This is an Alternates section from the construction documents for the Garden City Elementary School Renovation Project, a capital improvement initiative for the Savannah-Chatham County Public Schools in Georgia. The document, prepared by SSOE, Inc. as part of the 100% Construction Documents dated August 7, 2026 with Addendum 1 issued September 8, 2026, establishes the administrative and procedural requirements governing optional work items that bidders may propose as additions to or deductions from the base bid. The alternates are incorporated into the contract only if enumerated in the Agreement, and each alternate's cost or credit represents a net addition to or deduction from the Contract Sum. The primary alternate specified involves the replacement of the Main Service Entrance switchboard (SWBD-A), which shall match existing switchboard ratings for voltage, amperage, and kAIC ratings as documented in existing drawings and photographs.
The switchboard replacement alternate requires all inclusive Code compliance measures including surge protection, arc energy reducing maintenance switches, arc flash calculations, and appropriate labeling. Bidders are responsible for confirming all equipment sizes against the one-line diagram and must report any discrepancies to the engineer. All accepted alternates are to be executed under the same conditions as other contract work, with bidders required to include all miscellaneous devices, accessory objects, and incidental items necessary for complete installation as part of their alternate proposals. The project is being procured through a Construction Management at Risk (CMR) services contract under AIA Document A133-2019 with payment structured as Cost of the Work Plus a Fee with a Guaranteed Maximum Price.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Garden City ES Renovations Savannah-Chatham County Public Schools
100% Construction Documents R2 August 7, 2026
Addendum 1, September 8, 2026
SSOE, Inc.
Project No. 025-00581-00
012300 - 1
ALTERNATES
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 012300 - ALTERNATES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for alternates.
1.2 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if the Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. Alternates described in this Section are part of the Work only if enumerated in the Agreement.
2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternates into the Work. No other adjustments are made to the Contract Sum.
1.3 PROCEDURES
A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include, as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation, whether or not indicated as part of alternate.
B. Execute accepted alternates under the same conditions as other Work of the Contract.
C. Schedule: A Part 3 "Schedule of Alternates" Article is included at the end of this Section.
Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
A. Main Service Entrance switchboard (SWBD-A on Electrical One-line) is to be replaced as an Add Alternate.
1. Replacement should match existing switchboard ratings (voltage, amps, kAIC, etc). Equipment ratings shown on one line have been taken from existing drawings and photographs, confirm all equipment sizes and all discrepancies shall be
Garden City ES Renovations Savannah-Chatham County Public Schools
100% Construction Documents R2 August 7, 2026
Addendum 1, September 8, 2026
SSOE, Inc.
Project No. 025-00581-00
012300 - 2
ALTERNATES
Copyright © 2024 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S.
Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
brought to the attention of the engineer. Replacement of switchboard shall include all required and necessary Code requirements, including but not limited to; surge protection, arc energy reducing maintenance switch, arc flash calculations, and labels, etc.
END OF SECTION 012300