26RFP032826K_CRB_Cost Proposal.pdf
PDF 575 KB Posted
- Attached to
- 26RFP032826K-CRB Standby Professional Services for Environmental Engineering & Testing Services
- Solicitation number
- PE-66096-NONST-2026-000000173
- Issued by
- Fulton County, Georgia
About this file
This is a Cost Proposal Form for Fulton County, Georgia's Request for Proposal 26RFP032826K-CRB for Standby Professional Services in Environmental Engineering & Testing Services. The County seeks to engage one or more firms to provide technical and professional services for various County projects on an as-needed basis. The cost proposal form requires bidders to submit hourly rates and unit costs across five service categories: Environmental Engineering and Testing Services (EET), Bulk Sampling and Analysis, Geotechnical Survey Services, Indoor Air Quality Services (IAQ), and Code-Required Construction Materials Testing and Inspection Services (SCMI). The proposal form establishes specific line items for professional positions, laboratory analyses, field services, and inspection tasks, with bidders required to provide pricing for each individual service or position category listed.
All rates submitted must include direct costs associated with the scope of work, including overhead and profit. The cost proposal must be submitted separately from the technical proposal in a sealed envelope. Pricing categories span from professional hourly rates for positions such as Project Engineer, Registered Project Engineer, and Certified Industrial Hygienist, to unit costs for specific analyses including polarized light microscopy, transmission electron microscopy, soil boring, geotechnical testing, microbial and chemical analyses, and construction materials inspection services. The form requires a total cost summary combining all hourly rates and unit costs across the five service categories, enabling the County to evaluate pricing for potential selection of one or more firms to support diverse environmental engineering and testing needs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26RFP032826K_CRB (Solicitation).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 2
COST PROPOSAL FORM
SCHEDULE OF FEES
This form shall be completed and submitted as the cost proposal. The complete Cost Proposal is to be submitted separately from the Technical Proposal in a sealed envelope.
COST PROPOSAL SUMMARY FORM
Item #1: Total Hourly Rate Amount
Item #2: Total Hourly Rate Amount
Item #3: Total Unit Cost Amount
Item #4: Total Unit Cost Amount
Item #5: Total Unit Rate Amount
TOTAL COST ALL HOURLY RATES:
(Items 1, 2, 3, 4, and 5)
TOTAL COSTS: The rates shall include all direct costs associated with the scope of work, including, but not limited to Overhead and Profit. Rates shall be submitted as identified in Items 1 through 5 on the Cost Proposal Summary.
ENVIRONMENTAL ENGINEERING and TESTING SERVICES (EET)
Item #1:
Position Hourly Rate (Incl. OH&P)
Engineering Technician $_______________ Senior Engineering Technician $_______________ Project Engineer $_______________ Project Manager $_______________ Registered Project Engineer $_______________ Senior Registered Engineer $_______________ Certified Industrial Hygienist $_______________ Geo-Technical Engineer/Geologist $_______________
Hydro-Geologist $_______________ Principal Consultant $_______________ Clerical/CAD Operator/Technical Report Specialist $_______________
Total Item #1 – Hourly Rate $________________
ITEM #2:
Bulk Sampling Hourly Rate
Analysis of Bulk sample by PLM (Polarized Light Microscopy) coupled with dispersion staining Techniques- per sample:
Normal turnaround time (3-5 days) $_______________ Rush basis (48 hour or less) $_______________
Analysis of bulk sample by phase contrast microscopy (NIOSH 7400 Method) – Per sample $_______________
Analysis of air samples by Transmission Electron Microscopy (TEM)- per sample:
48- Hour turnaround time $_______________ 24- Hour turnaround time $_______________
Dust characterization / Optical microscopy $_______________ Lead in air (NIOSH 7300 method) $_______________ TCLP Volatile plus metals (List current EPA methods) $_______________ TCLP Metals (List current EPA methods) $_______________ PAH 8270 (List current EPA methods) Soil $_______________ Water $_______________
BTEX 8020 OR 602 (List current EPA methods) Soil $_______________ Water $_______________
BTEX + TPH GRO 5030 /8020/8015
(List current EPA methods) Soil $_______________ Water $_______________
TPH DRO 3510 OR 3550/8015 (List current EPA methods) Soil $_______________ Water $_______________
TPH DRO 3510 OR 5030/8015 (List current EPA methods) Soil $_______________ Water $__________________________
Automatic turbidity Sampler (NTU), per calendar day $_______________ Turbidity Sampling/analysis, Outfall, per sample $_______________ Turbidity sampling/analysis, Stream, per sample $_______________
Total Item #2 – Unit Costs $_______________
ITEM #3:
Geotechnical Survey
Soil Test Boring (Split-spoon samples at 5-foot intervals, up to 50-foot depth) $_______________ Less than 50 blows per linear foot $_______________ Greater than 50 blows per linear foot $_______________ Additional Split-spoon samples, each add $____________________ Boring depth greater than 50 feet $_______________ Boring depths between 100 and 200 feet $_______________ Auger Boring (0-50-footdepth), per linear foot $_______________ Undisturbed samples, standard 3-inch Shelby tube, each $_______________ Bag Samples, each $_______________ Truck Mounted Rig, LS $_______________ All-Terrain Vehicle, LS $_______________
Total Item #3 - Hourly Rate $_______________
ITEM #4:
Indoor Air Quality Services (IAQ) Hourly Rate
Professional Services - Chief IAQ Scientist $_______________ Principal IAQ Scientist $_______________ Senior IAQ Scientist $_______________ IAQ Scientist $_______________ Technical Consultant 2 $_______________ Technical Consultant I $_______________ IAQ Technician $_______________ Administrative Support $_______________ Litigation Support * $_______________ Chief IAQ Scientist $_______________ Principal lAO Scientist $_______________ Senior lAO Scientist $_______________ lAO Scientist $_______________ Technical Consultant 2 $_______________ Technical Consultant I $_______________ lAO Technician $_______________ Administrative Support $_______________
(Note: * Litigation support specifically defined as deposition/trial/arbitration preparation and testimony, preparation of expert report)
Sample Analyses – Microbial
Cellotape lift sample analysis — per sample -Standard turnaround time (5 business days) $__________________
-Rush turnaround time (same or next business day) $__________________
Air sample analysis – Culturable fungi – species level ID-per sample $__________________
Air sample analysis - Fungal spore trap per sample $__________________
Dust analysis – Culturable fungi, species level ID — per sample $__________________
Dust analysis — Indoor allergen panel (e.g., dust mite, etc.) $__________________
Per sample
Bulk material analysis — Culture-based— per sample $__________________
Bulk material analysis — Direct microscopic exam — per sample $__________________
Swab surface wipe sample analysis — per sample $__________________
Water analysis — Legionella — per sample $__________________
Sample Analyses – Chemical - Anderson sampler rental, per day $__________________
Air sample analysis – Total and Individual VOCs $________________
(TVOC/IVOC)-full scan-(EPA IP-1 B method specific to IAQ)-per sample $________________
Air sample analysis – Total VOCs (TVOC) — per sample $________________
Air sample analysis – Microbial VOCs (MVOCs) — per sample $________________
Air sample analysis – TVOC/IVOC/MVOC — per sample $________________
Dust analysis – VOCs — per sample $________________
Air sample analysis – Formaldehyde (EPA lP-6A & ASTM $________________
5197-97 methods) — per sample Air sample analysis – Selected aldehydes including $_______________
Formaldehyde (EPA IF-GA & ASTM 5197-97 methods) - per sample Analysis of Passive VOC monitor - per sample $_______________
Analysis of Passive Formaldehyde— per Sample $_______________
For Each Sampling Event the Following shall apply
1-5 Samples $_______________
5-9 Samples $_______________
10+ Samples $_______________
The minimum professional qualifications of an Indoor Air Quality Scientist require a Certified Industrial Hygienist (CIH). A staff person having a CIH and a P.E.is acceptable and a P.E. with a CIH is acceptable. A Professional Engineer without a CIH qualification is not acceptable.
Total Item #4 Hourly Rate $____________________
ITEM #5:
CODE REQUIRED CONSTRUCTION MATERIALS TESTING & INSPECTION SERVICES (SCMI)
Rates shall be for special inspector/engineer qualifications.
Reference IBC Table 1704.3 Required Verification and Inspection of Steel Construction
Verification/Inspection/Report Continuous/ Periodic
Referenced Standard 8
IBC Ref.
Hourly Rate
1. Material verification of strength bolts, nuts, and washers identification markings to conform to ASTM standards specified in the approved construction documents;
confirmation of compliance.
P
Applicable
ASTM Materials speci AISC
ASD, Section
A3.4; AISC
LRFD, Section
A3.3
2. Inspection of high-strength bolting for bearing-style connections and Slip-critical connections.
C & P
AISC LRFD
Section
M2.5
1704.3.3
3. Materials verification of Structural Steel identification marking to conform to ASTM standards specified in the approved construction documents and manufacturers’ certified mill test Reports required.
ASTM A 6 or
ASTM A 568
ASTM A 6 or
ASTM A 568
1708.4
4. Materials verification of weld filler materials identification makings to conform to AWS specification in the approved construction documents.
AISC, ASD,
Section
A3.6; AISC
LRFD, Section
A3.5
Reference IBC Table 1704.4 Required Verification and Inspection of Concrete Construction
Verification/Inspection/Report
Continuous/
Periodic
Referenced
Standard 8
IBC Ref.
1. Inspection of reinforcing steel, Including pre-stressing tendons, and placement.
p
ACI 318: 3.5, 7.1-
7.7
1903.5, 1907.1, 1907.7, 1914.4
2. Inspection of reinforcing steel Welding in accordance with table
1704.3, item 5B
AWS D.4
ACI 318: 3.5.2
1903.5.2
Reference IBC Table 1704.5.1 Level 1 Special Inspection
Frequency of
Inspection
Reference for
Criteria
Inspection Task
Continuous During ask listed
Periodically during task
ACI 530/ASCE
5/TMS 402a
ACI 530.1
ASCE
6/TMS
602a
1. As masonry construction begins, the following shall be verified to ensure compliance:
a. Proportions of site Prepared mortar.
X
Art. 2.6A
b. Construction of mortar Joints.
Art. 3.3B
c. Location of Reinforcement connectors.
Art. 3.4
Reference IBC Table 1704.5.3 Level 2 Special Inspection
Frequency of
Inspection
Reference for Criteria
Inspection Task
Continuous during task listed
Periodically during task
ACI 530/
5/TMS
402a
ACI 530.1
6/TMS
602a
1. From the beginning of masonry construction, the following shall be verified to ensure compliance:
a. Proportions of site-mixed mortar and grout.
Art. 2.6A
b. Placement of masonry units and construction of mortar joints.
Art. 3.3B
c. Placement of reinforcement and connectors.
Art. 3.4
d. Grout space prior to Grounding
Art. 3.2D
e. Placement of grout
Art. 3.5
Total Item #5 – Hourly Rate $_____________
TOTAL HOURLY RATE ALL ITEMS:
(#1 THUR #5)