26R0178 P084 - PLA Request for Information clean.pdf

PDF 110 KB Posted

Attached to
P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT, RHODE ISLAND
Solicitation number
Not on record
Issued by

About this file

This is a Request for Information (RFI) and market survey regarding the potential use of Project Labor Agreements (PLAs) for two naval construction projects at Naval Station Newport, Rhode Island.

The primary project is P084 Next Generation Torpedo Integration Lab, a 12,920 square foot multi-story steel frame laboratory and office facility designed to support depot-level testing of critical torpedo systems. Construction includes shallow foundations, metal standing seam roofing, masonry and metal panel exterior walls, site preparations, underground stormwater retention, mechanical and electrical utilities, telecommunications, landscaping, drainage, parking, and exterior lighting. The secondary project is Option 1, P1016 Consolidated RDT&E Systems Facility, a 17,978 square foot multi-story laboratory facility with structural steel framing, standing-seam roof, masonry veneer and metal panel siding, and includes demolition of Building 1272T (548 m2 engineering facility). Both projects fall under NAICS Code 236220, with estimated construction costs between $25 million and $100 million and anticipated performance periods of approximately 901 calendar days. Naval Facilities Engineering System Command (NAVFAC) Mid-Atlantic is soliciting public comments on whether PLAs should be required for these projects. Executive Order 14063 mandates PLA use for large-scale federal construction projects ($35 million and above) unless exceptions apply under FAR 22.502-2(d). Responses to the attached questionnaire must be submitted via email to demetrice.jenkin2.civ@us.navy.mil no later than 2:00 P.M. local time on 08 July 2026. The questionnaire addresses respondent classification, specialized construction availability, labor market conditions, contractor interest, prior PLA experience in the area, union versus prevailing wage rate comparisons, and potential cost implications of PLA requirements.

View the file

Other files

File Type Posted
Project Labor Agreement Questionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Labor Agreement (PLA) Request for Information (RFI) for

P084 Next Generation Torpedo Integration Lab Naval Station Newport, Newport, Rhode Island

This is a request for information/market survey. This is not a request for proposal, request for quote, or an invitation for bid. There will be no solicitation, specification, or drawings available at this time.

Naval Facilities Engineering System Command (NAVFAC) Mid-Atlantic is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following construction project. This project will include the construction of a multi-story steel frame 12,920 SF laboratory and office facility. The facility will support a variety of functions including depot level testing of critical torpedo systems. Construction consists of a steel frame building with a shallow foundation, metal standing seam roof and masonry and metal panel exterior walls. The project includes all pertinent site preparations and site improvements, including underground stormwater retention system, mechanical and electrical utilities, telecommunications, landscaping, drainage, parking and exterior lighting.

For Option 1, P1016 Consolidated RDT&E Systems Facility, this project will include the construction of a multi-story 17,978 SF laboratory facility supported by shallow foundations. The facility will utilize structural steel framing with a standing-seam roof. Exteriors are planned as a combination of masonry veneer and metal panel siding. Demolition includes removal of Building 1272T, a 548 m2 engineering facility. The project NAICS Code is 236220. The magnitude of construction is anticipated to be $25M –

$100M. General period of performance is anticipated to be approximately 901 calendar days.

A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Federal Acquisition Regulation (FAR) policy states:

Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction projects with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.502-2(d) (Deviation 2026-

O0040) applies. Reference is made to: FAR Subpart 22.5 (Deviation 2026-O0040) Use of Project Labor

Agreements for Federal Construction Projects; provision, FAR 52.222-33 (Deviation 2026-O0038)

Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 (Deviation 2026-

O0038) Project Labor Agreement.

In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire.

This is not an announcement of the availability of a solicitation nor is it a means of generating a plan holder’s list. This survey is for planning purposes only and shall not be construed as a Request for

Proposal or as an obligation on the part of the Government. The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information. The

Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended.

Responses shall be submitted on the attached questionnaire via email to demetrice.jenkin2.civ@us.navy.mil no later than 2:00 P.M. local time on 08 July 2026.

mailto:demetrice.jenkin2.civ@us.navy.mil

Project Labor Agreement (PLA) Questionnaire

Questions Responses

1) Are you responding as a representative of a government entity, union, contractor (union or non-union) and/or qualified small business?

2) Would the work involve specialized construction that is available from only a limited number of contractors or subcontractors? Explain in detail.

3) What is your understanding of the availability of union labor and non-union labor in this area for this type of project? Are you otherwise aware of national, regional, or local interest in participating in this project by union or non-union contractors.

Explain in detail.

4) As a qualified contractor for a project of this type, would you be interested in participating in this project?

Would the requirement of a PLA under this project impact your interest in any way? Explain in detail.

5) Are you aware of PLAs having been used on other similar construction projects in the area and/or other nearby areas?

Explain in detail.

6) How do union wage rates compare to prevailing wage rates for this type of project and in this area, i.e., prevailing wage rates under the Construction Wage Rates Requirements statute

(formerly known as the Davis-Bacon Act). Explain in detail.

7) Are there any ways in which the requirement of a PLA might increase costs on a project of this type in this area? Explain in detail.