27-24-SPS IFB Manual - Bates Elementary School Roof.pdf

PDF 13 MB Posted

Attached to
27-24-SPS Bates Elementary School Roof Replacement
Solicitation number
BD-27-1165-COSPS-COSPS-135508
Issued by
Massachusetts

About this file

Summary

This Invitation for Bid (IFB) Manual pertains to the roof replacement project at Bates Elementary School under the jurisdiction of the South Carolina Purchasing Consortium (SPS). The project involves the complete roof replacement and related roofing services for the elementary school facility. Interested bidders are required to submit sealed bids by the specified due date, with site visits available to allow potential bidders to inspect the facility and assess project conditions. A mandatory or optional bidders' conference may be held prior to bid submission to clarify project scope, specifications, and requirements. The contract will be awarded to the lowest responsive and responsible bidder, and the term of the contract will extend through the completion of the roofing work as defined in the project specifications and scope of work documents.

Pricing for the project shall be submitted on the bid forms provided in the IFB manual, with all costs to include labor, materials, equipment, and incidental expenses necessary for complete project delivery. The project is funded through the school district's capital improvement budget or related funding sources designated for facility maintenance and repairs. No specific set-asides for minority-owned, women-owned, or other designated business categories are indicated as selected in this solicitation. Bidders must comply with all applicable state and federal regulations, insurance requirements, and bonding provisions as outlined in the contract documents and general terms and conditions.

View the file

Other files

File Type Posted
27-24-SPS Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

Bates Elementary School Roof Replacement

53 Liberty Hill Avenue Salem, MA 01970

MSBA Project #202402580003

Construction Documents November 18, 2026

Awarding Authority:

City of Salem 93 Washington Street

Owner’s Project Manager:

Skanska USA Building, Inc. – Skanska Integrated Solutions 101 Seaport Boulevard, Suite 200 Boston, MA 02210

Architect:

Habeeb & Associates Architects 150 Longwater Drive Norwell, MA 02061

H&A JN 2505.01

Roof Replacement Construction Documents

Salem, MA

Habeeb & Associates Architects Table of Contents

H&A JN 2505.01 Section 01 0010-1

Section 00 0010

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Section 00 0010 Table Of Contents

Section 00 1116 City of Salem IFB 27-24-SPS

Section 00 3001 Prevailing Wage Rates, dated October 28, 2026 Section 00 3126 Existing Hazardous Material Information

Revised Limited Asbestos-Containing Material Inspection Report

Prepared by Atlas Technical Consultants, dated August 12, 2026

Section 00 8600 Drawing List

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 1000 Summary

Section 01 2200 Unit Prices

Section 01 3000 Administrative Requirements

Section 01 3100 Project Management and Coordination

Section 01 3119 Project Meetings

Section 01 3200 Construction Progress Documentation

Section 01 3300 Submittal Requirements

Section 01 3543 Environmental Protection Procedures

Section 01 4000 Quality Requirements

Section 01 4200 References

Section 01 4325 Testing Agency Services

Section 01 5000 Temporary Facilities and Controls

Section 01 5716 Temporary Pest Control

Section 01 6000 Product Requirements

Section 01 7329 Cutting and Patching

Section 01 7419 Construction Waste Management

Section 01 7700 Contract Closeout

Section 01 7839 Record Documents

Section 01 9100 Commissioning

DIVISION 02 - EXISTING CONDITIONS

Section 02 4100 Demolition

Section 02 0800 Asbestos Abatement

DIVISION 03 – CONCRETE

Section 03 5114 Cementitious Roof Deck

DIVISION 04 – MASONRY

Section 04 0001* Masonry Work (filed sub-bid)

Section 04 2000 Unit Masonry (part of 04 0001 filed sub-bid)

Salem, MA

Habeeb & Associates Architects Table of Contents

H&A JN 2505.01 Section 01 0010-2

DIVISION 05 – METALS

Section 05 3100 Steel Decking

Section 05 5000 Metal Fabrications

DIVISION 06 - WOOD, PLASTICS AND COMPOSITES

Section 06 1000 Rough Carpentry

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

Section 07 5019 Preparation for Reroofing

Section 07 5400 Thermoplastic Membrane Roofing

Section 07 6200 Sheet Metal Flashing and Trim

Section 07 7123 Manufactured Gutters, Scuppers and Downspouts

Section 07 7200 Roof Accessories

Section 07 9200 Joint Sealants

DIVISION 08 – OPENINGS

Section 08 1113 Hollow Metal Doors and Frames

Section 08 7100 Door Hardware

DIVISION 09 – FINISHES

Section 09 9000 Painting and Coating

DIVISION 22 – PLUMBING

Section 22 0001* Plumbing (filed sub-bid)

Section 22 1423 Storm Drainage Piping Specialties

DIVISION 23 – HVAC

Section 23 0001* HVAC (filed sub-bid)

DIVISION 26 – ELECTRICAL

Section 26 0001* Electrical Work (filed sub-bid)

DIVISION 31 – EARTHWORK

Section 31 2000 Earth Moving

* Indicates Filed Sub-Bid Required

END OF SECTION

CITY OF SALEM

INVITATION FOR BID

IFB #27-24-SPS

MSBA ARP Bates Elementary School Roof Replacement

November 18, 2026

FILED SUB-BIDS DUE:

Wednesday, December 16, 2026 at 11:00 AM

ROOFING PRIME GENERAL BIDS DUE:

Wednesday, January 13, 2027 at 11:00 AM

Late Bids Will Be Rejected

SDO Goals: MBE 7.11%, WBE 9.6%, VBE/SDVOBE 3%

DELIVER COMPLETED SUBMISSIONS TO:

City of Salem, MA Purchasing Department

93 Washington Street, 2nd Floor Phone: (978) 619-5696

IFB # 27-24-SPS

Bates Elementary School Roof Replacement

City of Salem, Massachusetts Purchasing

Department

COVER SHEET

The City of Salem reserves the right to reject any or all Bids, to omit any item or items called for, or to accept the bids(s) deemed in the best interest of the City.

• One Original and One copy of the Filed Sub Bid must be submitted on or before 11:00 AM on Wednesday, December 16, 2026

• One Original and One copy of the Roofing Prime General Bids must be submitted on or before 11:00 AM on Wednesday, January 13, 2027 to:

Anthony Delaney, Purchasing Agent Salem City Hall

93 Washington Street, 2nd Floor

The envelope containing the Bid and required information must be sealed and marked with Proposer’s name, title of proposal, IFB number, and date of opening. The Proposer must sign all required signature pages in order for the proposal to be considered.

The Proposer acknowledges receipt of the following ADDENDA #

BUSINESS/INDIVIDUAL NAME

ADDRESS

CITY, STATE, ZIP CODE

TELEPHONE

EMAIL

INDIVIDUAL/AUTHORIZED SIGNATURE

AUTHORIZED OFFICER NAME (print)

DATE

By signing above, the authorized officer is certifying that a complete examination of all bid/rfp documents has been made and that the goods/services will be delivered within the time specified and at the prices stated.

All bidders must sign and submit with their bid the attached Certificate of Good Faith and Tax

Attestation Form. Failure to do so will result in the bid being unresponsive and rejected.

CONTACT & CHECKLIST

CONTACT INFORMATION:

Name of Bidder: Contact Individual:

Address:

Phone: Alternate Phone:

Email Address: Social Security/Federal Tax Identification Number:

Authorized Signature:

BIDDER’S CHECKLIST:

Completed Cover Sheet (this sheet)

Bid Form Form of General Bid OR Form of Sub-bid 5% Bid Security Deposit Required Certifications Form (page 12 & 13) Statement of Qualifications DCAMM Certificate of Eligibility DCAMM Contractor's Update Statement SDO Contractor’s Certification Acknowledgement of Addenda: (if applicable)

FORM FOR GENERAL BID (Roofer Prime)

To: City of Salem, Massachusetts, Awarding Authority

From: Contractor

A. BATES ELEMENTARY SCHOOL – ROOF REPLACEMENT #27-24-SPS:

1. BASE BID: The undersigned proposes to furnish all labor and materials required for Project located in

Salem, Massachusetts, in accordance with the accompanying plans and specifications prepared by

Habeeb & Associates, Inc. specified below, subject to additions and deductions, if applicable, according to the terms of the specifications, for the lump sum price of

Dollars

(Total contract price in words, which governs)

(Total contract price amount in numbers)

2. UNIT PRICES: Each Unit Price shall be listed separately.

Unit Price No. 1:

Replace any severely deteriorated or damaged existing tectum roof deck found when roofing system is removed. Refer to Section 03 5114 – Cementitious Roof Deck for a description of this material.

$ per 1,000 SF

Unit Price No. 2:

Replace any severely rusted and deteriorated existing metal deck found when roofing system is removed. Refer to Section 05 3100 – Steel Decking for a description of this material.

$ per 1,000 SF

Unit Price No. 3:

Install perimeter roof blocking: Refer to Section 06 1000 – Rough Carpentry for a description of this material.

$ per 400 LF

Unit Price No. 4:

Install new masonry counterflashing at vertical masonry walls. Refer to Section 07 6200 – Sheet Metal Flashing and Trim.

$ per 100 LF

Unit Price No. 5:

Install new caulking at new masonry counterflashing. Refer to Section 07 9200 – Joint Sealants for a description of this material.

$ per 100 LF

B. ADDENDA: This Bidder has received, and this bid includes, the following addenda of which receipt is hereby acknowledged:

Date Number

C. SUB-DIVISION OF BID: The sub-division of the Proposed Contract Price is as follows:

Item 1: The work of the General Contractor, being all work other than that covered by Item 2:

Dollars (Total contract price in words, which governs)

(Total contract price amount in numbers)

Item 2: The work of the Sub-Bidders Indicated by Class of Work and Name of Filed Sub-Bidder.

Trade and Name of Sub-Bidder Amount Bond Required

___________________________________ $____________________ YES / NO

Bidder shall circle YES or NO indicating whether a bond is required. Failure to circle any or all spaces in the Bonds Required will be construed as an entry of the word “NO”.

D. FILED SUB BIDDERS: The undersigned agrees that each of the above named sub-bidders will be used for the work indicated at the amount stated, unless a substitution is made. The undersigned further agrees to pay the premiums for the performance and payment bonds furnished by sub-bidders as requested herein and that all of the cost of all such premiums is included in the amount set forth in Item 1 of this bid.

The undersigned agrees that if he is selected as general contractor, he will promptly confer with the awarding authority on the question of sub-bidders; and that the awarding authority may substitute for any sub-bid listed above a sub-bid filed with the awarding authority by another sub-bidder for the subtrade against whose standing and ability the undersigned makes no objection; and that the undersigned will use all such finally selected sub-bidders at the amounts named in their respective sub-bids and be in every way as responsible for them and their work as if they had been originally named in this general bid, the total contract price being adjusted to conform thereto.

E. CONTRACT: The undersigned agrees that, if he is selected as general contractor, he will within ten

(10) days, Saturdays, Sundays and legal holidays excluded, after presentation thereof by the awarding authority, execute a contract in accordance with the terms of this sub-bid and furnish a performance bond and also a labor and materials or payment bond, each of a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the awarding authority and each in the sum of the contract price, the premiums for which are to be paid by the general contractor and are included in the contract price.

F. EXAMINED CONDITIONS & DOCUMENTS: The undersigned Bidder hereby declares that he has visited the site, the conditions present, and has carefully examined the Contract Documents, together with all Addenda issued, received and acknowledged below, and has familiarized himself with the legal requirements (federal, state, and local laws, ordinances, and rule and regulations) and other conditions which may affect the cost, progress or performance of Work, and has made independent investigations, deemed necessary by the Bidder.

G. LABOR: The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work and that he will comply fully with all laws and regulations applicable to awards made subject to section forty-four A of Chapter 149 of the Massachusetts General Laws.

H. CERTIFICATE OF ELIGIBILITY: The undersigned has included with this Bid his Certificate of Eligibility and Update Statement as required by the General Laws.

I. NON-COLLUSION CERTIFICATION: The undersigned certifies under the penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this Paragraph, the word "person" shall mean any natural person, joint venture, partnership, corporation, or other business or legal entity.

J. OSHA COMPLIANCE CERTIFICATION: The undersigned agrees that if he is selected as the contractor, he will comply with the provisions of M.G.L. Chapter 30, Section 39S. The undersigned certifies, under penalties of perjury, that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that all employees to be employed in the work subject to this bid have successfully completed a course in construction safety and health approved by the United States Occupational Safety and

Health Administration that is at least 10 hours in duration.

K. TAXES: As required by MGL, Chapter 62C, s49A, the undersigned certifies that the bidder has complied with all laws of the Commonwealth relating to taxes.

L. DEBARMENT: The undersigned further certifies under penalties of perjury that the said undersigned is not presently debarred from doing public construction work in the Commonwealth under provisions of Section 29F of Chapter 29, or any other applicable debarment provisions of any other Chapter of the General Laws or any rule or regulation promulgated thereunder.

M. TIME OF COMPLETION: If selected Contractor the undersigned agrees to begin and complete the work as specified in the Contract Documents.

N. AUTHORITY RIGHTS: The Bidder understands the Awarding Authorities right to reject any and all bids.

Should the Invitation to Bid, Instruction to Bidders, Form For General Bid, Conditions of the Contract, Plans or Specifications require submission of special data to accompany the Bid, the Awarding Authority reserves the right to rule the bidder’s failure to submit such data an informality and to receive said data subsequently, within a reasonable time as set by the Authority.

The Bidder acknowledges that no proposal may be withdrawn for 30 days, Saturdays, Sundays, and legal holidays excluded, after opening of bids per MGL c. 149, 44A(3).

Date:

Name of Bidder:

By:

(Signature)

(Title of Person Signing Bid)

(Business Address)

(City and State)

Telephone Fax E-Mail

FORM FOR SUB- BID

To: City of Salem, Massachusetts, Awarding Authority

To: All General Bidders Except those Excluded:

A. BATES ELEMENTARY SCHOOL – ROOF REPLACEMENT #27-24-SPS

1. SECTION NUMBER:

2. SECTION NAME:

3. BASE BID: The undersigned proposes to furnish all labor and materials required for Project located in Salem, Massachusetts, in accordance with the accompanying plans and specifications prepared by Spencer Preservation Group, Inc. specified below, subject to additions and deductions according to the terms of the specifications, for the lump sum price of”

Dollars

(Total contract price in words, which governs)

(Total contract price amount in numbers)

4. UNIT PRICES: Each Unit Price shall be listed separately.

Unit Price No. 1:

Masonry face brick removal and installation: Refer to Section 04 2000 – Unit Masonry (part of 04 0001 filed sub-bid) for a description of this material.

$ per 100 LF

B. ADDENDA: This Bidder has received, and this bid includes, the following addenda of which receipt is hereby acknowledged:

Date Number

C. EXLUSIONS: This Sub-Bid

May be used by any General Bidder except:

May only be used by the following General Bidders:

(To exclude general bidders, fill in the blank lines above. Do not answer “C” if no general bidders are excluded.)

D. SUB-SUB-BID LISTING: The names of all persons, firms and corporation furnishing to the undersigned labor or labor and materials for the class or classes or part thereof of work for which the provisions of the Section of the Specifications for this sub-trade require a listing in this paragraph (including the undersigned if customarily furnished by persons on his own payroll and in the absence of a contrary provision in the specifications), the name of each such class of work or part thereof and the bid price for each such class of work or part thereof are:

Name of Sub-Sub-Bidder Class of Work Amount

(Do not give bid price for any class or part thereof furnished by the undersigned.)

The undersigned agrees that the above list of bids to the undersigned represents bona fide bids based on hereinbefore described plans, specifications, and addenda, and that, if the undersigned is awarded the contract, they will be used for the work indicated at the amounts stated, if satisfactory to the awarding authority.

E. EXECUTION OF CONTRACT: The undersigned agrees that, if he is selected as a sub-bidder, he will, within five (5) days, Saturdays, Sundays, and legal holidays excluded, after presentation of a subcontract by the General Bidder selected as the General Contractor, execute with such General Bidder a subcontract in accordance with the terms of this sub-bid and contingent upon the execution of the General Contract, and, if pre-qualification is required pursuant to G.L.c.149, §44D 3/4, or if requested so to do in the general bid by such General Bidder, who shall pay the premiums therefore, furnish a performance bond, also a labor and materials payment bond, each of a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the Awarding Authority, and each in the full sum of the subcontract price.

The undersigned further agrees to be bound to the general contractor by the terms of the hereinbefore described plans, specifications, including all general conditions stated therein, and addenda, and to assume toward him all the obligations and responsibilities that he, by those documents, assumes toward the owner

F. Examined Conditions and Documents: The undersigned Bidder hereby declares that he has visited the site, the conditions present, and has carefully examined the Contract Documents, together with all Addenda issued, received and acknowledged below, and has familiarized himself with the legal requirements (federal, state, and local laws, ordinances, and rule and regulations) and other conditions which may affect the cost, progress or performance of Work, and has made independent investigations, deemed necessary by the Bidder

The undersigned agrees that the above list of bids to the undersigned represents bona fide bids based on the hereinbefore described plans, specifications and addenda and that, if the undersigned is awarded the contract, they will be used for the work indicated at the amounts stated, if satisfactory to the awarding authority.

G. CERTIFICATE OF ELIGIBILITY: The undersigned has included with this Bid his Certificate of Eligibility and Update Statement as required by the General Laws.

H. TAXES: As required by MGL, Chapter 62C, s49A, the undersigned certifies that the bidder has complied with all laws of the Commonwealth relating to taxes.

I. DEBARMENT: The undersigned further certifies under penalties of perjury that the said undersigned is not presently debarred from doing public construction work in the Commonwealth under provisions of Section 29F of Chapter 29, or any other applicable debarment provisions of any other Chapter of the General Laws or any rule or regulation promulgated thereunder.

J. LABOR: The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work and that he will comply fully with all laws and regulations applicable to awards of subcontracts subject to section 44 F of Chapter 149 of the Massachusetts General Laws.

K. NON-COLLUSION The undersigned further certifies under the penalties of perjury that this sub-bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the word “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.

L. OSHA COMPLIANCE CERTIFICATION: The undersigned agrees that if he is selected as the contractor, he will comply with the provisions of M.G.L. Chapter 30, Section 39S. The undersigned certifies, under penalties of perjury, that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that all employees to be employed in the work subject to this bid have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration.

M. The undersigned offers the following information as evidence of his qualifications to perform the work as bid upon according to all the requirements of the plans and specifications:

1. Have been in business under present business name years.

2. Ever failed to complete any work awarded?

3. List one or more recent buildings with names of the general contractor and architect on which you served as a sub-contractor for work of similar character as required for the above-named building.

Building Architect General Contractor Amount of Contract

(a)

(b)

(c)

4. Bank reference

Date:

Name of Bidder:

By:

(Signature)

(Title of Person Signing Bid)

(Business Address)

(City and State)

Telephone Fax E-Mail

Town and State NOTE: This proposal must bear the written signature of the bidder. If the bidder is a partnership, the proposal must be signed by a partner. If the bidder is a corporation, the proposal must be signed by a duly authorized officer or agent of such corporation.

REQUIRED CERTIFICATIONS

1. NON-COLLUSION:

The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean any natural person, business, partnership, corporation, union, committee, club, or other organization, entity, or group of individuals.

2. TAX COMPLIANCE:

Pursuant to M.G.L. c. 62C, §49A, I certify under the penalties of perjury that, to the best of my knowledge and belief, I am in compliance with all laws of the Commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting child support.

3. CORPORATE BIDDER (if applicable):

I, certify that I am the of the corporation named as Bidder in the Bid included herein, that , who signed said Bid on behalf of the Bidder was then of said corporation, that I know his signature, that his signature thereon is genuine and that said Bid was duly signed, sealed and executed for and in behalf of said corporation by authority of its governing body.

(Corporate Seal)

(Secretary-Clerk)

4. PREVAILING WAGES:

The undersigned bidder or quoter hereby certifies, under the pains and penalties of perjury, that the foregoing bid or quote is based upon the payment to laborers employed on the project of wages in an amount no less than the applicable prevailing wage rates established for the project by the Massachusetts Department of Labor and Workforce Development. The undersigned bidder or quoter agrees to indemnify the awarding authority for, from and against any loss, expenses, damages, action or claims, including any expense incurred in connection with any delay or stoppage of the project work, arising out of or as a result of (1) the failure of the said bid or quote to be based upon the payment of the said applicable prevailing wage rates, or (2) the failure of the bidder or quoter, if selected as the Contractor, to pay laborers employed on the project the said applicable prevailing wages.

5. DEBARRMENT

The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.

6. LABOR HARMONY AND OSHA TRAINING

The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards made subject to section 44A.

(Signature of authorized individual submitting proposal)

(Printed Name)

(Name of Bidder (if different than name))

(Federal Tax Identification or Social Security Number)

(Date)

1.1 PROCUREMENT DESCRIPTION

The City of Salem, the Awarding Authority, invites sealed bids for the upgrade of Roof Replacement at the Bates Elementary School, 53 Liberty Hill Avenue, Salem, MA, in accordance with the enclosed bid and Contract Documents supplied by the City of Salem, Massachusetts.

There will be an optional site visit on December 2, 2026, at 3:00 PM.

1.2 APPLICABLE LAW

This procurement will be conducted pursuant to Massachusetts General Laws Chapter 149.

1.3 APPROVAL

Any contract that may result from the procurement shall be subject to the approval of the Mayor of the City of Salem.

1.4 INCORPORATION BY REFERENCE

All requirements, specifications, terms and conditions described in this Invitation for Bids shall be incorporated by reference into any contract that may result.

1.5 TIME FOR AWARD

Any contract that may result from the procurement shall be awarded within thirty (30) days after the bid opening. The time for award may be extended by mutual agreement between the City and apparent low bidder.

1.6 RIGHT TO CANCEL/REJECT

The City reserves the right to cancel this Invitation for Bids or reject in whole or in part any and all bids if the City determines that cancellation or rejection serves the best interests of the City.

1.7 TAXATION

Purchases made by the City are exempt from the payment of Federal excise tax and the payment of Commonwealth of Massachusetts sales tax and any such taxes must not be included in the bid pricing.

PART 1. GENERAL INFORMATION

1.8 OBTAINING THE INVITATION FOR BIDS

The Invitation for Bids and related documents shall be available for free download from the City’s Purchasing Department website at https://www.salem.com/bids.

2.1 REQUIREMENTS AND SUBMISSIONS

Below please find a description of the requirements and submissions that must be included as part of a bid. Bids must be sealed and marked as noted.

2.1.1 BID PRICING FORM

Every bid must include a completed ‘Bid Pricing Form’. (All material, equipment and labor is F.O.B. City of Salem.)

2.1.2 NON-COLLUSION

Every bid must include a certification of good faith, certifying that the bid was made in good faith and without collusion or fraud. See ‘Required Certifications’.

2.1.3 TAX COMPLIANCE

Every bid must include a written certification that the bidder has complied with all state laws relating to taxes, reporting of employees and contractors, and child support.

See ‘Required Certifications’.

2.1.4 CORPORATE BIDDER

If the bid is being submitted by a corporation, the bid must include a certification that the individual submitting the bid has been authorized to bind the corporation. See ‘Required Certifications’.

2.1.5 STATEMENT OF QUALIFICATIONS

Every bid must include a statement of work he/she has done of a character similar to that of the work included in the proposed contract and to give references that will enable the Owner to judge his/her experience and skills to successfully undertake this project.

2.1.6 BID DEPOSIT

Each bid must be accompanied by a deposit equal to five percent (5%) of the amount of the bid. The bid deposit may be in the form of a certified treasurer’s or cashier’s check payable to the City of Salem from a responsible back or trust company; cash;

or a bid bond.

PART 2. INSTRUCTIONS TO BIDDERS

2.1.7 PAYMENT BOND

Before Contract signing, the Contractor shall furnish the Owner with a Labor/Materials Payment Bond in the amount of one hundred percent (100%) of the Contract price, to insure completion of work and payment for all labor and materials furnished on the project.

The bond shall be written in conformance with Massachusetts General Laws, Chapter 149, Section 29, as amended.

2.1.8 PERFORMANCE BOND

Before Contract signing, the Contractor shall furnish the Owner with a Performance Bond in the amount of one hundred percent (100%) of the Contract price.

Each filed sub-bidder requested to do so on the General Bidder’s Form shall furnish the General Contractor with Performance Bonds and Labor and Materials Payment Bonds complying with provisions of M.G.L. Chapter 149, Section 44F. If the sub-bidder's bond requirement space is left blank on the General Bidder's Bid Form, the blank will be interpreted as "yes", the bond will be required, and there will be no increase in Contract Amount to provide these bonds.

2.1.9 PREVAILING WAGE

Wage rates for this project are subject to the prevailing wage rates as set by the Department of Labor Standards. A copy of the prevailing wage rates for this project is included in the Invitation for Bids, along with a Payroll Record Form and Statement of Compliance.

Certified Weekly Payroll documents shall be sent to the Office of the Purchasing Agent, 93 Washington Street, 3rd Floor, Salem, MA 01970. Payroll records must be sent three (3) business days after the close of the previous work week. See ‘Certification Regarding Payment of Prevailing Wage Rates’.

2.1.10 DEBARMENT

Every bid must include a certification regarding the contractor’s debarment status. A debarred contractor is not eligible or the award of public contracts during the period of its debarment. See ‘Required Certifications’.

2.1.11 LABOR HARMONY AND OSHA CERTIFICATION

Every bid must include a certification regarding labor harmony training approved by the U.S. Occupation Safety and Health Administration completed by all employees to be employed at the worksite. See ‘Required Certifications’.

2.2 BID DELIVERY

Below please find a description of the manner in which sealed bids must be submitted.

2.2.1 DUE DATE, TIME & ADDRESS

Filed Sub-Bids shall be received by the Office of the Purchasing Agent on or before

11:00 AM on December 16, 2026, where they will be opened and recorded. Within three business days, the list and bid amounts of approved filed sub-bids will be posted in the Office of the Purchasing Agent, on the website and e-mailed to all bidders on record as having picked up the Invitation for Bids.

Any filed sub-bid received after that time shall be rejected as non-responsive.

General Bids shall be received by the Office of the Purchasing Agent on or before 11:00

AM on January 13, 2027, where they will be opened and recorded.

Any general bid received after that time shall be rejected as non-responsive.

2.2.2 COPIES

Bidders must submit one (1) original copy of the bid.

2.2.3 LABELING

The outside of the envelope containing the sealed bid must be labeled with 1) the bid number 2) the bid opening date and time and 3) the name of the bidder.

2.3 SIGNATURES

A bid must be signed as follows: 1) if the bidder is an individual, by her/him personally;

2) if the bidder is a partnership, by the name of the partnership, followed by the signature of each general partner; and 3) if the bidder is a corporation, by the authorized officer, whose signature must be attested to by the clerk/secretary of the corporation, and with the corporate seal affixed.

2.4 QUESTIONS, CHANGES, MODIFICATIONS AND WITHDRAWALS

2.4.1 QUESTIONS

Questions concerning this Invitation for Bids must be submitted in writing to Anthony P.

Delaney at adelaney@salem.com and copy Joe Mello at jmello@habeebarch.com and Susan Feddema at susan.feddema@Skanska.com at least five (5) days prior to the bid opening date. Written responses will be mailed to all bidders on record as having picked up the Invitation for Bids.

2.4.2 CHANGES

If any changes are made to this Invitation for Bids, addenda will be issued. Addenda will be posted in the Office of the Purchasing Agent, on the website and e-mailed to all bidders on record as having picked up the Invitation for Bids.

2.4.3 MODIFICATIONS AND WITHDRAWALS

A bidder may correct, modify, or withdraw a bid by written notice received by the City of Salem prior to the time and date set for bid opening.

Modifications must be submitted in a sealed envelope clearly labeled "Modification No. " to the address listed in part one of this section. Each modification must be numbered in sequence and must reference the Invitation for Bids.

After the bid opening a bidder may not change any provision of the bid in a manner prejudicial to the interests of the City or fair competition. Minor informalities will be waived, or the bidder will be allowed to correct them. If a mistake and the intended bid are clearly evident on the face of the bid document, the mistake will be corrected to reflect the intended correct bid, and the bidder will be notified in writing; the bidder may not withdraw the bid. A bidder may withdraw a bid if a mistake is clearly evident on the face of the bid document, but the intended correct bid is not similarly evident.

2.5 UNFORESEEN OFFICE CLOSURES

If, at the time of the scheduled bid opening the Salem Procurement Office is closed due to uncontrolled events such as fire, snow, ice, wind, or building evacuation, the bid opening will be postponed until 11:00 AM on the next normal business day. Bids will be accepted until that date and time.

2.6 BID OPENING PROCEDURE

At the time and place fixed for opening of bids, the City will cause to be opened and publicly read aloud every bid received within the time set for receiving bids, irrespective of any irregularities therein. Bidders and other persons properly interested may be present, in person or by representative.

3.1 SCOPE OF WORK

REFER TO THE PROJECT MANUAL

PART 3. SPECIFICATIONS

4.1 TERM OF CONTRACT

The performance period for any contract that results from this Invitation for Bids shall commence upon issuance of the ‘Notice to Proceed.’

4.2 ASSIGNMENTS AND SUBCONTRACTING

The selected vendor shall not assign, sell, subcontract or otherwise transfer any interest in this contract without the prior written consent of the City. The successful bidder shall be fully responsible to the City for the acts and omissions of his subcontractor, and of persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by him.

4.3 PAYMENT

The City shall make every effort to furnish payment within thirty (30) days of receipt of a reasonably detailed invoice. Any invoice received must reference the contract number.

Nothing contained in the contract shall create any contractual relation between any subcontractor and the City of Salem. The Successful Bidder shall cause appropriate provision to be inserted in all subcontracts relative to the work to require compliance by each subcontractor with the application provisions of the Contract for the improvements embraced in the site preparation.

4.4 INSURANCE REQUIREMENTS

See sample contract for all requirements relative to insurance.

4.5 CHANGE ORDERS AND ADJUSTMENTS

Any request for a change order or adjustment must be submitted in writing and contain, an explanation of the need for the change order, a statement of work including a cost breakdown of each addition, and a statement that the change order is in the best interest of the awarding authority. The City is not obligated to pay for change orders that are not approved in writing, by the original contract signatories.

4.6 INDEMNIFICATION

Unless otherwise provided by law, the Vendor will indemnify and hold harmless the City against any and all liability, loss, damages, costs or expenses for personal injury or damage to real or tangible personal property which the City may sustain, incur or be required to pay, arising out of or in connection with the performance of the Contract by

PART 4. TERMS & CONDITIONS

reason of any negligent action/inaction or willful misconduct by the Contractor, its agents, servants or employees.

4.7 FEDERAL AND STATE LAW

The selected contractor shall comply with all applicable Federal, State and Local laws and ordinances.

4.8 STATEMENT OF WORK

Except as otherwise specifically stated in the bid and contract documents the selected contractor shall secure, at its own expense, all necessary permits and licenses and comply with all city and state codes and regulations. The selected contractor shall provide and pay for all materials, equipment, labor, tools, temporary construction of every nature, charges, levies, fees, or other expenses incurred and all other services and facilities of every nature whatsoever for his performance of the Contract within the specified time and required for this project. The selected contractor must provide all materials and equipment free of any lien, claim or encumbrance.

4.9 SAMPLE CONTRACT

See ‘Sample Contract’.

CONTRACT NO. 24-32-PLAN

CITY OF SALEM

CONTRACT FOR SERVICES

Over $10,000

This agreement is made and entered into by and between the City of Salem (hereinafter the CITY), a municipal corporation organized and existing under the laws of the Commonwealth of Massachusetts, and (hereinafter the CONTRACTOR).

ARTICLE I. DEFINITION.

This CONTRACT as used herein shall mean these articles, and the “contract documents” which include but are not limited to the following identified items and all documents, and forms submitted therewith, or attached hereby.

Attachment A: Scope of Services, and/or other bid package materials

Attachment B: Additional Contract Terms and Conditions

Attachment C: Statement of Corporate Authority

Addenda:

ARTICLE II. AMOUNT AND DURATION.

This CONTRACT in an amount not to exceed $ shall commence on or about and shall terminate no later than , unless a written amendment to renew or extend this CONTRACT is executed in accordance with the provisions of this CONTRACT.

ARTICLE III. PERFORMANCE.

The Contractor agrees to provide all goods and/or services set forth in Invitation for Bids, Documents, Scope of Services, and the CONTRACTOR’s bid and/or as outlined in ATTACHMENT A - SCOPE

OF SERVICES.

ARTICLE IV. TERMINATION.

Without Cause. The CITY may terminate this CONTRACT on sixty (60) calendar days notice, or may suspend this CONTRACT for up to sixty (60) calendar days upon receipt of notice, when in the best interests of the City by providing notice to the CONTRACTOR, which shall be in writing and shall be deemed delivered and received when given in person to the CONTRACTOR, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the CONTRACTOR.

For Cause. If the CONTRACTOR is determined by the CITY to be in default of any term or condition of

CONTRACT, the CITY may terminate this contract on thirty (30) days notice by providing notice to the

CONTRACTOR, which shall be in writing and shall be deemed delivered and received when given in person to the CONTRACTOR, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the CONTRACTOR. If the CITY is determined by the CONTRACTOR to be in default of any term or condition of this CONTRACT the CONTRACTOR may terminate this contract on thirty (30) days notice by providing notice to the CITY, which shall be in writing and shall be deemed delivered and received when given in person to the CITY, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the CITY.

Default. The following shall constitute events of default under this CONTRACT: a) any material misrepresentation made by the CONTRACTOR to the CITY, b) any failure to perform any of its obligations under this CONTRACT including, but not limited to the following: (i) failure to commence performance of this CONTRACT at the time specified in this CONTRACT due to a reason or circumstance within the CONTRACTOR'S reasonable control, (ii) failure to perform this CONTRACT with sufficient personnel and equipment or with sufficient material to ensure the completion of this

CONTRACT within the specified time due to a reason or circumstance within the CONTRACTOR'S reasonable control, (iii) failure to performance this CONTRACT in a manner reasonably satisfactory to the CITY, (iv) failure to promptly re-perform with reasonable time the services that were rejected by the

CITY as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the

CONTRACTOR'S reasonable control, (vi) failure to comply with a material term of this CONTRACT, including, but not limited to, the provision of insurance and nondiscrimination, and (vii) any other acts specifically and expressly stated in this CONTRACT as constituting a basis for termination of this

CONTRACT, and (viii) failure to comply with any and all requirements of state law, and/or regulations, and City ordinances, and/or regulations.

ARTICLE V. REMEDIES OF THE CITY.

The CITY may deduct the cost of any substitute contract or performance for expenses, losses, and all damages, including incidental and consequential damages as a result of any event of non-conformance or non-performance of the CONTRACTOR in complying with the terms of this CONTRACT, and shall withhold such expenses, losses, and damages from sums due, or to become due.

ARTICLE VI. REMEDIES OF THE CONTRACTOR.

If the damages, other than loss, non-conformance, or non-performance, are actually sustained by the CONTRACTOR due to any act or omission for which the CITY is legally responsible the CITY shall allow a sum equal to the amount of such damages sustained by the Contractor as determined by the CITY in writing, provided the Contractor shall have provided to all signatories of the contract a detailed written statement of such damages and cause thereof within 30 days of the act of omission by the CITY.

ARTICLE VII. ASSIGNABILITY.

The CONTRACTOR shall not assign, subcontract or in any way transfer any interest in this contract without the prior written consent of the Procurement Officer of said City. In the event of such occurrence the City reserves the right to deal with any assignee subcontractor or transferee directly and the contractor agrees to remain bound by all terms and conditions of this contract in accordance with its original tenor. The provisions of this CONTRACT shall be binding upon, and shall inure to the benefit of, the successors and assigns of the CONTRACTOR and any public body or bodies succeeding the interests of the CITY.

ARTICLE VIII. INDEMNIFICATION.

The CONTRACTOR shall assume the defense, indemnify and hold harmless the CITY, the CITY'S agents and employees, from and against all losses and all claims, demands, payments, suits, actions, recoveries and judgments of every nature and description brought or recovered against them by reason of acts, in actions, omissions, negligence, reckless or intentional misconduct of the said CONTRACTOR, its agent(s), officers, employees, or subcontractors; in the execution of the work or in guarding the same. Unless otherwise provided by law, the CITY may elect to indemnify the CONTRACTOR for claims arising in tort if it is determined that the CONTRACTOR performed its obligations under this CONTRACT pursuant to the direct supervision and control of the CITY or its designated agent(s).

ARTICLE IX. WORKER’S COMPENSATION AND OTHER INSURANCE.

The CONTRACTOR shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation

Act) to all employees of the CONTRACTOR who are subject to the provisions of Chapter 152 of the

General Laws of Massachusetts.

Failure to provide and continue in force such insurance during the period of this contract shall be deemed a material breach of this contract, shall operate as an immediate termination thereof, and CONTRACTOR shall indemnify the CITY for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article.

Prior to commencement of any work and until completion of its work under this CONTRACT shall maintain the following insurance coverage, at its cost, from insurance acceptable to the CITY, giving evidence of such coverage to the CITY prior to execution of this CONTRACT, a copy of such insurance coverage to be attached herewith:

General - The Vendor shall before commencing performance of the Contract be responsible for providing and maintaining insurance coverage in force for the life of the Contract of the kind and in adequate amounts to secure all of the obligations under the Contract and with insurance companies licensed to write insurance in the Commonwealth of Massachusetts. All such insurance carried shall not be less than the kinds and amounts designated herein, and the Vendor agrees that the stipulation herein of the kinds and limits of coverage shall in no way limit the liability of the Vendor to any such kinds and amounts of insurance coverage. All policies issued shall indemnify and save harmless the City of Salem, its agents and employees from any and all claims for damages to persons or property as may rise out of the performance of this Contract.

Vendor’s Comprehensive General Public Liability and Property Damage Liability Insurance - The

Vendor shall carry Comprehensive General Liability Insurance providing for a limit of not less than One

Million Dollars ($1,000,000.00) for all damages arising out of bodily injury to or death of one person, and subject to that limit for each person, a total limit of not less than Two Million Dollars ($2,000,000.00) for all damages arising out of bodily injuries or death of two or more persons in any one accident; and Vendor’s Comprehensive Property Damage Liability Insurance providing for a limit of not less than One Million

Dollars ($1,000,000.00) for all damages arising out of injury to or destruction of property in any one accident, and subject to that limit per accident, a total (or aggregate) limit or not less than One Million

Dollars ($2,000,000.00) for all damages arising out of injury to or destruction of property during the policy period.

Comprehensive Automotive and Property Damage Insurance - The Vendor shall carry Automobile

Insurance covering all owned vehicles, hired vehicles or non-owned vehicles under the control of the

Vendor while performing work under the Contract in the amount of not less than One Million Dollars

($1,000,000.00) for all damages arising out of bodily injuries to or death of one person and subject to that limit for each person, a total of not less than Two Million Dollars ($2,000,000.00) for all damages arising out of bodily injuries to or death of two or more persons in any one accident; and Property Damage coverage in the amount of not less than One Million Dollars ($1,000,000.00) for all damages to or destruction of property.

The Vendor must carry Workman’s Compensation Insurance in the amounts prescribed under

Massachusetts State Law and meet all other City and State Laws and Regulations.

No cancellation(s) of such insurance, whether by the insurer or by the insured party shall be valid unless written notice thereof is given by the parties proposing cancellation to the other party and to the City of

Salem at least fifteen (15) days prior to the intended effective date thereof, which date shall be expressed in said notice, which shall be sent by registered mail, return receipt requested. These provisions shall apply to the legal representative(s), trustee in bankruptcy, receiver, assignee, trustee, and successor(s) in interest of the Vendor.

All insurance coverage shall be at the sole expense of the Vendor and shall be placed with such company as may be acceptable to the City of Salem and shall constitute a material part of the contract documents.

Failure to provide written proof to City and continue in force such insurance as aforesaid shall be deemed a material breach of the contract, and may constitute sufficient grounds for immediate termination of the same.

All required insurance must be endorsed to name the CITY as Additional Insured. The General Liability insurance shall be endorsed to waive the insurer's rights of subrogation against the City. All policies and certificate for insurance must contain language that the insurance shall not be canceled, materially changed or non-renewed without at least thirty (30) days advance written notice to the CITY. The

CONTRACTOR under this CONTRACT shall not allow it subcontractors to begin work until similar insurance has been so obtained and certificates of insurance approved by the CONTRACTOR.

ARTICLE X. CORPORATE CONTRACTOR.

If CONTRACTOR is a corporation, CONTRACTOR shall endorse the Certificate of Corporate Authority for the CONTRACTORS’ signatory (Attachment C), or shall otherwise provide a form similar in nature and substance acceptable to the CITY.

If CONTRACTOR is a non-profit corporation, CONTRACTOR shall provide satisfactory proof of present status as a non-profit corporation. Such proof shall be in the form of a certification from the

Massachusetts Secretary of State's office and/or from the Internal Revenue Service and shall provide the

Federal Tax Identification Number of the non-profit corporation. This agreement shall not be enforceable against the CITY unless and until the CONTRACTOR complies with this section. Failure to inform the

CITY in writing of revocation, or other loss of non-profit status shall be deemed a material breach of this contract and operate as an immediate termination thereof.

ARTICLE XI. SUBJECT TO APPROPRIATION.

The obligations of the CITY under this CONTRACT shall be subject to appropriation. In the absence of appropriation this CONTRACT shall be immediately terminated without liability for damages, penalties, or other charges.

In the requisite circumstances, the obligations of the CITY under this CONTRACT shall be subject to the formal award of the state, federal grant.

ARTICLE XII. DOCUMENTS, MATERIALS, ETC.

Any materials, reports, information, data, etc.