27-303-009_ContractBook_Color.pdf
PDF 20 MB Posted
- Attached to
- Restoration of Sidewalk Excavations Citywide I
- Solicitation number
- 27-303-009
- Issued by
- Suffolk County, Boston City, Massachusetts
About this file
This is a Contract Book and Specifications document issued by the Boston Water and Sewer Commission for Contract No. 27-303-009, covering the restoration of sidewalk excavations citywide in Boston, Massachusetts. The Commission solicits proposals from contractors to reconstruct sidewalks on an emergency or as-needed basis throughout the city. The project includes various bid items such as brick sidewalk installation on sand, concrete, and bituminous concrete bases; edgestone reset; water and sewer/drain casting raises and adjustments; pedestrian ramps; concrete sidewalks; and special duty police services. The bid includes 55,000 square feet of concrete sidewalk work (Item SW2-1) and multiple units of specialized work including 10 water castings, 10 sewer/drain castings, 750 square feet of pedestrian ramps, and extensive special duty police hours at various rates. The contractor must commence work within five days of receiving written notice to proceed, with time being of the essence in the contract. A preconstruction conference is required before work begins, where the contractor must submit construction schedules, material submittals, and shop drawings for approval.
Pricing for bid items ranges from $200 per unit for raising water castings to $95.49 per hour for special duty Boston police overtime. The contract is subject to Massachusetts prevailing wage requirements, with detailed wage schedules provided for multiple construction classifications including laborers, equipment operators, carpenters, electricians, and various specialized trades, with rates effective through 2028. The contractor shall pay $750.00 per calendar day in liquidated damages for any premature mobilization or work begun before receiving formal notice to proceed. All work must comply with Boston Public Works Department and Boston Transportation Department requirements, include traffic control measures, and maintain roadway surfaces during a specified maintenance period. The contractor is required to maintain workers' compensation and employer's liability insurance, provide a performance bond and payment bond, and comply with minority and women business enterprise utilization requirements and resident job policy provisions as outlined in the specifications.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COPY NO.
PROPOSAL NO.
BOSTON WATER AND SEWER COMMISSION
CONTRACT NO. 27-303-009
FOR
RESTORATION OF SIDEWALK EXCAVATIONS
CITYWIDE I
EXECUTIVE DIRECTOR
HENRY F. VITALE
September 2026
CHIEF OF OPERATIONS
CHASE P. BERKELEY, P.E.
CHIEF OF OPERATIONS
OPERATIONS DIVISION
980 HARRISON AVENUE, BOSTON, MASSACHUSETTS 02119
PROPOSAL, CONTRACT
AND SPECIFICATIONS
CONTRACT NO. 27-303-009
FOR
RESTORATION OF
SIDEWALK EXCAVATIONS
CITYWIDE I
BOSTON WATER AND SEWER COMMISSION
OPERATIONS DIVISION
980 HARRISON AVENUE, BOSTON, MASSACHUSETTS 02119
i
TABLE OF CONTENTS
ITEM
Purchasing Department Bid Information 1
Information for Bidders 2
IB.1 General Description and Location of Work 2 IB.2 Bidding Information 2 IB.3 Use and Calculation of Unit Prices 4 IB.4 Permits and Fees to be Responsibility of Commission 5 IB.5 Substitution of Equal Items for Specified Items 5 IB.6 Determination of Equality 6 IB.7 Retail Sales Act Exemption 6 IB.8 Special Duty Police 6 IB.9 Time for Commencement and Completion of Work 7 IB.10 Minority Employee Utilization Requirement 7 IB.11 Minority Business Enterprise/Women Business Enterprise Requirements 8 IB.12 CDL Drug and Alcohol Testing Requirements 8 IB.13 Price Adjustment – Diesel Fuel; Gasoline and Liquid Asphalt and Portland 9 IB.14 Large Vehicle Protective Devices, Convex Mirrors, Convex Cross-Over Mirrors and Safety Devices Compliance 11 IB.15 State Tax Compliance Certificate 12
Proposal and Contract 13
I. Proposal 13
1.1 Interested Persons 13
1.2 Execution and Delivery of Contract, Performance Bond
and Payment Bond 13
1.3 Bid Deposit 14
1.4 Documents Included in Contract 14
1.4.1 Labor 15
1.5 Time of the Essence, Liquidated Damages 15
1.6 Contract Price 15
1.7 Bidder's Certification Statement 16
1.8 Bidder's M/WBE Certification Statement 16
ii
Identification of Bidder 17
Certificate of Authority 19
II. Contract 20
Article I - The Contract Documents 20
Article II - The Work 21 Article III - The Contract Price 21
Article IV - Payment of the Contract Sum 21
4.1 Progress Payments 21
4.2 Final Payments 21
Article V– Obligation of Contractor to Perform 22
5.1 Responsibility of Contractor for Errors;
Indemnification by Contractor 22
5.1.1 Indemnification 23
5.2 Performance in Accordance with Specifications 25
5.3 Change Orders 25
5.4 Variation in Specified Amounts of Materials 26
5.5 Claims for Loss, Damage, Extra Cost or Injury 26
and Extensions of Time
5.6 Materially Different Subsurface and Latent 27
Physical Conditions
5.7 Full Compliance with Specifications 27
5.8 Function of Commission Engineers 28
5.9 Employment of Commission Personnel 28
Article VI-Authority of Executive Director 28
6.1 Contract Interpretation 28
6.2 Duties and Authority of Commission Engineers 29
and Inspectors
6.3 Access to Construction Site 29
6.4 Inspection of Off-Site Materials 29
6.5 Supervision by Contractor 30
Article VII- Requirements of Department of Labor 31 And Industries and MCAD iii
7.1 Compliance with Labor Laws 31
7.2 Employment Preference 31
7.3 Maximum Hours 31
7.4 Minimum Wage Rates 31
7.5 Payment of Health and Welfare Wage Rates 32
Article VIII- Minority Participation 32
8.1 Definitions 32
8.2 Minority Employee Utilization (Labor) 32
Article IX – Residents Job Policy 36
9.1 Definitions 36
9.2 General Policy Statement 37
9.3 The BWSC Residents Job Policy 37
9.4 Organizational Procedures 37
Article X – Utilization of Minority-Owned Business 38 Enterprises and Women-Owned Business Enterprises
10.1 Definitions 38
10.2 Goals 39
10.3 Indemnification of M/WBEs 40
10.4 Material Breach 41
10.5 Waiver of Modification 41
Article XI- Department of Telecommunications and Energy 41 Department of Labor and Industries
11.1 Transportation Charges 41
Article XII – Subcontractors 41
12.1 Payment of Subcontractors 41
12.2 Payment for Labor and Materials by Contractor 44
Article XIII – Insurance 44
13.1 Liability Insurance 44
13.2 Workman’s Compensation and Employer’s Liability Insurance 45
13.3 Certificate of Compliance 45
13.4 Effect of Failure to Continue Insurance in Force 46
13.5 Authorized Insurers 46
13.6 Identification of Insurance Carrier 46
iv
Article XIV- Satisfactory Performance; Remedy for 46 Defective Work
14.1 Defective and Unauthorized Work 46
14.2 Termination by the Commission for Cause 47
14.3 Payment Following Termination 48
Article XV – Final Inspection and Acceptance;
Method of Payment 48
15.1 Final Inspection 48
15.2 Unacceptable Performance 48
15.3 Satisfactory Performance 48
15.4 Final Estimate 49
Article XVI – Discharge of Bonds 49
Article XVII – Liability Under Contract 50
17.1 General Release and Discharge by Contractors 50
17.2 Acts of God 50
Article XVIII – Record Keeping, Internal Accounting Controls, 51 Financial Statement – M.G.L., CH.30, Section 39R
18.1 Record Keeping 51
18.2 Examination of Records 51
18.3 Change in Record Keeping 51
18.4 Filing Requirements 51
18.5 Financial Statements 51
18.6 Statement of Management 51
18.7 Public Accountant’s Statement 52
18.8 Filing Financial Statement 52
Article XIX – Right to Know Act 52
Article XX - Compliance with Laws 52
Article XXI- Provisions Required by Law Deemed Inserted 53
Article XXII – CDL License Requirement 53
Article XXIII – Authority of the Commission 54
Article XXIV – State Tax Compliance Certificate 54 v
Performance Bond 56 Payment Bond 58 Certificate 60
General Conditions
GC.1 Definitions GC-2 GC.2 Abbreviations GC-4 GC.3 Time for Commencement and Completion of Work GC-4 GC.4 Interpretation of Specifications GC-5 GC.5 Project Meetings GC-5 GC.6 Construction Schedule and Order of Work GC-5 GC.7 Submittals GC-5 GC.8 Pipe Locations GC-7 GC.9 Lines, Grades and Measurements GC-7 GC.10 Responsibility for Materials GC-7 GC.11 Non-Interference with Other Work GC-8 GC.12 Changes in Work and Extras GC-8 GC.13 Orderly and Competent Employees GC-9 GC.14 Employ Sufficient Labor and Equipment GC-9 GC.15 Work to Conform GC-9 GC.16 Traffic Control GC-10 GC.17 Precautions and Restoration of Property GC-12 GC.18 Emergency Street Openings GC-13 GC.19 Sanitary Regulations GC-13 GC.20 Compliance with Laws GC-13 GC.21 Cleaning Up GC-13 GC.22 Standard Drawings GC-14 GC.23 Excess Paving Deductions GC-14 GC.24 Periodic Payments GC-14 GC.25 By-pass System GC-15 GC.26 Maintenance Period of Roadway Surface GC-15 GC.27 Daily Scheduling of Work GC-16 GC.28 Contractor's Emergency Contact and Response GC-16 Requirements GC.29 BWSC Project Sign Requirements GC-17 GC.30 Winter Work Shut Down GC-18 GC.31 Utility Company Notifications GC-18 GC.32 Use of BWSC Hydrants GC-19 GC.33 Pavingstones and Cobblestones GC-20 GC.34 Liquidated Damages GC-20 GC.35 Noise Control GC-20 GC.36 BPWD Requirements GC-20 GC.37 ADA Requirements GC-21 vi
GC.38 Delays in Obtaining Permits GC-21 GC.39 Post Hydrants Supplied by Commission GC-22 GC.40 BPWD Construction Sign Requirements GC-22 GC.41 Edgestone GC-23 GC.42 Sidewalks GC-23 GC.43 Temporary By-Pass/Flow Diversion of GC-23 Sewers/Storm Drains GC.44 Bid Items for Sewer and Drain Pipe GC-25 GC.45 Don’t Dump Signs GC-25 GC.46 Method of Cutting Pavement GC-26 GC.47 Work Outside of Permitted Time GC-26 GC.48 Lead Free Products GC-26
Special Conditions
SC.1 Location and General Description of Work SC-1 SC.2 Time for Commencement and Completion of Work SC-1 SC.3 Contractor's Emergency Contract and Response
Requirements SC-1 SC.4 Working Hours and Schedules SC-2 SC.5 Removal of Excavate and Debris SC-2 SC.6 Work Incidental to the Contract SC-3 SC.7 Boston Transportation Department Requirements SC-3 SC.8 Work Beyond the Limits of this Contract SC-3 SC.9 Removal of Snow and Ice SC-3 SC.10 Posting of No Parking Signs SC-3 SC.11 Payment Items Covered by This Contract SC-3 SC.12 Inspector's Reports SC-3 SC.13 MBE/WBE & Minority/Residency Requirements Waiver SC-3 SC.14 Adjustment of Existing Castings SC-4 SC.15 Boston Public Works Department Requirements SC-4 SC.16 Payment for Item SW2-1 SC-4 SC.17 Pedestrian Ramps Appearance SC-4 SC.18 Boston Public Works Department Regulations SC-5
Specifications
A1 Excavation and Backfill A1-1 to A1-8 A2 Gravel A2-1 to A2-2 B1 Bituminous Concrete Paving B1-1 to B1-7 B2 Brick Sidewalks or Roadways B2-1 to B2-13 B6 Reset Edgestone B6-1 to B6-3 C9 Raise Water Castings C9-1 to C9-2 D3 Raise Sewer or Drain Casting D3-1 to D3-3 vii
D4 Cement Concrete D4-1 to D4-3 D4-02 Cement Concrete Sidewalks D4-02-1 to D4-02-5 D18 Pedestrian Ramps D18-1 to D18-6 P1 Special Duty Police P1-1 T1 City Signal, Light and Way Restoration T1-1 to T1-7
Appendices
BID PAGES
Restoration of Sidewalk Excavations Citywide I FY27
SUBTOTAL PAGE 17A-- 1 Date: 8/25/2026
Project Number : 27-303-009 Bid Number :
ITEM QUANTITY ITEM WITH UNIT BID PRICE WRITTEN IN
WORDS
UNIT PRICE
DOLLARS CENTS TOTAL
DOLLARS
TOTAL
CENTS
B2-03 100.00 sf
BRICK SIDEWALK ON SAND BASE
B2-04 100.00
BRICK SIDEWALK ON CONC. BASE
B2-05 500.00
BRICK SDWLK ON BIT.CONC. BASE
B6-1 350.00 lf
RESET EDGESTONE
C9-1 10.00 ea
RAISE WATER CSTG. TO GRADE
TWO HUNDRED DOLLARS AND ZERO
$200
$2,000
D18-1 750.00
PEDESTRIAN RAMP
D3-1
RAISE SEWER / DRAIN CASTING
THREE HUNDRED FIFTY DOLLARS AND
ZERO CENTS
$350
$3,500
D3-1A
ADJ. SEWER / DRAIN CASTING
P1-1 200.00 hr
SPEC. DUTY BOSTON POLICE
SIXTY SIX DOLLARS AND ZERO CENTS
$66
$13,200
P1-1R 1,000.00
SPEC. DUTY BOSTON POLICE, R.L.
NINETY FIVE DOLLARS AND FORTY NINE
$95
$95,490
SUBTOTAL
SUBTOTAL PAGE 17A-- 2 Date: 8/25/2026
Project Number : 27-303-009 Bid Number :
ITEM QUANTITY ITEM WITH UNIT BID PRICE WRITTEN IN
WORDS
UNIT PRICE
DOLLARS CENTS TOTAL
DOLLARS
TOTAL
P1-2 40.00
SPEC. DUTY POLICE SERG.
SEVENTY THREE DOLLARS AND
SEVENTY CENTS
$73
$2,948
P1-2R 40.00
SPEC. DUTY POLICE SERG., R.L.
ONE HUNDRED TEN DOLLARS AND
TWENTY EIGHT CENTS
$110
$4,411
P1-3 24.00
SPECIAL DUTY STATE POLICE
SIXTY ONE DOLLARS AND EIGHTY
EIGHT CENTS
$61
$1,485
P1-4 12.00
STATE POLICE TIME & A 1/2
NINETY TWO DOLLARS AND EIGHTY TWO
$92
$1,113
P1-5
SPEC. DUTY POLICE LT.
SEVENTY EIGHT DOLLARS AND TEN
$78
$937
P1-5R
SPEC. DUTY POLICE LT., R.L.
ONE HUNDRED TWENTY FOUR DOLLARS
AND ELEVEN CENTS
$124
$1,489
P1-6
SPEC. DUTY POLICE CAPT.
EIGHTY NINE DOLLARS AND TEN CENTS
$89
$1,069
P1-6R
SPEC. DUTY POLICE CAPT., R.L.
ONE HUNDRED FORTY THREE DOLLARS
AND THIRTY SIX CENTS
$143
$1,720
SW2-1
55,000.00
CONCRETE SIDEWALK
T1-33 5.00
REMOVE + RESET ST.LT. BASE
SUBTOTAL
SUBTOTAL PAGE 17A-- 3 Date: 8/25/2026
SUMMARY COSTS
SUBTOTAL PAGE 17A-- 1 $
SUBTOTAL PAGE 17A-- 2 $
GRAND TOTAL $
UNIT OF MEASUREMENT LEGEND
cy cubic yard gal gallon ls lump sum sf square foot day day hr hour mo month sy square yard ea each lb pound pct percent ton ton ft foot lf linear foot ser service vf vertical foot
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
MAURA HEALEY
Governor
KIM DRISCOLL
Lt. Governor
As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LAUREN JONES
Secretary
MICHAEL FLANAGAN
Director
Awarding Authority: Boston - Water & Sewer Commission City/Town: BOSTON
Wage Request No: 20260825170433 Job Location: 980 Harrison Av
Description of Work: Provide services to test, transport and dispose of waste sediments generated from cleaning of Wastewater facilities.
Contract Number: 27-303-009
§§ 26-27D Construction Project
This Prevailing Wage Schedule establishes the minimum wage rates that employees on this public works construction project must be paid. The project’s Wage Request Number is listed above and on all pages of this Schedule. This schedule applies only to this specific project.
Awarding Authority Responsibilities Contractor Responsibilities
You must include this Prevailing Wage Schedule (PWS) or an appropriate reference to it in all advertisements and calls for bids.
The PWS must be incorporated in its entirety into all contracts for this project (G.L. c. 149, § 27).
The wage rates on this PWS will remain in effect for the duration of the project. Exception: You must request an updated schedule for any multi-year construction project no later than 2 weeks before the project’s yearly anniversary date.
For CM AT RISK projects, the anniversary date is the earlier of the signing date of: (a) the GMP Amendment; or (b) the first amendment to permit procurement of construction services.
For all other construction projects, the anniversary date is the date the contract was signed by the Awarding Authority and the General Contractor.
You must also request an updated PWS if you have not opened bids or selected a contractor within 90 days of the date of issuance on this PWS.
For CM AT RISK projects, the earlier of (a) the signing date of the GMP Amendment; or (b) the bid for the first construction scope of work must be within 90 days of the date of issuance on this Schedule.
You must provide any updated PWS to all contractors working on the project, including general and sub-contractors.
You must keep the contractors’ weekly certified payroll records and Statements of Compliance on file for 3 years.
Awarding authorities have other prevailing wage responsibilities not listed above. Learn more at: [Prevailing wage: for awarding authorities | Mass.gov] and G.L. c. 149, §§ 26-27D.
You must pay all employees who perform construction work on this project at least the wage rate listed on this PWS. Warning! If you do not follow this requirement, you can face civil fines, criminal charges, or private lawsuits.
You must post this PWS at the worksite where it can be easily seen. (G.L.
c. 149, § 27)
You must file weekly payroll reports and a Statement of Compliance with the awarding authority (not DLS). You can file payroll reports by mail or email and must keep them on file for 3 years. Each weekly payroll report must include each employees’ name, address, occupational classification(s), hours worked, and wages paid. Find a sample report at:
mass.gov/dols/pw.
You cannot pay any employees at the apprentice rates listed on this PWS unless they are registered with the Massachusetts Division of Apprentice Standards (DAS). Qualifying apprentices must be paid at the applicable step rate and must carry their apprentice ID card during all work hours on the project. Apprentices not registered with DAS must be paid at the listed journeyworker’s rate, even if they are registered with a different federal/state public agency or private entity. For every week in which apprentice rates are paid, a copy of each apprentice's apprentice ID card issued by DAS shall be attached to the certified payroll records.
If you don’t know what classification or rate applies to the work being performed, you must ask DLS; paying the wrong rate subjects you to enforcement.
Please contact DLS if you have any questions about the Prevailing Wage Schedule: (617) 626-6953 or DLS.Feedback@mass.gov
Employees who are not paid the wage listed on the Prevailing Wage Schedule (PWS) may file a complaint with the Attorney General’s Fair Labor Division: www.mass.gov/ago/fld; (617) 727-3465.
Page 1 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
8/1/2026 $43.05 $15.91 $21.78 $0.00 $0.00 $80.74(2 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE A
12/1/2026 $43.05 $15.91 $23.52 $0.00 $0.00 $82.48
8/1/2026 $43.12 $15.91 $21.78 $0.00 $0.00 $80.81(3 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE A
12/1/2026 $43.12 $15.91 $23.52 $0.00 $0.00 $82.55
8/1/2026 $43.24 $15.91 $21.78 $0.00 $0.00 $80.93(4 & 5 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE A
12/1/2026 $43.24 $15.91 $23.52 $0.00 $0.00 $82.67
ADS/SUBMERSIBLE PILOT
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
1/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
6/1/2026 $49.15 $10.90 $9.75 $9.65 $0.00 $79.45
12/1/2026 $51.40 $10.90 $9.75 $9.65 $0.00 $81.70
6/1/2027 $53.00 $10.90 $9.75 $9.65 $0.00 $83.30
12/1/2027 $54.60 $10.90 $9.75 $9.65 $0.00 $84.90
6/1/2028 $56.28 $10.90 $9.75 $9.65 $0.00 $86.58
AIR TRACK OPERATOR
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.95 $10.90 $9.75 $9.65 $0.00 $88.25
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.00 $10.90 $9.75 $9.65 $0.00 $80.30AIR TRACK OPERATOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 1 (HEAVY & HIGHWAY)
12/1/2026 $51.50 $10.90 $9.75 $9.65 $0.00 $81.80
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
ASBESTOS REMOVER - PIPE / MECH. EQUIPT.
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (BOSTON)
12/1/2025 $44.80 $14.50 $4.30 $6.75 $0.00 $70.35
6/1/2026 $49.40 $10.90 $9.75 $9.65 $0.00 $79.70
12/1/2026 $50.90 $10.90 $9.75 $9.65 $0.00 $81.20
6/1/2027 $52.50 $10.90 $9.75 $9.65 $0.00 $82.80
12/1/2027 $54.10 $10.90 $9.75 $9.65 $0.00 $84.40
6/1/2028 $55.78 $10.90 $9.75 $9.65 $0.00 $86.08
ASPHALT RAKER
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.45 $10.90 $9.75 $9.65 $0.00 $87.75
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.50 $10.90 $9.75 $9.65 $0.00 $79.80ASPHALT RAKER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 1 (HEAVY & HIGHWAY)
12/1/2026 $51.00 $10.90 $9.75 $9.65 $0.00 $81.30
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03BACKHOE/FRONT-END LOADER
Page 2 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $49.40 $10.90 $9.75 $9.65 $0.00 $79.70
12/1/2026 $50.90 $10.90 $9.75 $9.65 $0.00 $81.20
6/1/2027 $52.50 $10.90 $9.75 $9.65 $0.00 $82.80
12/1/2027 $54.10 $10.90 $9.75 $9.65 $0.00 $84.40
6/1/2028 $55.78 $10.90 $9.75 $9.65 $0.00 $86.08
BARCO-TYPE JUMPING TAMPER
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.45 $10.90 $9.75 $9.65 $0.00 $87.75
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.15 $10.90 $9.75 $9.65 $0.00 $79.45
12/1/2026 $51.40 $10.90 $9.75 $9.65 $0.00 $81.70
6/1/2027 $53.00 $10.90 $9.75 $9.65 $0.00 $83.30
12/1/2027 $54.60 $10.90 $9.75 $9.65 $0.00 $84.90
6/1/2028 $56.28 $10.90 $9.75 $9.65 $0.00 $86.58
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.95 $10.90 $9.75 $9.65 $0.00 $88.25
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.00 $10.90 $9.75 $9.65 $0.00 $80.30BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &
HIGHWAY)
LABORERS
LABORERS - ZONE 1 (HEAVY & HIGHWAY)
12/1/2026 $51.50 $10.90 $9.75 $9.65 $0.00 $81.80
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
BOILER MAKER
BOILERMAKERS LOCAL 29
BOILERMAKERS LOCAL 29
1/1/2024 $48.12 $7.07 $14.60 $6.00 $0.00 $75.79
8/1/2026 $70.15 $12.84 $15.57 $8.02 $0.00 $106.58BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
WATERPROOFING)
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (BOSTON)
2/1/2027 $71.55 $12.84 $15.57 $8.02 $0.00 $107.98
Apprentice: BOILER MAKER
Effective Date: 1/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
2 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
3 70.00 $33.68 $7.07 $10.03 $4.20 $0.00 $54.98
4 75.00 $36.09 $7.07 $10.74 $4.50 $0.00 $58.40
5 80.00 $38.50 $7.07 $11.45 $4.80 $0.00 $61.82
6 85.00 $40.90 $7.07 $12.18 $5.10 $0.00 $65.25
7 90.00 $43.31 $7.07 $12.88 $5.40 $0.00 $68.66
8 95.00 $45.71 $7.07 $13.62 $5.70 $0.00 $72.10
Apprentice to Journeyworker Ratio: 1:4
Page 3 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
6/1/2026 $58.70 $17.05 $13.35 $3.25 $0.00 $92.35BULLDOZER/GRADER/SCRAPER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.14 $17.05 $13.35 $3.25 $0.00 $93.79
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $50.40 $10.90 $9.75 $9.80 $0.00 $80.85CAISSON & UNDERPINNING BOTTOM MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $51.90 $10.90 $9.75 $9.80 $0.00 $82.35
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.25 $10.90 $9.75 $9.80 $0.00 $79.70CAISSON & UNDERPINNING LABORER
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $50.75 $10.90 $9.75 $9.80 $0.00 $81.20
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.58 $10.90 $9.75 $9.80 $0.00 $80.03CAISSON & UNDERPINNING TOP MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $51.08 $10.90 $9.75 $9.80 $0.00 $81.53
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.40 $10.90 $9.75 $9.65 $0.00 $79.70
12/1/2026 $50.90 $10.90 $9.75 $9.65 $0.00 $81.20
6/1/2027 $52.50 $10.90 $9.75 $9.65 $0.00 $82.80
12/1/2027 $54.10 $10.90 $9.75 $9.65 $0.00 $84.40
6/1/2028 $55.78 $10.90 $9.75 $9.65 $0.00 $86.08
CARBIDE CORE DRILL OPERATOR
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.45 $10.90 $9.75 $9.65 $0.00 $87.75
For apprentice rates see "Apprentice- LABORER"
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 8/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $35.08 $12.84 $15.57 $8.02 $0.00 $71.51
2 60.00 $42.09 $12.84 $15.57 $8.02 $0.00 $78.52
3 70.00 $49.11 $12.84 $15.57 $8.02 $0.00 $85.54
4 80.00 $56.12 $12.84 $15.57 $8.02 $0.00 $92.55
5 90.00 $63.14 $12.84 $15.57 $8.02 $0.00 $99.57
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 2/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $35.78 $12.84 $15.57 $8.02 $0.00 $72.21
2 60.00 $42.93 $12.84 $15.57 $8.02 $0.00 $79.36
3 70.00 $50.09 $12.84 $15.57 $8.02 $0.00 $86.52
4 80.00 $57.24 $12.84 $15.57 $8.02 $0.00 $93.67
5 90.00 $64.40 $12.84 $15.57 $8.02 $0.00 $100.83
Apprentice to Journeyworker Ratio: 1:5
Page 4 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
3/1/2026 $62.19 $10.58 $11.47 $8.50 $0.00 $92.74
9/1/2026 $63.69 $10.58 $11.47 $8.50 $0.00 $94.24
CARPENTER
CARPENTERS
CARPENTERS -ZONE 1 (Metro Boston)
3/1/2027 $65.19 $10.58 $11.47 $8.50 $0.00 $95.74
4/1/2026 $39.39 $8.29 $4.47 $5.00 $0.00 $57.15
10/1/2026 $40.19 $8.29 $4.47 $5.00 $0.00 $57.95
CARPENTER WOOD FRAME
CARPENTERS
CARPENTERS -ZONE 1 (Wood Frame)
4/1/2027 $40.99 $8.29 $4.47 $5.00 $0.00 $58.75
All Aspects of New Wood Frame Work
Apprentice: CARPENTER
Effective Date: 3/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $27.99 $11.08 $0.00 $1.73 $0.00 $40.80
2 45.00 $27.99 $11.08 $0.00 $1.73 $0.00 $40.80
3 55.00 $34.20 $11.08 $0.00 $3.40 $0.00 $48.68
4 55.00 $34.20 $11.08 $0.00 $3.40 $0.00 $48.68
5 70.00 $43.53 $11.08 $11.41 $5.10 $0.00 $71.12
6 70.00 $43.53 $11.08 $11.41 $5.10 $0.00 $71.12
7 80.00 $49.75 $11.08 $11.44 $6.80 $0.00 $79.07
8 80.00 $49.75 $11.08 $11.44 $6.80 $0.00 $79.07
Apprentice: CARPENTER
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $28.66 $11.08 $0.00 $1.73 $0.00 $41.47
2 45.00 $28.66 $11.08 $0.00 $1.73 $0.00 $41.47
3 55.00 $35.03 $11.08 $0.00 $3.40 $0.00 $49.51
4 55.00 $35.03 $11.08 $0.00 $3.40 $0.00 $49.51
5 70.00 $44.58 $11.08 $11.41 $5.10 $0.00 $72.17
6 70.00 $44.58 $11.08 $11.41 $5.10 $0.00 $72.17
7 80.00 $50.95 $11.08 $11.44 $6.80 $0.00 $80.27
8 80.00 $50.95 $11.08 $11.44 $6.80 $0.00 $80.27
Apprentice to Journeyworker Ratio: 1:5
Apprentice: CARPENTER WOOD FRAME
Effective Date: 4/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $19.70 $8.29 $0.00 $0.00 $0.00 $27.99
2 50.00 $19.70 $8.29 $0.00 $0.00 $0.00 $27.99
3 55.00 $21.66 $8.29 $0.00 $2.00 $0.00 $31.95
4 55.00 $21.66 $8.29 $0.00 $2.00 $0.00 $31.95
5 70.00 $27.57 $8.29 $4.47 $3.00 $0.00 $43.33
Page 5 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
7/1/2026 $54.49 $13.35 $16.43 $7.78 $1.80 $93.85
1/1/2027 $55.94 $13.35 $16.43 $7.78 $1.80 $95.30
7/1/2027 $57.29 $13.35 $16.43 $7.78 $1.80 $96.65
CEMENT MASONRY/PLASTERING
PLASTERERS AND CEMENT MASONS LOCAL 534
Plasterers and Cement Masons - Zone 1
1/1/2028 $58.64 $13.35 $16.43 $7.78 $1.80 $98.00
Apprentice: CARPENTER WOOD FRAME
Effective Date: 4/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
6 70.00 $27.57 $8.29 $4.47 $3.00 $0.00 $43.33
7 80.00 $31.51 $8.29 $4.47 $4.00 $0.00 $48.27
8 80.00 $31.51 $8.29 $4.47 $4.00 $0.00 $48.27
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $20.10 $8.29 $0.00 $0.00 $0.00 $28.39
2 50.00 $20.10 $8.29 $0.00 $0.00 $0.00 $28.39
3 55.00 $22.10 $8.29 $0.00 $2.00 $0.00 $32.39
4 55.00 $22.10 $8.29 $0.00 $2.00 $0.00 $32.39
5 70.00 $28.13 $8.29 $4.47 $3.00 $0.00 $43.89
6 70.00 $28.13 $8.29 $4.47 $3.00 $0.00 $43.89
7 80.00 $32.15 $8.29 $4.47 $4.00 $0.00 $48.91
8 80.00 $32.15 $8.29 $4.47 $4.00 $0.00 $48.91
Apprentice to Journeyworker Ratio: 1:5
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 7/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $27.25 $13.35 $16.43 $0.00 $0.00 $57.03
2 60.00 $32.69 $13.35 $16.43 $7.78 $1.80 $72.05
3 65.00 $35.42 $13.35 $16.43 $7.78 $1.80 $74.78
4 70.00 $38.14 $13.35 $16.43 $7.78 $1.80 $77.50
5 75.00 $40.87 $13.35 $16.43 $7.78 $1.80 $80.23
6 80.00 $43.59 $13.35 $16.43 $7.78 $1.80 $82.95
7 90.00 $49.04 $13.35 $0.00 $7.78 $0.00 $70.17
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 1/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $27.97 $13.35 $16.43 $0.00 $0.00 $57.75
Page 6 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
6/1/2026 $49.40 $10.90 $9.75 $9.65 $0.00 $79.70
12/1/2026 $50.90 $10.90 $9.75 $9.65 $0.00 $81.20
6/1/2027 $52.50 $10.90 $9.75 $9.65 $0.00 $82.80
12/1/2027 $54.10 $10.90 $9.75 $9.65 $0.00 $84.40
6/1/2028 $55.78 $10.90 $9.75 $9.65 $0.00 $86.08
CHAIN SAW OPERATOR
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.45 $10.90 $9.75 $9.65 $0.00 $87.75
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $60.61 $17.05 $13.35 $3.25 $0.00 $94.26CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.09 $17.05 $13.35 $3.25 $0.00 $95.74
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $37.63 $17.05 $13.35 $3.25 $0.00 $71.28COMPRESSOR OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $38.58 $17.05 $13.35 $3.25 $0.00 $72.23
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DELEADER (BRIDGE)
PAINTERS LOCAL 35
PAINTERS LOCAL 35 - ZONE 1
1/1/2026 $59.56 $10.35 $12.00 $12.60 $0.00 $94.51
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 1/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
2 60.00 $33.56 $13.35 $16.43 $7.78 $1.80 $72.92
3 65.00 $36.36 $13.35 $16.43 $7.78 $1.80 $75.72
4 70.00 $39.16 $13.35 $16.43 $7.78 $1.80 $78.52
5 75.00 $41.96 $13.35 $16.43 $7.78 $1.80 $81.32
6 80.00 $44.75 $13.35 $16.43 $7.78 $1.80 $84.11
7 90.00 $50.35 $0.00 $16.43 $0.00 $0.00 $66.78
Apprentice to Journeyworker Ratio: 1:5
Apprentice: DELEADER (BRIDGE)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.78 $10.35 $0.00 $0.00 $0.00 $40.13
2 55.00 $32.76 $10.35 $0.00 $6.93 $0.00 $50.04
3 60.00 $35.74 $10.35 $0.00 $7.56 $0.00 $53.65
4 65.00 $38.71 $10.35 $0.00 $8.19 $0.00 $57.25
5 70.00 $41.69 $10.35 $12.00 $8.82 $0.00 $72.86
6 75.00 $44.67 $10.35 $12.00 $9.45 $0.00 $76.47
7 80.00 $47.65 $10.35 $12.00 $10.08 $0.00 $80.08
8 90.00 $53.60 $10.35 $12.00 $11.34 $0.00 $87.29
Apprentice to Journeyworker Ratio: 1:1
Page 7 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
6/1/2026 $49.30 $10.90 $9.75 $9.65 $0.00 $79.60
12/7/2026 $50.80 $10.90 $9.75 $9.65 $0.00 $81.10
6/7/2027 $52.40 $10.90 $9.75 $9.65 $0.00 $82.70
12/6/2027 $54.00 $10.90 $9.75 $9.65 $0.00 $84.30
6/5/2028 $55.68 $10.90 $9.75 $9.65 $0.00 $85.98
DEMO: ADZEMAN
LABORERS
LABORERS - ZONE 1
12/4/2028 $57.35 $10.90 $9.75 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.30 $10.90 $9.75 $9.65 $0.00 $80.60
12/7/2026 $51.80 $10.90 $9.75 $9.65 $0.00 $82.10
6/7/2027 $53.40 $10.90 $9.75 $9.65 $0.00 $83.70
12/6/2027 $55.00 $10.90 $9.75 $9.65 $0.00 $85.30
6/5/2028 $56.68 $10.90 $9.75 $9.65 $0.00 $86.98
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
LABORERS
LABORERS - ZONE 1
12/4/2028 $58.35 $10.90 $9.75 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.05 $10.90 $9.75 $9.65 $0.00 $80.35
12/7/2026 $51.55 $10.90 $9.75 $9.65 $0.00 $81.85
6/7/2027 $53.15 $10.90 $9.75 $9.65 $0.00 $83.45
12/6/2027 $54.75 $10.90 $9.75 $9.65 $0.00 $85.05
6/5/2028 $56.43 $10.90 $9.75 $9.65 $0.00 $86.73
DEMO: BURNERS
LABORERS
LABORERS - ZONE 1
12/4/2028 $58.10 $10.90 $9.75 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.30 $10.90 $9.75 $9.65 $0.00 $80.60
12/7/2026 $51.80 $10.90 $9.75 $9.65 $0.00 $82.10
6/7/2027 $53.40 $10.90 $9.75 $9.65 $0.00 $83.70
12/6/2027 $55.00 $10.90 $9.75 $9.65 $0.00 $85.30
6/5/2028 $56.68 $10.90 $9.75 $9.65 $0.00 $86.98
DEMO: CONCRETE CUTTER/SAWYER
LABORERS
LABORERS - ZONE 1
12/4/2028 $58.35 $10.90 $9.75 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.05 $10.90 $9.75 $9.65 $0.00 $80.35
12/7/2026 $51.55 $10.90 $9.75 $9.65 $0.00 $81.85
6/7/2027 $53.15 $10.90 $9.75 $9.65 $0.00 $83.45
12/6/2027 $54.75 $10.90 $9.75 $9.65 $0.00 $85.05
6/5/2028 $56.43 $10.90 $9.75 $9.65 $0.00 $86.73
DEMO: JACKHAMMER OPERATOR
LABORERS
LABORERS - ZONE 1
12/4/2028 $58.10 $10.90 $9.75 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.30 $10.90 $9.75 $9.65 $0.00 $79.60
12/7/2026 $50.80 $10.90 $9.75 $9.65 $0.00 $81.10
6/7/2027 $52.40 $10.90 $9.75 $9.65 $0.00 $82.70
12/6/2027 $54.00 $10.90 $9.75 $9.65 $0.00 $84.30
6/5/2028 $55.68 $10.90 $9.75 $9.65 $0.00 $85.98
DEMO: WRECKING LABORER
LABORERS
LABORERS - ZONE 1
12/4/2028 $57.35 $10.90 $9.75 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $58.70 $17.05 $13.35 $3.25 $0.00 $92.35DIRECTIONAL DRILL MACHINE OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.14 $17.05 $13.35 $3.25 $0.00 $93.79
Page 8 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DIVER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
8/1/2024 $78.11 $10.08 $11.62 $10.04 $0.00 $109.85 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Diver wage 70/80/90 2A $69.83, 3A $91.79,4A $102.14 Total Rate
DIVER TENDER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
8/1/2024 $55.79 $10.08 $11.62 $12.67 $0.00 $90.16 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Piledriver wage 70/80/90 2A $54.20, 3A $73.93,4A $82.05 Total Rate
DIVER TENDER (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
8/1/2024 $83.69 $10.08 $11.62 $12.67 $0.00 $118.06
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER/SLURRY (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
DRAWBRIDGE OPERATOR (Construction)
DRAWBRIDGE - SEIU LOCAL 888
DRAWBRIDGE - SEIU LOCAL 888
7/1/2020 $26.77 $6.67 $3.93 $0.00 $0.16 $37.53
3/1/2026 $66.86 $13.00 $14.64 $9.00 $0.00 $103.50
9/1/2026 $68.78 $13.00 $14.69 $9.00 $0.00 $105.47
3/1/2027 $69.97 $13.00 $14.73 $9.00 $0.00 $106.70
9/1/2027 $71.88 $13.00 $14.79 $9.00 $0.00 $108.67
ELECTRICIAN
ELECTRICIANS LOCAL 103
ELECTRICIANS LOCAL 103
3/1/2028 $73.08 $13.00 $14.82 $9.00 $0.00 $109.90
Apprentice: ELECTRICIAN
Effective Date: 3/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $26.74 $13.00 $0.80 $0.00 $0.00 $40.54
2 40.00 $26.74 $13.00 $0.80 $0.00 $0.00 $40.54
3 45.00 $30.09 $13.00 $13.53 $4.05 $0.00 $60.67
4 45.00 $30.09 $13.00 $13.53 $4.05 $0.00 $60.67
5 50.00 $33.43 $13.00 $13.63 $4.50 $0.00 $64.56
6 55.00 $36.77 $13.00 $13.73 $4.95 $0.00 $68.45
7 60.00 $40.12 $13.00 $13.83 $5.40 $0.00 $72.35
8 65.00 $43.46 $13.00 $13.93 $5.85 $0.00 $76.24
9 70.00 $46.80 $13.00 $14.03 $6.30 $0.00 $80.13
10 75.00 $50.15 $13.00 $14.13 $6.75 $0.00 $84.03
Page 9 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
1/1/2026 $77.26 $16.38 $11.06 $10.70 $0.00 $115.40ELEVATOR CONSTRUCTOR
ELEVATOR CONSTRUCTORS LOCAL 4
ELEVATOR CONSTRUCTORS LOCAL 4
1/1/2027 $80.55 $16.48 $11.16 $11.00 $0.00 $119.19
Apprentice: ELECTRICIAN
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $27.51 $13.00 $0.83 $0.00 $0.00 $41.34
2 40.00 $27.51 $13.00 $0.83 $0.00 $0.00 $41.34
3 45.00 $30.95 $13.00 $13.56 $4.05 $0.00 $61.56
4 45.00 $30.95 $13.00 $13.56 $4.05 $0.00 $61.56
5 50.00 $34.39 $13.00 $13.66 $4.50 $0.00 $65.55
6 55.00 $37.83 $13.00 $13.76 $4.95 $0.00 $69.54
7 60.00 $41.27 $13.00 $13.87 $5.40 $0.00 $73.54
8 65.00 $44.71 $13.00 $13.97 $5.85 $0.00 $77.53
9 70.00 $48.15 $13.00 $14.07 $6.30 $0.00 $81.52
10 75.00 $51.59 $13.00 $14.18 $6.75 $0.00 $85.52
Apprentice Notes
Apprentice to Journeyworker Ratio: 2:3
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $38.63 $0.00 $0.00 $0.00 $0.00 $38.63
2 55.00 $42.49 $16.38 $11.06 $10.70 $0.00 $80.63
3 65.00 $50.22 $16.38 $11.06 $10.70 $0.00 $88.36
4 70.00 $54.08 $16.38 $11.06 $10.70 $0.00 $92.22
5 80.00 $61.81 $16.38 $11.06 $10.70 $0.00 $99.95
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $40.28 $0.00 $0.00 $0.00 $0.00 $40.28
2 55.00 $44.30 $16.48 $11.16 $11.00 $0.00 $82.94
3 65.00 $52.36 $16.48 $11.16 $11.00 $0.00 $91.00
4 70.00 $56.39 $16.48 $11.16 $11.00 $0.00 $95.03
5 80.00 $64.44 $16.48 $11.16 $11.00 $0.00 $103.08
Page 10 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
1/1/2026 $54.08 $16.38 $11.06 $10.07 $0.00 $91.59ELEVATOR CONSTRUCTOR HELPER
ELEVATOR CONSTRUCTORS LOCAL 4
ELEVATOR CONSTRUCTORS LOCAL 4
1/1/2027 $56.39 $16.48 $11.16 $11.00 $0.00 $95.03
For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR"
6/1/2026 $49.50 $10.90 $9.75 $9.65 $0.00 $79.80FENCE & GUARD RAIL ERECTOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 1 (HEAVY & HIGHWAY)
12/1/2026 $51.00 $10.90 $9.75 $9.65 $0.00 $81.30
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
5/1/2026 $54.40 $16.55 $13.35 $3.25 $0.00 $87.55
11/1/2026 $55.69 $16.55 $13.35 $3.25 $0.00 $88.84
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $57.12 $16.55 $13.35 $3.25 $0.00 $90.27
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
5/1/2026 $56.02 $16.55 $13.35 $3.25 $0.00 $89.17
11/1/2026 $57.32 $16.55 $13.35 $3.25 $0.00 $90.47
FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $58.77 $16.55 $13.35 $3.25 $0.00 $91.92
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
5/1/2026 $26.28 $16.55 $13.35 $3.25 $0.00 $59.43
11/1/2026 $27.04 $16.55 $13.35 $3.25 $0.00 $60.19
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $27.89 $16.55 $13.35 $3.25 $0.00 $61.04
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
3/1/2026 $66.86 $13.00 $14.64 $9.00 $0.00 $103.50
9/1/2026 $68.78 $13.00 $14.69 $9.00 $0.00 $105.47
3/1/2027 $69.97 $13.00 $14.73 $9.00 $0.00 $106.70
9/1/2027 $71.88 $13.00 $14.79 $9.00 $0.00 $108.67
FIRE ALARM INSTALLER
ELECTRICIANS LOCAL 103
ELECTRICIANS LOCAL 103
3/1/2028 $73.08 $13.00 $14.82 $9.00 $0.00 $109.90
For apprentice rates see "Apprentice- ELECTRICIAN"
3/1/2026 $53.49 $13.00 $14.23 $7.20 $0.00 $87.92
9/1/2026 $55.02 $13.00 $14.28 $7.20 $0.00 $89.50
3/1/2027 $55.98 $13.00 $14.31 $7.20 $0.00 $90.49
9/1/2027 $57.50 $13.00 $14.36 $7.20 $0.00 $92.06
FIRE ALARM REPAIR / MAINTENANCE
/ COMMISSIONING
ELECTRICIANS LOCAL 103
ELECTRICIANS LOCAL 103
3/1/2028 $58.46 $13.00 $14.38 $7.20 $0.00 $93.04
For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN"
6/1/2026 $47.55 $17.05 $13.35 $3.25 $0.00 $81.20FIREMAN (ASST. ENGINEER)
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $48.73 $17.05 $13.35 $3.25 $0.00 $82.38
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $29.21 $10.90 $9.75 $9.65 $0.00 $59.51FLAGGER & SIGNALER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 1 (HEAVY & HIGHWAY)
12/1/2026 $29.21 $10.90 $9.75 $9.65 $0.00 $59.51
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
3/1/2026 $59.24 $10.33 $11.47 $8.80 $0.00 $89.84
9/1/2026 $60.74 $10.33 $11.47 $8.80 $0.00 $91.34
FLOORCOVERER
FLOORCOVERERS LOCAL 2168
FLOORCOVERERS LOCAL 2168 ZONE I
3/1/2027 $62.24 $10.33 $11.47 $8.80 $0.00 $92.84
Page 11 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03FORK LIFT/CHERRY PICKER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $37.63 $17.05 $13.35 $3.25 $0.00 $71.28GENERATOR/LIGHTING PLANT/HEATERS
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $38.58 $17.05 $13.35 $3.25 $0.00 $72.23
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
GLAZIERS LOCAL 35
GLAZIERS LOCAL 35 (ZONE 1)
1/1/2026 $54.85 $10.35 $12.00 $12.60 $0.00 $89.80
Apprentice: FLOORCOVERER
Effective Date: 3/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $26.66 $10.33 $0.00 $1.76 $0.00 $38.75
2 45.00 $26.66 $10.33 $0.00 $1.76 $0.00 $38.75
3 55.00 $32.58 $10.33 $0.00 $3.52 $0.00 $46.43
4 55.00 $32.58 $10.33 $0.00 $3.52 $0.00 $46.43
5 70.00 $41.47 $10.33 $11.47 $5.28 $0.00 $68.55
6 70.00 $41.47 $10.33 $11.47 $5.28 $0.00 $68.55
7 80.00 $47.39 $10.33 $11.47 $7.04 $0.00 $76.23
8 80.00 $47.39 $10.33 $11.47 $7.04 $0.00 $76.23
Apprentice: FLOORCOVERER
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $27.33 $10.33 $0.00 $1.76 $0.00 $39.42
2 45.00 $27.33 $10.33 $0.00 $1.76 $0.00 $39.42
3 55.00 $33.41 $10.33 $0.00 $3.52 $0.00 $47.26
4 55.00 $33.41 $10.33 $0.00 $3.52 $0.00 $47.26
5 70.00 $42.52 $10.33 $11.47 $5.28 $0.00 $69.60
6 70.00 $42.52 $10.33 $11.47 $5.28 $0.00 $69.60
7 80.00 $48.59 $10.33 $11.47 $7.04 $0.00 $77.43
8 80.00 $48.59 $10.33 $11.47 $7.04 $0.00 $77.43
Apprentice Notes
Steps are 750 hrs.
Page 12 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03HOISTING ENGINEER/CRANES/GRADALLS
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48
Apprentice: GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $27.43 $10.35 $0.00 $0.00 $0.00 $37.78
2 55.00 $30.17 $10.35 $0.00 $6.88 $0.00 $47.40
3 60.00 $32.91 $10.35 $0.00 $7.50 $0.00 $50.76
4 65.00 $35.65 $10.35 $0.00 $8.13 $0.00 $54.13
5 70.00 $38.40 $10.35 $11.95 $8.75 $0.00 $69.45
6 75.00 $41.14 $10.35 $11.95 $9.38 $0.00 $72.82
7 80.00 $43.88 $10.35 $11.95 $10.00 $0.00 $76.18
8 90.00 $49.37 $10.35 $11.95 $11.25 $0.00 $82.92
Apprentice to Journeyworker Ratio: 1:1
Apprentice: HOISTING ENGINEER/CRANES/GRADALLS
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 55.00 $32.66 $0.00 $0.00 $0.00 $0.00 $32.66
2 60.00 $35.63 $17.05 $13.35 $3.25 $0.00 $69.28
3 65.00 $38.60 $17.05 $13.35 $3.25 $0.00 $72.25
4 70.00 $41.57 $17.05 $13.35 $3.25 $0.00 $75.22
5 75.00 $44.54 $17.05 $13.35 $3.25 $0.00 $78.19
6 80.00 $47.50 $17.05 $13.35 $3.25 $0.00 $81.15
7 85.00 $50.47 $17.05 $13.35 $3.25 $0.00 $84.12
8 90.00 $53.44 $17.05 $13.35 $3.25 $0.00 $87.09
Apprentice: HOISTING ENGINEER/CRANES/GRADALLS
Effective Date: 12/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 55.00 $33.46 $0.00 $0.00 $0.00 $0.00 $33.46
2 60.00 $36.50 $17.05 $13.35 $3.25 $0.00 $70.15
3 65.00 $39.54 $17.05 $13.35 $3.25 $0.00 $73.19
4 70.00 $42.58 $17.05 $13.35 $3.25 $0.00 $76.23
5 75.00 $45.62 $17.05 $13.35 $3.25 $0.00 $79.27
6 80.00 $48.66 $17.05 $13.35 $3.25 $0.00 $82.31
7 85.00 $51.71 $17.05 $13.35 $3.25 $0.00 $85.36
8 90.00 $54.75 $17.05 $13.35 $3.25 $0.00 $88.40
Apprentice to Journeyworker Ratio: 1:6
Page 13 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
HVAC (DUCTWORK)
SHEETMETAL WORKERS LOCAL 17
SHEETMETAL WORKERS LOCAL 17 - A
2/1/2026 $62.93 $14.91 $18.74 $9.53 $2.98 $109.09
For apprentice rates see "Apprentice- SHEET METAL WORKER"
3/1/2026 $66.86 $13.00 $14.64 $9.00 $0.00 $103.50
9/1/2026 $68.78 $13.00 $14.69 $9.00 $0.00 $105.47
3/1/2027 $69.97 $13.00 $14.73 $9.00 $0.00 $106.70
9/1/2027 $71.88 $13.00 $14.79 $9.00 $0.00 $108.67
HVAC (ELECTRICAL CONTROLS)
ELECTRICIANS LOCAL 103
ELECTRICIANS LOCAL 103
3/1/2028 $73.08 $13.00 $14.82 $9.00 $0.00 $109.90
For apprentice rates see "Apprentice- ELECTRICIAN"
HVAC (TESTING AND BALANCING - AIR)
SHEETMETAL WORKERS LOCAL 17
SHEETMETAL WORKERS LOCAL 17 - A
2/1/2026 $62.93 $14.91 $18.74 $9.53 $2.98 $109.09
For apprentice rates see "Apprentice- SHEET METAL WORKER"
HVAC (TESTING AND BALANCING -WATER)
PIPEFITTERS LOCAL 537
PIPEFITTERS LOCAL 537
3/1/2026 $70.58 $13.95 $14.00 $9.55 $0.00 $108.08
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
HVAC MECHANIC
PIPEFITTERS LOCAL 537
PIPEFITTERS LOCAL 537
3/1/2026 $70.58 $13.95 $14.00 $9.55 $0.00 $108.08
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
6/1/2026 $49.15 $10.90 $9.75 $9.65 $0.00 $79.45
12/1/2026 $51.40 $10.90 $9.75 $9.65 $0.00 $81.70
6/1/2027 $53.00 $10.90 $9.75 $9.65 $0.00 $83.30
12/1/2027 $54.60 $10.90 $9.75 $9.65 $0.00 $84.90
6/1/2028 $56.28 $10.90 $9.75 $9.65 $0.00 $86.58
HYDRAULIC DRILLS
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.95 $10.90 $9.75 $9.65 $0.00 $88.25
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.00 $10.90 $9.75 $9.65 $0.00 $80.30HYDRAULIC DRILLS (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 1 (HEAVY & HIGHWAY)
12/1/2026 $51.50 $10.90 $9.75 $9.65 $0.00 $81.80
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
9/1/2025 $60.34 $14.75 $9.52 $10.09 $0.00 $94.70INSULATOR (PIPES & TANKS)
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (BOSTON)
9/1/2026 $59.02 $16.15 $11.46 $11.49 $0.00 $98.12
Apprentice: INSULATOR (PIPES & TANKS)
Effective Date: 9/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $30.17 $14.75 $9.27 $5.05 $0.00 $59.24
2 60.00 $36.20 $14.75 $9.32 $6.05 $0.00 $66.32
3 70.00 $42.24 $14.75 $9.37 $7.06 $0.00 $73.42
Page 14 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
IRONWORKER/WELDER
IRONWORKERS LOCAL 7
IRONWORKERS LOCAL 7 (BOSTON AREA)
3/16/2026 $58.65 $9.25 $12.75 $15.00 $0.00 $95.65
6/1/2026 $49.40 $10.90 $9.75 $9.65 $0.00 $79.70
12/1/2026 $50.90 $10.90 $9.75 $9.65 $0.00 $81.20
6/1/2027 $52.50 $10.90 $9.75 $9.65 $0.00 $82.80
12/1/2027 $54.10 $10.90 $9.75 $9.65 $0.00 $84.40
6/1/2028 $55.78 $10.90 $9.75 $9.65 $0.00 $86.08
JACKHAMMER & PAVING BREAKER OPERATOR
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.45 $10.90 $9.75 $9.65 $0.00 $87.75
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.15 $10.90 $9.75 $9.65 $0.00 $79.45
12/1/2026 $50.65 $10.90 $9.75 $9.65 $0.00 $80.95
6/1/2027 $52.25 $10.90 $9.75 $9.65 $0.00 $82.55
12/1/2027 $53.85 $10.90 $9.75 $9.65 $0.00 $84.15
6/1/2028 $55.53 $10.90 $9.75 $9.65 $0.00 $85.83
LABORER
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.20 $10.90 $9.75 $9.65 $0.00 $87.50
Apprentice: INSULATOR (PIPES & TANKS)
Effective Date: 9/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
4 80.00 $48.27 $14.75 $9.42 $8.07 $0.00 $80.51
Apprentice: INSULATOR (PIPES & TANKS)
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.51 $16.15 $11.21 $5.75 $0.00 $62.62
2 60.00 $35.41 $16.15 $11.26 $6.89 $0.00 $69.71
3 70.00 $41.31 $16.15 $11.31 $8.04 $0.00 $76.81
4 80.00 $47.22 $16.15 $11.36 $9.19 $0.00 $83.92
Apprentice to Journeyworker Ratio: 1:4
Apprentice: IRONWORKER/WELDER
Effective Date: 3/16/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 70.00 $41.06 $9.25 $12.75 $5.00 $0.00 $68.06
2 80.00 $46.92 $9.25 $12.75 $5.00 $0.00 $73.92
3 90.00 $52.79 $9.25 $12.75 $5.00 $0.00 $79.79
4 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
5 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
6 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Page 15 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
6/1/2026 $49.25 $10.90 $9.75 $9.65 $0.00 $79.55LABORER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 1 (HEAVY & HIGHWAY)
12/1/2026 $50.75 $10.90 $9.75 $9.65 $0.00 $81.05
6/1/2026 $49.15 $10.90 $9.75 $9.65 $0.00 $79.45LABORER: CARPENTER TENDER
Apprentice: LABORER
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $29.49 $10.90 $9.75 $9.65 $0.00 $59.79
2 70.00 $34.41 $10.90 $9.75 $9.65 $0.00 $64.71
3 80.00 $39.32 $10.90 $9.75 $9.65 $0.00 $69.62
4 90.00 $44.24 $10.90 $9.75 $9.65 $0.00 $74.54
Apprentice: LABORER
Effective Date: 12/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $30.39 $10.90 $9.75 $9.65 $0.00 $60.69
2 70.00 $35.46 $10.90 $9.75 $9.65 $0.00 $65.76
3 80.00 $40.52 $10.90 $9.75 $9.65 $0.00 $70.82
4 90.00 $45.59 $10.90 $9.75 $9.65 $0.00 $75.89
Apprentice to Journeyworker Ratio: 1:5
Apprentice: LABORER (HEAVY & HIGHWAY)
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $29.55 $10.90 $9.75 $9.65 $0.00 $59.85
2 70.00 $34.48 $10.90 $9.75 $9.65 $0.00 $64.78
3 80.00 $39.40 $10.90 $9.75 $9.65 $0.00 $69.70
4 90.00 $44.33 $10.90 $9.75 $9.65 $0.00 $74.63
Apprentice: LABORER (HEAVY & HIGHWAY)
Effective Date: 12/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $30.45 $10.90 $9.75 $9.65 $0.00 $60.75
2 70.00 $35.53 $10.90 $9.75 $9.65 $0.00 $65.83
3 80.00 $40.60 $10.90 $9.75 $9.65 $0.00 $70.90
4 90.00 $45.68 $10.90 $9.75 $9.65 $0.00 $75.98
Page 16 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate
12/1/2026 $50.65 $10.90 $9.75 $9.65 $0.00 $80.95
6/1/2027 $52.25 $10.90 $9.75 $9.65 $0.00 $82.55
12/1/2027 $53.85 $10.90 $9.75 $9.65 $0.00 $84.15
6/1/2028 $55.53 $10.90 $9.75 $9.65 $0.00 $85.83
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.20 $10.90 $9.75 $9.65 $0.00 $87.50
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.15 $10.90 $9.75 $9.65 $0.00 $79.45
12/1/2026 $50.65 $10.90 $9.75 $9.65 $0.00 $80.95
6/1/2027 $52.25 $10.90 $9.75 $9.65 $0.00 $82.55
12/1/2027 $53.85 $10.90 $9.75 $9.65 $0.00 $84.15
6/1/2028 $55.53 $10.90 $9.75 $9.65 $0.00 $85.83
LABORER: CEMENT FINISHER TENDER
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.20 $10.90 $9.75 $9.65 $0.00 $87.50
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.30 $10.90 $9.75 $9.65 $0.00 $79.60
12/7/2026 $50.80 $10.90 $9.75 $9.65 $0.00 $81.10
6/7/2027 $52.40 $10.90 $9.75 $9.65 $0.00 $82.70
12/6/2027 $54.00 $10.90 $9.75 $9.65 $0.00 $84.30
6/5/2028 $55.68 $10.90 $9.75 $9.65 $0.00 $85.98
LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER
LABORERS
LABORERS - ZONE 1
12/4/2028 $57.35 $10.90 $9.75 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.40 $10.90 $9.75 $9.65 $0.00 $79.70
12/1/2026 $50.90 $10.90 $9.75 $9.65 $0.00 $81.20
6/1/2027 $52.50 $10.90 $9.75 $9.65 $0.00 $82.80
12/1/2027 $54.10 $10.90 $9.75 $9.65 $0.00 $84.40
6/1/2028 $55.78 $10.90 $9.75 $9.65 $0.00 $86.08
LABORER: MASON TENDER
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.45 $10.90 $9.75 $9.65 $0.00 $87.75
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.50 $10.90 $9.75 $9.65 $0.00 $79.80LABORER: MASON TENDER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 1 (HEAVY & HIGHWAY)
12/1/2026 $51.00 $10.90 $9.75 $9.65 $0.00 $81.30
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2026 $49.15 $10.90 $9.75 $9.65 $0.00 $79.45
12/1/2026 $50.65 $10.90 $9.75 $9.65 $0.00 $80.95
6/1/2027 $52.25 $10.90 $9.75 $9.65 $0.00 $82.55
12/1/2027 $53.85 $10.90 $9.75 $9.65 $0.00 $84.15
6/1/2028 $55.53 $10.90 $9.75 $9.65 $0.00 $85.83
LABORER: MULTI-TRADE TENDER
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.20 $10.90 $9.75 $9.65 $0.00 $87.50
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.15 $10.90 $9.75 $9.65 $0.00 $79.45
12/1/2026 $50.65 $10.90 $9.75 $9.65 $0.00 $80.95
6/1/2027 $52.25 $10.90 $9.75 $9.65 $0.00 $82.55
12/1/2027 $53.85 $10.90 $9.75 $9.65 $0.00 $84.15
6/1/2028 $55.53 $10.90 $9.75 $9.65 $0.00 $85.83
LABORER: TREE REMOVER
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.20 $10.90 $9.75 $9.65 $0.00 $87.50
This classification applies to the removal of standing trees, and the trimming and removal of branches and limbs when related to public works construction or site clearance
Page 17 of 31Wage Request Number: 20260825170433Issue Date: 08/25/2026
Supplemental
Unemployment Total Rate incidental to construction . For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.40 $10.90 $9.75 $9.65 $0.00 $79.70
12/1/2026 $50.90 $10.90 $9.75 $9.65 $0.00 $81.20
6/1/2027 $52.50 $10.90 $9.75 $9.65 $0.00 $82.80
12/1/2027 $54.10 $10.90 $9.75 $9.65 $0.00 $84.40
6/1/2028 $55.78 $10.90 $9.75 $9.65 $0.00 $86.08
LASER BEAM OPERATOR
LABORERS
LABORERS - ZONE 1
12/1/2028 $57.45 $10.90 $9.75 $9.65 $0.00 $87.75
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.50 $10.90 $9.75 $9.65 $0.00 $79.80LASER BEAM OPERATOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 1 (HEAVY & HIGHWAY)
12/1/2026 $51.00 $10.90 $9.75 $9.65 $0.00 $81.30
For apprentice rates see…
This is the start of the file's text. The full file is on GovTribe.