27_012 Addendum 1.pdf

PDF 125 KB Posted

Attached to
Bid Ref. #27-012 Natural Gas Pipeline Construction
Solicitation number
PE-64750-NONST-2027-000000213
Issued by
Dade County, Georgia

About this file

This addendum document pertains to Bid Reference #27-012 for natural gas pipeline construction issued by the City of Albany, Procurement Division, in Albany, Georgia. The addendum modifies or clarifies the original bid documents and specifications for the natural gas pipeline construction project. Sealed bids are to be received by the City of Albany, Procurement Division, located at 222 Pine Avenue, Suite 260, Albany, Georgia 31701, with a deadline of 2:30 p.m. on September 16, 2026. The addendum serves to provide additional information, clarifications, or modifications to the original contract documents that bidders must acknowledge and incorporate into their proposals.

The specific contents of the addendum modifications are not detailed in the available documentation. Bidders are required to review this addendum in conjunction with all other bid documents and specifications to ensure full compliance with the project requirements. No information regarding pricing terms, set-asides, incumbent contractors, funding sources, or other financial details is provided in the addendum summary. Prospective bidders should contact the City of Albany, Procurement Division, directly for complete details regarding all addendum revisions and any associated bid requirements or modifications.

View the file

Other files

File Type Posted
27_012 Natural Gas Pipeline Construction Bid .pdf PDF
27_012 Addendum 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

August 3, 2026

TO: All Potential Bidders

SUBJECT: Natural Gas Pipeline Construction

Bid Ref. #27-012

Bid opening date & time: September 16, 2026, 2:30 p.m.

ADDENDUM NO. #1

The items contained in this addendum are added to and/or deleted from and become part of the specifications and proposal documents for the above-referenced Invitation to Bid. Bidders must acknowledge receipt of the Addendum on the Bid Form, located in the invitation to bid, when the bids are submitted.

ADD/DELETE:

ADD: ”This project will be bid on a lump sum basis for all specified work and will be awarded to the responsive and responsible bidder submitting the lowest total base bid. A 5% Bid Bond is required of all bidders. Bid bond must be present for bid to be read or considered. 100% Performance and Payment bonds will be required of the successful bidder.”

QUESTIONS/ANSWERS:

QUESTION #1: Does Albany have plans to have a third-party coating inspector present when the pipeline is being constructed/buried?

Answer: Yes, a representative of the gas department wil l be inspecting the process.

End of Addendum 1

Destiny Solomon Destiny Solomon, Buyer I

Cc: Ronald Bowers, Gas Distribution Superintendent

Kurt Anthony, Deputy Director of Utility Operations Jamie Brown, Utility General Supervisor

Velma Hodges, Administrative Manager

ADDENDUM NO. #1
ADD/DELETE:
ADD: ”This project will be bid on a lump sum basis for all specified work and will be awarded to the responsive and responsible bidder submitting the lowest total base bid. A 5% Bid Bond is required of all bidders. Bid bond must be present for bid to ...
End of Addendum 1