please provide the applicable Technology/telecommunications specifications, approved manufacturers, cable types, testing and warranty requirements.

Answer #5:

Owner's contractor will provide all new data, telephone and other classroom technology. CMR to provide support for Owner-furnished technology equipment. Contractor to remove all old nonfunctional intercom speakers.

Question #6:

The drawings require relocation and extension of an existing security camera at the new front-entry location. Please confirm the existing CCTV manufacturer and whether the contractor is responsible for cabling, device relocation, programming, licensing, head-end modifications and final system integration.

Answer #6:

Work to be owner provided.

Question #7:

The drawings require relocation and extension of an existing intercom device to the new front-entry location. Please confirm the existing system manufacturer and the contractor’s responsibilities for cabling, equipment, programming and system integration.

Answer #7:

Work to be owner provided.

Question #8:

Please clarify the scope. The drawings look like we're just replacing the main curtain like with like, but the specs describe an entire stage rigging system and new fabric.

Answer #8:

Replace the existing curtains and valance with new curtain and valance. See the enclosed revised 116143 – Stage Curtains specification

STAGE CURTAINS

Question #9:

Please confirm and provide a release form if a revit model is available to be sent out for use in preparation of the technical approach for this project.

Answer #9:

No Revit model will be provided for the RFP, final CMR will have access to electronic files.

Question #10:

Detail 3 on Sheet A-870 calls for the existing curtain track to remain however, specs section 116143 describe an entire stage rigging system and new fabric. Please confirm the intended scope of work.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 4 | 23

Answer #10:

See response to No. 8.

Question #11:

Please clarify if #207 is just the ‘Diamond tread plate wall panel’ or if we need to quote the entire walk-in. If this item is an existing Kolpak walk-in, please provide the serial number.

Answer #11:

This is an existing Kolpak walk-in, this is Stainless Steel wall Diamond tread plate wall panel’ plating, similar to what is existing on the cooler doors as wainscot to 4’ AFF to add to longevity of cooler that has deteriorated metal panel near the floor.

Question #12:

The drawings show a Fireproofing UL Design on sheet A-063. Please clarify if spray applied fireproofing is required for this project.

Answer #12:

Spray fireproofing is not required, but other components of the assembly detailed apply to the engagement of the rated assembly with structural members.

Question #13:

Please provide clarification regarding the HSS5x5x1/2 shown in detail 3 on sheet S-121. Is this continuous throughout or just in the specified locations shown on SD-120?

Answer #13:

The HSS5x5x1/2 shown on S-121 detail 3 are all existing. Documents to be revised and are now labeled correctly.

Question #14:

Please confirm the following door types:

Door 104A: HM door and frame, but frame type is linked to A-370, the storefront elevations - Door 118B: Aluminum door and HM frame type, but exterior storefront frame material - Door 200: Aluminum door and frame type, exterior storefront frame material, but HM head and jamb details - Door 206: Wood door, no frame type, interior storefront frame material, but HM head and jamb details Door 207: Wood door, no frame type, interior storefront frame material, but HM head and jamb details Door 300B: Aluminum door, HM frame type, but exterior storefront frame material and HM head and jamb details

Answer #14:

Door hardware shall be revised as required by the clarifications below.

Door 104A: HM door and frame, Elevations will be revised.

Door 118B: Aluminum door and exterior storefront frame material – Schedule to be revised Door 200: Aluminum door and frame type, exterior storefront frame material, Detail references will be updated to storefront head jamb sill details.

Door 206: Wood door, no frame type, This should be HM frame, details will be updated Door 207: Wood door, no frame type, This should be HM frame, details will be updated Door 300B: HM door and frame, Elevations will be revised. (Similar to door 104A)

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 5 | 23

Question #15;

Please clarify the wall tile base in the classrooms, as the elevations all show CT-1A, but the finish legend ( A-801) does not have a CT-1A, only CT-1

Answer #15:

CT-1 tile to go to floor, allow for addition RB-1. Goal is to align accent tiles with counter.

Question #16:

Please verify and confirm the load calculations of shoring and locations shown on sheet S-000, note E.

Answer #16:

Note E on S-000 states that: “The contractor shall provide temporary erection bracing and shoring of all structural work as required for the stability of the structure during all phases of construction.” Load calculations and shoring locations are to be delegated design provided by the contractor.

Question #17:

Please clarify the CMU infill structural details (rebar locations) at the gym louver shown as D01 on the 2nd floor on Detail A3 on sheet AD-300

Answer #17:

Please see the following detail that has been added to sheet S-600.

Question #18:

Please confirm specifications for the new roof. Please confirm that ES1-rated metal will be used instead of PVC.

Answer #18:

See attached revised roof specifications with clarifications. Roof is existing Sarnafil roof with applied ribs, and to be matched for existing warranty continuity. Roof edge fascia, gravel stops, and shop-fabricated edge metal shall be ANSI/SPRI/FM 4435/ES‑1 compliant and capable of resisting the design wind pressures indicated on the drawings.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 6 | 23

Question #19:

Please provide details to show the connection of the new gutter tying into the existing gutter.

Answer #19:

Existing gutters to be removed. And replaced.

Question #20:

Confirm if coated metal flashing can substitute for copper flashing shown on detail A5 on sheet A-313.

Answer #20:

Where tie into exiting copper flashings is necessary dissimilar metals should not be utilized.

Coated metal flashing compatible with the roof assemblies is allowed.

Question #21:

Will power for lighting/receptacles, water fountains, etc be needed? If any MEPs are required, where will the gazebo be feed from? Note 32 on civil and A-001

Answer #21:

a. No lighting at Gazebo, or MEP’s

b. Note 32 on civil and A-001 Will be revised

Question #22:

Please confirm if we are price any components regarding the playground equipment and areas.

i.e. shades, drainage, footings, grading, mulch etc.

Answer #22:

See drawings:

Playsets and pour-and-play surface are by owner.

Shade sails are in contract for this project.

Provide grading and drainage as required by in documents.

Question #23:

Please provide architectural details for the wood bridges. Will the bridge require any pathway lighting?

Answer #23:

Lighting is not required: bridges are to be replaced one for one.

Question #24:

Please provide the geotechnical dated January 23rd, 2026 report mentioned on sheet S-000

Answer #24:

See the enclosed 2026.01.21 - Garden City Elementary Parking Lot Geotech Report - WSP.pdf

Question #25:

Please provide all of the OFOI (owner furnished owner installed ) and OFCI (owner furnished contractor installed) projects items so that we can coordinate and ensure we are not double covering items slated to be provided by SCCPSS.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 7 | 23

Answer #25:

Furniture is by owner, Drawings IN-110 through IN1145 - F.F.E. Plans are included to show contract shelving. All other furniture is fore reference unless noted otherwise in the documents.

Question #26:

For the new walkway canopies, will lighting and cameras be required?

Answer #26:

Lighting is not required. Cameras and security by owner. Coordination of work with owners contractor required.

Question #27:

Per page A-330, detail #4, Solid Surface Window Sill notated. No products/finish specified for these items

Answer #27:

See finish schedule basis of design, SS-2 in Admin, SS-1 in other locations.

Question #28:

AD-110 does not appear to include a keynote legend to indicate what the "A-xx" tags indicate.

Please clarify the keynote designations on this sheet.

Answer #28:

Legend added to sheet.

Question #29:

Note 19 on AD-110 indicates to remove and replace gypsum wall board with impact resistant gypsum wall board in "Offices and other areas..." Please specify which rooms this work should take place in.

Answer #29:

Allow for replacement of all GWB, U.N.O.

Question #30:

Note 5 on AD-110 indicates to remove all flooring and prep for new, however only key notes on AD-111 indicate what specific flooring is to be removed. Please confirm that all existing flooring is to be removed and please indicate the type of existing flooring in the areas not currently demonstrated if so.

Answer #30:

Remove existing flooring, except for Servery and Kitchen Spaces’ Quary Tile. Flooring in rest rooms consists of ceramic tiles in setting bed, as-built drawings indicate with 2” slab depression. Carpet is used in offices, conference rooms, part of the media center, reading rooms, testing rooms, and counselling.

Question #31:

Please clarify what item is to be demolished on sheet AD-112 in the open area directly across from Elec 306.

Answer #31:

Exterior concrete splash pads.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 8 | 23

Question #32:

The structural demolition plans (SD-110, SD-120, SD-121, and SD-122) do not include any notes on the demolition and include shading, color coding, etc. that are not detailed in any legend on these sheets. Please clarify what each color and/or symbol on the SD sheets is meant to represent.

Answer #32:

Please see the following demolition legend that has been added to all demo sheets.

Question #33:

Detail 7/S-400 includes a callout which reads "See Note #1." Please confirm that the Note 1 referred to in this detail is Note 1 from sheet S-110 or otherwise clarify what note this represents.

Answer #33:

Note 1 refers to the note at the bottom of detail 7/S-400 that reads: “Contractor shall add piping for downspouts in concrete base. See plumbing drawings.” This has been updated with a “1.”

for clarity.

Question #34:

Within the project manual, what scope of work is referenced in specification section 034500 Precast Architectural Concrete?

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 9 | 23

Answer #34:

Exterior Sills, please see the attached revised spec section. Similar to Detail C5/A-362.

Question #35:

The architectural design sheets do not seem to indicate any athletic equipment within the gym.

Specification section 116623 specifies a myriad of gym/athletic equipment but appears to be incomplete. Please clarify the scope of any gym or athletic equipment on the project.

Answer #35:

Athletic equipment in gym to be by owner. Currently plan is to re-use and remount existing equipment. Coordination with work required. Specification 116623 is removed from the specification.

Question #36:

Detail 3/A-870 demonstrates a typical projector screen installation and notes state to see plans for locations. Architectural floor plans include an abbreviation (PSM) for projector screens, yet no PSM tags appear present in the floor plans. Additionally, the reflected ceiling plans demonstrate a symbol for ceiling mounted projectors, but these symbols do not appear to show on the reflected ceiling plans. Please clarify where projectors are intended to be mounted.

Answer #36:

See RCP reference section detail to provide projector screen at proscenium opening behind the stage curtain, detail 3/A-870.Similarly the projector is in the cafeteria see RCP referencing detail F7/A-870. The cafeteria and stage are the only projector and screen locations. PSM will be updated to be consistent with the specification, and the screen is by owners AV contractor.

Question #37:

Please clarify if any environmental testing is available or if any testing and/or abatement should be assumed and included in pricing.

Answer #37:

No environmental testing has been conducted; no abatement is assumed. Testing should be conducted as specified and as required by the standard of care with selective demollition. No testing or abatement should be assumed for pricing.

Question #38:

Flooring notes on finish plans indicate to use VCT-2 for stair landings. No VCT-2 is referenced anywhere else in the drawings.

Answer #38:

The only stair landings are the stage, to be LVT-3. Note will be revised.

Question #39:

Specs indicate installation of horizontal louver blinds, however, plans and details show recessed roller shades. Please clarify

Answer #39:

See revised specification. Manual fabric roller shades will be in admin windows. All classroom windows receive blinds, basis of design per SCCPSS guideline is Levelor 1-inch aluminum horizontal blinds or equal.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 10 | 23

Question #40:

Specs and plans do not give any product data on desired shades. Please provide more information on what window treatments are being requested.

Answer #40:

Manual fabric roller shades will be in admin windows. All classroom windows receive blinds, basis of design per SCCPSS guideline is Levelor 1-inch aluminum horizontal blinds or equal.

Question #41:

Please provide specs and/or drawings for new wood bridges

Answer #41:

Wood bridge to match existing.

Question #42:

To add the single WSHP, the specs require that the entire system is dumped, cleaned, and refilled. Please confirm this is the intent.

Answer #42:

The entire system is to be dumped and refilled (WSHP has been enlarged, so a new control valve will be needed).

Question #43:

The specs call for cleaning duct. Is the intent to clean only the new duct after installation or is the intent to have all existing duct cleaned as well?

Answer #43:

Per entry 2 in the Mechanical Scope section of M-001: All existing to remain ducts (including dryer exhaust) shall be cleaned. Existing to remain diffusers with visible dust shall also be cleaned.

Question #44:

Please provide door hardware spec section. If unavailable, provide directions on how you would like the hardware supply and install priced.

Answer #44:

Price work based on the enclosed revised specification with door hardware schedule.

Question #45:

Is a new BDA / DAS system required? Is there any Bosch security scope required?

Answer #45:

BDA testing was completed by owner, testing failed, BDA is required, BDA Test Attached. BDA / ERRC System: The Contractor shall provide a complete bi-directional antenna (BDA) system for emergency responder radio coverage (ERRC) for the entire building. The BDA/ERRC system shall be designed and installed by an FCC certified technician trained on the system being installed. The system shall comply with UL 2524, NFPA 72, NFPA 1221 and IFC. The system shall be of the same manufacturer as the fire alarm system. BDA system design shall be submitted with the fire alarm system shop drawings for Engineer’s review. Provide roof penetration as required for roof mounted antenna. Roof penetration shall be performed by roofing contractor.

Coordinate with Architect for location. Critical areas shall be provided with 100% floor area radio coverage. General building areas shall be provided with 95% radio coverage or as specified by

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 11 | 23

AHJ. Do not include in base bid, all cost with this work will be paid out of owner allowance.

Question #46:

Per Spec section 095113, Please indicate desired product/manufacturers for Acoustical ceiling tiles

Answer #46:

See revised Specification 0951113 Acoustical Panel Ceilings, Owners basis of design is Armstrong Mesa 680.

Question #47:

Per pages Ad-130/A-130, the notes indicate "K01 - Clean All Existing Roofs." Please clarify the required scope of roof cleaning for the existing metal roof system to remain

Answer #47:

Existing roof is PVC with applied rib – not metal. Cleaning is to be conducted per revised specification, and consistent with CertainTeed roofing warranty.

Question #48:

Page A-001 indicated a new Daktronics Galaxy Display for the new monument sign. Please confirm if other manufacturers for this display are accepted.

Answer #48:

SCCPSS sole sources Daktronics Displays.

Question #49:

Spec Section 116143 references spec section 055000 for steel framing and supports for stage curtains, but that spec section is missing. Please provide

Answer #49:

Specification revised, curtain only is being replaced.

Question #50:

Page C-703, detail P-655 shows a header across the entry gates. Wouldn’t this header tube impede with School Buses, Delivery Trucks, etc…Please confirm?

Answer #50:

Detail and specification will be revised to note to provide gate that provides clear opening without header or center post. The header and center post have been removed from the detail as to not impeded vehicular traffic.

Question #51:

Per specification 096566 - Resilient Athletic Flooring, paragraph 2.2, please confirm if Encore Athletic Serenity Motivate would be an accepted manufacturer?

Answer #51:

We will consider the alternate, specification is revised.

Question #52:

Foundation detail G7 on page A-330 indicates a perforated foundation drain and states to see civil drawings. The civil drawings do not appear to show foundation drains anywhere. Please advise?

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 12 | 23

Answer #52:

Perforated drain is not required; detail will be revised.

Question #53:

Civil plans C-501/C-503 indicate new detention ponds being installed, however the civil demo plans C-202/C-204 do not show to remove any of the trees that are within the limits of the pond grading. Please advise

Answer #53:

The trees within the limits of the proposed ponds are to be removed.

Question #54:

NPDES Permit Note 27 states that “No concrete trucks shall be allowed to wash out or discharge surplus concrete or drum wash water onsite”. Please clarify if NPDES-compliant concrete washout stations would be acceptable?

Answer #54:

A concrete washout area is shown at the east entrance. See sheet CE-201. Note 27 will be omitted on IFC drawings.

Question #55:

Staking plans C-301, C-302, and C-303 indicate work being performed inside of the tree protection zones. Please clarify the plan for allowing a 19” + inch cut for the paver system Detail P-01D on C-701 along with any other disturbances necessary inside the protected zones.

Answer #55:

Excavation work will have to be done within the critical root zone. The site contractor is to consult an arborist for work performed within the critical root zone.

Question #56:

Detail E3 on A-133 states to see plumbing drawings for underground drainage tie in for the canopy. There is nothing shown in the plumbing or civil drawings for this detail, please provide more information.

Answer #56:

All front entry elevation canopies and downspouts will be piped to the storm water drainage system with:

• 800 LF of 18” HDPE pipe connected to GI 18 and GI 27 at the front of the school.

• 1200 LF of 15” HDPE pipe on exterior walls and courtyard.

• 52 cleanouts.

• 55 downspout boots.

Question #57:

Note 4 on C-202 states that contractor is responsible for demolition and excavation necessary for the GA Power lighting plan. Please provide the GA Power lighting plan.

Answer #57:

CMR to coordinate with GA Power.

Question #58:

Please confirm what #7 represents on page PL-106?

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 13 | 23

Answer #58:

Note #7 to read “Contractor shall cap existing piping.” Will update to provide note #7

Question #60:

Sheet AD-110 General Demolition Sheet Note #5 states “Remove ALL flooring and prep for new, grind and level where necessary…”. The enlarged demo sheets only reflect the gym and admin requiring floor demo. Please confirm which is correct.

Answer #60:

All flooring is to be removed and replaced per new finish plans.

Question #61:

Sheet AD-110 General Demolition Sheet Note #6 states “Repair cracks in slab and evaluate slab for moisture”. We cannot see cracks nor evaluate the moisture conditions underneath existing flooring which makes it difficult to quantify for bidding purposes. Would the owner consider utilizing an Allowance for this item?

Answer #61:

Do not include in base bid, all costs with this work will be paid out of owner allowance.

Question #62:

Sheet AD-110 General Demolition Sheet Note #20 states “Remove and return all furniture to owner”. Please provide additional direction with regards to what the expectation is for returning all furniture to the owner (i.e. storing somewhere onsite/offsite, transporting to a specific location, etc.).

Answer #62:

Allow for Delivery to SCCPSS Facility.

Question #63:

Sheet AD-110 General Demolition Sheet Note #27 states “remove and return single use water fountains to owner”. Please provide additional direction with regards to what the expectation is for returning all furniture to the owner (i.e. storing somewhere onsite/offsite, transporting to a specific location, etc.).

Answer #63:

Allow for Delivery to SCCPSS Facility. Will add this note: Remove and salvage existing single-use water fountains for Owner reuse. Protect fixtures during removal, storage, and transportation and deliver to an Owner-designated location.

Question #64:

Overall Roof Plan A-130 keynote K01 states “Clean all existing roofs”. Can a specification or additional detail be provided to clearly define acceptable parameters for cleaning the existing roof?

Answer #64:

Specification updated, clean per Sarnafil roof guidelines to preserve existing Warranty.

Question #65:

All hangers shall have pipe straps to the structure/FP-500 FP details calls for retainer straps.

These are existing hangers do you want the fire sprinkler sub to install these retainer straps on all existing hangers?

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 14 | 23

Answer #65:

Cannot find the reference to this question in the drawings or specifications. – Provide new hangers for new work.

Question #66:

"All risers are to be tested and are in complete serviceable condition". Do you want the fire sprinkler sub to be responsible for the existing risers which is not indicated as part of the scope of work shown as part of this contract?

Answer #66:

Cannot find the reference to this question in the drawings or specifications. CMR is to manage subcontractor scope. Testing should be per documents.

Question #67:

The documents indicate to provide metraflex fire loop seismic expansion joint. This is an existing system, do you want the fire sprinkler sub to install this seismic expansion joint and, if so, how many?

Answer #67:

The requirement referenced in note 16 on sheet fp.001 is intended for the fire protection contractor's delegated design of the fire sprinkler system. The note is provided to address conditions where a fire protection seismic expansion joint may be required due to the final routing of sprinkler piping and the location of building expansion or seismic joints. The fire protection contractor shall evaluate the final system layout and provide seismic expansion joints where required by applicable codes, standards, and the approved sprinkler system design. No specific quantity or location is identified in the contract documents. The requirement applies only if such conditions are encountered as part of the fire protection contractor's final design.

Question #68:

The documents indicate "Provide complete shop drawings, with hydraulic calcs, with new flow info and specs brochure". Do you want the fire sprinkler sub to provide the architect and owner with these drawings, hydraulic cals, and flow test information and specs brochure for the completed sprinkler system? Does the school system or architect have any drawings on the sprinkler system?

Answer #68:

CMR is to manage subcontractor scope. There are as-built drawings which may be, and will be made available to CMR. Per Section 211000 - WATER-BASED FIRE-SUPPRESSION SYSTEMS, the Fire Protection Contractor is required to provide complete shop drawings, hydraulic calculations, current water supply/flow test information, and product data for the fire sprinkler system as part of the delegated design and submittal requirements

Question #69:

Fire stop all penetrations of smoke/fire penetrations. These are existing conditions do you want the fire sprinkler contractor to recaulk all holes in existing system?

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 15 | 23

Answer #69:

CMR is to manage subcontractor scope. As a general note yes, all unsealed penetrations found in existing rated partitions should be sealed. It should be noted that most of the classroom corridors are rated smoke partitions. Per section 211000 - water-based fire-suppression systems, firestopping is required for penetrations associated with the fire protection work and in accordance with the applicable firestopping requirements. the contract documents do not require the fire protection contractor to recaulk or firestop all existing sprinkler penetrations throughout the building. firestopping shall be provided for new penetrations and existing penetrations disturbed by the work.

Question #70:

"Provide hanger spacing is in accordance with NFPA 13". These hangers are existing to the systems already installed do you want the fire sprinkler contractor to be responsible for installing new hangers throughout the school?

Answer #70:

The requirement for hanger spacing in accordance with nfpa 13 applies to new and modified fire sprinkler piping within the project scope. In accordance with nfpa 13, existing sprinkler systems are not required to be retroactively upgraded solely to meet current hanger spacing requirements unless the existing piping is being modified or affected by the work. The fire protection contractor is not required to install new hangers throughout the existing facility. New hangers and supports shall be provided in renovated areas and where required to support new or modified sprinkler piping associated with the work.

Question #71:

Door 104A: HM door and frame, but frame type is linked to A-370, the storefront elevations.

Please confirm which is correct.

Answer #71:

HM is the intent, for the entire separation between Hallway 100 and Reception 104. Documents will be revised.

Question #72:

Door 118B: Aluminum door and HM frame type, but exterior storefront frame material. Please clarify.

Answer #72:

This is to be Storefront, Documents will be revised.

Question #73:

Door 200: Aluminum door and frame type, exterior storefront frame material, but HM head and jamb details. Please clarify.

Answer #73:

This is to be Storefront, Documents will be revised.

Question #74:

Door 206 & 207: Wood door, no frame type, interior storefront frame material, but HM head and jamb details. Please clarify.

Answer #74:

To be HM frames and WD doors. Documents will be revised.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 16 | 23

Question #75:

Per page QF1.2, please confirm half wall construction type for where it calls out item 235 (SS Wall Cap).

Answer #75:

Confirmed, allow for cold formed metal framing @ 16” O.C., steel posts with base plates in cavity @ 48” O.C., moisture resistant glass matt sheathing, and .090 Marlite FRP type facing and trim and Rubber base.

Question #76:

For the half wall on QF1.2, please confirm if plumbing lines will be required in it.

Answer #76:

There is No plumbing

Question #77:

For the half wall on QF1.2, please confirm how we are getting electricity into this wall to serve the new Hot Holding Cabinets (#227).

Answer #77:

Utility post will be added to revised drawings, circuit is accounted for in electrical drawings, routing will be overhead and down, documents will be revised.

Question #78:

CPT-4: Please provide the product selection and installation requirements for Vestibule 118

Answer #78:

Finishes will be LVT. Finish schedule will be revised.

Question #79:

Gym Striping: Provide the complete court layout, dimensions, line widths, colors, and any logos or special markings

Answer #79:

Floor striping to be compatible with resilient flooring. Striping shown on A-711 based on existing that consists of volleyball court layout with Foursquare game areas at the perimeter lines. Colors to match architect’s sample.

Question #80:

CT-1A: Provide product selection and clarify it’s relationship to CT-1/CT-1B, including tile base heights and profiles

Answer #80:

See interior elevations.

Question #81:

CT-5: Provide the wall tile selection and installation limits for Rooms 07, 08, and 106

Answer #81:

Office 106 will be revised to be AR GWB – No Tile. Rooms 07 & 08 should be referenced to Type D floor plan tied to sheet A-411 – tile pattern shown on wet wall with sink.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 17 | 23

Question #82:

Tech 205: Confirm the missing floor finish and identify any locations requiring static-control flooring.

Answer #82:

Static dissipative tile is to be provided in Tech room 205, include demo of existing and prep of floor. Finish schedule to be updated. Coordinate all room work with owner rework of MDF data racks.

Question #83:

LVT Layout: Confirm straight-set versus staggered installation, offsets, and grain direction for LVT -2, LVT-4, LVT-5, and LVT-6

Answer #83:

Majority of grain pattern is shown throughout corridors – LVT-3 wood pattern; random staggered installation. Accents at intersections will be verified with mock up.

Question #84:

Moisture Mitigation: Provide available slab test results and confirm the mitigation scope or allowance to include if tests fail.

Answer #84:

Slab testing is required once demolition of substrate is complete per new flooring manufactures requirements and per revised flooring specification. Any mitigation required will be paid for out of owner’s allowance.

Question #85:

Tile Installation: Confirm required setting assemblies, mortar-bed thicknesses, grout types, and waterproofing/crack-isolation locations.

Answer #85:

Demolition of all existing rest rooms floor tile is on 2” depressed slabs. Work is to be accomplished, and substrate is to be prepared, to allow for new tile installation.

Question #86:

Gym Underlayment: Confirm whether GF-1 requires additional underlayment beyond the factory-bonded rubber backing.

Answer #86:

Install flooring per manufacturers requirements.

Question #87:

Cooler/Freezer Tile: Confirm whether tile, base, preparation, and adjacent restoration fall entirely within Allowance 4 or require separate flooring pricing.

Answer #87:

Cooler/Freezer tile, base, preparation, and adjacent restoration fall entirely within Allowance 4.

Question #88:

Please confirm if floor cleanouts and floor drains need to be removed and replaced where the flooring is being replaced.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 18 | 23

Answer #88:

All new and replaced floor drains and cleanouts have been showed on the plumbing drawings.

all other floor drains and cleanouts in areas receiving new flooring not called out on the plumbing drawings are to remain as installed.

Question #89:

What is the existing stub-out height of the sanitary for the classroom sinks?

Answer #89:

Provide field verification for all connections of new work typ. Existing and new counter/sink heights are similar.

Question #90:

Please confirm the floor and wall demo of the group restrooms to accommodate the installation of new plumbing carriers and rough-in locations.

Answer #90:

Floor and wall demo is necessary - cutting and patching should be performed as necessary to accomplish work; new wall and fixture layout is shown on the drawings.

Question #91:

Please confirm the stub-out height of the existing water for the water closets in the classrooms.

Answer #91:

Provide field verification for all connections of new work typ.

Drawing notes shall be modified to the following:

Existing domestic water supply stub-outs serving classroom water closets shall be reused and modified as required to accommodate the installation of new child-height water closets.

Coordinate fixture rough-in requirements with the fixture manufacturer and adjust water supply piping, stops, and connections as necessary to provide a complete, operational, and code-compliant installation.

Question #92:

Recently, all the water coolers in Savannah-Chatham County schools were changed. Please confirm that the water coolers are still being replaced.

Answer #92:

Yes. All existing electric water coolers (EWCs) shown on the Contract Documents shall be removed and replaced as part of this project.

Question #93:

If the water coolers are remaining, please verify if they need to be removed and replaced for the installation of a solid surface "backsplash" to be installed behind them. This was recently done at the Georgetown K-8 renovation.

Answer #93:

Existing electric water coolers shown on the Contract Documents shall be removed and replaced as part of this project. Existing CMU has Stainless panels over previous work, removal of panels and cmu repair is to be done prior to installation of new fixtures typ.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 19 | 23

Question #94:

Please confirm that all of the existing mop sinks are floor-mounted, and there are no wall-mounted service sinks (similar to a Zurn Z5880). If they are wall-mounted service sinks, a free-standing sink similar to a Fiat FL1 is acceptable.

Answer #94:

All existing mop sinks shall be removed and replaced with new floor-mounted mop sinks.

Extend and modify existing plumbing connections as required to accommodate the new fixture installation and provide a complete, operational system in accordance with the Contract Documents and applicable plumbing code requirements.

Question #95:

Please confirm there is hot water serving all rooms where hot water is expected, for example, at all existing mop sinks.

Answer #95:

Hot water service is provided to all mop sinks, group toilet rooms, and staff areas included within the project scope.

Question #96:

The structural drawings show slab demolition in the kitchen; however, the flooring is to remain.

Are we to assume using attack stock to patch this area?

Answer #96:

The slab demolition in the kitchen has been removed from the structural drawings.

Question #97:

Door 300B: Aluminum door, HM frame type, but exterior storefront frame material and HM head and jamb details. Please clarify.

Answer #97:

See previous responses, schedule and details to be revised to reflect AL storefront system.

Question #98:

Detail 6 Sheet L300 stating “install shock pad per manufacturers specification”. I see in the cut sheet that there’s a 2-inch “something” under the turf, but we don’t see anything that is specifying what the 2-inch is and nothing about the shock pad. Please clarify.

Answer #98:

The “shock pad” is BROCK USA POWERBASE PLAY 50 (9' HEIGHT OF FALL) and the Infill is

MOTZ 'SAFESHELL' (OR EQUIVALENT).

Question #99:

The specs include approximately 22 different types from Anitfreeze water type, dry chemical, foam, wet chemical type, purple K dry, carbon dioxide, dry powder, halon, clean agent, etc.. Also should the cabinets be shelf, recessed, semi-recessed, surface mount... Please clarify the intended scope of work for Fire Extinguishers and Cabinets.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 20 | 23

Answer #99:

Specification to be updated: Allow for complete replacement.

FEC cabinets to be replaced one for one, Semi-recessed Cabinets; One-piece combination trim and perimeter door frame overlapping surrounding wall surface, with exposed trim face and wall return at outer edge and Rolled-Edge Trim: 2-1/2-inch backbend depth.

FEC specification to be revised to: Multipurpose Dry-Chemical Type in Steel Container: UL-rated 4-A:60-B:C, 10-lb capacity, with monoammonium phosphate-based dry chemical in enameled-steel container.

Question #100:

CPT-4: Please provide the product selection and installation requirements for Vestibule 118.

Answer #100:

CPT to be revised to LVT – see previous response.

Question #101:

VCT-2: Identify the stair landings requiring VCT-2, provide its product selection, and clarify the conflicting LVT-3 assignments.

Answer #101:

Note will be revised, there is no stair landing. The only stairs are transitions between Cafeteria and Stage.

Question #102:

Gym striping: Provide the complete court layout, dimensions, line widths, colors, and any logos or special markings.

Answer #102:

Floor striping to be compatible with resilient flooring. Striping shown on A-711 based on existing that consists of volleyball court layout with Foursquare game areas at the perimeter lines. Colors to match architect’s sample. No LOGO

Question #103:

CT-1A: Provide the product selection and clarify its relationship to CT-1/CT-1B, including tile base heights and profiles.

Answer #103:

See Previous notes

Question #104:

CT-5: Provide the wall tile selection and installation limits for Rooms 07, 08, and 106.

Answer #104:

See Previous notes

Question #105:

Tech 205: Confirm the missing floor finish and identify any locations requiring static-control flooring.

Answer #105:

See Previous notes

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 21 | 23

Question #106:

LVT layout: Confirm straight-set versus staggered installation, offsets, and grain direction for LVT-2, LVT-4, LVT-5, and LVT-6.

Answer #106:

See Previous notes

Question #107:

Moisture mitigation: Provide available slab test results and confirm the mitigation scope or allowance to include if tests fail.

Answer #107:

See Previous notes

Question #108:

Tile installation: Confirm required setting assemblies, mortar-bed thicknesses, grout types, and waterproofing/crack-isolation locations.

Answer #108:

See Previous notes

Question #109:

Gym underlayment: Confirm whether GF-1 requires additional underlayment beyond its factory-bonded rubber backing.

Answer #109:

See Previous notes

Question #110:

Cooler/freezer tile: Confirm whether tile, base, preparation, and adjacent restoration fall entirely within Allowance 4 or require separate flooring pricing.

Answer #110:

See Previous notes

Question #111:

Can some additional information (manufacturer, model, etc..) be specified to assist in ensuring acceptable equipment is priced for this scope?

Answer #111:

Question unclear.

Question #112:

CT-1 is listed as a 12”x24” and a 24”x48” on Finish Legend A-801. Please advise which size is to be priced for this tile.

Answer #112:

It looks like the 48” size is in the color number, the 12”x24” is correct design intent.

Question #113:

The ceramic specifications provided have a long generic list of information in regards to the installation methods. What areas would be needed to carry Radiant Heat under tile?

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 22 | 23

Answer #113:

Specification to be revised for ceramic tile – no radiant heat.

Question #114:

There are multiple joint widths listed in the installation methods. What are the joint widths for floor and wall tile?

Answer #114:

Specification revised for ceramic tile for uniform 3/16” width

Question #115:

Epoxy Grout is listed in the installation methods as well as standard grout. Which grout is to be figured?

Answer #115:

Specification revised

Question #116:

Movement joints are listed in the specifications, however none of the structural drawings show if any control joints are going through the bathroom locations. Can the locations of these joints be provided?

Answer #116:

Movement joints are in place to provide for the replacement of existing expansion joints in the building – spec is to be revised.

Question #117:

Transition Detail H7 on A-363 shows a vinyl reducer from LVT to Ceramic Tile. The ceramic specifications list stone thresholds in these locations. Can we get clarification on what transition is needed at LVT to Ceramic Tile? If stone thresholds are needed at gang bathrooms locations, can multiple pieces be installed? A one-piece stone threshold of that length is a custom order.

Answer #117:

Stone thresholds are needed at gang bathrooms locations, multiple pieces can be installed.

Finish schedule and specification will be updated.

Question #118:

CT-1 is listed on the finish schedule for base, with elevations showing tile stacking straight to the floors. Is CT-1 to be cut to a base or is a full tile starting from the floor on walls with tile?

Answer #118:

See interior elevations, for full tile design intent.

Question #119:

Are the CMU walls painted in bathroom locations that are receiving wall tile?

Answer #119:

Existing walls do have paint; appropriate prep is necessary prior to tiling.

R F P C 2 7 - 0 3 C M R S e r v i c e s f o r G a r d e n C i t y E l e m e n t a r y S c h o o l R e n o v a t i o n P r o j e c t - A d d e n d u m # 4 P a g e 23 | 23

Question #120:

There is not an attic stock percentage listed for any materials being installed. What should be carried for attic stock on all finish materials?

Answer #120:

Specifications are being updated.

Question #121:

Sheet A-133 walkway canopy says "basis of design Peachtree T-bent".. Can specifications be provided?

Answer #121:

Peachtree Protective Covers Model T-Bent” is the Basis of Design for the front canopy. The bus drop is similar to the “Gable or Ridge Bent” model, but is to match and replace the existing bus drop canopy.

Question #122:

Can Civil & Structural CAD Files be provided?

Answer #122:

Drawing files will be Selected with the awarded CMR

***ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED***

End of Addendum #4 to RFP C27-03