This is an Addendum 1 document containing Requests for Clarification (RFCs) and answers for the Natatorium Boiler Replacement project at Rochester Adams High School in Michigan, issued by Rochester Community Schools on June 16, 2026. The project involves the replacement of domestic water heaters and boilers in the natatorium facility. The RFP clarifications address specifications for three domestic water heaters, the provision of Cleaver Brooks CFCE-700-2000-125-HW boiler models to replace existing Patterson Kelley units, breaching and chimney specifications, and exhaust flue and intake routing requirements. Key clarifications confirm that if both boilers are replaced under Mandatory Alternate #3, they must be completed sequentially to maintain one active boiler during heating season, and that the existing primary pump CP-1N should remain in place. A pre-bid attendee list is referenced as an attachment to the document.
The project specifications indicate natural gas-fired condensing boilers with a 2000 MBH input rating, 125 psi design rating, and hot water applications. Relief valves are set at 60 psi and can be adjusted if required by design. D.J. Conley Associates, Inc. provided equipment specifications and a proposal with pricing to follow, including freight costs and startup and training services. The proposal specifies a lead time of 2-3 weeks from order placement, with payment terms of 30 days net upon shipment notification. CSI's East Branch Manager, Scott Claerhout, serves as the point of contact for the project (e-mail: Sclaerhout@csibas.com; phone: 248-434-6270).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 27.01 Addendum 2.pdf | ||
| 27.01 Advertisement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 16, 2026
Request for Proposal Clarification
27.01 - Natatorium Boiler Replacement – Rochester Adams High School
Addendum 1
QUESTIONS:
1. The Domestic Water Heater Schedule calls out 3-DWH's only 2 are shown. Missing Boiler Room #104? Missing Boiler schedule and specification. Missing Breechings, chimneys, and stacks spec. Exhaust flues& Intakes will need to be ran up the wall. Please provide elevations and sections. CUH-1N is missing from the plans.
Answer: Sheet M 7.05 was issued with the RFP for reference. Refer to sheet M7.03 with the pertinent information on the existing boilers.
2. Provide 2018 mechanical schedule sheet that includes the correct PK boiler information?
Answer: Refer to sheet M7.03 with the pertinent information on the existing boilers.
3. Provide Cleaver Brooks model # to replace the PKs with: Refer to the attached information provided by DJ Conley on the boiler specifications?
Answer: The Cleaver Brooks CFCE model would be "CFCE-700-2000-125-HW". The relief valve would be set at 60 psi, but can be changed if needed by design.
CFCE = Cleaver Brooks Model 700 = Natural Gas 2000 = MBH Input Rating 125 = Boiler Pressure Vessel Design Rating HW = Hot Water Application ("H" code stamp)
4. Clarify desired schedule to have work completed and if mandatory alternate #3 is accepted, that both boilers can be demo'd / removed at the same time?
Answer: If both boilers are to be replaced, then they would have to be completed one at a time to keep one boiler active or wait to replace them after the heating season when the boilers are not needed.
5. Clarify intent for primary pump CP-1N (the one that currently runs) if mandatory alternate #3 is accepted. i.e. should it be rebuilt / replaced or shall existing remain?
Answer: Pump CP-1N is to remain.
6. Provide CSI point of contact?
Answer: Scott Claerhout / East Branch Manager: e-mail: Sclaerhout@csibas.com , Office: 248 434-6270, Mobile 248 420-4340 Address: 1618 Star-Batt Drive, Rochester Hills, MI 48309.
7. Provide Pre-bid attendee list?
Answer: See attached attendance list.
2015-074
SHEET NUMBER
PROJECT NUMBER
SHEET
PROJECT
DRAWN
APPROVED
CHECKED
ISSUE DATE ISSUED FOR
KEY PLAN
Rochester Community
Michigan Rochester Hills, Adams High School Schools associates
F 248.656.7746 T 248.656.1377 48307 Rochester, MI
FRENCH
architects planners interiors
5145 Livernois, Suite 100
Troy, Michigan 48098-3276
Tel: 248-879-5666 Fax: 248-879-0007 www.PeterBassoAssociates.com
CONSULTING ENGINEERS
Peter Basso Associates Inc
PBA Project No.: 2016-0105
236 Mill Street
Remodel
AutoCAD SHX Text
DUCT SYSTEM APPLICATION SCHEDULE
AutoCAD SHX Text
DUCT MATERIAL
AutoCAD SHX Text
AIR SYSTEMS
AutoCAD SHX Text
G90 GALV. SHEET METAL
AutoCAD SHX Text
DOUBLE-WALL LINED G90 GALV. SHEET METAL (SOLID INNER WALL)
AutoCAD SHX Text
DOUBLE-WALL LINED G90 GALV. SHEET METAL (PERF. INNER WALL)
AutoCAD SHX Text
G90 GALV. SHEET METAL WITH 1-INCH LINING
AutoCAD SHX Text
GALVANNEALED SHEET METAL
AutoCAD SHX Text
ALUMINUM
AutoCAD SHX Text
TYPE 304 STAINLESS STEEL
AutoCAD SHX Text
TYPE 316 STAINLESS STEEL
AutoCAD SHX Text
PVC COATED GALV. SHEET METAL (4X1)
AutoCAD SHX Text
PVC COATED GALV. SHEET METAL (1X4)
AutoCAD SHX Text
PVC COATED GALV. SHEET METAL (4X4)
AutoCAD SHX Text
16 GA. CARBON STEEL
AutoCAD SHX Text
ZERO-CLEARANCE PREFABRICATED RANGE HOOD EXHAUST DUCT
AutoCAD SHX Text
FABRIC
AutoCAD SHX Text
DESIGN PRESSURE CLASS (INCHES WG)
AutoCAD SHX Text
SEAL CLASS
AutoCAD SHX Text
MAX. ALLOWABLE LEAKAGE RATE (PERCENT)
AutoCAD SHX Text
KEYED NOTES
AutoCAD SHX Text
SUPPLY AIR WITHOUT TERMINAL UNITS
AutoCAD SHX Text X
AutoCAD SHX Text +2
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
RETURN AIR WITHOUT TERMINAL UNITS
AutoCAD SHX Text X
AutoCAD SHX Text -2
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
EXHAUST AIR WITHOUT TERMINAL UNITS
AutoCAD SHX Text X
AutoCAD SHX Text -2
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SUPPLY AIR UPSTREAM OF TERMINAL UNITS
AutoCAD SHX Text X
AutoCAD SHX Text +6
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SUPPLY AIR DOWNSTREAM OF TERMINAL UNITS
AutoCAD SHX Text X
AutoCAD SHX Text +2
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
LOCKER ROOM AND WET AREA EXHAUST
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text -2
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AIR TRANSFER DUCT
AutoCAD SHX Text X
AutoCAD SHX Text +2
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
OUTSIDE AIR AND MIXED AIR DUCT
AutoCAD SHX Text X
AutoCAD SHX Text -6
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
OUTSIDE AIR, RELIEF AIR AND EXHAUST AIR PLENUMS ADJACENT TO EXTERIOR LOUVERS
AutoCAD SHX Text X
AutoCAD SHX Text +/-66
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text GENERAL NOTES 1. 'X' INDICATES ACCEPTABLE SELECTION. IF MORE THAN ONE SELECTION IS INDICATED FOR A DUCT SYSTEM, CONTRACTOR MAY SELECT FROM THOSE INDICATED SELECTIONS. 2. 4 X 1 PVC-COATED GALVANIZED STEEL: FACTORY-APPLIED PVC COATINGS SHALL BE 4 MILS (0.10 MM) THICK ON EXTERIOR SHEET METAL SURFACES OF DUCTS AND FITTINGS EXPOSED TO CORROSIVE CONDITIONS AND MINIMUM 1 MIL (0.025 MM) THICK ON INTERIOR SURFACES. 3. 1 X 4 (4 X 1 REVERSE COATED) PVC-COATED GALVANIZED STEEL: FACTORY-APPLIED PVC COATINGS SHALL BE 4 MILS (0.10 MM) THICK ON INTERIOR SHEET METAL SURFACES OF DUCTS AND FITTINGS EXPOSED TO CORROSIVE CONDITIONS AND MINIMUM 1 MIL (0.025 MM) THICK ON EXTERIOR SURFACES. 4. 4 X 4 PVC-COATED GALVANIZED STEEL: FACTORY-APPLIED PVC COATINGS SHALL BE 4 MILS (0.10 MM) THICK ON SHEET METAL SURFACES OF DUCTS AND FITTINGS EXPOSED TO CORROSIVE CONDITIONS AND 4 MILS (0.10 MM) THICK ON OPPOSITE SURFACES. KEYED NOTES A. SCREWS, DAMPERS, OR PROJECTIONS OF ANY TYPE ON INTERIOR OF DUCT SURFACE ARE PROHIBITED. B. DUCT SHALL BE LINED WITHIN 25 FEET UPSTREAM OF FANS. C. ALL WELDED CONSTRUCTION.
AutoCAD SHX Text
DUCT SYSTEM INSULATION APPLICATION SCHEDULE
AutoCAD SHX Text
INSULATION MATERIAL & THICKNESS (INCHES)
AutoCAD SHX Text
FIELD APPLIED JACKET MATERIAL
AutoCAD SHX Text
FIBERGLASS BLANKET 0.75 LB/CU FT
AutoCAD SHX Text
FIBERGLASS BLANKET 1.0 LB/CU FT
AutoCAD SHX Text
FIBERGLASS BOARD 2.25 LB/CU FT
AutoCAD SHX Text
FIBERGLASS BOARD 6.0 LB/CU FT
AutoCAD SHX Text
FLEXIBLE ELASTOMERIC
AutoCAD SHX Text
ASTM E2336 2-HOUR FIRE RATED BLANKET
AutoCAD SHX Text
2-HOUR FIRE RATED BLANKET
AutoCAD SHX Text
KEYED NOTES
AutoCAD SHX Text
ALUMINUM
AutoCAD SHX Text
SELF-ADHESIVE (FOR OUTDOOR APPLICATIONS)
AutoCAD SHX Text
DUCT SYSTEMS LOCATED INDOORS
AutoCAD SHX Text
SUPPLY AIR, EXCEPT AS NOTED BELOW
AutoCAD SHX Text 1.5
AutoCAD SHX Text A
AutoCAD SHX Text
RETURN AIR IN UNVENTED ATTICS ABOVE INSULATED CEILINGS
AutoCAD SHX Text 1.5
AutoCAD SHX Text EXHAUST AND RELIEF AIR BETWEEN ISOLATION DAMPER AND PENETRATION OF BUILDING EXTERIOR, EXCEPT AS NOTED BELOW
AutoCAD SHX Text 1.5
AutoCAD SHX Text LOCKER ROOM AND WET AREA EXHAUST BETWEEN EXHAUST GRILLE & CONNECTION TO GENERAL EXHAUST OR BETWEEN EXHAUST GRILLE AND PENETRATION OF BUILDING EXTERIOR
AutoCAD SHX Text 1.5
AutoCAD SHX Text PLENUMS, DUCTS, AND DUCT ACCESSORIES NOT REQUIRING INSULATION: FIBROUS-GLASS DUCTS DOUBLE-WALL METAL DUCTS WITH INSULATION OF SUFFICIENT THICKNESS TO COMPLY WITH ENERGY CODE AND ASHRAE/IESNA 90.1 - 2007 METAL DUCTS WITH DUCT LINER OF SUFFICIENT THICKNESS TO COMPLY WITH ENERGY CODE AND ASHRAE/IESNA 90.1 - 2007 EXPOSED SUPPLY DUCT IN CONDITIONED SPACE SERVED BY THAT SYSTEM FABRIC SUPPLY DUCTS FACTORY-INSULATED FLEXIBLE DUCTS FACTORY-INSULATED PLENUMS AND CASINGS FLEXIBLE CONNECTORS VIBRATION-CONTROL DEVICES FACTORY-INSULATED ACCESS PANELS AND DOORS
AutoCAD SHX Text GENERAL NOTES 1. 'X' OR THICKNESS IN INCHES INDICATE ACCEPTABLE SELECTION. IF MORE THAN ONE SELECTION IS INDICATED FOR A DUCT SYSTEM, CONTRACTOR MAY SELECT FROM THOSE INDICATED SELECTIONS. 2. REFER TO METAL DUCT SECTION OF SPECIFICATIONS FOR DUCT LINING AND DOUBLE-WALL INSULATED DUCT. 3. REFER TO HVAC CASINGS SECTION OF SPECIFICATIONS FOR DOUBLE-WALL INSULATED PLENUMS. KEYED NOTES A. INCLUDE INSULATION AROUND DUCT MOUNTED COILS AND AIR TERMINAL UNIT COILS. B. NUMBER OF LAYERS AND TOTAL INSULATION THICKNESS AS RECOMMENDED BY SELECTED MANUFACTURER. C. DOES NOT APPLY TO PREFABRICATED, ZERO-CLEARANCE GREASE DUCT. D. PROVIDE MANUFACTURER'S RECOMMENDED PROTECTIVE COATING FOR FLEXIBLE ELASTOMERIC THERMAL DUCT INSULATION. E. INSULATE DUCTWORK IN CRAWLSPACES, VENTILATED ATTICS, AND PARKING GARAGES HAVING NATURAL OR MECHANICAL VENTILATION THE SAME AS OUTDOOR DUCTWORK.
AutoCAD SHX Text
PACKAGED AIR COOLED LIQUID CHILLER SCHEDULE
AutoCAD SHX Text
UNIT NUMBER
AutoCAD SHX Text
CAPACITY TONS
AutoCAD SHX Text
CHILLED WATER
AutoCAD SHX Text
COMPRESSOR MOTOR
AutoCAD SHX Text
EFFICIENCY
AutoCAD SHX Text
CONDENSER
AutoCAD SHX Text
CONDENSER FAN MOTOR
AutoCAD SHX Text
MODULATION/ CONTROL TYPE
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
MODEL NUMBER
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
FLOW GPM
AutoCAD SHX Text
FLUID TYPE
AutoCAD SHX Text E.W.T. °F
AutoCAD SHX Text L.W.T. °F
AutoCAD SHX Text
MAXIMUM W.P.D. FT. HEAD
AutoCAD SHX Text
FOULING FACTOR
AutoCAD SHX Text
NUMBER OF COMPRESSOR
AutoCAD SHX Text
KW TOTAL
AutoCAD SHX Text
RLA EACH
AutoCAD SHX Text
MINIMUM FULL LOAD EER
AutoCAD SHX Text
MINIMUM IPLV (EER)
AutoCAD SHX Text
AMBIENT AIR TEMPERATURE °F
AutoCAD SHX Text
MINIMUM AMBIENT TEMPERATURE °F
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
FLA EACH
AutoCAD SHX Text
VOLTS
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
FLA
AutoCAD SHX Text
MOP
AutoCAD SHX Text
OPTIONS/ ACCESSORIES
AutoCAD SHX Text
CH-1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EG30
AutoCAD SHX Text 55.29
AutoCAD SHX Text 42.0
AutoCAD SHX Text 9.48
AutoCAD SHX Text 0.0001
AutoCAD SHX Text
AutoCAD SHX Text 426.2
AutoCAD SHX Text 339/235
AutoCAD SHX Text 10.02
AutoCAD SHX Text 17.11
AutoCAD SHX Text 95.0
AutoCAD SHX Text
AutoCAD SHX Text 12 /8
AutoCAD SHX Text 2.4
AutoCAD SHX Text
VFC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
YVAA0413HYV
AutoCAD SHX Text remarks
AutoCAD SHX Text NOTE: 1. REFER TO SCHEDULES GENERAL NOTES. 2. MODEL NUMBERS ARE YORK UNLESS OTHERWISE NOTED. 3. FLUID TYPE: W = WATER, PGXX = PROPYLENE GLYCOL SOLUTION XX PERCENTAGE OF GLYCOL, EGXX = ETHYLENE GLYCOL SOLUTION XX PERCENTAGE OF GLYCOL. XX PERCENTAGE OF GLYCOL, EGXX = ETHYLENE GLYCOL SOLUTION XX PERCENTAGE OF GLYCOL. PERCENTAGE OF GLYCOL, EGXX = ETHYLENE GLYCOL SOLUTION XX PERCENTAGE OF GLYCOL. XX PERCENTAGE OF GLYCOL. PERCENTAGE OF GLYCOL. 4. EFFICIENCY RATINGS SHALL BE IN ACCORDANCE WITH ARI STANDARD 550/590-98 WITH ADDENDA THROUGH JULY 2002.
AutoCAD SHX Text
GAS FIRED CONDENSING BOILER SCHEDULE
AutoCAD SHX Text
UNIT IDENTIFICATION
AutoCAD SHX Text
NUMBER OF CONTROL STAGES
AutoCAD SHX Text
FUEL
AutoCAD SHX Text
AGA INPUT MBH
AutoCAD SHX Text
CONDENSING AGA OUTPUT MBH
AutoCAD SHX Text
NON CONDENSING AGA OUTPUT MBH
AutoCAD SHX Text
PRESSURE RATING PSIG
AutoCAD SHX Text
DIMENSIONS
AutoCAD SHX Text
WATER (30% EG)
AutoCAD SHX Text
MODULATION/ CONTROL TYPE
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
MODEL NUMBER
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
INLET PRESSURE AT GAS TRAIN INCH W.C.
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
WIDTH
AutoCAD SHX Text
HEIGHT
AutoCAD SHX Text E.W.T. °F
AutoCAD SHX Text L.W.T. °F
AutoCAD SHX Text
FLOW GPM
AutoCAD SHX Text
W.P.D. FT
AutoCAD SHX Text
VOLTS
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
FLA
AutoCAD SHX Text
OPTIONS/ ACCESSORIES
AutoCAD SHX Text B-1N
AutoCAD SHX Text
5:1 MODULATING
AutoCAD SHX Text
NATURAL GAS
AutoCAD SHX Text 3-14
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 61.75
AutoCAD SHX Text 30.25
AutoCAD SHX Text 53.25
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AUTO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C-2000
AutoCAD SHX Text B-2N
AutoCAD SHX Text
5:1 MODULATING
AutoCAD SHX Text
NATURAL GAS
AutoCAD SHX Text 3-14
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 61.75
AutoCAD SHX Text 30.25
AutoCAD SHX Text 53.25
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AUTO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C-2000
AutoCAD SHX Text NOTE: 1. REFER TO SCHEDULES GENERAL NOTES. 2. MODEL NUMBERS ARE PATTERSON KELLEY UNLESS OTHERWISE NOTED. 3. BOILERS ARE EACH SIZED AT 2/3 OF THE ANTICIPATED BUILDING LOAD. 4. PROVIDE BOILER WITH CONDENSATE NEUTRALIZATION TANK ASSEMBLY.
AutoCAD SHX Text x
AutoCAD SHX Text g:\2016\2016-0105-00\CAD\2016-0105-M7-SH.dwg, M7.03, 6/2/2017 10:22:15 AM, Jason E. Flint, Peter Basso Associates Inc., M7.03, 6/2/2017 10:22:15 AM, Jason E. Flint, Peter Basso Associates Inc.M7.03, 6/2/2017 10:22:15 AM, Jason E. Flint, Peter Basso Associates Inc., 6/2/2017 10:22:15 AM, Jason E. Flint, Peter Basso Associates Inc.6/2/2017 10:22:15 AM, Jason E. Flint, Peter Basso Associates Inc., Jason E. Flint, Peter Basso Associates Inc.Jason E. Flint, Peter Basso Associates Inc., Peter Basso Associates Inc.
AutoCAD SHX Text c FRENCH ASSOCIATES, INC.
AutoCAD SHX Text 5/26/2017
AutoCAD SHX Text
BID DOCUMENTS
AutoCAD SHX Text
MECHANICAL SCHEDULES
AutoCAD SHX Text M7.03
AutoCAD SHX Text
ZAV
AutoCAD SHX Text
GRN
AutoCAD SHX Text
RNR
BMogk Approved
26225 SHERWOOD AVENUE * WARREN, MICHIGAN 48091 * PHONE (248) 589-8220 * FAX (248) 589-3744
TO: ALL BIDDERS June 15, 2026
Proposal 26-AM-XXXX-DJC
ROCHESTER ADAMS HIGH SCHOOL NATATORIUM
CFCE 2000 HIGH EFFICIENCY BOILERS (1)
D.J. Conley Associates, Inc. ("Company") offers to furnish the Equipment described herein for the purchase price noted, exclusive of all taxes. Prices quoted are firm for 30 days from date of Proposal, but are subject to adjustment in accordance with the provisions as noted in the attached Terms and Conditions of Sale. This Proposal is subject to withdrawal at any time without notice and any contract resulting from this Proposal is subject acceptance by the Company at Troy, Michigan. No statements or understandings relating to the subject matter, other than those set forth herein, shall be binding on the Company. This includes any contract or additional Terms and Conditions that may be set forth in Buyer's purchase order submitted to Company in response to this Proposal. Buyer’s acceptance of this document in writing or by issuance of a purchase order indicates that buyer has read, understands and agrees to be bound by all of the terms of this document, including the Terms and Conditions of Sale incorporated herein. D. J. Conley Associates, Inc. Terms and Conditions of Sale are available on the Company website and can be accessed at www.djconley.com.
Item Qty. CFCE 2000 SCOPE OF SUPPLY
#1 1 Boiler Description:
Boiler Input Capacity: 2000 MBTU Model Dimension: 35.8in x 56in x 79.9in Unit Weight: 2166lbs Fuel: Natural Gas Emissions Level (NG): 20 ppm Safety Valve Setting: 60lb Voltage: 115 V Insurance: CSD-1 Compliant
#2 1 Connections:
Gas Connection: 1.5” NPT Stack Connection: 8” I.D. Collar Direct Vent Connection: 8” I.D. Collar Supply and Return Connection: 4 in. 150FL Air Vent Connection: 1.5 in. NPT Waterside Drain Connection: 1.5 in. NPT Flue Gas Condensate Drain Connection: 1 in. NPT
#3 1 Boiler Trim:
Air Vent Valve Kit: 0.75 in. Brass NPT (Shipped Loose) Condensate Treatment Package: Tank with Media, Trap By Others (8000 MBTU Capacity Each) Gas Regulator (Shipped Loose): RV81 w/vent
#4 1 Controls Package:
Premix Burner/Flame Safeguard: Integrated Ember Controls W/7” Touchscreen Level Control Package: Main Low Water Cutoff (LWCO):Warrick 3E-1 Manual Reset Protocol translator will not be provided when Bacnet MSTP or Modbus RTU is selected as a BMS language.
Main Power Distribution: Non-Fused Disconnect (115/1/60) (Ship Loose Kit)
#5 1 Gas Train Configuration:
Nema Rating: NEMA 1 Piping Material: Prepiped Carbon Steel Manual Valve #2: 1.25in Ball (Factory Piped) Safety Shutoff Valves: Honeywell Dual Solenoid without POC (Factory Piped) GPR Configuration: RV81 (Ship Loose Kit) Manual Valve #1: 1.5in Ball (Ship Loose Kit); Customer Connection: 1.5in Pressure Requirements:
Minimum Gas Pressure (@ Inlet of Manual Valve): 7 in. w.c.
Maximum Gas Pressure (@ Inlet of Manual Valve): 14 in. w.c.
Customer Supply Gas Pressure (@ Inlet of Manual Valve): 7 in. w.c.
#6 1 Submittal Package:
Dimensional Diagram Wiring Diagram Test Fire Report ASME Data Report Integrated Controls Wiring Schematic System Arrangement: Primary Secondary Flow with Control of Boiler Pumps -Enable and Speed Control
#7 1 Startup and Training by DJ Conley Associates, Inc http://www.djconley.com/
26225 SHERWOOD AVENUE * WARREN, MICHIGAN 48091 * PHONE (248) 589-8220 * FAX (248) 589-3744
TO: ALL BIDDERS June 15, 2026
Proposal 26-AM-XXXX-DJC
ROCHESTER ADAMS HIGH SCHOOL NATATORIUM
CFCE 2000 HIGH EFFICIENCY BOILERS (1)
D.J. Conley Associates, Inc. ("Company") offers to furnish the Equipment described herein for the purchase price noted, exclusive of all taxes. Prices quoted are firm for 30 days from date of Proposal, but are subject to adjustment in accordance with the provisions as noted in the attached Terms and Conditions of Sale. This Proposal is subject to withdrawal at any time without notice and any contract resulting from this Proposal is subject acceptance by the Company at Troy, Michigan. No statements or understandings relating to the subject matter, other than those set forth herein, shall be binding on the Company. This includes any contract or additional Terms and Conditions that may be set forth in Buyer's purchase order submitted to Company in response to this Proposal. Buyer’s acceptance of this document in writing or by issuance of a purchase order indicates that buyer has read, understands and agrees to be bound by all of the terms of this document, including the Terms and Conditions of Sale incorporated herein. D. J. Conley Associates, Inc. Terms and Conditions of Sale are available on the Company website and can be accessed at www.djconley.com.
Item Qty. Pricing PTC (USD)
#1 1 CFC-E2-700-2000-125HW (120/1/60) Integrated Ember Controls
Freight (EXW - Ex Works Factory) Cost (USD): INCLUDED
Total Price to Customer (USD): TO FOLLOW
EXCEPTIONS AND CLARIFICATIONS:
• Installation by others
• Exhaust venting can be quoted separately
• Freight included, unloading by others
• Sales Tax not included in pricing
• Submittal lead time: included with this quote
• Delivery lead time: 2-3 weeks from order placement
Payment Terms (with approved credit): 30 days net 100% invoiced upon notification of shipment
No Sales, Use or Excise Taxes are included in above quoted pricing Please return one signed copy of the proposal or your purchase order referenced to this proposal number and date to:
D.J. Conley Associates, Inc.
Date Accepted: _____________20___ By__________________________________ ____________________________________ (Purchaser) (Signature)
Proposal furnished by D.J. CONLEY ASSOCIATES, INC., 26225 SHERWOOD AVENUE, WARREN, MI 48091
Aaron Miller amiller@djconley.com
Office: 248-589-8220 Cell: 248-379-3257 http://www.djconley.com/
CB-8659-2000
CFC-E 2000
ClearFire®-CE Submittal Sheet
Condensing Boiler
2000 MBH
JOB NAME:_______________________________________________________________________
REVIEWER NOTES:
ClearFire®-CE Submittal
CB REPRESENTATIVE __________________________________________________________________________
JOB NAME ___________________________________________________________________________________
EQUIPMENT TAGS ____________________________________________________________________________
LOCATION ____________________________________________________________________________________
ALTITUDE ____________________________________________________________________________________
CONTRACTOR ________________________________________________________________________________
ENGINEER ___________________________________________________________________________________
MODEL NUMBER _____________________ QTY___________
FUEL _______NATURAL GAS _______PROPANE
BOILER ROOM GAS SUPPLY PRESSURE ___________________
VOLTAGE _________
DESIGN SUPPLY AND RETURN WATER TEMPERATURE __________________________________________
FLOW RATE (GPM)_____________WATERSIDE PRESSURE DROP (FT HEAD @ FLOW RATE)_____________
_____WATER _____GLYCOL (if glycol, type and percentage):__________________________________________
BOILER OUTPUT W/GLYCOL DERATE (or N/A)_______________________
Description Units 2000* Input Max. Btu/hr 2,000,000 Natural Gas ft3/hr 2000
Propane ft3/hr 800
Output at 120/80 F [49/27 C] 100% Firing Btu/hr 1,880,000 Output at 180/140 F [82/60 C] 100% Firing Btu/hr 1,760,000 MAWP psi 125 Operating Temp., Max. °F 210
Dry Weight pounds 2041 Shipping Weight pounds 2166 Operating Weight pounds 2858 Water Volume gallons 98 Fan Motor Size Watts 1,700 Operating Voltage, Fan Volts/ph/Hz 115/1/60 Control Circuit Volts/ph/Hz 115/1/60 Current Draw, Fan Amperes 13.5 Current Draw Cont. Cct. Amperes 2 Full Load Amps Amperes 16 Max Over Current Protection Amperes 20 Condensate Quantity Firing Nat. Gas & operating @ 120/80 F. gal/hr 13.5 Flue Gas Mass Flow @ 100% Firing lb/hr 2,226 Flue Gas Temp. Oper. 180/140 F °F 180 Flue Gas Temp. Oper. 120/80 F °F 130 Effective fireside heating surface ft2 488.09 *12% derate with 7ppm NOx option
PROJECT INFORMATION
BOILER RATINGS
• Duplex Stainless Steel TurboFer® firetube heat exchanger.
- True counterflow design
- Thermal shock proof design
- Superior effective heating surface area for excellent operational efficiency
- Dual temperature returns provide 6% efficiency gain
- Single pass design
• High water volume and low waterside pressure drop
- Ideal for Primary Variable Flow pumping
- Reduced cycling with no buffer tank required
- Capable of low flow situations with no need for a flow switch
• Low emission premix burner featuring:
- Self-regulating linkageless control
- ECM variable speed combustion air blower modulation
- Whisper quiet operation (<70dBA at high fire)
- 10:1 turndown [natural gas]
- <20 ppm NOx standard [natural gas]
- <7 ppm NOx optional
- SCAQMD Rule 1146.2 certified
• UL certified for natural gas or propane
• Combustion air intake via room air or direct vent connection on boiler
• Spark ignition with UV scanner for flame supervision
• ASME CSD-1 compliant
• ENERGY STAR certified
• Factory tested prior to shipment
• Standard short circuit current rating (SCCR): 10kA
• Trim and Controls -Manual reset high limit temperature cut-off with adjustable set point -Low water cutoff, probe type, manual reset with test switch -Thermistor sensors for supply and return water temperature readings -Combination temperature/pressure gauge -ASME Safety relief valve (ship loose) -Combustion air proving switch -Blocked flue/condensate safety switch
• Gas Train in Accordance with ASME CSD-1 and Includes:
-Low and high gas pressure switches -Single body gas valve, dual solenoid safety shutoff -Leak test plugs -Manual shutoff valve
• Ember integrated boiler safety and system control
• Color touch-screen display/interface
• Multiple loop PID set point control - central heat, domestic hot water and lead/lag demand priority
• Lead Lag control for up to eight boilers
• Boiler pump, DHW pump, system pump, iso valve, damper enable/disable
• Modulating pump speed control tracking firing rate or boiler delta T
• Outdoor temperature reset
• Post shutdown pump or valve delay
• Remote enable and set point capability
• Modbus RTU or BACnet MSTP communications (RS485)
• Multiple protocol gateway solutions available for other BMS integration requirements
• On-screen fault annunciation
• Remote alarm & boiler status contacts standard
• Non-volatile alarm history (last 10 lockouts)
• Cloud enabled for remote monitoring capabilities (with optional CB ProtoAir)
STANDARD FEATURES
STANDARD EQUIPMENT
INTELLIGENT, INTEGRATED CONTROLS
CFC-E Boiler Options Selection Guide
All options ship loose for field installation
Boiler Options
Reusable air filter
Adjustable feet
Condensate neutralization
Combination trap / tank (8000 MBH)
Tank only (8000 MBH)
Auto air vent
Stack Thermometer
Boiler drain valve
Boiler Electrical Disconnect (NEMA 1 - non fused)
Automatic isolation valve (24VAC standard)
Auxiliary low water cut off
Seismic anchor provisions
Gas train options
Gas pressure regulator - stepdown low pressure: up to 21 in. WC medium pressure: 22 - 56 in. WC high pressure: 2 - 15 psig
Gas pressure relief valve - required above 1 psig (UL); 1/2 psig (cUL/CSA)
Control Options
Supply header sensor for Lead Lag operation (NEMA 4X)
Redundant supply header sensor for Redundant Lead (NEMA 4X)
System pump control Module (in NEMA 1 enclosure with fuse and power supply) Includes:
Temperature control (two temperature transmitters)
Pressure control (D/P transmitter)
Alarm lights and horn package
Alarm horn only package
Outdoor temperature sensor (with weather cover)
Stack temperature limit sensor
Flow switch
Protocol translator (in NEMA1 Enclosure with fuse and power supply)
Modbus RTU / BACnet MSTP communication standard
BACnet IP
Modbus TCP
Metasys N2
LonWorks
Protocol translator ship loose for mounting in boiler control panel (includes 24VDC power supply) Modbus RTU / BACnet MSTP communication standard
BACnet IP
Modbus TCP
Metasys N2
LonWorks
BOILER OPTIONS
AaronMiller Text Box
BY OTHERS
AaronMiller Rectangle
AaronMiller Text Box x
Percent Efficiency
AHRI Certified Efficiency
CFC-E Flow Rates*
Waterside Pressure Drop CFC-E 2000
% Firing Rate
Return Water Temperature °F ( °C ) 68 80 100 120 130 140 160
(20) (27) (38) (49) (55) (60) (72) 20% 98.0 97.1 94.5 91.4 90.0 88.9 88.0 50% 96.6 95.5 93.0 90.5 89.3 88.5 87.7 75% 95.5 94.1 91.7 89.6 88.8 88.2 87.5
100% 94.3 92.7 90.5 88.8 88.3 87.8 87.2 Conditions: Natural Gas; ΔT = 20°F
Combustion Efficiency (%) Thermal Efficiency (%)
94.3 95.5
System Temperature Drop °F *Recommended flow rates relative to temperature drop so as not to exceed boiler output.
Based on 94% nominal effficiency
NOTE: Flow rates based on 100% water only. Not applicable to glycol solutions. Contact local C-B representative for assistance with glycol sys-tems.
NOTE: The flow rates shown are recommended design flow rates. The CFC-E is capable of handling delta T's up to 120 deg F without damage to the heat exchanger.
10 20 30 40 50 60
Flow Rate GPM
377 188 126 94 75 63
OPERATING EFFICIENCIES
FLOW RATES
PRESSURE DROP
0 100 200 300 400 500 600
P re ss u re p si
Flow Rate gpm
DIMENSIONS (inches) CFC-E 2000 A Overall Height 79.8 B Overall Width 35.7 C Overall Depth 56 D Width Less Casing 33.0 E Gas Connection to Floor 74.1 F Side of Casing to Gas Connection 5.6 G Side of Casing to Air Inlet 12.3 H Top of Casing to Air Inlet 8.1 J Floor to Condensate Drain 6.3 K Floor to Bottom of Casing 11.4 L Side of Base to Flue Outlet (Centered) 8.5 M Side of Base to Flue Outlet (Offset) 7.5 N Rear of Base to Flue Outlet 7.5 P Casing Depth 42.6 Q Casing Height 68.4 R Floor to Lower Return Connection 16.9 S Floor to Upper Return Connection 31.8 T Floor to Supply Connection 59.5 U Floor to Air vent Connection 66.3 V Air Vent Line Projection From Rear of Casing 3.5
FORK POCKETS
LL Pocket Height 3.9 MM Pocket Width 11.8 NN Overall Pocket Width 27.6
CENTER OF GRAVITY
PP Casing - Side Panel 18.0 QQ Casing - Front Panel 24.6 RR Bottom of Base 34.0
SEISMIC BRACES (optional) SS Bracket-to-Bracket Width (hole center) 35.2 TT Bracket-to-Bracket Length (hole center) 54
DIMENSIONS AND CONNECTION SIZES
L M
N
BB
PP
JJ
SS
TT
SIDE CLEARANCE
V P
FRONT CLEARANCE
TOP CLEARANCE
REAR
CLEARANCE
GG
HH
Y
X
W
KK
Q
H G
C
R
S
T
F
DD Z
MM
LLJ
K
NN
D B
A E U
OPTIONAL ADJUSTABLE FEET ALLOW FOR
1.56” TO 3.88” ADDITIONAL HEIGHT
FF
2 EACH SIDE
RR
CONNECTIONS
W Water Low Temp. Return, CL150 RF Flange 4"
X Water High Temp. Return, CL150 RF Flange 4"
Y Water Supply, CL150 RF Flange 4"
Z Air Vent, NPT 1-1/2" AA Vessel Drain, NPT 1-1/2"
BB Flue Gas Outlet
Standard (Offset) 8" Option 10"
CC Combustion Air 8"
DD Gas, NPT 1-1/2" EE Condensate Drain, NPT 1"
FF Electrical Conduit, Left or Right 0.87”
GG Safety Relief Valve Vessel Connection, NPT 1-1/4" HH Safety Relief Valve
30 psig Inlet x Outlet, NPT 1-1/4" x 1-1/2"
50 - 60 psig Inlet x Outlet, NPT 1" x 1-1/4" 75 - 125 psig Inlet x Outlet, NPT 3/4" x 1"
JJ Flue Coupling, NPT 1/2"
KK Water Outlet Coupling, NPT 3/4"
CLEARANCES
Notes:
Boiler rear must be accessible for servicing.
Side clearance to wall or between boilers.
Side clearance typical each side.
Top 14"
Side 3" Rear 20"
Front 36"
The boiler should be lifted by the base using a suitable fork lift. Note: The boiler should not be moved by pushing, prying, or pulling on any part of the casing. If the floor is not level, piers or a raised pad slightly larger in length and width than the boiler base dimensions will make boiler installation and leveling easier.The boiler must be installed so that all compo-nents remain accessible for inspection, cleaning, or mainte-nance. Field-installed piping and electrical connections must be arranged so as to avoid interfering with removal of the cas-ing panels or with the burner door.
To avoid damage to casing, removal of front and side casing panels is recommended during installation.
Care should be taken to secure load at the top to prevent tipping.
WARNING! Do not install the boiler on carpeting.
NOTE: For crane lifting refer to CFC-E Installation manual 750-487 for instructions.
STACK SIZING USING OUTSIDE AIR FOR COMBUSTION (DIRECT VENT)
Each additional 90° elbow equals 5 equivalent feet of ductwork. Flue terminations may add 5-10 feet to the equivalent length and should also be included in the equivalent length calculation.
Draft tolerance at boiler flue connection during operation is +/-0.25” W.C.
*Maximum vent length assumes horizontal run and sidewall terminations. Larger diameter venting, vertical flue runs, and vertical flue termination may allow for longer vent lengths than indicated here, provided the engineered draft calculations are within the allowable operational tolerance of +/-0.25” W.C.
Boiler Combustion Air Duct
(Inches Diameter) Combustion Air SCFM Required
Flue Connection/Duct (Inches Diameter)
Max. Length* (Equivalent Feet)
CFC-E 2000 8 500
8 standard 100
10 optional 120
RIGGING AND TRANSPORTATION
STACK DESIGN
WD is typical and may not reflect actual customer boiler. Refer to job specific WD for actual wiring connections.
WIRING DIAGRAM
(REMOVE JUMPER)
45 (120VAC OUTPUT)
In addition to our Standard Warranty, Cleaver Brooks offers the following non-prorated Extended Warranty on the ClearFire CFC-E boilers:
1. The pressure vessel is guaranteed against thermal shock for the lifetime of the boiler when utilized in a closed loop hydronic heating system with a temperature differential of 120°F or less. The boiler pressure vessel is guaranteed accordingly without a minimum flow rate or return water temperature requirement. The boiler shall not require the use of flow switches or other devices to ensure minimum flow.
2. The pressure vessel, tubes, and tube sheets (heat exchanger) are guaranteed against flue gas corrosion and materials/workmanship for a period of fifteen (15) years.
3. The condensate collection box shall be guaranteed against corrosion for twenty (20) years.
4. The burner cylinder shall be warranted for a period of five (5) years.
All parts not covered by the above warranties are valid for twenty-four (24) months from the date of initial operation of the Equipment, but in no event shall the Warranty extend more than thirty
(30) months from the date of shipment of the Equipment by Cleaver-Brooks. This includes all electrical and burner components.
The pressure vessel thermal shock warranty covers leaks in the pressure vessel including the furnaces, tubes, tube sheets, and shell (not including failed gaskets), which, from our inspection, are attributed to unequal or rapid expansion, typically referred to as “thermal shock,” or stress cracking. This warranty does not cover damage or failures that are attributed, by our inspection, to corrosion, operation at low water level, accumulation of scale, sludge or dirt in the boiler, or other improper service, operation, or neglect.
Cleaver Brooks' liability hereunder is limited to repairing or furnishing a replacement pressure vessel or component parts thereof, as deemed necessary by our inspection. Cleaver Brooks is not responsible for shipping, handling, installation and other costs, including all costs associated with the removal and disposition of the old pressure vessel or component parts. In no event shall Cleaver Brooks be responsible for any incidental, consequential or other damages, including, without limitation, any damages resulting from loss of use of the boiler.
Refer to official warranty documents for specific warranty information.
WARRANTY
ClearFire®-CE High-Mass Condensing
Firetube Boiler 500 to 6,000 MBH
A Cleaver-Brooks Sustainable Solution
Get Future-Ready with TurboFer®
Energy Savings and Environmental Benefits
The ClearFire®-CE (CFC-E) condensing boiler combines the patented TurboFer® heat exchanger technologies with innovative Ember controls and burner design to offer the most efficient condensing boiler on the market.
With its proprietary combination of technologies, the CFC-E provides safe, efficient, reliable, and sustainable operation for a variety of applications.
The ClearFire-CE is future-ready and built to last with a robust design.
It also helps you achieve your sustainable energy goals.
The ClearFire-CE offers:
» Lowest total cost of ownership – due to its large water volume, the ClearFire-CE is designed for use in variable-flow primary systems, offering the lowest total cost of ownership spanning installation through operation
» Energy-efficient operation – superior heat transfer and low waterside pressure drop reduces pumping energy, gas and electrical consumption
» Environmentally conscious burner design – offers 20 ppm NOx standard and 7 ppm NOx optional
» Future-proof fuel flexibility – features a burner and controls that can support renewable natural gas or a hydrogen blend without burner changes
Our CFC-E boiler meets the strict performance and sustainability criteria required to earn the Cleaver-Brooks Sustainability Seal.
Find out more at cleaverbrooks.com/sustainability.
» Increased turndown to 10:1
» New Ember controls
» AluFer® to TurboFer technology
» Enhanced casing design
CFC-E Updates:
Based on the first generation of ClearFire® boilers, which have operated reliably in a variety of applications for 20+ years, the latest model boasts a patented TurboFer® heat exchanger for even greater efficiencies in a more compact footprint.
The newest ClearFire-CE can operate on renewable natural gas or a hydrogen-and-natural-gas blend of up to 20% hydrogen.
The vertical design supports more distinct temperature stratification of the heating water. Along with the integrated dual-return connection, this leads to more effective heat transfer.
UP TO
99%
EFFICIENT
Efficiency-Gaining Features:
» TurboFer heat exchanger with optimized heat transfer leads to superior operating efficiencies, up to 99%
» 10:1 fully modulating turndown
» Duplex stainless steel construction provides corrosion resistance to flue gas condensate and chloride stress cracking
» Large-water-volume pressure vessel with low waterside pressure drop reduces pumping energy
» Integrated lead-lag controls intelligently sequence and modulate up to eight boilers
4 5
Advanced Burner & Controls Engineering Innovation Boosts Efficiency
Technology Enhancements The firetube technology provides unmatched heat transfer and condensing characteristics and delivers excellent waterside corrosion resistance while keeping water treatment requirements simplified.
| » | Thermal conductivity is 10 times greater than stainless steel alone |
| » | Provides maximum effective heating surface where it is needed most – on the fireside |
| » | Heating surface area is up to five times greater than other condensing boilers |
6%+ Increase in Efficiency The ClearFire®-CE features two separate returns: the high-temperature return at the upper inlet connection and the low-temperature return at the lower inlet connection. This strengthens counterflow heat exchange characteristics, resulting in increased condensing performance.
The dual-return design of the ClearFire-CE helps it achieve optimal condensing performance, even in applications with non-condensing temperature heating loops, resulting in 6%+ increases in system efficiency.
Improved Turndown All capacities of the ClearFire®-CE now feature 10:1 fully modulating turndown. This turndown is achieved with the boiler operating efficiently across the entire firing range by keeping excess air levels consistent. Additionally, minimal moving parts simplifies maintenance and provides repeatable combustion performance.
The increased turndown helps the boilers match the load demand more closely, leading to increased system efficiencies as well as reduced boiler cycling and wear-and-tear on the burner components.
Industry-Leading Non-Prorated Warranties » Lifetime thermal shock
» 15-year fireside corrosion
» 5-year burner canister
» 20-year condensate collection pan
» 2-year parts warranty4
Heat Transfer Done Right The TurboFer design starts with a duplex stainless steel tube die-fitted with an inner (fireside) aluminum-alloy finned heating surface. The top of the tube is then pressed together producing a smaller cross-sectional area that increases flue gas velocity and turbulence. The flue gases speed up, creating a swirling effect, which leads to superior heat transfer in a compact footprint.
The TurboFer® heat exchanger is a newly engineered, patented core component of the boiler. The unique design of the heat exchanger and its innovative technology generates turbulence on the fireside, increasing heat transfer and boosting efficiency.
Combined with the other innovations, this reduces your initial investment and ongoing operating costs.
Integrated Ember Controls The CFC-E features an integrated Ember control platform that has the built-in ability to control lead-lag, outside air temperature reset, automatic isolation valves, primary pumps, and BAS integration, enabling seamless design and functionality.
The controls have redundant host functionality.
BACnet is included as standard, and true ∆T pump speed control means there are many built-in features to support different system requirements.
Inherent O2 Trim The CFC-E uses a variable-speed ECM combustion air fan, reducing electrical consumption.
This design allows for true linear modulation and standard ultra-low emissions with premix combustion.
ClearFire® boilers utilize a gas valve/venturi that automatically adjusts for changes in combustion air density. This maintains consistent excess air levels from low-to-high fire without additional controls that require tuning and maintenance, meaning fewer service visits to maintain peak efficiency.
500 750 1000 1500 2000 2500 3000 3500 4000 5000 6000
Overall Height (“A” - inch) 78.0 78.0 78.0 79.8 79.8 95.2 95.2 91.3 91.3 93.6 93.6
Overall Width (“B” - inch) 32.6 32.6 32.6 35.7 35.7 35.7 35.7 48.4 48.4 58.7 58.7
Overall Depth (“C” - inch) 49.4 49.4 49.4 56.0 56.0 56.0 56.0 68.4 68.4 80.6 80.6
Dry Weight (lb) 1,298 1,298 1,396 1,861 2,041 2,420 2,475 3,575 3,575 4,900 5,275
Shipping Weight (lb) 1,413 1,413 1,511 1,986 2,166 2,541 2,596 3,725 3,725 5,075 5,450
Operating Weight (lb) 2,065 2,065 2,113 2,778 2,858 3,470 3,492 5,227 5,304 7,502 7,659
Water Volume (gallon) 92 92 86 110 98 126 122 198 198 312 285
ClearFire®-CE Dimensions and Ratings
Broad Range of Applications
Office Buildings Healthcare Facilities
Multi-Family HousingCampus SystemsManufacturing Processes
CB
A
The ClearFire®-CE is capable of variable-flow pumping, allowing for maximum operating efficiency in a variety of system applications.
| » | Office Buildings |
| » | Schools, Colleges & Universities |
| » | Healthcare Facilities |
| » | Multi-Family Housing |
| » | Building Heating |
| » | Manufacturing Processes |
Condense for Maximum Efficiency
Meeting Your Needs
Boiler Condensate to Drain Condensate
Neutralization
H2O
CO2
NOX
O2
Sensible Heat
Hot Water
Heat
Latent Heat
Condensing Boiler
Fuel + Oxygen
15%
INCREASED
ENERGY SAVINGS
Condensation, the crucial element to improving efficiency, is maximized within the key design features of the TurboFer® heat exchanger. The flue gases from the combustion process contain steam, which stores large quantities of latent energy. When the steam cools to below 130° F, it becomes liquid, condensing and releasing the latent energy and transferring the heat to the water through the TurboFer heat exchanger. Energy otherwise lost through the boiler flue is now retained, increasing efficiencies and achieving additional energy savings of approximately 15%.
Skid Systems Cleaver-Brooks pre-engineered and pre-packaged, skid-mounted hydronic boiler solutions offer a simple solution to get up and running in less time, with less effort than traditional field-installed systems. Single-point piping and electrical connections, and robust skid design make installation simple and easy.
HxO Heat Exchanger The HxO is designed to provide instantaneous domestic hot water supply to your building without the need for additional fuel-fired or electric heating equipment. By utilizing your new or existing hot water heating loop, the HxO will provide on-demand water for your system.
Outdoor Boiler Cleaver-Brooks offers a UL-listed and AHRI-certified outdoor option for the ClearFire®-CE boiler that allows the boilers to be installed outdoors in moderate climates. The outdoor hood kit allows for simple installation and mounts directly onto all current ClearFire-CE boilers.
Printed in the USA
CB-8665
08/2025
Product designs, specifications and/or data in this document are provided for informational purposes only and are not warranties of any kind.
Product designs and/or specifications may be changed at any time without notice. The only warranties that apply to sales of products and services are Cleaver-Brooks standard written warranties, which will be furnished upon request.
Cleaver-Brooks and other trademarks and service marks used herein are the property of The Cleaver-Brooks Company, Inc.
© 2025 The Cleaver-Brooks Company, Inc. All rights reserved.
The Power of Total Integration is how Cleaver-Brooks delivers the world’s broadest range of integrated, sustainable thermal solutions. In addition to our products, this includes Cleaver-Brooks global authorized sales representatives and independent service contractors, training resources, and trusted expertise that add significant value to your Cleaver-Brooks investment.
Natatorium Boiler Replacement - Rochester Adams High School
Mandatory Pre Bid Walkthrough Sign In Name Company Email Phone
)'(0(6 Ll�JJl\l.. M.�Cb� '-'tlt()v.>�1 5afu /J \�,tl�Ut'\61,4 � ... \C.11{,. CJ>/JI. � �<> u;1 ('>5o-::f-l-f ,4AtJI.. /(n,PltLt. �,A_,-_��• &6JJlu.o.// �&,.dc-�,,µ,c;,e ��{Kt':..7� fi.vte 5nllltr ,Jc, fr,,·� 8<>, �c/;.1, K5llft/(/' r;,, I' J/o,'f 60,Je/' c�.{,d/" '7JY- .7(1'-Yi.J' T
Jeff 13ttifr:t.M ISti.,w-1- 111�·,,,..A.. 1b,rulo .. Q� •A ..1_,,,�,.r,u1._ C.M ��r · ';J.5f· 1fw T� 1�--,z.J,....i.- �\... U-J�O ·-rowvhv ·� /B., w j o -w\N\ ?,\'3'Z'Zo�7t..
tt.JM � l I IA k:. Ji 'S ' I IS'..., -LJ ("-.Q') T t.:>"'-1, '? ;t 1L 'I I • l I "S> ;:2½�-9n-;:;i0cl
Sign
/A
/pl£_ .,.
AiA/V' (\ I \J
7' v-- '
Date
C;p /J; /2._r t,Jt1J 2t;
1t/11 lat c.f I • '\ t./r,(6C
END ADDENDUM
| 27.01 Addendum 1 PACKET Answers to RFCs.docx.pdf |
| 27.01 Addendum 1 Answers to RFCs.docx.pdf |
| June 16, 2026 |
| QUESTIONS: |
| END ADDENDUM |
| M7.03-MECHANICAL-SCHEDULES-Rev.0.pdf |
| CFCE 2000 Boiler Scope of Supply.pdf |
| CFC-E 2000 Submittal.pdf |
| BR_CB-8665_CFC-E.pdf |
| scan_cwhetstone_2026-06-11-12-26-27.pdf |
27.01 Addendum 1 Answers to RFCs.docx (1).pdf
| June 16, 2026 |
| QUESTIONS: |
| END ADDENDUM |
| JOB NAME: ROCHESTER ADAMS HIGH SCHOOL |
| Text1: |
| CB REPRESENTATIVE: DJ CONLEY ASSOCIATES, INC |
| JOB NAME_2: |
| EQUIPMENT TAGS: B-1 |
| LOCATION: ROCHESTER, MICHIGAN |
| ALTITUDE: N/A |
| CONTRACTOR: ALL BIDDERS |
| ENGINEER: JMK ENGINEERING |
| MODEL NUMBER: CFCE 700-2000-125-HW |
| QTY: 1 |
| FUEL: X |
| NATURAL GAS: |
| BOILER ROOM GAS SUPPLY PRESSURE: 7"-14" W.C. FIELD VERIFICATION REQUIRED |
| VOLTAGE: 120/1/60 |
| DESIGN SUPPLY AND RETURN WATER TEMPERATURE: 160/140 |
| FLOW RATE GPM 1: 188 |
| FLOW RATE GPM 2: X |
| WATERSIDE PRESSURE DROP FT HEAD FLOW RATE: .70' TDH |
| WATER: |
| GLYCOL if glycol type and percentage: |
| BOILER OUTPUT WGLYCOL DERATE or NA: |
| undefined_2: On |
| undefined_3: Off |
| undefined_4: On |
| undefined_5: On |
| undefined_6: Off |
| undefined_7: Off |
| undefined_8: On |
| undefined_9: Off |
| undefined_10: Off |
| undefined_11: Off |
| undefined_15: On |
| undefined_16: Off |
| undefined_20: Off |
| undefined_21: Off |
| undefined_22: Off |
| undefined_23: Off |
| undefined_24: Off |
| undefined_25: Off |
| undefined_26: Off |
| undefined_27: Off |
| combo: Off |
| tank: On |
| low pres: On |
| med pres: Off |
| high pres: Off |
| temp control: Off |
| pres control: Off |
| bip: Off |
| lon: Off |
| bip2: Off |
| mod: Off |
| meta: Off |
| lon2: Off |
| Check Box2: Off |
| Check Box3: Off |
File details come from the government source that posted it. Updated .