This is a supplemental Performance Work Statement (PWS) for Task Group Instruction (TGI) 38K4255112-A01 in support of ship repair work on the USS DEWEY (DDG-105) at the U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) in Yokosuka, Japan. The contractor is required to accomplish replacement of Low Pressure Air Compressor (LPAC) screens using RIX retrofit kits for units #1, #2, and #3 in accordance with specified TGIs and technical references. The work must comply with TGI_38K4255112-A01_F/O, NSI FY26 CH-1 NAVSEA Standard Items/LI FY26 Local Standard Items, and TM S6220-EU-MMA-010 REV. 12 for the STAR 200C and 200D compressor models. Performance period is scheduled for 14 September 2026 to 18 September 2026 (5 days), with normal working hours from 8:00 AM to 4:45 PM Japan Standard Time, Monday through Friday. All testing must occur in the presence of an SRF-JRMC Quality Assurance representative, and the contractor must provide copies of verification/guarantee (V/G) test and inspection records to SRF QA.
The Government will furnish crane and rigging services, utility services (electrical, low pressure air, water, and steam supply), safety inspections for SRF-JRMC employees, and Quality Assurance inspection for specified symbols. The contractor is responsible for providing all equipment and materials necessary to complete the work. Key points of contact include Project Engineer Daniel Works (TPOC), Business Agent Ryan Nakamitsu (FPOC), and USCS Project Superintendent Andre Dudek (Project POC). The contract includes extensive requirements regarding contractor workplace conduct, restrictions on equipment use without written consent, parking registration, prohibited use of certain colored materials, radio equipment restrictions, photography prohibitions in operations areas, and compliance with OSHA safety standards and Japanese, Navy, Federal, State, and local environmental regulations. All contractor personnel require security passes/ID badges and foreign nationals require prior written approval from Commander, Naval Sea Systems Command. Additionally, the contractor must report all labor hours through the ECMRA secure data collection system and maintain compliance with FAR clause 52.222-50 regarding Combating Trafficking in Persons.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - N0040626Q0301.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
1. GENERAL SCOPE OF WORK:
This is a supplemental performance work statement (PWS) to Task Group Instruction (TGI) 38K4255112-
A01, to help define the scope of the contract; identifies technical reference documents applicable to performance of this contract; and describes the general tasks that the Government will require under this contract in support of the USS DEWEY (DDG-105).
Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Yokosuka is requesting contractor to accomplish replacement of LPAC screens using RIX retro-fit kits for #1, #2 and #3 LPACs in accordance with TGIs and references listed in paragraph 2.
2. REFERENCES:
The following references are applicable, and the contractor must comply with the references listed:
2.1. TGI_38K4255112-A01_F/O – INSTALL EACH RETRO FIT KIT OF LOW PRESSURE AIR
COMPRESSOR
2.2. NSI FY26 CH-1 NAVSEA Standard Items/LI FY26 Local Standard Items
2.3. TM S6220-EU-MMA-010 REV. 12 COMPRESSOR, AIR, LOW PRESSURE OIL-FREE, MODEL
STAR 200C AND 200D
3. REQUIREMENTS:
3.1. Contractor to accomplish work on #1, #2 and #3 LPACs in accordance with TGIs and references listed in paragraph 2.
3.2. Contact the Project POC’s regarding any questions, recommendations, and concerns. Recommendations must be submitted in writing.
3.3. Any testing shall be accomplished in the presence of SRF-JRMC QA representative.
3.4. Provide a copy of the (V/G) test and inspection records to the SRF QA.
4. GOVERNMENT FURNISHED PROPERTY/SERVICES:
4.1. SRF JRMC will provide the following support service work under TGI_38K4255112-S02.
4.1.1. Crane and rigging service
4.1.2. Rigging service without crane operation
4.1.3. Utility service, electrical
4.1.4. Utility service, including low pressure air supply, water supply, and steam supply.
4.1.5. Safety inspection for SRF-JRMC employees
4.1.6. Quality Assurance (QA) Inspection for (G) Symbol(s)
5. CONTRACTOR FURNISHED PROPERTY:
The contractor shall provide all equipment and material necessary to complete the work required except those listed in Government Furnished Property.
6. PLACE OF PERFORMANCE:
The worksite is on the USS DEWEY (DDG-105) at U.S. Naval Ship Repair Facility SRF-JRMC, Yokosuka, Japan.
7. POCs
TPOC
Project Engineer: Daniel Works
Office (from U.S.): +81-80-6522-9369
Email: Address: Daniel.k.works.civ@us.navy.mil
U.S. Naval Ship Repair Facility and JRMC, Yokosuka, Japan
FPOC
Business Agent: Ryan Nakamitsu
Office (from U.S.): +81-80-9350-1461
Email: Address: ryan.m.nakamitsu.civ@us.navy.mil
PROJECT POC
USCS Project Superintendent: Andre Dudek
Office (from U.S.): +81-80-6522-9479
Email: Address: andre.r.dudek.civ@us.navy.mil
8. PERIOD OF PERFORMANCE:
On-site Tech Rep POP: 14 September 2026 to 18 September 2026 (5 Days)
9. ESTIMATED WORK HOURS:
Normal working hours scheduled for SRF work is between the hours of 8:00AM to 4:45PM JST, with a 45-minute lunch break, Monday through Friday.
10. TRAVEL REQUIREMENTS:
Immediately after contract award, coordinate with RMMCO for onboarding, entry into Japan and accommodations during ROM period.
DIST-RMMCO-YOKOSUKA@SRF.NAVY.MIL
11. GENERAL INFORMATION:
11.1. Nothing contained in the performance work statement shall relieve the Contractor from complying with applicable Federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits that may be required for the Contractor or Subcontractor(s) to perform a particular function, such as hazardous waste handling or disposal, or example.
11.2. Medical treatment. Government emergency vehicles and medical personnel shall only be used in emergency situations affecting contractor personnel whose life may be in danger or who are seriously injured. Government facilities may be used in these instances as the first point of treatment. Transfer to a non-Government medical treatment facility shall be made as soon as possible and as determined by attending medical authorities.
12. CONTRACTOR IN THE WORKPLACE:
12.1. Identification. All Contractor spaces/desks shall be clearly marked as contractor spaces only.
12.2. All e-mail addresses used by contractor personnel shall identify the company name.
12.3. All contractor correspondence shall be clearly marked with company name or letterhead.
12.4. Contractor personnel shall insure that when answering telephones that they identify themselves as contractor personnel.
12.5. Contractor personnel are not to handle/operate any lifting and handling equipment or other shop equipment, machines or tools without written consent from project superintendent prior to accomplishment of the task.
13. RESTRICTIONS:
13.1. Parking - Vehicles and equipment required by the Contractor to complete this contract must be registered with Security. Forms for obtaining vehicle passes and permits may be obtained from the Receiving
Activity Point of Contact. Parking is available at or near the work site or at other authorized areas on the station. Contractor vehicles must be marked on the outside with the company name or logo or both.
Failure not to comply may result in ticketing and/or loss of vehicle privileges.
13.2. Restricted Colors - Naval activities use the colors magenta and yellow to identify specially controlled materials. The contractor is specifically prohibited from using magenta and yellow colored plastic wrapping materials or bags, tape, or other covering materials.
13.3. Radio Restrictions - Operation of privately owned citizens band or amateur radio equipment (receive and transmit) within the geographic limits of the activity is prohibited. All radio equipment installed in privately owned motor vehicles must be turned off upon entering the premises.
13.4. Privately Owned Personal Computers and Cellular Telephones - The used of privately owned personal computers and cellular telephones by contractor personnel while on Naval .Installations is restricted.
Contractors requiring such devices in the performance of this contract shall obtain a copy of the applicable parts of Naval Instruction from the Contracting Officer.
13.5. Photography/Recording - Contractor personnel are prohibited from having photographic equipment, tape recorders, or other recording devices in their possession while inside the Operations Area (OA).
14. SAFETY AND ENVIRONMENTAL
14.1. Safety Requirements. The contractor shall establish, administer, and enforce safety rules that will meet the current requirements of the Occupational Safety and Health Administration (OSHA), and all applicable work item references. Work to be performed under this contract shall be accomplished using the guidelines identified Contractors and Subcontractors. When necessary, work shall be coordinated with the Safety Department to ensure all safety and health requirements are considered.
14.2. Safety Equipment. The contractor shall provide their employees with all necessary safety equipment during the performance of work on this contract. All contractor personnel shall have in their possession and shall properly wear OSHA approved personnel protective safety equipment (i.e. hard-hats, steel-toe safety shoes, safety glasses and hearing protection). If required, the Contractor shall provide all appropriate safety barricades, signs, and signal lights required to properly isolate the area of work.
14.3. Prior to commencing work, the Contractor representative(s) shall arrange with the Receiving Activity
Point of Contact, to meet in conference with the customer, shop supervision, and other necessary personnel to discuss and develop mutual understandings relative to the administration of the Safety
Program.
14.4. Environmental Requirements. Work performed under this contract shall be in compliance with all
Japanese, Navy, Federal, State and local regulations, and all work items references, pertaining to the environment at all times. When necessary, work shall be coordinated with the Environmental Department to ensure that regulations are considered.
14.5. Responsibilities. The contractor bears sole responsibility for the safety of his her employees and compliance with environmental regulations. Naval safety personnel will monitor the safety of procedures, conduct inspections of the workplace, and perform safety related investigations, evaluations. The contractor shall conduct routine inspections of work and storage areas under his cognizance to maintain compliance with the cleanliness, material and waste management, air and water pollution controls, and provides general oversight on the environmental issues associated with this contract.
14.6. Situations that warrant corrective action will be brought to the attention of the contractor through the
Contracting Officer Representative (COR). If violations could cause major damage or loss of life, Safety or Environmental personnel may contact contractor supervisory personnel on site and request corrective action or work stoppage. The COR will be notified immediately. The Commanding Officer has final authority for Station safety and environmental matters. He has delegated the Safety and Occupational
Health Manager the authority to represent the Command in all safety matters and to resolve any disputes which may arise, and he has delegated the Environmental Manager the authority to represent the
Command in all safety matters and to resolve any disputes, which may arise. Any interpretation of the various environmental regulations will be made by the Safety or Environmental Manager.
14.7. Accident Reporting. All accidents occurring on Station are reported to the Station Safety Department. If accidents occur after regular working hours the Command Duty Officer, shall be notified. Motor vehicle accidents occurring on Station are reported to both the Safety Department and Security Manager. In all cases, the accident scene must be preserved until the Government investigator has authorized movement of the materials and vehicles involved. Materials and equipment may be moved only as necessary to facilitate the removal of injured persons. The contractor shall forward a copy of all accident reports involving contractor employees to the COR. If Government property is involved, a copy of the accident report shall also be forwarded to the Government Property Administrator (GPA).
15. SECURITY
15.1. Admittance To The Work: Upon contract award, employees or representatives of the Contractor may require access to the Receiving Activities Operations Area (OA) or Industrial Area (IA) and shall be admitted to the work site only after they have been issued a Security Pass/ID Badge.
15.2. Notice: Persons who are currently on probation or parole from a felony conviction cannot qualify for security clearances, and will be denied access to the activity.
15.3. It shall be the Contractor's responsibility to collect and account for all identification passes issued to their personnel at the expiration of the contract or when access is no longer required.
15.4. Foreign Nationals or Affiliations - Foreign Nationals (non U.S. Citizens) or persons affiliated with, or employed by, a foreign owned company will not be granted access to a Naval Activity's OA/IA, without prior written approval from Commander, Naval Sea Systems Command.
16. PERFORMANCE REQUIREMENT STATEMENT SUMMARY
Primary Performance Standard Performance Standard/AQL Performance Assessment
Method
Performance of required items Services performed meet requirements 100% of the time
Review of performance by
Surveillance Officer
The contractor maintained close liaison and good communications with the
Government
Any problems or questions encountered by either party are addressed within 2 business days
Review of performance by
Surveillance Officer
The contractor invoiced in a timely manner and in accordance with the contract
Invoices submitted with
COR/Surveillance Officer signature
Review of performance by
Surveillance Officer
Combating Trafficking in Persons - Using mindful observance and attentive listening the Surveillance Officer will monitor the contractor’s performance regarding trafficking in persons such that non-compliance with FAR clause 52.222-50, Combating Trafficking in Persons, is brought to the immediate attention of the contracting officer.
100% compliance with FAR 52.222-
All times the Surveillance Officer interfaces with the contractor
AQL = Acceptable Quality Level
17. CONTRACTOR MANPOWER REPORTING
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for CFAO via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/ http://www.ecmra.mil/