26RFP032826K_CRB_Cost Proposal.pdf

PDF 575 KB Posted

Attached to
26RFP032826K-CRB Standby Professional Services for Environmental Engineering & Testing Services
Solicitation number
PE-66096-NONST-2026-000000173
Issued by
Fulton County, Georgia

About this file

This is a Cost Proposal Form for Fulton County, Georgia's Request for Proposal 26RFP032826K-CRB for Standby Professional Services in Environmental Engineering & Testing Services. The County seeks to engage one or more firms to provide technical and professional services for various County projects on an as-needed basis. The cost proposal form requires bidders to submit hourly rates and unit costs across five service categories: Environmental Engineering and Testing Services (EET), Bulk Sampling and Analysis, Geotechnical Survey Services, Indoor Air Quality Services (IAQ), and Code-Required Construction Materials Testing and Inspection Services (SCMI). The proposal form establishes specific line items for professional positions, laboratory analyses, field services, and inspection tasks, with bidders required to provide pricing for each individual service or position category listed.

All rates submitted must include direct costs associated with the scope of work, including overhead and profit. The cost proposal must be submitted separately from the technical proposal in a sealed envelope. Pricing categories span from professional hourly rates for positions such as Project Engineer, Registered Project Engineer, and Certified Industrial Hygienist, to unit costs for specific analyses including polarized light microscopy, transmission electron microscopy, soil boring, geotechnical testing, microbial and chemical analyses, and construction materials inspection services. The form requires a total cost summary combining all hourly rates and unit costs across the five service categories, enabling the County to evaluate pricing for potential selection of one or more firms to support diverse environmental engineering and testing needs.

View the file

Other files

File Type Posted
26RFP032826K_CRB (Solicitation).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 2

COST PROPOSAL FORM

SCHEDULE OF FEES

This form shall be completed and submitted as the cost proposal. The complete Cost Proposal is to be submitted separately from the Technical Proposal in a sealed envelope.

COST PROPOSAL SUMMARY FORM

Item #1: Total Hourly Rate Amount

Item #2: Total Hourly Rate Amount

Item #3: Total Unit Cost Amount

Item #4: Total Unit Cost Amount

Item #5: Total Unit Rate Amount

TOTAL COST ALL HOURLY RATES:

(Items 1, 2, 3, 4, and 5)

TOTAL COSTS: The rates shall include all direct costs associated with the scope of work, including, but not limited to Overhead and Profit. Rates shall be submitted as identified in Items 1 through 5 on the Cost Proposal Summary.

ENVIRONMENTAL ENGINEERING and TESTING SERVICES (EET)

Item #1:

Position Hourly Rate (Incl. OH&P)

Engineering Technician $_______________ Senior Engineering Technician $_______________ Project Engineer $_______________ Project Manager $_______________ Registered Project Engineer $_______________ Senior Registered Engineer $_______________ Certified Industrial Hygienist $_______________ Geo-Technical Engineer/Geologist $_______________

Hydro-Geologist $_______________ Principal Consultant $_______________ Clerical/CAD Operator/Technical Report Specialist $_______________

Total Item #1 – Hourly Rate $________________

ITEM #2:

Bulk Sampling Hourly Rate

Analysis of Bulk sample by PLM (Polarized Light Microscopy) coupled with dispersion staining Techniques- per sample:

Normal turnaround time (3-5 days) $_______________ Rush basis (48 hour or less) $_______________

Analysis of bulk sample by phase contrast microscopy (NIOSH 7400 Method) – Per sample $_______________

Analysis of air samples by Transmission Electron Microscopy (TEM)- per sample:

48- Hour turnaround time $_______________ 24- Hour turnaround time $_______________

Dust characterization / Optical microscopy $_______________ Lead in air (NIOSH 7300 method) $_______________ TCLP Volatile plus metals (List current EPA methods) $_______________ TCLP Metals (List current EPA methods) $_______________ PAH 8270 (List current EPA methods) Soil $_______________ Water $_______________

BTEX 8020 OR 602 (List current EPA methods) Soil $_______________ Water $_______________

BTEX + TPH GRO 5030 /8020/8015

(List current EPA methods) Soil $_______________ Water $_______________

TPH DRO 3510 OR 3550/8015 (List current EPA methods) Soil $_______________ Water $_______________

TPH DRO 3510 OR 5030/8015 (List current EPA methods) Soil $_______________ Water $__________________________

Automatic turbidity Sampler (NTU), per calendar day $_______________ Turbidity Sampling/analysis, Outfall, per sample $_______________ Turbidity sampling/analysis, Stream, per sample $_______________

Total Item #2 – Unit Costs $_______________

ITEM #3:

Geotechnical Survey

Soil Test Boring (Split-spoon samples at 5-foot intervals, up to 50-foot depth) $_______________ Less than 50 blows per linear foot $_______________ Greater than 50 blows per linear foot $_______________ Additional Split-spoon samples, each add $____________________ Boring depth greater than 50 feet $_______________ Boring depths between 100 and 200 feet $_______________ Auger Boring (0-50-footdepth), per linear foot $_______________ Undisturbed samples, standard 3-inch Shelby tube, each $_______________ Bag Samples, each $_______________ Truck Mounted Rig, LS $_______________ All-Terrain Vehicle, LS $_______________

Total Item #3 - Hourly Rate $_______________

ITEM #4:

Indoor Air Quality Services (IAQ) Hourly Rate

Professional Services - Chief IAQ Scientist $_______________ Principal IAQ Scientist $_______________ Senior IAQ Scientist $_______________ IAQ Scientist $_______________ Technical Consultant 2 $_______________ Technical Consultant I $_______________ IAQ Technician $_______________ Administrative Support $_______________ Litigation Support * $_______________ Chief IAQ Scientist $_______________ Principal lAO Scientist $_______________ Senior lAO Scientist $_______________ lAO Scientist $_______________ Technical Consultant 2 $_______________ Technical Consultant I $_______________ lAO Technician $_______________ Administrative Support $_______________

(Note: * Litigation support specifically defined as deposition/trial/arbitration preparation and testimony, preparation of expert report)

Sample Analyses – Microbial

Cellotape lift sample analysis — per sample -Standard turnaround time (5 business days) $__________________

-Rush turnaround time (same or next business day) $__________________

Air sample analysis – Culturable fungi – species level ID-per sample $__________________

Air sample analysis - Fungal spore trap per sample $__________________

Dust analysis – Culturable fungi, species level ID — per sample $__________________

Dust analysis — Indoor allergen panel (e.g., dust mite, etc.) $__________________

Per sample

Bulk material analysis — Culture-based— per sample $__________________

Bulk material analysis — Direct microscopic exam — per sample $__________________

Swab surface wipe sample analysis — per sample $__________________

Water analysis — Legionella — per sample $__________________

Sample Analyses – Chemical - Anderson sampler rental, per day $__________________

Air sample analysis – Total and Individual VOCs $________________

(TVOC/IVOC)-full scan-(EPA IP-1 B method specific to IAQ)-per sample $________________

Air sample analysis – Total VOCs (TVOC) — per sample $________________

Air sample analysis – Microbial VOCs (MVOCs) — per sample $________________

Air sample analysis – TVOC/IVOC/MVOC — per sample $________________

Dust analysis – VOCs — per sample $________________

Air sample analysis – Formaldehyde (EPA lP-6A & ASTM $________________

5197-97 methods) — per sample Air sample analysis – Selected aldehydes including $_______________

Formaldehyde (EPA IF-GA & ASTM 5197-97 methods) - per sample Analysis of Passive VOC monitor - per sample $_______________

Analysis of Passive Formaldehyde— per Sample $_______________

For Each Sampling Event the Following shall apply

1-5 Samples $_______________

5-9 Samples $_______________

10+ Samples $_______________

The minimum professional qualifications of an Indoor Air Quality Scientist require a Certified Industrial Hygienist (CIH). A staff person having a CIH and a P.E.is acceptable and a P.E. with a CIH is acceptable. A Professional Engineer without a CIH qualification is not acceptable.

Total Item #4 Hourly Rate $____________________

ITEM #5:

CODE REQUIRED CONSTRUCTION MATERIALS TESTING & INSPECTION SERVICES (SCMI)

Rates shall be for special inspector/engineer qualifications.

Reference IBC Table 1704.3 Required Verification and Inspection of Steel Construction

Verification/Inspection/Report Continuous/ Periodic

Referenced Standard 8

IBC Ref.

Hourly Rate

1. Material verification of strength bolts, nuts, and washers identification markings to conform to ASTM standards specified in the approved construction documents;

confirmation of compliance.

P

Applicable

ASTM Materials speci AISC

ASD, Section

A3.4; AISC

LRFD, Section

A3.3

2. Inspection of high-strength bolting for bearing-style connections and Slip-critical connections.

C & P

AISC LRFD

Section

M2.5

1704.3.3

3. Materials verification of Structural Steel identification marking to conform to ASTM standards specified in the approved construction documents and manufacturers’ certified mill test Reports required.

ASTM A 6 or

ASTM A 568

ASTM A 6 or

ASTM A 568

1708.4

4. Materials verification of weld filler materials identification makings to conform to AWS specification in the approved construction documents.

AISC, ASD,

Section

A3.6; AISC

LRFD, Section

A3.5

Reference IBC Table 1704.4 Required Verification and Inspection of Concrete Construction

Verification/Inspection/Report

Continuous/

Periodic

Referenced

Standard 8

IBC Ref.

1. Inspection of reinforcing steel, Including pre-stressing tendons, and placement.

p

ACI 318: 3.5, 7.1-

7.7

1903.5, 1907.1, 1907.7, 1914.4

2. Inspection of reinforcing steel Welding in accordance with table

1704.3, item 5B

AWS D.4

ACI 318: 3.5.2

1903.5.2

Reference IBC Table 1704.5.1 Level 1 Special Inspection

Frequency of

Inspection

Reference for

Criteria

Inspection Task

Continuous During ask listed

Periodically during task

ACI 530/ASCE

5/TMS 402a

ACI 530.1

ASCE

6/TMS

602a

1. As masonry construction begins, the following shall be verified to ensure compliance:

a. Proportions of site Prepared mortar.

X

Art. 2.6A

b. Construction of mortar Joints.

Art. 3.3B

c. Location of Reinforcement connectors.

Art. 3.4

Reference IBC Table 1704.5.3 Level 2 Special Inspection

Frequency of

Inspection

Reference for Criteria

Inspection Task

Continuous during task listed

Periodically during task

ACI 530/

5/TMS

402a

ACI 530.1

6/TMS

602a

1. From the beginning of masonry construction, the following shall be verified to ensure compliance:

a. Proportions of site-mixed mortar and grout.

Art. 2.6A

b. Placement of masonry units and construction of mortar joints.

Art. 3.3B

c. Placement of reinforcement and connectors.

Art. 3.4

d. Grout space prior to Grounding

Art. 3.2D

e. Placement of grout

Art. 3.5

Total Item #5 – Hourly Rate $_____________

TOTAL HOURLY RATE ALL ITEMS:

(#1 THUR #5)

File details come from the government source that posted it. Updated .