1-RFP C27-03 - A133-2019 Sample Contract.pdf
PDF 656 KB Posted
- Solicitation number
- RFP C27-03 (ESPLOST)
- Issued by
- Chatham County, Georgia
About this file
This is an AIA Document A133-2019 Standard Form of Agreement between the Savannah-Chatham County Public School System (SCCPSS) and a Construction Manager as Constructor for the Garden City Elementary School Renovation Project located at 4037 Kessler Avenue, Savannah, Georgia 31408. The agreement establishes the terms and conditions for Construction Management at Risk (CMR) services, which will be procured through formal sealed proposals (RFP C27-03) funded by ESPLOST. The Construction Manager will provide both preconstruction phase services—including preliminary program evaluation, cost estimating, scheduling, constructability analysis, and recommendations on materials and building systems—and construction phase services involving overall project administration, cost control, daily site management, and progress monitoring. The contract structure includes two distinct phases: the preconstruction phase concluding with acceptance of a Guaranteed Maximum Price (GMP) proposal, and the construction phase commencing upon execution of the GMP Amendment. The Construction Manager must submit monthly updated project schedules in P-6 format (.XER files) and will be subject to liquidated damages of $1,000 per calendar day for failure to meet the Substantial Completion date specified in the agreement.
Compensation for preconstruction services shall be established on a fixed amount or hourly billing rate basis as specified in the agreement, with hourly rates covering all taxes, insurance, benefits, and customary employee benefits. Upon GMP acceptance, the Construction Manager's compensation for construction phase services consists of the Cost of the Work plus a fixed Construction Manager's Fee, with cost savings split equally between the Owner (50%) and the Construction Manager (50%) upon Final Completion. The Guaranteed Maximum Price includes a Construction Manager's contingency that may only be used with Owner approval through the District's Change Order process, with unused contingency reverting to the Owner. All change orders must be reviewed by project Architect/Engineer and District staff, with the Superintendent authorized to approve changes up to $50,000 without additional School Board approval; changes exceeding $50,000 require Board Resolution approval. The Construction Manager is required to furnish performance and payment bonds equal to 100% of the GMP, with bonds increased proportionally for any change order increasing the GMP by five percent or more. The Owner retains audit rights over all Construction Manager records for six years post-final payment, and disputes shall be resolved through litigation in Chatham County, Georgia state or federal courts, with the Construction Manager waiving any defense of lack of personal jurisdiction or improper venue.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D R
A F
T
Document A133
– 2019
Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed
Maximum Price
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (640e2aedf442e4498d096805)
ADDITIONS AND DELETIONS:
The author of this document may have revised the text of the original
AIA standard form. An Additions and
Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
AIA Document A201™–2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified.
ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.
This AGREEMENT is made as of the date upon which it is signed by the last party to sign this Agreement
(In words, indicate day, month, and year.)
BETWEEN the Owner:
(Name, legal status, address, and other information)
The Board of Public Education for the City of Savannah and the County of Chatham a/k/a The Savannah-Chatham County Public School System “SCCPSS”)
The public school district responsible for public education in the City of Savannah and
Chatham County, referred to herein as “Owner,” “SCCPSS,” or the “District”
208 Bull Street
Savannah, GA 31401 and the Construction Manager:
for the following Project:
(Name, location, and detailed description)
The Architect:
The Owner and Construction Manager agree as follows.
A F
T
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
TABLE OF ARTICLES
1 INITIAL INFORMATION
2 GENERAL PROVISIONS
3 CONSTRUCTION MANAGER’S RESPONSIBILITIES
4 OWNER’S RESPONSIBILITIES
5 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES
6 COMPENSATION FOR CONSTRUCTION PHASE SERVICES
7 COST OF THE WORK FOR CONSTRUCTION PHASE
8 DISCOUNTS, REBATES, AND REFUNDS
9 SUBCONTRACTS AND OTHER AGREEMENTS
10 ACCOUNTING RECORDS
11 PAYMENTS FOR CONSTRUCTION PHASE SERVICES
12 DISPUTE RESOLUTION
13 TERMINATION OR SUSPENSION
14 MISCELLANEOUS PROVISIONS
15 SCOPE OF THE AGREEMENT
ARTICLE 1 INITIAL INFORMATION
§ 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1.
(For each item in this section, insert the information or a statement such as “not applicable” or “unknown at time of execution.”)
§ 1.1.1 The Owner’s program for the Project, as described in Section 4.1.1:
(Insert the Owner’s program, identify documentation that establishes the Owner’s program, or state the manner in which the program will be developed.)
§ 1.1.2 The Project’s physical characteristics:
(Identify or describe pertinent information about the Project’s physical characteristics, such as size; location; dimensions;
geotechnical reports; site boundaries; topographic surveys; traffic and utility studies; availability of public and private utilities and services; legal description of the site, etc.)
§ 1.1.3 The Owner’s budget for the Guaranteed Maximum Price, as defined in Article 6:
(Provide total and, if known, a line item breakdown.)
A
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
§ 1.1.4 The Owner’s anticipated design and construction milestone dates:
.1 Design phase milestone dates, if any:
.2 Construction commencement date:
Upon the issuance of a notice to proceed by Owner after execution of this Agreement.
.3 Substantial Completion date or dates:
.4 Other milestone dates:
§ 1.1.5 The Owner’s requirements for accelerated or fast-track scheduling, or phased construction, are set forth below:
(Identify any requirements for fast-track scheduling or phased construction.)
§ 1.1.6 The Owner’s anticipated Sustainable Objective for the Project:
(Identify and describe the Owner’s Sustainable Objective for the Project, if any.)
§ 1.1.6.1 If the Owner identifies a Sustainable Objective, the Owner and Construction Manager shall complete and incorporate
AIA Document E234™–2019, Sustainable Projects Exhibit, Construction Manager as Constructor Edition, into this
Agreement to define the terms, conditions and services related to the Owner’s Sustainable Objective. If E234–2019 is incorporated into this agreement, the Owner and Construction Manager shall incorporate the completed E234–2019 into the agreements with the consultants and contractors performing services or Work in any way associated with the Sustainable
Objective.
§ 1.1.7 Other Project information:
(Identify special characteristics or needs of the Project not provided elsewhere.)
§ 1.1.8 The Owner identifies the following representative in accordance with Section 4.2:
(List name, address, and other contact information.)
§ 1.1.9 The persons or entities, in addition to the Owner’s representative, who are required to review the Construction
Manager’s submittals to the Owner are as follows:
(List name, address and other contact information.)
§ 1.1.10 The Owner shall retain the following consultants and contractors:
(List name, legal status, address, and other contact information.)
A
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
.1 Geotechnical Engineer:
.2 Civil Engineer:
.3 Other, if any:
(List any other consultants retained by the Owner, such as a Project or Program Manager.)
§ 1.1.11 The Architect’s representative:
§ 1.1.12 The Construction Manager identifies the following representative in accordance with Article 3:
§ 1.1.13 The Owner’s requirements for the Construction Manager’s staffing plan for Preconstruction Services, as required under Section 3.1.9:
(List any Owner-specific requirements to be included in the staffing plan.)
§ 1.1.14 The Owner’s requirements for subcontractor procurement for the performance of the Work:
(List any Owner-specific requirements for subcontractor procurement.)
§ 1.1.15 Other Initial Information on which this Agreement is based:
§ 1.2 The Owner and Construction Manager may rely on the Initial Information. Both parties, however, recognize that such information may materially change and, in that event, the Owner or the Construction Manager may seek the execution of a
Change Order as to the project scope, project budget, the Guaranteed Maximum Price, or the Construction Manager’s compensation. All Change Orders must be approved by the Owner pursuant to Board Policy FGG. Under current policy FGG, all change orders must be reviewed by the project Architect/Engineer, appropriate District and Program Management staff, which sometimes reviews Change Orders through a committee called the Change Control Board (“CCB”), as designated by the Superintendent before being recommended for further approval. The Superintendent is delegated authority to approve and sign Change Orders which will change the overall amount of a contract (up or down) by $50,000 or less, but cannot approve and sign Change Orders for changes in excess of $50,000. All Change Orders which will change the overall amount of a contract (up or down) by more than $50,000 must be documented as a Board Resolution. Upon approval by the Board, a Change Order may be signed by the Board President, the Superintendent, or the Chief Financial Officer. A summary of all approved Change Orders will be provided to the Board of Education quarterly as an information item. If Policy FGG is amended to change the process or dollar amount of approval levels after execution of this contract, the terms of the updated policy will control.
If Owner and Construction Manager cannot reach agreement on a Change Order, then Owner may direct Construction Manager to proceed with any changes in the Work with the cost to be determined by Construction Change Directive.
§ 1.3 Owner will notify Construction Manager of any changes to the Owner’s Representative within seven (7) days of any change. Similarly, Construction Manager will notify Owner of any changes to the Construction Manager’s representative within seven (7) days of any change.
A
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
ARTICLE 2 GENERAL PROVISIONS
§ 2.1 The Contract Documents
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other
Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this
Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract and are as fully a part of the Contract as if attached to this Agreement or repeated herein. Upon the Owner’s acceptance of the Construction
Manager’s Guaranteed Maximum Price proposal, the Contract Documents will also include the documents described in
Section 3.2.3 and identified in the Guaranteed Maximum Price Amendment and revisions prepared by the Architect and furnished by the Owner as described in Section 3.2.8. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. If anything in the other
Contract Documents, other than a Modification, is inconsistent with this Agreement, this Agreement shall govern. An enumeration of the Contract Documents, other than a Modification, appears in Article 15.
§ 2.2 Relationship of the Parties
The Construction Manager accepts the relationship of trust and confidence established by this Agreement and covenants with the Owner to cooperate with the Architect and exercise the Construction Manager’s skill and judgment in furthering the interests of the Owner to furnish efficient construction administration, management services, and supervision; to furnish at all times an adequate supply of workers and materials; and to perform the Work in an expeditious and economical manner consistent with the Owner’s interests. The Owner agrees to furnish or approve, in a timely manner, information required by the Construction Manager and to make payments to the Construction Manager in accordance with the requirements of the
Contract Documents.
§ 2.3 General Conditions
§ 2.3.1 For the Preconstruction Phase, AIA Document A201™–2017, General Conditions of the Contract for Construction, shall apply as follows: Section 1.5, Ownership and Use of Documents; Section 1.7, Digital Data Use and Transmission;
Section 1.8, Building Information Model Use and Reliance; Section 2.2.4, Confidential Information; Section 3.12.10, Professional Services; Section 10.3, Hazardous Materials; Section 13.1, Governing Law. The term “Contractor” as used in
A201–2017 shall mean the Construction Manager.
§ 2.3.2 For the Construction Phase, the general conditions of the contract shall be as set forth in A201–2017, which document is incorporated herein by reference. The term “Contractor” as used in A201–2017 shall mean the Construction Manager.
ARTICLE 3 CONSTRUCTION MANAGER’S RESPONSIBILITIES
The Construction Manager’s Preconstruction Phase responsibilities are set forth in Sections 3.1 and 3.2, and in the applicable provisions of A201-2017 referenced in Section 2.3.1. The Construction Manager’s Construction Phase responsibilities are set forth in Section 3.3. The Owner and Construction Manager may agree, in consultation with the Architect, for the Construction
Phase to commence prior to completion of the Preconstruction Phase, in which case, both phases will proceed concurrently.
The Construction Manager shall identify a representative authorized to act on behalf of the Construction Manager with respect to the Project.
§ 3.1 Preconstruction Phase
§ 3.1.1 Extent of Responsibility
The Construction Manager shall exercise reasonable care in performing its Preconstruction Services. The Owner and Architect shall be entitled to rely on, and shall not be responsible for, the accuracy, completeness, and timeliness of services and information furnished by the Construction Manager. The Construction Manager, however, does not warrant or guarantee estimates and schedules except as may be included as part of the Guaranteed Maximum Price. The Construction Manager is not required to ascertain that the Drawings and Specifications are in accordance with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, but the Construction Manager shall promptly report to the
Architect and Owner any nonconformity discovered by or made known to the Construction Manager as a request for information in such form as the Architect may require.
§ 3.1.2 The Construction Manager shall provide a preliminary evaluation of the Owner’s program, schedule and construction budget requirements, each in terms of the other.
A
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
§ 3.1.3 Consultation
§ 3.1.3.1 The Construction Manager shall schedule and conduct meetings with the Architect and Owner to discuss such matters as procedures, progress, coordination, and scheduling of the Work.
§ 3.1.3.2 The Construction Manager shall advise the Owner and Architect on proposed site use and improvements, selection of materials, building systems, and equipment. The Construction Manager shall also provide recommendations to the Owner and
Architect, consistent with the Project requirements, on constructability; availability of materials and labor; time requirements for procurement, installation and construction; prefabrication; and factors related to construction cost including, but not limited to, costs of alternative designs or materials, preliminary budgets, life-cycle data, and possible cost reductions. The
Construction Manager shall consult with the Architect regarding professional services to be provided by the Construction
Manager during the Construction Phase.
§ 3.1.3.3 The Construction Manager shall assist the Owner and Architect in establishing written protocols for the development, use, transmission, reliance, and exchange of digital data, including building information models for the Project.
§ 3.1.4 Project Schedule
When Project requirements in Section 4.1.1 have been sufficiently identified, the Construction Manager shall prepare and update a Project schedule monthly for the Architect’s review and the Owner’s acceptance. The Construction Manager shall obtain the Architect’s approval for the portion of the Project schedule relating to the performance of the Architect’s services.
The Project schedule shall coordinate and integrate the Construction Manager’s services, the Architect’s services, other
Owner consultants’ services, and the Owner’s responsibilities; and identify items that affect the Project’s timely completion.
The updated Project schedule shall include the following: submission of the Guaranteed Maximum Price proposal;
components of the Work; times of commencement and completion required of each Subcontractor; ordering and delivery of products, including those that must be ordered in advance of construction; and the occupancy requirements of the Owner.
The Project schedule shall accurately depict a feasible critical path for reaching Substantial Completion and Final Completion by the dates set forth in Guaranteed Maximum Price Amendment. The Contractor’s construction schedule shall be submitted in the “P-6” format in a ".XER” file so that the Owner, Architect, and their other Consultants, may analyze the schedule to make sure it is feasible and properly sequenced. Schedules shall be updated monthly and revised if necessary to accurately account for changes in the critical path for any reason, including approved Change Order work or Contractor delay. Failure to initially provide or maintain an accurate schedule will be a basis for declaring the Contractor in default, which, if not cured withing fourteen days (14) upon receipt of notice by the District, may result in the termination of the Contractor for cause.
§ 3.1.5 Phased Construction
The Construction Manager, in consultation with the Architect, shall provide recommendations with regard to accelerated or fast-track scheduling, procurement, and sequencing for phased construction. The Construction Manager shall take into consideration cost reductions, cost information, constructability, provisions for temporary facilities, and procurement and construction scheduling issues.
§ 3.1.6 Cost Estimates
§ 3.1.6.1 Based on the preliminary design and other design criteria prepared by the Architect, the Construction Manager shall prepare, for the Architect’s review and the Owner’s approval, preliminary estimates of the Cost of the Work or the cost of program requirements using area, volume, or similar conceptual estimating techniques. If the Architect or Construction
Manager suggests alternative materials and systems, the Construction Manager shall provide cost evaluations of those alternative materials and systems.
§ 3.1.6.2 As the Architect progresses with the preparation of the Schematic Design, Design Development and Construction
Documents, the Construction Manager shall prepare and update, at appropriate intervals agreed to by the Owner, Construction
Manager and Architect, an estimate of the Cost of the Work with increasing detail and refinement. The Construction Manager shall include in the estimate those costs to allow for the further development of the design, price escalation, and market conditions, until such time as the Owner and Construction Manager agree on a Guaranteed Maximum Price for the Work.
The estimate shall be provided for the Architect’s review and the Owner’s approval. The Construction Manager shall inform the Owner and Architect in the event that the estimate of the Cost of the Work exceeds the latest approved Project budget, and make recommendations for corrective action.
A
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
§ 3.1.6.3 If the Architect is providing cost estimating services as a Supplemental Service, and a discrepancy exists between the
Construction Manager’s cost estimates and the Architect’s cost estimates, the Construction Manager and the Architect shall work together to reconcile the cost estimates.
§ 3.1.7 As the Architect progresses with the preparation of the Schematic Design, Design Development and Construction
Documents, the Construction Manager shall consult with the Owner and Architect and make recommendations regarding constructability and schedules, for the Architect’s review and the Owner’s approval.
§ 3.1.8 The Construction Manager shall provide recommendations and information to the Owner and Architect regarding equipment, materials, services, and temporary Project facilities.
§ 3.1.9 The Construction Manager shall provide a staffing plan for Preconstruction Phase services for the Owner’s review and approval.
§ 3.1.10 If the Owner identified a Sustainable Objective in Article 1, the Construction Manager shall fulfill its Preconstruction
Phase responsibilities as required in AIA Document E234™–2019, Sustainable Projects Exhibit, Construction Manager as
Constructor Edition, attached to this Agreement.
§ 3.1.11 Subcontractors and Suppliers
§ 3.1.11.1 If the Owner has provided requirements for subcontractor procurement in section 1.1.14, the Construction Manager shall provide a subcontracting plan, addressing the Owner’s requirements, for the Owner’s review and approval.
§ 3.1.11.2 The Construction Manager shall develop bidders’ interest in the Project.
§ 3.1.11.3 The processes described in Article 9 shall apply if bid packages will be issued during the Preconstruction Phase.
§ 3.1.12 Procurement
The Construction Manager shall prepare, for the Architect’s review and the Owner’s acceptance, a procurement schedule for items that must be ordered in advance of construction. The Construction Manager shall expedite and coordinate the ordering and delivery of materials that must be ordered in advance of construction. If the Owner agrees to procure any items prior to the establishment of the Guaranteed Maximum Price, the Owner shall procure the items on terms and conditions acceptable to the Construction Manager. Upon the establishment of the Guaranteed Maximum Price, the Owner shall assign all contracts for these items to the Construction Manager and the Construction Manager shall thereafter accept responsibility for them.
§ 3.1.13 Compliance with Laws
The Construction Manager shall comply with applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities applicable to its performance under this Contract, and with equal employment opportunity programs, and other programs as may be required by governmental and quasi-governmental authorities.
§ 3.1.14 Other Preconstruction Services
Insert a description of any other Preconstruction Phase services to be provided by the Construction Manager, or reference an exhibit attached to this document
(Describe any other Preconstruction Phase services, such as providing cash flow projections, development of a project information management system, early selection or procurement of subcontractors, etc.)
§ 3.2 Guaranteed Maximum Price Proposal
§ 3.2.1 At a time to be mutually agreed upon by the Owner and the Construction Manager, the Construction Manager shall prepare a Guaranteed Maximum Price proposal for the Owner’s and Architect’s review, and the Owner’s acceptance. The
Guaranteed Maximum Price in the proposal shall be the sum of the Construction Manager’s estimate of the Cost of the Work, the Construction Manager’s contingency described in Section 3.2.4, and the Construction Manager’s Fee described in Section
6.1.2.
A
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
§ 3.2.2 To the extent that the Contract Documents are anticipated to require further development, the Guaranteed Maximum
Price includes the costs attributable to such further development consistent with the Contract Documents and reasonably inferable therefrom. Such further development does not include changes in scope, systems, kinds and quality of materials, finishes, or equipment, all of which, if required, shall be incorporated by Change Order.
§ 3.2.3 The Construction Manager shall include with the Guaranteed Maximum Price proposal a written statement of its basis, which shall include the following:
.1 A list of the Drawings and Specifications, including all Addenda thereto, and the Conditions of the Contract;
.2 A list of the clarifications and assumptions made by the Construction Manager in the preparation of the
Guaranteed Maximum Price proposal, including assumptions under Section 3.2.2;
.3 A statement of the proposed Guaranteed Maximum Price, including a statement of the estimated Cost of the
Work organized by trade categories or systems, including allowances; the Construction Manager’s contingency set forth in Section 3.2.4; and the Construction Manager’s Fee;
.4 The anticipated date of Substantial Completion upon which the proposed Guaranteed Maximum Price is based;
and
.5 A date by which the Owner must accept the Guaranteed Maximum Price.
§ 3.2.4 In preparing the Construction Manager’s Guaranteed Maximum Price proposal, the Construction Manager shall include a Construction Manager’s Contingency in the Schedule of Values. The approved Construction Manager’s Contingency may only be used for reimbursable Cost of Work items not expressly listed elsewhere in the approved Schedule of Values. If the
Construction Manager wishes to use the Construction Contingency, then before performing the work for which the
Construction Contingency is sought to be used, the Construction Manager shall submit a Change Order through the Owner’s
Project Management Information System (currently e-Builder) indicating the proposed used of the Contingency and further showing a negative reduction of the Contingency and its application to another line in the Schedule of Values. If the requested Change Order is approved by the Architect and the Owner, pursuant to the Board Policy on Change Orders, then
Construction Manager may proceed with the Change Order work and assign it to the existing project contingency. Any unused Contingency shall revert to the Owner upon Final Completion of the Project.
§ 3.2.5 The Construction Manager shall meet with the Owner and Architect to review the Guaranteed Maximum Price proposal. In the event that the Owner or Architect discover any inconsistencies or inaccuracies in the information presented, they shall promptly notify the Construction Manager, who shall make appropriate adjustments to the Guaranteed Maximum
Price proposal, its basis, or both.
§ 3.2.6 If the Owner notifies the Construction Manager that the Owner has accepted the Guaranteed Maximum Price proposal in writing before the date specified in the Guaranteed Maximum Price proposal, the Guaranteed Maximum Price proposal shall be deemed effective without further acceptance from the Construction Manager. Following acceptance of a Guaranteed
Maximum Price, the Owner and Construction Manager shall execute the Guaranteed Maximum Price Amendment amending this Agreement, a copy of which the Owner shall provide to the Architect. The Guaranteed Maximum Price Amendment shall set forth the agreed upon Guaranteed Maximum Price with the information and assumptions upon which it is based.
§ 3.2.7 The Construction Manager shall not incur any cost to be reimbursed as part of the Cost of the Work prior to the execution of the Guaranteed Maximum Price Amendment, unless the Owner provides prior written authorization for such costs.
§ 3.2.8 The Owner shall authorize preparation of revisions to the Contract Documents that incorporate the agreed-upon assumptions and clarifications contained in the Guaranteed Maximum Price Amendment. The Owner shall promptly furnish such revised Contract Documents to the Construction Manager. The Construction Manager shall notify the Owner and
Architect of any inconsistencies between the agreed-upon assumptions and clarifications contained in the Guaranteed
Maximum Price Amendment and the revised Contract Documents.
§ 3.2.9 The Construction Manager shall include in the Guaranteed Maximum Price all sales, consumer, use and similar taxes for the Work provided by the Construction Manager that are legally enacted, whether or not yet effective, at the time the
Guaranteed Maximum Price Amendment is executed.
A
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
§ 3.3 Construction Phase
§ 3.3.1 General
§ 3.3.1.1 For purposes of Section 8.1.2 of A201–2017, the date of commencement of the Work shall mean the date of commencement of the Construction Phase.
§ 3.3.1.2 The Construction Phase shall commence upon the Owner’s execution of the Guaranteed Maximum Price Amendment or, prior to acceptance of the Guaranteed Maximum Price proposal, by written agreement of the parties. The written agreement shall set forth a description of the Work to be performed by the Construction Manager, and any insurance and bond requirements for Work performed prior to execution of the Guaranteed Maximum Price Amendment.
§ 3.3.2 Administration
§ 3.3.2.1 The Construction Manager shall schedule and conduct meetings to discuss such matters as procedures, progress, coordination, scheduling, and status of the Work. The Construction Manager shall prepare and promptly distribute minutes of the meetings to the Owner and Architect.
§ 3.3.2.2 Upon the execution of the Guaranteed Maximum Price Amendment, the Construction Manager shall prepare and submit to the Owner and Architect a construction schedule for the Work and a submittal schedule in accordance with Section
3.10 of A201–2017.
§ 3.3.2.3 Monthly Report
The Construction Manager shall record the progress of the Project. If requested by the Owner, the Construction Manager shall submit written progress reports to the Owner and Architect, showing percentages of completion and other information required by the Owner, on a monthly basis, or otherwise as agreed to by the Owner.
§ 3.3.2.4 Daily Logs
The Construction Manager shall keep, and make available to the Owner and Architect, a daily log containing a record for each day of weather, portions of the Work in progress, number of workers on site, identification of equipment on site, problems that might affect progress of the work, accidents, injuries, and other information required by the Owner.
§ 3.3.2.5 Cost Control
The Construction Manager shall develop a system of cost control for the Work, including regular monitoring of actual costs for activities in progress and estimates for uncompleted tasks and proposed changes. The Construction Manager shall identify variances between actual and estimated costs and report the variances to the Owner and Architect, and shall provide this information in its monthly applications for payment.
ARTICLE 4 OWNER’S RESPONSIBILITIES
§ 4.1 Information and Services Required of the Owner
§ 4.1.1 The Owner shall provide information with reasonable promptness, regarding requirements for and limitations on the
Project, including a written program which shall set forth the Owner’s objectives, constraints, and criteria, including schedule, space requirements and relationships, flexibility and expandability, special equipment, systems, sustainability and site requirements.
§ 4.1.2 [Reserved]
§ 4.1.3 The Owner shall establish and periodically update the Owner’s budget for the Project, including (1) the budget for the
Cost of the Work as defined in Article 7, (2) the Owner’s other costs, and (3) reasonable contingencies related to all of these costs. If the Owner significantly increases or decreases the Owner’s budget for the Cost of the Work, the Owner shall notify the Construction Manager and Architect. The Owner, in consultation with the Architect, and the Construction Manager, may thereafter make changes to the Project budget by Change Order or the Owner, in consultation with the Architect but without agreement by the Construction Manager, may make a change to the Project budget by a Change Order approved by
Construction Change Directive.
§ 4.1.4 Structural and Environmental Tests, Surveys and Reports. During the Preconstruction Phase, the Owner shall furnish the following information or services with reasonable promptness. The Owner shall also furnish any other information or services under the Owner’s control and relevant to the Construction Manager’s performance of the Work with reasonable promptness
A
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
after receiving the Construction Manager’s written request for such information or services. The Construction Manager shall be entitled to rely on the accuracy of information and services furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work.
§ 4.1.4.1 The Owner shall furnish tests, inspections, and reports, required by law and as otherwise agreed to by the parties, such as structural, mechanical, and chemical tests, tests for air and water pollution, and tests for hazardous materials.
§ 4.1.4.2 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a written legal description of the site. The surveys and legal information shall include, as applicable, grades and lines of streets, alleys, pavements and adjoining property and structures; designated wetlands; adjacent drainage; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the site; locations, dimensions and other necessary data with respect to existing buildings, other improvements and trees; and information concerning available utility services and lines, both public and private, above and below grade, including inverts and depths.
All the information on the survey shall be referenced to a Project benchmark.
§ 4.1.4.3 The Owner, when such services are requested, shall furnish services of geotechnical engineers, which may include test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, seismic evaluation, ground corrosion tests and resistivity tests, including necessary operations for anticipating subsoil conditions, with written reports and appropriate recommendations.
§ 4.1.5 During the Construction Phase, the Owner shall furnish information or services required of the Owner by the Contract
Documents with reasonable promptness. The Owner shall also furnish any other information or services under the Owner’s control and relevant to the Construction Manager’s performance of the Work with reasonable promptness after receiving the
Construction Manager’s written request for such information or services.
§ 4.1.6 If the Owner identified a Sustainable Objective in Article 1, the Owner shall fulfill its responsibilities as required in
AIA Document E234™–2019, Sustainable Projects Exhibit, Construction Manager as Constructor Edition, attached to this
Agreement.
§ 4.2 Owner’s Designated Representative
The Owner’s Superintendent shall identify a representative authorized to act on behalf of the Owner with respect to the
Project. Subject to more specific direction of the Owner’s Superintendent or its governing body, the Elected School Board, The Owner’s representative shall render decisions promptly and furnish information expeditiously, so as to avoid unreasonable delay in the services or Work of the Construction Manager. Except as otherwise provided in Section 4.2.1 of
A201–2017, the Architect does not have such authority. The term “Owner” means the Owner or the Owner’s authorized representative.
Construction Manager further agrees that no Change Order or other claimed modification to this Agreement that would change the Project Cost is enforceable against the District without the approval of the District’s governing body, the elected
School Board, or the elected School Board’s designee by a formal policy of the elected School Board, such as Policy FGG, which gives the Superintendent authority to approve certain Change Orders under $50,000 (up or down) without additional
School Board approval. The signature of the President of the elected School Board, the Superintendent, the Chief Financial
Officer, the Owner’s Representative, or any other person purporting to act on behalf of the District is only binding on the
District if that person’s execution of this Agreement or a subsequent Change Order or other written amendment of this
Agreement has been authorized by the School Board and/or Board Policy. If it is subsequently determined that this
Agreement or any claimed Change Order or written modification to this Agreement was signed without proper authority from the District’s governing body, the elected School Board, (either by standing Board Policy or special direction of the Board) then the Construction Manager agrees that this Agreement or any claimed written modification of this Agreement shall be void and not constitute a binding contract or written amendment on the District. The Construction Manager agrees that it may have to repay any and all sums it may receive from the District pursuant to any alleged contract or alleged Change Order or other claimed written modification of a contract that was not property authorized by the District’s School Board or its designee under Board Policy.
While the Architect shall serve as an agent for Owner pursuant to the terms of the Architect’s contract with the Owner, the
Architect shall not be considered the “Owner’s Representative” as that term is used in this Agreement or otherwise in the management of the Project. The term “Owner” means the Owner or the Owner’s authorized representative.
A
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
§ 4.2.1 Legal Requirements. The Owner shall be responsible for retaining at its own expense its own legal, insurance and accounting service professionals, including auditing services, that may be reasonably necessary at any time for the Project to meet the Owner’s needs and interests. The Architect and Construction Manager are responsible for retaining their own legal, insurance, and accounting services professionals at their own expense.
§ 4.3 Architect
The Owner shall retain an Architect to provide services, duties and responsibilities for the Project through a separate contract of Owner’s choosing. The Owner shall provide the Construction Manager with a copy of the scope of services in the executed agreement between the Owner and the Architect, and any further modifications to the Architect’s scope of services in the agreement.
Documents prepared by the Architect are instruments of the Architect’s service for use solely with respect to this Project.
Depending on the terms of the contract between Owner and Architect, the Documents prepared by the Architect shall be either property of the Owner or property of the Architect licensed to Owner for use on the Project. The Contractor, subcontractors, sub-subcontractors, and suppliers are authorized to use and reproduce the instruments of service solely and exclusively for execution of the Work. The instruments of service may not be used for other Projects or for additions to this Project outside the scope of the Work without the specific written consent of the Architect and Owner.
ARTICLE 5 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES
§ 5.1 Compensation
§ 5.1.1 For the Construction Manager’s Preconstruction Phase services described in Sections 3.1 and 3.2, the Owner shall compensate the Construction Manager as follows:
(Insert amount of, or basis for, compensation and include a list of reimbursable cost items, as applicable.)
§ 5.1.2 The hourly billing rates for Preconstruction Phase services of the Construction Manager and the Construction
Manager’s Consultants and Subcontractors, if any, are set forth below.
(If applicable, attach an exhibit of hourly billing rates or insert them below.)
Individual or Position Rate
§ 5.1.2.1 Hourly billing rates for Preconstruction Phase services include all costs to be paid or incurred by the Construction
Manager, as required by law or collective bargaining agreements, for taxes, insurance, contributions, assessments and benefits and, for personnel not covered by collective bargaining agreements, customary benefits such as sick leave, medical and health benefits, holidays, vacations and pensions, and shall remain unchanged unless the parties execute a Modification.
§ 5.1.3 [Reserved]
§ 5.2 Payments
§ 5.2.1 Unless otherwise agreed, payments for services shall be made monthly in proportion to services performed.
§ 5.2.2 Payments are due and payable upon presentation of the Construction Manager’s invoice. Amounts unpaid Forty ( 40 ) days after the invoice date shall bear interest at the rate entered below, or in the absence thereof at the legal rate prevailing from time to time at the principal place of business of the Construction Manager.
(Insert rate of monthly or annual interest agreed upon.)
5 % (per year)
A
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
ARTICLE 6 COMPENSATION FOR CONSTRUCTION PHASE SERVICES
§ 6.1 Contract Sum
§ 6.1.1 The Owner shall pay the Construction Manager the Contract Sum in current funds for the Construction Manager’s performance of the Contract after execution of the Guaranteed Maximum Price Amendment. The Contract Sum is the Cost of the Work as defined in Article 7 plus the Construction Manager’s Fee.
§ 6.1.2 The Construction Manager’s Fee:
(State a lump sum, percentage of Cost of the Work or other provision for determining the Construction Manager’s Fee.)
% CMR Fee
§ 6.1.3 The method of adjustment of the Construction Manager’s Fee for changes in the Work:
« Shall be by Change Order or Change Order approved Construction Change Directive as set forth in the AIA Document
A201™–2017, General Conditions of the Contract for Construction for the Project »
§ 6.1.4 Limitations, if any, on a Subcontractor’s overhead and profit for increases in the cost of its portion of the Work:
A Subcontractor shall be entitled to no more than fifteen percent (15%) overhead and profit resulting from additions to its portion of the changed Work.
§ 6.1.5 Rental rates for Construction Manager-owned equipment shall not exceed one hundred percent ( 100 %) of the standard rental rate paid at the place of the Project.
§ 6.1.6 Liquidated damages, if any:
(Insert terms and conditions for liquidated damages, if any.)
$1000/day per calendar day for Construction Manager’s failure to meet the Substantial Completion Date set forth in this
Agreement. Construction Manager agrees that the injury resulting to the Owner from failure to meeting the material completion date is difficult, if not impossible, to accurately estimate, and the parties intend this Liquidated Damages provision to be liquidated damages, not a penalty, and Construction Manager agrees that this is a reasonable pre-estimate of the Owner’s damages resulting from the failure to meeting the material completion date.
§ 6.1.7 Other:
(Insert provisions for bonus, cost savings or other incentives, if any, that might result in a change to the Contract Sum.)
§ 6.1.7.1 Cost Savings. Should the actual Cost of the Work, including the Construction Manager’s Fee, total less than the
Guaranteed Maximum Price, the Cost Savings will be apportioned as follows: Fifty percent (50%) to the Owner and Fifty percent (50%) to the Construction Manager. Any such Cost Savings will be distributed at the time Final Payment is made.
§ 6.2 Guaranteed Maximum Price
The Construction Manager guarantees that the Contract Sum shall not exceed the Guaranteed Maximum Price set forth in the
Guaranteed Maximum Price Amendment, subject to additions and deductions by Change Order as provided in the Contract
Documents. Costs which would cause the Guaranteed Maximum Price to be exceeded shall be paid by the Construction
Manager without reimbursement by the Owner.
§ 6.3 Changes in the Work
§ 6.3.1 The Owner may, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions. The Owner shall issue such changes in writing by Change Order agreed to by Owner, Architect, and Construction Manager, or Change Orders approved only by Owner and Architect without agreement by Construction Manager by Construction Change Directive as set forth in the AIA Document A201™–2017, General
Conditions of the Contract for Construction for the Project..
§ 6.3.1.1 The Architect may order minor changes in the Work (with no change in the Contract Sum or Contract Time) as
A
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 13:24:25 EST on 12/08/2025 under Subscription No.20240058424 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
provided in Article 7 of AIA Document A201–2017, General Conditions of the Contract for Construction.
§ 6.3.2 Adjustments to the Guaranteed Maximum Price on account of changes in the Work subsequent to the execution of the
Guaranteed Maximum Price Amendment may be determined by any of the methods listed in Article 7 of AIA Document
A201–2017, General Conditions of the Contract for Construction.
§ 6.3.3 Adjustments to subcontracts awarded on the basis of a stipulated sum shall be determined in accordance with Article 7 of A201–2017, as they refer to “cost” and “fee,”…