18-SECTION 012100 - ALLOWANCES.pdf

PDF 57 KB Posted

Attached to
CMR Services for Garden City Elementary School Renovation Project
Solicitation number
RFP C27-03 (ESPLOST)
Issued by
Chatham County, Georgia

About this file

This is a Sections and Allowances document for the Garden City Elementary School Renovation Project, a Construction Management at Risk (CMR) services contract opportunity in Savannah, Georgia. The document outlines allowance provisions and financial allocations for the renovation project located at 4037 Kessler Ave, Savannah GA 31408. The CMR services contract will be structured under the AIA Document A133 - 2019 Agreement Between Owner and Construction Manager as Constructor, with compensation based on Cost of the Work Plus a Fee with a Guaranteed Maximum Price. The scope encompasses construction management services for the elementary school renovation project, with the selected firm entering into a formal contract with the school district upon completion of the sealed proposal process.

The allowances section specifies provisional sums and budget allocations for identified project elements, establishing contingency funds and cost parameters for construction activities. These allowances provide flexibility for the construction manager to account for unforeseen conditions and variations in scope while maintaining the guaranteed maximum price structure. The document establishes financial controls and budgetary frameworks that align with the AIA A133 agreement terms, ensuring cost transparency and defined payment mechanisms throughout the project delivery phase.

View the file

Other files

File Type Posted
25-Garden City Elementary BDA Signal Survey 12-1-2025.pdf PDF
9-RFP C27-03 - Solicitation Form 2 - Contractor Affidavit.pdf PDF
3-RFP C27-03 - A201-2017 Sample Contract.pdf PDF
17-SECTION 012200 - UNIT PRICES.pdf PDF
8-RFP C27-03 - Solicitation Form 1 - Offeror Information Form.pdf PDF
11-RFP C27-03 - Solicitation Form 4 - Lobbying.pdf PDF
5-RFP C27-03 - Phasing Option 4.1 reduced 2026-07-30.pdf PDF
13-RFP C27-03 - Solicitation Form 6 - Performance Bond Form.pdf PDF
23-RFP C27-03 - Solicitation Document - Pages 25-27.pdf PDF
21-RFP C27-03 - Pre-Proposal Register.pdf PDF
19-SECTION 012300 - ALTERNATES.pdf PDF
15-RFP C27-03 - Solicitation Form 8 - GMP Proposal Form.pdf PDF
16-RFP C27-03 - Addendum 1.pdf PDF
1-RFP C27-03 - A133-2019 Sample Contract.pdf PDF
22-RFP C27-03 - Addendum 3.pdf PDF
27-RFP C27-03 - Addendum 4.pdf PDF
24-Garden City Updated Spec Sections Addendum 4.pdf PDF
6-RFP C27-03 - Project Manual 082826.pdf PDF
2-RFP C27-03 - A133-2019 Sample Exhibit A - GMP Amendment.pdf PDF
14-RFP C27-03 - Solicitation Form 7 - Payment Bond Form.pdf PDF
7-RFP C27-03 - Solicitation Document.pdf PDF
4-RFP C27-03 - DRAWINGS 100 CD R2 Add-0.pdf PDF
10-RFP C27-03 - Solicitation Form 3 - Debarment.pdf PDF
26-Garden City Elementary Parking Lot Geotech Report - WSP.pdf PDF
20-RFP C27-03 - Addendum 2.pdf PDF
12-RFP C27-03 - Solicitation Form 5 - Bid Security Form.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Garden City ES Renovations Savannah-Chatham County Public Schools

100% Construction Documents R2 August 7, 2026

Addendum No. 1, September 8, 2026

SSOE, Inc.

Project No. 025-00581-00

012100 - 1

ALLOWANCES

Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.

Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.

SECTION 012100 - ALLOWANCES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements governing allowances.

B. Types of allowances include the following:

1. Lump-sum allowances.

1.2 DEFINITIONS

A. Allowance: A quantity of work or dollar amount included in the Contract, established in lieu of additional requirements, used to defer selection of actual materials and equipment to a later date when direction will be provided to Contractor. If necessary, additional requirements will be issued by Change Order.

1.3 UNIT-COST ALLOWANCES

A. Use lump sum allowances only as directed by the Owner.

B. Contractor's overhead, profit, and related costs for the Allowance work are included in the allowance and are not part of the Contract Sum. These costs include delivery, installation , taxes , insurance, equipment rental, and similar costs.

1. Change Orders authorizing use of funds from the lump sum allowances will include Contractor's related costs and reasonable overhead and profit consistent with contract requirements.

C. Unused Materials: Return unused materials purchased under an allowance to manufacturer or supplier for credit to Owner, after installation has been completed and accepted.

D. At Project closeout all unused amounts remaining in the lump sum allowances will be deducted from the Contract by Change Order.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine products covered by an allowance promptly on delivery for damage or defects.

Return damaged or defective products to manufacturer for replacement.

Garden City ES Renovations Savannah-Chatham County Public Schools

100% Construction Documents R2 August 7, 2026

Addendum No. 1, September 8, 2026

SSOE, Inc.

Project No. 025-00581-00

012100 - 2

ALLOWANCES

Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.

Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.

3.2 PREPARATION

A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.

3.3 SCHEDULE OF ALLOWANCES

A. Allowance No. 1: Quantity Allowance: Include 2000 cu. yd. of unsatisfactory soil excavation and disposal off-site and replacement with satisfactory soil material from off-site, as specified in Section 312000 "Earth Moving."

1. Coordinate quantity allowance adjustment with unit-price requirements in Section 012200 "Unit Prices."

B. Allowance No. 2: Modular Classroom Allowance: Include the sum of $6,000,000 to providing modular classroom buildings and modular buildings for administrative and support spaces as required for the phasing outlined in RFP, and for the completion of work including site prep, installation, and removal of modular buildings.

1. Include Modular Classroom Utility Extensions for providing modular buildings adequate for the phasing outlined in RFP, including but not limited to:

a. Include simplex grinder pump station / wet well, force main, sanitary sewer, with both potable and prinkler water extensions to the modulars.

b. Include temporary power and data cabling to modular buildings.

2. This allowance includes material, receiving, handling, and installation and Contractor overhead and profit.

3. Coordinate quantity allowance adjustment with corresponding unit-price requirements in Section 012200 "Unit Prices."

C. Allowance No. 3: Owner Allowance: Include a contingency allowance of $500,000.00 for use according to Owner's written instructions.

D. Allowance No. 4: Walk-In Cooler and Walk-In Freezer Replacement: Include the sum of $225,000 for removal and replacement of the existing walk-in cooler and walk-in freezer, including insulated box assemblies, doors, refrigeration, controls, electrical connections, accessories, integral quarry tile flooring and base, and related floor preparation.

Allowance shall include all cutting, patching, repair, replacement, and refinishing of adjacent floors, walls, ceilings, roof and exterior wall assemblies affected by the work, with adjacent construction restored to a new, finished, watertight, cleanable, and serviceable condition.

END OF SECTION 012100