The file's text, extracted by GovTribe without its formatting.
Instructions
| CONTRACT: 26PSX0142 |
| Instructions |
| 1. Complete all yellow-shaded fields in the tabs titled "Items 1-20" and "Items 21-23". If any fields are left blank, the bid will be deemed nonresponsive. |
| 2. Furnish all information requested for the equipment proposed on the Exhibit B - Price Schedule. |
| 3. Enter"NO BID" for items not being offered. |
| 4. Submit the completed Exhibit B-Price Schedule in its original Excel(.xlsx) format. Scanned copies or PDF versions will not be accepted. |
| 5. Save the completed file using the "Save As" function and following naming convention: |
| CompanyName_PriceSchedule |
| Additional Equipment Tab: |
| Completion of the additonal equipment tab is optional. If bidding on optional equipment, complete the applicable fields. Enter "NO BID" for items not being offered. |
Items 1-20
| CONTRACT: 26PSX0142 | | | |
| EXHIBIT B - PRICE SCHEDULE | | | |
| Complete all yellow-shaded fields in "Items 1-20" . If any fields are left blank, the bid will be deemed nonresponsive. | | | |
| 1 | Backhoe with Front Loader – 4 Wheel Drive Tractor Combination with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Backhoe |
| Model | | Bucket Width |
| Series | | Max Dig Depth |
| Drive Type | | Loader |
| Engine HP | | Rated Capacity |
| Operating Weight | | Bucket Width |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | | |
| DISTRICT 2 | | |
| DISTRICT 3 | | |
| DISTRICT 4 | | |
| In Addition to Daily Rate | Night Work Additional | |
| EQUIPMENT ATTACHMENTS | | | |
| a | Hydraulic Hammer | | |
| b | Auger | | |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | | |
| 2 | GRADALL with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Bucket Type |
| Model | | Bucket Width |
| Series | | Rated Capacity |
| Drive Type | | Maximum Dig Depth |
| Operating Weight | | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | | |
| DISTRICT 2 | | |
| DISTRICT 3 | | |
| DISTRICT 4 | | |
| In Addition to Daily Rate | Night Work Additional | |
| EQUIPMENT ATTACHMENTS | | | |
| a | Ditching Bucket | | |
| b | Grading Blade | | |
| c | 24” – 36” Excavating Bucket | | |
| d | 15” Trenching Bucket | | |
| e | 8’ Boom Extension | | |
| f | Tele-stick (telescopic stick-arm extension) | | |
| g | Fixed Thumb Grapple | | |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | | |
| 3 | Medium Excavator – Off Road Track/Crawler Combination with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Bucket Type |
| Model | | Rated Capacity |
| Series | | Bucket Width |
| Drive Type | | Max Dig Depth |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | | |
| DISTRICT 2 | | |
| DISTRICT 3 | | |
| DISTRICT 4 | | |
| In Addition to Daily Rate | Night Work Additional | |
| EQUIPMENT ATTACHMENTS | | | |
| a | Boom Extension | | |
| b | Hydraulic Hammer | | |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | | |
| 4 | Large Excavator – Off Road Track/Crawler Combination with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Bucket Type |
| Model | | Rated Capacity |
| Series | | Bucket Width |
| | | Max Dig Depth |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | | |
| DISTRICT 2 | | |
| DISTRICT 3 | | |
| DISTRICT 4 | | |
| EQUIPMENT ATTACHMENTS | | | |
| a | Hydraulic Hammer Attachment | | |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | | |
| 5 | Wheeled Excavator with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Bucket Type |
| Model | | Rated Capacity |
| Series | | Bucket Width |
| | | Max Dig Depth |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | | |
| DISTRICT 2 | | |
| DISTRICT 3 | | |
| DISTRICT 4 | | |
| In Addition to Daily Rate | Night Work Additional | |
| EQUIPMENT ATTACHMENT | | | |
| a | Hydraulic Hammer Attachment | | |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | | |
| 6 | Long Reach Excavator with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Bucket Type |
| Model | | Rated Capacity |
| Series | | Bucket Width |
| | | Max Dig Depth |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | | |
| DISTRICT 2 | | |
| DISTRICT 3 | | |
| DISTRICT 4 | | |
| a | In Addition to Daily Rate | Night Work Additional | |
| 7 | Pipe/Catch Basin/Manhole Cleaning Unit with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Pipe Cleaner |
| Model | | Min PSI |
| | | Tank Capacity |
| | | Catch Basin/Manhole |
| | | Rated Capacity |
| | | Pump Capabilities |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | | |
| DISTRICT 2 | | |
| DISTRICT 3 | | |
| DISTRICT 4 | | |
| a | In Addition to Daily Rate | Night Work Additional | |
| 8 | Street Sweeper/Broom – Front or Side Unloading Hopper with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Unloading |
| Model | | Front |
| Hopper Capacity | | Side |
| | | Gutter Brooms |
| | | Right |
| | | Left |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | | |
| DISTRICT 2 | | |
| DISTRICT 3 | | |
| DISTRICT 4 | | |
| b | In Addition to Daily Rate | Night Work Additional | |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | | |
| 9 | Medium Duty Track-Type Dozer with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Blade Width |
| Model | | |
| Series | | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | | |
| DISTRICT 2 | | |
| DISTRICT 3 | | |
| DISTRICT 4 | | |
| In Addition to Daily Rate | Night Work Additional | |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | | |
| 10 | Crane: Pneumatic Tired with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Boom Type |
| Model | | Boom Length |
| Series | | Lift Capacity |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | | |
| DISTRICT 2 | | |
| DISTRICT 3 | | |
| DISTRICT 4 | | |
| a | In Addition to Daily Rate | Night Work Additional | |
| 11 | Crane: Rough Terrain Pneumatic Tired with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Boom Type |
| Model | | Boom Length |
| Series | | Lift Capacity |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | | |
| DISTRICT 2 | | |
| DISTRICT 3 | | |
| DISTRICT 4 | | |
| In Addition to Daily Rate | Night Work Additional | |
| EQUIPMENT ATTACHMENT | | | |
| a | Clamshell Attachment (min. 3/8 C.Y. – max. 1 C.Y.) Capacity | | |
| 12 | Front End Loader with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Bucket Capacity (CY) |
| Model | | Bucket Width |
| Series | | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | | |
| DISTRICT 2 | | |
| DISTRICT 3 | | |
| DISTRICT 4 | | |
| b | In Addition to Daily Rate | Night Work Additional | |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | $ | |
| 13 | Skid Steer Front End Loader with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Bucket Capacity (CY) |
| Model | | Bucket Width |
| Series | | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | $ | $ |
| DISTRICT 2 | $ | $ |
| DISTRICT 3 | $ | $ |
| DISTRICT 4 | $ | $ |
| b | In Addition to Daily Rate | Night Work Additional | $ |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | $ | |
| 14 | Motor Grader – Tandem Axle Medium duty with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Net Weight |
| Model | | Blade Dimension |
| Series | | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | $ | $ |
| DISTRICT 2 | $ | $ |
| DISTRICT 3 | $ | $ |
| DISTRICT 4 | $ | $ |
| In Addition to Daily Rate | Night Work Additional | $ |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | $ | |
| 15 | Screening Plant with Wheeled Loader with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Loader MFG |
| Model | | Model |
| Series | | Series |
| Screen Size/Deck Size | | Bucket Capacity |
| Screening Capacity | | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | $ | $ |
| DISTRICT 2 | $ | $ |
| DISTRICT 3 | $ | $ |
| DISTRICT 4 | $ | $ |
| In Addition to Daily Rate | Night Work Additional | $ |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | $ | |
| 16 | Roadway Cold Milling Machine with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | |
| Model | | |
| Series | | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | $ | $ |
| DISTRICT 2 | $ | $ |
| DISTRICT 3 | $ | $ |
| DISTRICT 4 | $ | $ |
| In Addition to Daily Rate | Night Work Additional | $ |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | $ | |
| 17 | Self-Propelled Asphalt Paver with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | |
| Model | | |
| Series | | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | $ | $ |
| DISTRICT 2 | $ | $ |
| DISTRICT 3 | $ | $ |
| DISTRICT 4 | $ | $ |
| In Addition to Daily Rate | Night Work Additional | $ |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | $ | |
| 18 | Oscillating Asphalt Tandem Compaction Roller with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Operating Weight |
| Model | | |
| Series | | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | $ | $ |
| DISTRICT 2 | $ | $ |
| DISTRICT 3 | $ | $ |
| DISTRICT 4 | $ | $ |
| In Addition to Daily Rate | Night Work Additional | $ |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | $ | |
| 19 | Vibratory Asphalt Tandem Compaction Roller with Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Operating Weight |
| Model | | |
| Series | | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | $ | $ |
| DISTRICT 2 | $ | $ |
| DISTRICT 3 | $ | $ |
| DISTRICT 4 | $ | $ |
| In Addition to Daily Rate | Night Work Additional | $ |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | $ | |
| 20 | Utility Circular Manhole Saw attached to a Skid Steer With Operator | | |
| One model per equipment type | | |
| Proposed Equipment Information | | |
| Manufacturer | | Coring Diameter |
| Model | | |
| Series | | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | $ | $ |
| DISTRICT 2 | $ | $ |
| DISTRICT 3 | $ | $ |
| DISTRICT 4 | $ | $ |
| In Addition to Daily Rate | Night Work Additional | $ |
| TRANPORTATION FEE | | | |
| a | Transportation fee (Lump sum) | $ | |
Items 21-23
| CONTRACT: 26PSX0142 | | | | |
| EXHIBIT B - PRICE SCHEDULE | | | | |
| Complete all yellow-shaded fields in "Items 21-23" . If any fields are left blank, the bid will be deemed nonresponsive. | | | | |
| 21 | Drainage Installation Unit Type: Catch Basin Tops and Basin Structure Repairs | | | |
| One model per equipment type | | | |
| Proposed Equipment Information | | | |
| a. | Backhoe Loader | c. | Mixer |
| Manufacturer | | Manufacturer | |
| Model | | Model | |
| Series | | Series | |
| Bucket Width | | Mixer Capacity | |
| Max Dig Depth | | d. | Air Compressor |
| b. | Truck | Manufacturer | |
| Manufacturer | | Model | |
| Model | | Series | |
| Series | | Air Capacity(CFM) | |
| Dump Body Capacity | | | |
| | | e. | Hand Compactor |
| | | Manufacturer | |
| | | Model | |
| | | Series | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | $ | $ |
| DISTRICT 2 | $ | $ |
| DISTRICT 3 | $ | $ |
| DISTRICT 4 | $ | $ |
| In Addition to Daily Rate | Night Work Additional | $ |
| ADDITIONAL EQUIPMENT | | | |
| a | 5-8 C.Y. Capacity Dump Truck with Working Laborer Driver | $ | $ |
| b | Self-Propelled Asphalt & Concrete Saw | $ | $ |
| 22 | Drainage Installation Unit Type I: (Including Excavation Box) with Operator | | | |
| One model per equipment type | | | |
| Proposed Equipment Information | | | |
| a. | Backhoe Loader | c. | Mixer |
| Manufacturer | | Manufacturer | |
| Model | | Model | |
| Series | | Series | |
| Bucket Width | | Mixer Capacity | |
| Max Dig Depth | | d. | Air Compressor |
| b. | Truck | Manufacturer | |
| Manufacturer | | Model | |
| Model | | Series | |
| Series | | Air Capacity(CFM) | |
| Dump Body Capacity | | | |
| | | e. | Hand Compactor |
| | | Manufacturer | |
| | | Model | |
| | | Series | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | $ | $ |
| DISTRICT 2 | $ | $ |
| DISTRICT 3 | $ | $ |
| DISTRICT 4 | $ | $ |
| In Addition to Daily Rate | Night Work Additional | $ |
| ADDITIONAL EQUIPMENT | | | |
| a | 5-8 C.Y. Capacity Dump Truck with Working Laborer Driver | $ | $ |
| b | Self-Propelled Asphalt & Concrete Saw | $ | $ |
| 23 | Drainage Installation Unit Type II: (Including Excavation Box) with Operator | | | |
| One model per equipment type | | | |
| Proposed Equipment Information | | | |
| a. | Wheeled Excavator | c. | Mixer |
| Manufacturer | | Manufacturer | |
| Model | | Model | |
| Series | | Series | |
| Bucket Width(s) | | Mixer Capacity | |
| Bucket Capacity | | d. | Air Compressor |
| | | Manufacturer | |
| b. | Truck | Model | |
| Manufacturer | | Series | |
| Model | | Air Capacity(CFM) | |
| Series | | | |
| Dump Body Capacity | | e. | Hand Compactor |
| | | Manufacturer | |
| | | Model | |
| | | Series | |
| DOT Districts | Hourly Rate | Daily Rate |
| DISTRICT 1 | $ | $ |
| DISTRICT 2 | $ | $ |
| DISTRICT 3 | $ | $ |
| DISTRICT 4 | $ | $ |
| In Addition to Daily Rate | Night Work Additional | $ |
| ADDITIONAL EQUIPMENT | | | |
| a | 5-8 C.Y. Capacity Dump Truck with Working Laborer Driver | $ | $ |
| b | Self-Propelled Asphalt & Concrete Saw | $ | $ |
Additonal Equipment
| CONTRACT: 26PSX0142 |
| EXHIBIT B - PRICE SCHEDULE |
| Contractors may submit pricing for any or all of the additional equipment listed on this tab. The additional equipment may be requested by a Client Agency, on a as-needed basis. |
| 1 | Dump Truck - 15 cubic yard capacity, with qualified operator | | | | | |
| DOT Districts | Manufacturer | Model | Quantity Available | Hourly Rate | Daily Rate |
| DISTRICT 1 | | | | $ | $ |
| DISTRICT 2 | | | | $ | $ |
| DISTRICT 3 | | | | $ | $ |
| DISTRICT 4 | | | | $ | $ |
| 2 | Dump Truck - 20 cubic yard capacity, with qualified operator | | | | | |
| DOT Districts | Manufacturer | Model | Quantity Available | Hourly Rate | Daily Rate |
| DISTRICT 1 | | | | $ | $ |
| DISTRICT 2 | | | | $ | $ |
| DISTRICT 3 | | | | $ | $ |
| DISTRICT 4 | | | | $ | $ |
| 3 | Dump Truck -24 ton capacity, with qualified operator | | | | | |
| DOT Districts | Manufacturer | Model | Quantity Available | Hourly Rate | Daily Rate |
| DISTRICT 1 | | | | $ | $ |
| DISTRICT 2 | | | | $ | $ |
| DISTRICT 3 | | | | $ | $ |
| DISTRICT 4 | | | | $ | $ |
| 4 | Site Truck-30 cubic yard body, with qualified operator | | | | | |
| DOT Districts | Manufacturer | Model | Quantity Available | Hourly Rate | Daily Rate |
| DISTRICT 1 | | | | $ | $ |
| DISTRICT 2 | | | | $ | $ |
| DISTRICT 3 | | | | $ | $ |
| DISTRICT 4 | | | | $ | $ |
Price Adjustment
| CONTRACT: 26PSX0142 |
| PRICE ADJUSTMENT |
1. Prices listed in Exhibit B- Price Schedule shall remain firm for twenty four (24) months following the Effective Date. Beginning in the third year of the Contract, the Contractor may submit a written request only during the thirty (30) days immediately preceding each anniversary date of the Effective Date. Any requested adjustment shall be based on the percentage change in the Producer Price Index (PPI) for NAICS 532412-1 Construction Machinery and Equipment Rental and Leasing, as published by the U.S. Bureau of Labor Statistics.
2. For purposes of calculating each adjustment, the comparison index shall be the most recently published index available at the time the request is submitted, and the base index shall be the index published for the same month one (1) year prior. Each adjustment shall compare the same publication month in successive years (e.g., September to December). The adjustment shall not exceed the percentage change between these two index values.
3. During any approved extension term(s) of the Contract, the Contractor may submit no more than one (1) written request per extension year, for a price adjustment, which shall be calculated in accordance with the provisions set forth above.
4. DAS may, at its sole discretion, approve, modify, or deny any such request, in whole or in part. Approved adjustments will take effect on the applicable anniversary date