262908CG_Permit_Information.pdf

PDF 6 MB Posted

Attached to
Phillippi Creek Phase II Maximum Allowable Dredging
Solicitation number
262908CG
Issued by
Sarasota County, Siesta Key CDP, Florida

About this file

This file is a permit application and supporting documentation for the Phillippi Creek Maintenance Dredging Phase II Project submitted by Sarasota County, Florida, with consultation from the Florida Department of Environmental Protection (FDEP) and the U.S. Army Corps of Engineers (USACE). The project consists of maintenance dredging approximately 77,160 cubic yards of material over an estimated 33,500 linear feet within Phillippi Creek between US-41 and South Beneva Road to restore the permitted design elevation of -4 feet mean low water (MLW). The scope of work includes: expanding the dredge footprint along the creek's entirety with a 10-foot offset from existing shoreline, connecting gaps in previously authorized dredging areas, maintenance dredging of three oxbow areas (Mineola Drive, Seclusion Drive, and River Ridge Drive), and removal of an emergent shoal near 2337 River Ridge Drive. The project is intended to restore navigable depths, improve hydraulic capacity for stormwater conveyance, reduce flood risk to adjacent residential communities and public infrastructure, and enhance drainage effectiveness. Dredging will occur east of the US-41 bridge and is proposed to be phased, with dredge material management areas (DMMAs) identified at eight Sarasota County-owned properties for material staging and disposal.

The permit application requests verification of exemption under Chapter 62-330.051, Florida Administrative Code, for maintenance dredging activities in previously dredged portions of a natural water body within drainage rights-of-way. Construction methodology will employ either mechanical or hydraulic dredging performed from shallow-draft barges, with floating turbidity curtains and weighted skirts installed to maintain turbidity levels no more than 29 Nephelometric Turbidity Units (NTUs) above background levels. Dredged material will be dewatered in lined containers or at upland DMMAs with erosion control devices, then disposed of at an approved upland landfill facility. Best management practices will include adherence to standard manatee conditions for in-water work and sea turtle and smalltooth sawfish construction guidelines. The project's phased dredging approach with turbidity monitoring and material management demonstrates compliance with environmental protection standards. A concurrent permit modification request to the USACE includes proposals to add Sarasota County as a co-applicant to existing permits and to expand authorized dredging widths from 30 feet to 50 feet in certain sections to provide consistent channel dimensions throughout the creek system for improved stormwater conveyance and flood mitigation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERMIT

INFORMATION

PERMIT INFORMATION

The following permit applications have been submitted by the county and are currently under regulatory review. Attached information includes information on the following permits:

1- FDEP Request for a Verification of an Exemption 2- Request to Modify Department of the Army Corp of Engineers Permit No.

File No. SAJ-2025-001036-JLA 3- WNCA/Earthmoving government exemption is EP-WNCA-26-00176

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville | Jacksonville | Tallahassee

June 30, 2026 137150

Mr. Toby Schwetje, Program Administrator

Florida Department of Environmental Protection

South District

2295 Victoria Avenue, Suite 364

Fort Myers, FL 33901

Sent via email: SD_ERP_Permit@dep.state.fl.us

RE: Request for a Verification of an Exemption

For the proposed Phillippi Creek Maintenance Dredging Phase II Project in Sarasota

County, Florida

Dear Mr. Schwetje:

On behalf of the applicant, Sarasota County (County), this is to submit an Exemption Verification request to the Florida Department of Environmental Protection (FDEP), requesting verification that the proposed activities are exempt pursuant to Chapter 62-330.051, Florida Administrative

Code (F.A.C.) for the proposed Phillippi Creek Maintenance Dredging Phase II Project within portions of the creek in Sarasota County, Florida, herein referred to as “Project”. A signed

Verification of Exemption form can be found in Attachment A.

The Project site is located within the limits of Phillippi Creek and does not have dedicated parcel numbers associated with it. The following provides a summary of the proposed Project.

Background

Phillippi Creek is a significant waterbody within Sarasota County, bordered by hundreds of residential properties and serving as an important recreational and drainage resource for the surrounding community. The creek supports a variety of recreational uses including fishing, kayaking, canoeing, and boating, while also functioning as a critical conveyance system for stormwater runoff throughout the watershed. Historically, Phillippi Creek was channelized in the

1920’s and has since underwent dredging efforts in the late 1990s and early 2000s to restore navigable depths and improve hydraulic capacity.

Over time, natural processes including sedimentation, shoreline erosion, and stormwater transport have resulted in the gradual accumulation of material within the creek bottom. These processes have reduced channel depths in several areas and limit the overall hydraulic efficiency of the system. As sediment continues to accumulate, portions of the creek have become http://www.cumminscederberg.com/ mailto:SD_ERP_Permit@dep.state.fl.us

Phillippi Creek Maintenance Dredging Project Phase II 137150

June 30, 2026 Page 2 of 6

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville | Jacksonville | Tallahassee increasingly shallow, creating restrictions to water movement and reducing the effectiveness of the creek as a drainage conveyance during significant storm events.

Recent bathymetric surveying of Phillippi Creek identified numerous shallow areas and bottlenecks throughout the system. These findings suggest that existing sediment accumulation is restricting drainage capacity and impeding water flow, potentially contributing to upstream flooding. Permitted dredging activities have previously targeted priority shoaling areas within the creek; however, those efforts did not comprehensively address the issue. The proposed maintenance dredging activities herein are intended to restore capacity, enhance drainage effectiveness, and reduce flood risk to adjacent residential communities and public infrastructure.

Recently, permits were secured from the USACE and FDEP by WCIND for authorization to maintenance dredge the existing navigational channel within Phillippi Creek to a depth of -4.0 mean low water (MLW). Additional permits were secured by the County further upstream that authorized maintenance dredging of the creek from bank to bank. An additional shoal area was approved under a USACE modification and FDEP exemption verification. Table 1, in conjunction with Figure 1, outlines the recent permit efforts for Phase I of the project.

Table 1. Existing permits table

Permit No.

Date

Issued Permittee Description

0151152-006 EE 10/22/2025

WCIND

Maintenance dredge approx. 557,850

SF, removing approx. 19,141 CY of material within the navigation channel of

Phillippi Creek to a previously authorized depth of -4.0 ft MLW by either hydraulic or mechanical dredging.

SAJ-1999-00532 10/6/2025

464168-001 EE 10/3/2025

Sarasota County

Dredge Phillippi Creek from Tuttle

Avenue North and east to Beneva Road to -4 MLW and remove 49,299.71 CY of material over 8,925 LF.

SAJ-2025-01036 10/8/2025

151152-007 EE 2/17/2026

WCIND/Sarasota

County

Maintenance dredge approx. 33,825 SF north of the navigation channel to a depth of -4.0 MLW by either hydraulic or mechanical dredging removing approximately 4,227 CY of material.

SAJ-1999-00532

(modification) 4/30/2026

June 30, 2026 Page 3 of 6

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville | Jacksonville | Tallahassee

Figure 1. Phillippi Creek recent permit areas map.

Due to ongoing stormwater conveyance and flooding concerns, the County would like to: (1) expand the dredge footprint along the entirety of the Project length, (2) connect gaps of previously authorized areas, (3) include maintenance dredging of three oxbows, and (4) remove an area of accumulated sediment (i.e., emergent shoal). Cummins Cederberg, Inc. (Cummins Cederberg) and Sarasota County held a pre-application meeting on January 12, 2026 with the FDEP to discuss Phase II of the Phillippi Creek dredging efforts (limited to Items #1 - #3 above). A meeting

N

WCIND Shoal Maintenance

Dredge SAJ-1999-00532

(SP-JLA) Modification

June 30, 2026 Page 4 of 6

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville | Jacksonville | Tallahassee summary is included as Attachment B. Since the pre-app meeting, the County has revised the dredging width and added Item #4 above; the final proposed scope of work is detailed below.

Proposed Scope of Work

The County proposes to expand the previously approved dredging activities to include the submerged bottom of the creek within a 10-foot offset from the existing shoreline and adjacent structures to improve drainage and reduce flooding within this portion of Sarasota County. The originally approved scope (i.e., Phase I) targeted isolated high spot areas throughout the creek;

this additional scope would include the gaps and previously untouched segments to provide a more continuous and efficient creek channel for stormwater conveyance and adequate drainage capacity. All proposed dredging will occur east of the US-41 bridge.

The County also seeks authorization to maintenance dredge three oxbow areas located along the creek at Mineola Drive, Seclusion Drive, and River Ridge Drive. Each oxbow was dredged from the uplands prior to 1970 (as shown in the pre-app PPT) and is proposed to be returned to historically authorized design width and elevations to match the rest of the creek and restore conveyance capacity and improve hydraulic connectivity within the system. Dredging at each oxbow is proposed as follows:

• Mineola Drive oxbow - approximately 6,031 CY of material to -4.0’ MLW

• Seclusion Drive oxbow - approximately 7,933 CY of material to -4.0’ MLW

• River Ridge Drive oxbow - approximately 16,918 CY of material to -4.0’ MLW

Lastly, numerous emergent shoals have established themselves along the creek shorelines waterward of existing seawalls since the original channelization. This County would like to remove the accumulated sediment from an emergent shoal located near 2337 River Ridge Drive to restore adequate creek width for vessel traffic and adequate drainage. Attachment C provided the plat book page of the shoal to be removed. The plat book depicts a creek width of 150 LF from seawall to shoreline of the platted properties. Removing this emergent shoal would involve maintenance dredging approximately 5,477 CY of material.

In total approximately 77,160 CY of material will be dredged from Phillippi Creek. The Project drawings (Attachment D) depict the proposed plan and provide more detail. The proposed project will occur within all areas of the approved authorizations plus additional portions of the Creek

(Figure 2).

June 30, 2026 Page 5 of 6

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville | Jacksonville | Tallahassee

Figure 2. Phillippi Creek Phase II maintenance dredging areas: main creek expansion (green, but will not include area west of the US-41 bridge); oxbows

(yellow); and emergent shoal (red).

Avoidance and Minimization

The creek is generally devoid of significant resources to the east of US-41 bridge where dredging will take place. As the proposed Project is anticipated to meet exemption criteria, any impacts resulting from the activities are considered to be de minimis.

Construction Methodology

Construction methodology and best management practices (BMPs) will be conducted pursuant to permit requirements. A Dredge Methodology and Material Management Plan, inclusive of identified Dredge Material Management Areas (DMMAs), is included as Attachment E)

June 30, 2026 Page 6 of 6

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville | Jacksonville | Tallahassee

Best management practices will be implemented throughout construction, including installation of floating turbidity curtains and adherence to the current “Standard Manatee Conditions for In-Water

Work” and the “Sea Turtle and Smalltooth Sawfish Construction Guidelines.”

All construction activities will be completed from a shallow draft barge, with specific methodology determined by the selected contractor. Dredging will be phased. Turbidity curtains will be installed prior to commencement of dredging activities in each dredging zone/phase and will remain in place until all dredging is completed and turbidity levels have returned to background levels.

Turbidity will be monitored as directed by the approved environmental permits. Material management will occur in lined containers on the barge or at an upland material management site with erosion control devices. Once dry, dredge material will be hauled away and disposed of at an approved upland landfill facility.

Thank you for your review of this request for the proposed Phillippi Creek Maintenance Phase II

Dredging Project. The processing fee will be paid under separate cover. An application is being submitted concurrently to the U.S. Army Corps of Engineers (USACE) for federal authorization of the Project. Should you have any questions or require additional information, please do not hesitate to contact me at 954-621-6367 or apacelko@cumminscederberg.com.

Sincerely, CUMMINS CEDERBERG, INC.

Alex Pacelko

Project Scientist

Enclosures:

Attachment A – Signed FDEP Exemption Verification Form

Attachment B – FDEP Pre-Application Meeting Summary

Attachment C – South Gate Units 26 and 27 Plat Book Page

Attachment D – Project Drawings

Attachment E – Dredge Methodology and Material Management Plan mailto:apacelko@cumminscederberg.com

Form 62-330.050(1) – Request for Verification of Exemption Incorporated by reference in subsection 62-330.050(2), F.A.C. (effective date: December 22, 2020) Page 1 of 6

Request for Verification of an Exemption

Instructions: This form is used to request verification whether an activity qualifies for an exemption from the Environmental Resource Permit (ERP) requirements of Sections 373.406 or 403.813(1) of the Florida Statutes (F.S.) and Rule 62-330.051 of the Florida Administrative Code (F.A.C.); and from the State 404 Program requirements of Rule 62-331, F.A.C. Alternatively, you can use the on-line self-certification site of the applicable Agency for activities that qualify for a self-certification (see below).

Notice is not required to conduct most exempt activities However, verification of such qualification is helpful for the following reasons:

• Certain projects in retained waters may qualify for the State Programmatic General Permit (SPGP).

If the project qualifies for and receives SPGP authorization, you do not need to apply separately to the Corps; and

• To provide assurance to persons who are unsure whether the requested work qualifies for an exemption. If it does not, the information provided will expedite the process of applying for the applicable ERP and/or State 404 Program permit.

Prior notice to the Agency is required before conducting one or more of the following:

• Activities having minimal impact under Section 373.406(6), F.S., often referred to as a “de minimis” exemption.

• Maintenance dredging under Section 403.813(1)(f), F.S., and paragraph 62-330.050(7)(a), F.A.C., when the dredging is within previously dredged portions of natural water bodies within drainage rights-of-way or drainage easements which have been recorded in the public records of the county.

• The repair, stabilization, or paving of existing county-maintained roads and the repair or replacement of bridges that are part of the roadway under Section 403.813(1)(t), F.S., and paragraph 62-330.050(4)(e), F.A.C.

• Removal by an individual, residential property owner of organic detrital material from freshwater rivers or lakes that have a natural sand or rocky substrate and that are not located in an Aquatic Preserve under Section 403.813(1)(u), F.S., and paragraph 62-330.050(3)(b), F.A.C.

• Maintenance dredging at seaports under Section 403.813(3), F.S., and paragraph 62- 330.050(7)(g), F.A.C.

• Minor silvicultural surface water management systems under Rule 62-330.0511, F.A.C. (Note—do not use THIS form for that notice; instead use the procedures in Rule 62-330.0511, F.A.C.)

• Dry borrow pits of less than five acres located entirely in uplands in accordance with subsection 62-330.051(16), F.A.C.

Exempt activities on state-owned submerged lands (SSL), other than those excepted in paragraph 18- 21.0051(1)(a), F.A.C., must also be authorized by the Board of Trustees of the Internal Improvement Trust Fund (BOT). Authorization to use SSL is not linked with regulatory exemptions; therefore, it is possible to qualify for a regulatory exemption, yet not be authorized to conduct the activity until the separate SSL authorization is granted. If an activity may be located in, on, or over SSL, we recommend completing Section F of the Environmental Resource Permit Application form.

Requests to “self-certify” a private, single-family dock or a boat lift associated with such a dock must be submitted to the Department’s Internet site at: http://www.fldepportal.com/go/ and CANNOT be made using this form. However, requests to verify construction of a dock or boat lift that does not qualify for self-certification may be made using this form.

Any submittal requesting verification of an exemption must also include:

• Location map(s) of sufficient detail to allow someone who is unfamiliar with the site to travel to and locate the specific site of the activity.

• One set of plans and drawings, calculations, environmental information, and other supporting documents that clearly and legibly depict and describe the proposed activities in sufficient detail to demonstrate that the work qualifies for the exemption.

• The required fee.

Incorporated by reference in subsection 62-330.050(2), F.A.C. (effective date; December 22, 2020) Page 2 of 6

We recommend contacting your local Corps district office if your project is not within state-assumed waters regulated under Chapter 62-331, F.A.C., does not qualify for the State Programmatic General Permit (SPGP), and you are not sure whether the project requires separate Corps authorization. If Corps authorization is required, you will need to submit the appropriate federal application form separately to the Corps. Corps contact information may be found online in the Jacksonville District Regulatory Division website.

Please identify the exemption(s) you are requesting to use:

Subsection/Paragraph 62-330.051 (7a), F.A.C.

Section 373.406(6), F.S. (known as the “de minimis” exemption — see section 3.2.7(c) of Applicant’s Handbook Volume I for additional information)

Section 373.406( ), F.S.

Section 373.4145(6)( ), F.S. (for certain “grandfathered” activities in the Panhandle of Florida)

Section 403.813(1)(f), F.S. (generally, “dredge and fill” exemptions)

40 CFR § 232.3(c)( ) (State 404 Program exemptions incorporated in 62-331.020, F.A.C.)

I do not know the exemption number

Please provide numbers for additional or other exemptions if you are requesting to use more than one in one of the above list categories:

Part 1: General Information

A. Contact

Last Name: Quartermaine First Name: Ben Middle:

Title: Stormwater Director Company: Sarasota County

Address: 1001 Sarasota Center Blvd.

City: Sarasota State: FL Zip: 34240

Home Telephone: Work Telephone: 941-861-0985

Cell Phone:

E-mail Address: BQuartermaine@SCGov.net

Correspondence will be sent via email, unless you check here to receive it via US Mail:

B. Land Owner(s) (if different or in addition to contact identified above)

Last Name: N/A First Name: N/A Middle: N/A

Title: N/A Company: N/A

Address: N/A

City: State: Zip:

Home Telephone: Work Telephone:

Cell Phone:

E-mail Address:

Correspondence will be sent via email, unless you check here to receive it via US Mail:

mailto:BQuartermaine@SCGov.net

Incorporated by reference in subsection 62-330.050(2), F.A.C. (effective date; December 22, 2020) Page 3 of 6

C. Consultant/Agent (if different or in addition to contact identified above)

Last Name: Pacelko First Name: Alex Middle:

Title: Project Scientist Company: Cummins Cederberg, Inc.

Address: 111 2nd Ave NE, Suite 1100

City: St. Petersburg State: FL Zip: 33701

Home Telephone: Work Telephone: 954-621-6367

Cell Phone:

E-mail Address: APacelko@CumminsCederberg.com

Correspondence will be sent via email, unless you check here to receive it via US Mail:

D. Location of Proposed Activities

Tax Parcel Identification Number: N/A – within Phillippi Creek

Address: N/A – within Phillippi Creek

City: N/A County: Sarasota Zip: Various

Latitude (DMS) N27o 16’ 25” Longitude (DMS) W82o 31’ 44”

E. Name of Project (if there is one): Phillippi Creek Maintenance Dredging Phase II

F. Date Activity is Proposed: To Commence: TBD To be Completed: TBD

G. Proposed Activities (be specific; use additional sheets as necessary)

Describe in general terms the proposed project, system, or activity (including materials to be used and construction methods), and means of accessing the property (for construction, maintenance, and inspections, including any need for an access easement): Due to ongoing stormwater conveyance and flooding concerns, the County would like to: (1) expand the dredge footprint along the entirety of the Project length, (2) connect gaps of previously authorized areas, (3) include maintenance dredging of three oxbows, and (4) remove an area of accumulated sediment (i.e., emergent shoal). Refer to the cover letter, Project drawings, and attachments for additional details. The total estimated total volume of sediment to be removed is approximately 77,160 cubic yards (CY).

Dredging activities conducted will adhere to applicable federal, state, and local environmental protection standards. The dredge will provide safe access for recreational boaters and emergency police vessels, increased water flow, and a larger capacity to sequester rainfall and stormwater runoff.

H. Is any work proposed in wetlands or other surface waters? Yes No. If yes, please specifically describe, with specific references as to how the limits of the proposed work will comply with the terms and conditions of the above exemption: Dredging is proposed to occur within previously dredged sections of Phillippi Creek, areas historically dredged from uplands, and to remove accumulated sediment – all maintenance activities. Dredging is proposed to a depth of -4.0 MLW. Please see Attachment D for Project drawings.

mailto:APacelko@CumminsCederberg.com

Incorporated by reference in subsection 62-330.050(2), F.A.C. (effective date; December 22, 2020) Page 4 of 6

I. Please provide a description of all sediment and erosion controls to be used during the completion of this activity (such as use of turbidity screens and silt fences):

Prior to the initiation of any work, floating turbidity curtains with weighted skirts that extend to within 1 foot of the bottom will be placed around the active dredging areas and will be maintained and remain in place for the duration of construction, to ensure that turbid discharges do not occur outside the boundaries of the floating turbidity screens. Turbidity will be monitored as directed by the approved environmental permits. Material management will occur in lined containers on the barge or at an upland material management site with erosion control devices.

Once dry, dredge material will be hauled away and disposed of at an approved upland landfill facility.

Dredge Material Management Areas (DMMAs) have been identified in the Project drawings (Attachment D) and further details are provided in the Dredge Material Management Plan (Attachment E).

Incorporated by reference in subsection 62-330.050(2), F.A.C. (effective date; December 22, 2020) Page 5 of 6

Part 2: Acknowledgement

I understand this form is being provided solely to seek verification of qualification to use one or more Environmental Resource Permit (ERP) and/or State 404 Program exemption(s), and that I am NOT requesting the Agency to process this form as an application for a permit.

By checking this box, I hereby waive, in accordance with Rule 62-330.050(10), F.A.C., the 30-day deadline for issuance of the verification set forth in Rule 62-330.050(4), F.A.C. in the event my project also requires a State 404 Program authorization (other than an exemption) under Chapter 62-331, F.A.C., and request that the agency actions for the ERP exemption and State 404 Program authorization be issued at the same time. (This is strongly recommended to ensure consistency, and to reduce the potential need for project modifications to resolve inconsistencies that may occur when the agency actions are issued at different times). If this box is checked and the Agency determines that no State 404 Program authorization is required, the Agency(ies) will continue to abide by subsection 62-330.050(4), F.A.C.

I understand that the Agency will make a reasonable effort to determine, within 30 days of receipt of this form, whether the proposed activities qualify for an exemption, unless this timeframe has been waived, above. If they do not, the Agency will provide its determination that the requested activity does not meet the terms and conditions of an ERP or State 404 Program exemption, at which time I may provide a new form with additional or modified information, or I may submit an application for an ERP and/or State 404 Program permit. In either case, denial of qualification to use an exemption will be made without prejudice, pending submittal of clarification of any errors or omissions contained in this form or other information that demonstrates compliance with the terms and conditions of the exemption.

Typed/Printed Name: Ben Quartermaine Signature: Date:

Certification of Sufficient Real Property Interest and Authorization for Staff to Access to the Property:

I certify that:

I, or the person I represent, hereby certify that I, or that person, possess sufficient real property interest in or control, as defined in Section�4.2.3(d)�of�Applicant’s�Handbook�Volume�I, over the land upon which the activities described in this form are proposed, and that I have, or that landowner has given me, legal authority to grant permission for staff of the Agency to access, inspect, and sample the lands and waters of the property as necessary for the review of the proposed activities specified in this form. If such sufficient real property interest is based on an entity having the power of eminent domain and condemnation authority, I/we shall make appropriate arrangements to enable staff of the Agency to access, inspect, and sample the property as described above.

Typed/Printed Name: Ben Quartermaine Signature: Date:

(Corporate Title if applicable):

Part 3: Submittal and Fees

This form and the appropriate fee should be submitted to the agency having regulatory authority for the activity.

Operating Agreements between the Department and the water management districts spell out which agency will process any given application. For more information go to https://floridadep.gov/water/submerged-lands-environmental-resources-coordination/content/submitting-erp.

This form may be submitted online; to do so, follow the online submittal requirements of the agency:

x Florida Department of Environmental Protection:

http://www.fldepportal.com/go/

Benjamin Quartermaine

Benjamin Quartermaine C=US, E=bquartermaine@scgov.net, O=Sarasota County, OU="Stormwater ", CN=Benjamin Quartermaine

2026.06.30 11:58:31-04'00'

Benjamin Quartermaine

Benjamin Quartermaine

C=US,

E=bquartermaine@scgov.net, O=Sarasota County, OU="Stormwater ", CN=Benjamin Quartermaine

2026.06.30 11:58:53-04'00'

Incorporated by reference in subsection 62-330.050(2), F.A.C. (effective date; December 22, 2020) Page 6 of 6

• Northwest Florida Water Management District:

https://permitting.sjrwmd.com/nwepermitting/jsp/start.jsp

• Suwannee River Water Management District:

https://permitting.sjrwmd.com/srepermitting/jsp/start.jsp

• St. Johns River Water Management District:

https://permitting.sjrwmd.com/epermitting/jsp/AccountOverview.do?command=init

• Southwest Florida Water Management District:

http://www.swfwmd.state.fl.us/permits/epermitting/

• South Florida Water Management District:

http://my.sfwmd.gov/ePermitting/MainPage.do

If submitting a paper version of this form, please see (Appendix A) of the Environmental Resource Permit Applicant’s Handbook Volume I for submittal locations.

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville | Jacksonville | Tallahassee

Dredge Methodology and Material Management

Plan

Phillippi Creek Maintenance Dredge Phase II Project

June 2026

1 PROJECT LOCATION

Dredging will occur within Phillippi Creek, from the US-41 overpass and east to Beneva Road, within Sarasota County (Project). Eight potential dredge material management areas (DMMAs) are being proposed at Sarasota County owned properties, as depicted in the Project drawings.

These include:

1. Phillippi Estate Park, Sarasota FL, 34235 (Parcel ID: 0084090002)

2. 2404 Nassau Street, Sarasota FL, 34231 (Parcel ID: 0075070036)

3. 2792 Valencia Drive, Sarasota FL, 34239 (Parcel ID: 0057080001)

4. 2401 Ashton Road, Sarasota FL, 34231 (Pending Acquisition, Parcel ID: 0085140038)

5. 0 Brookhaven Drive, Sarasota FL, 34237 (Parcel ID: 0052100013)

6. 1420 Gilbert Avenue (adj. to 3190 Bahia Vista Street), Sarasota FL, 34231 (Parcel ID:

0055020300)

7. 1027 Greer Drive (adj. to 849 Locklear Avenue), Sarasota FL, 34239 (Parcel ID:

0054150009)

8. 2540 Bee Ridge Road, Sarasota FL, 34239 (Parcel ID: 0074020043)

2 PROJECT DESCRIPTION

Residents along Phillippi Creek have experienced excessive flooding during recent storm events that can likely be attributed to the accumulation of sediment within the creek, reducing the capacity for stormwater conveyance associated with upstream portions of the creek. As such, the proposed

Project includes maintenance dredging Phillippi Creek to a depth of -4.0’ Mean Low Water (MLW) with a 10-foot offset from the existing shoreline. Additional maintenance dredging is proposed to restore three creek-adjacent oxbows and to remove one emergent shoal area along the shoreline.

A total of 77,160 cubic yards of material will be removed, in accordance with the Project drawings.

Bathymetric surveys and geotechnical borings were conducted throughout the proposed Project area to determine the grain size data and sediment chemical composition for disposal.

Phillippi Creek Phase II Project Dredge Methodology and Material Management Plan

June 30, 2026 Page 2 of 3

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville | Jacksonville | Tallahassee

3 CONSTRUCTION AND DREDGE METHODOLOGY

Dredging activities will be performed using either mechanical or hydraulic dredging methods, as selected by the contractor and depending on site-specific conditions and accessibility. Mechanical dredging may involve the use of a shallow draft barge-mounted clamshell or bucket or upland-based excavator, maintaining a minimum 1-foot clearance from the creek bottom. If hydraulic dredging is employed, cutterhead dredges with associated pipeline, and similar equipment may be utilized. The selected dredging method and equipment will be subject to regulatory compliance and approved prior to mobilization.

If contamination is present, extra caution will be taken when removing contaminated sediments.

If mechanical dredging is used for contaminated sediment removal, a clamshell bucket, mounted on a shallow draft barge or land-based excavator will be employed to carefully remove sediments with minimal resuspension. Contaminated dredged material will be carefully placed into sealed, lined containers or watertight barges for temporary storage and transport. These containers will be staged in the designated upland area for dewatering if necessary, and disposal at an approved facility in accordance with all applicable environmental regulations. If hydraulic dredging is used for contaminated sediments, the material will be pumped to an upland containment area, where it will be placed in either geotextile dewatering tubes or within a lined dewatering basin (e.g., HDPE-lined cell). The containment system will be designed to facilitate drying and prevent discharge of any untreated return water. All handling, storage, and transport of contaminated material will follow best management practices (BMPs) to avoid spills and cross-contamination.

If hydraulic dredging methodology is selected for non-contaminated sediments, flocculants may be introduced to promote the aggregation of fine particles. The slurry will then be pumped to dewatering areas where solids will settle or be filtered out. The resulting effluent will be sampled and analyzed to confirm the absence of contaminants before any discharge into tidal waters.

All return water (decant water) from dewatering operations will be collected, treated onsite as necessary, and tested for compliance with applicable discharge standards (e.g., Florida Surface

Water Quality Criteria) before being discharged into tidal waters or municipal stormwater systems, if permitted.

All handling, dewatering, and disposal of contaminated material will follow BMPs and be conducted in accordance with applicable FDEP and local regulations. Final disposal of dewatered sediments will occur at a permitted upland disposal facility approved for contaminated or special waste, depending on analytical results.

The selected contractor will determine the dredged material management methodology based on site-specific conditions, regulatory requirements, and operational logistics. The selected method will be pre-approved by the project engineer and comply with permit conditions. All material will be transported for final disposal at an approved upland landfill.

Phillippi Creek Phase II Project Dredge Methodology and Material Management Plan

June 30, 2026 Page 3 of 3

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville | Jacksonville | Tallahassee

4 TURBIDITY CONTROL AND MONITORING

Standard floating turbidity curtains with weighted skirts extending to within one foot of the bottom will be installed around the dredge area (Figure 1). These curtains will be continuously maintained and will remain in place for the duration of in-water work to ensure turbidity remains contained within the project footprint. Best management practices for turbidity and erosion control will be utilized during all dredging and material management activities to prevent turbidity more than 29

Nephelometric Turbidity Units (NTUs) above background levels beyond the turbidity curtain.

Turbidity monitoring will be established as directed by approved environmental permits.

Figure 1. Turbidity curtain typical detail

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville |Jacksonville | Tallahassee

Meeting Minutes

Project Name: Phillippi Creek - Oxbow Maintenance and Channel Widening Project

CC Project Number: 137150

Meeting Date: January 12, 2026

Time: 10:00 AM

Location: Microsoft Teams Meeting

Participants: Jonathan Guinn, Florida Department of Environmental Protection

Ben Quartermine, Sarasota County

Hannah Brechue, Sarasota County

John Morgan, Sarasota County

Scott Woodman, Sarasota County

Crystal Miller, Sarasota County

Austin Gordon, Sarasota County

Jennifer Bistyga, Cummins Cederberg, Inc.

Jenna Phillips, Cummins Cederberg, Inc.

Rebecah Delp, Cummins Cederberg, Inc.

Andrew Condon, Cummins Cederberg, Inc.

Alex Pacelko, Cummins Cederberg, Inc.

1. Purpose

The purpose of the meeting was to discuss, with the Florida Department of Environmental

Protection (FDEP), the proposed maintenance dredging, channel widening, and oxbow restoration activities along Phillippi Creek in Sarasota County, Florida (Project). This meeting was meant to identify potential concerns and permitting restrictions that FDEP may have relative to the proposed Project scope.

2. Background

Ms. Rebecah Delp presented a slide deck (Attachment A) to provide Project background, existing conditions, permit history, and context for the proposed scope of work.

Sarasota County and WCIND have separate, active permits to conduct maintenance dredging activities within certain portions of the creek. The authorized work is to dredge Phillippi Creek to varying widths to a depth of -4.0 mean-low water (MLW) (Table 1). The current authorizations from the FDEP are exemption verifications and cannot be modified; therefore, new applications will be submitted to include the new proposed scope of work.

Phillippi Creek - Oxbow Maintenance and Channel Widening 137150

June 24, 2026 Page 2 of 3

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville |Jacksonville | Tallahassee

Agency Permit Number Applicant Scope of Work

FDEP 464168-001-EE

Sarasota

County

Maintenance dredge 1.6 miles of drainage rights-of-way/easement to a depth of -4’ MLW, removing approximately 49,299 CY of material from 12,855 SF; ≥50’-wide channel cuts USACE SAJ-2025-01036

FDEP 151152-006-EE

WCIND

Maintenance dredge approximately 19,141 CY of material from 557,850 SF of area within the navigational channel of Phillippi Creek to a previously authorized depth of -4.0 MLW by either hydraulic or mechanical dredging;

channel width limited to 30’-wide

USACE SAJ-1999-00532

3. Discussions

The additional proposed work includes:

• Maintenance dredging of three oxbow features and to a width of approximately 30 feet, to restore the original design.

• Maintenance dredging Phillippi Creek from Tuttle Avenue to the US-41 Bridge to a width of approximately 50 feet, consistent with Sarasota’s County current dredge width in the north extent of the creek.

Final quantities and design drawings are still being refined.

Oxbow Maintenance Dredging

The project team discussed the three oxbows proposed for maintenance dredging. Based on available permit history and historical aerials, the oxbows are anticipated to qualify for an exemption. Recent bathymetric data collected within the past year identified areas with depths shallower than -4 feet MLW.

Approximately 37,381 cubic yards (CY) of material is proposed to be dredged from the three oxbows. The proposed design includes a bottom width of approximately 30 feet within the oxbows.

An U.S. Army Corps of Engineers permit previously authorized dredging of the southern oxbow to -4 feet MLW with a 30-foot width (Permit No. 199806140).

Historical aerials indicate that all three oxbows were previously dredged from upland areas. Ms.

Delp requested confirmation from FDEP regarding authorization or any potential concerns related to the proposed maintenance dredging. Mr. Guinn indicated that he did not see any red flags associated with the proposed oxbow work as they were clearly dredged from the uplands and should qualify for an exemption.

Channel Widening

Location maps were reviewed to depict the areas that are currently authorized to be dredged under each active authorization. The maps also identify the proposed areas to be dredged within

June 24, 2026 Page 3 of 3

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville |Jacksonville | Tallahassee the gaps of the authorized work. The proposed approach is to connect existing permitted segments and gaps to provide a continuous 50-foot-wide channel from Tuttle Avenue to the US-

41 Bridge. The primary objective of widening navigational channel areas that were not previously authorized to 50-ft width is to restore and maintain adequate stormwater conveyance and drainage capacity.

Historic creek footprints were reviewed using historical aerials overlaid with current conditions. It was noted that the proposed widening aligns with previously dredged extents and historic channel conditions. The work is intended solely to remove accumulated sediment and does not propose dredging deeper or wider than historically existing conditions or previously dredged conditions.

Mr. Guinn stated that he did not see anything that would disqualify the proposed channel widening from being able to be authorized. Historic documentation demonstrates that the creek was previously dredged in its entirety for drainage purposes. Sarasota County noted that survey reports from the 2000s are being used to guide restoration efforts.

Ben Quartermaine asked on how the permit overlaps will be addressed. Ms. Delp stated that the

USACE permit will need to be modified to reflect the current scope. Mr. Guinn confirmed that exemptions cannot be modified and a new exemption to include the entirety of the proposed works should be submitted.

Next Steps

• Cummins Cederberg to schedule and hold a pre-application meeting with the USACE to discuss permit modification needs for federal authorization of the Project.

• Cummins Cederberg to prepare verification of exemption packages for the full project scope, including channel widening and oxbow maintenance dredging. FDEP confirmed this can be submitted under one exemption verification application.

Attachments

Attachment A – FDEP Pre-App Slide Deck

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville |Jacksonville | Tallahassee

Meeting Minutes

Project Name: Phillippi Creek - Oxbow Maintenance and Channel Widening Project

CC Project Number: 137150

Meeting Date: February 12, 2026

Time: 1:00 PM

Location: Microsoft Teams Meeting

Participants: Edgar Garcia, USACE

Jennifer Alexander, USACE

Terra Ray, Sarasota County

John Morgan, Sarasota County

Matt Schumaker, Sarasota County

Alex Boblek, Sarasota County

Scott Woodman, Sarasota County

Kristy Molyneaux, Sarasota County Resident

Jennifer Bistyga, Cummins Cederberg, Inc.

Jenna Phillips, Cummins Cederberg, Inc.

Rebecah Delp, Cummins Cederberg, Inc.

Andrew Condon, Cummins Cederberg, Inc.

Alex Pacelko, Cummins Cederberg, Inc.

1. Purpose

The purpose of the meeting was to discuss, with the U.S. Army Corps of Engineers (USACE), the proposed maintenance dredging, channel widening, and oxbow restoration activities along

Phillippi Creek in Sarasota County, Florida (Project). This meeting was meant to identify required federal authorizations and potential permit modification procedures, anticipated timelines, and permitting restrictions that USACE may have relative to the proposed Project scope.

2. Background

Ms. Rebecah Delp presented a slide deck (Attachment A) to provide Project background, existing conditions, permit history, and context for the proposed scope of work.

Sarasota County and WCIND have separate, active permits to conduct maintenance dredging activities within certain portions of the creek. The authorized work is to dredge Phillippi Creek to varying widths to a depth of -4.0 mean-low water (MLW) (Table 1). The current authorizations from the USACE are standard permits and may be modified to alter the scope of work and/or the permittees, as needed.

June 24, 2026 Page 2 of 4

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville |Jacksonville | Tallahassee

Agency Permit Number Applicant Scope of Work

FDEP 464168-001-EE

Sarasota

County

Maintenance dredge 1.6 miles of drainage rights-of-way/easement to a depth of -4’ MLW, removing approximately 49,299 CY of material from 12,855 SF; ≥50’-wide channel cuts USACE SAJ-2025-01036

FDEP 151152-006-EE

WCIND

Maintenance dredge approximately 19,141 CY of material from 557,850 SF of area within the navigational channel of Phillippi Creek to a previously authorized depth of -4.0 MLW by either hydraulic or mechanical dredging;

channel width limited to 30’-wide

USACE SAJ-1999-00532

3. Discussions

The additional proposed work includes:

• Potential permittee addition to SAJ-1999-00532 to allow for Sarasota County to work under this authorization in order to complete a section of the authorized dredging work that WCIND is no longer funding/completing themselves.

• Maintenance dredging of three oxbow features and to a width of approximately 30 feet, to restore the original design.

• Maintenance dredging Phillippi Creek from Tuttle Avenue to the US-41 Bridge to a width of approximately 50 feet, consistent with Sarasota’s County current dredge width in the north extent of the creek, for stormwater conveyance.

Final quantities and design drawings are still being refined.

Co-Applicant and Administrative Transfer

If the County intends to conduct dredging within the area authorized under WCIND’s permit, the

County may be added as a co-applicant/co-permittee under the active WCIND permit. The

USACE indicated that this administrative change could be processed within approximately one to two weeks, provided the work conforms to the currently authorized WCIND drawings and parameters.

Both permits remain active, and work may proceed within the existing authorized limits. Adding

Sarasota County as a co-applicant to the WCIND permit would make both the County and WCIND responsible for compliance with the permit, including adherence to all special conditions.

USACE stated that minor changes to means and methods (staging, material handling, etc.) may be permissible provided they do not trigger additional consultation or conflict with existing special conditions. It was noted that a previously submitted modification related to dewatering has already been approved. WCIND is able to proceed with dredging operations as authorized by the active permit in the interim.

June 24, 2026 Page 3 of 4

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville |Jacksonville | Tallahassee

Oxbow Maintenance Dredging

The Project team discussed the three oxbows proposed for maintenance dredging. Based on available permit history and historical aerials, the oxbows are anticipated to qualify as a maintenance event. Recent bathymetric data collected within the past year identified areas with depths shallower than -4 feet MLW.

Approximately 37,381 cubic yards (CY) of material is proposed to be dredged from the three oxbows. The proposed design includes a bottom width of approximately 30 feet within the oxbows.

An U.S. Army Corps of Engineers permit previously authorized dredging of the southern oxbow to -4 feet MLW with a 30-foot width (Permit No. 199806140). Historical aerials indicate that all three oxbows were previously dredged from upland areas.

USACE indicated that, based on the information presented, the proposed oxbow work appears that it would qualify as maintenance dredging and does not raise immediate concerns.

Channel Widening

Location maps were reviewed to depict the areas that are currently authorized to be dredged under each active authorization. The maps also identify the proposed areas to be dredged within the gaps of the authorized work. The proposed approach is to connect existing permitted segments and gaps to provide a continuous 50-foot-wide channel from Tuttle Avenue to the US-

41 Bridge. The primary objective of widening navigational channel areas that were not previously authorized to 50-ft width is to restore and maintain adequate stormwater conveyance and drainage capacity.

The primary purpose of the widening is to enhance stormwater conveyance and improve the creek’s ability to manage extreme storm events. USACE emphasized that the Project purpose must be clearly defined in the application, specifically indicating that the intent is to restore historic drainage capacity. The USACE noted that the stated purpose influences regulatory review and agency coordination.

Historic creek footprints were reviewed using historical aerials overlaid with current conditions. It was noted that the proposed widening aligns with previously dredged extents and historic channel conditions. The work is intended solely to remove accumulated sediment and does not propose dredging deeper or wider than historically existing conditions or previously dredged conditions.

Sarasota County noted that additional stormwater modeling is being performed to further quantify conveyance benefits.

Ms. Alexander noted that both active permits will need to be modified: the WCIND permit to remove any overlap area that Sarasota County is now taking over, and the Sarasota County permit to add the proposed widening and oxbow work. The County permit will require a new public noticing period. Administratively, application review would proceed similar to a new permit action, although processed as a modification. Ms. Alexander clarified the reason both permits must be modified is that the USACE cannot have two active permits over the same area; the footprint must be clearly reassigned.

June 24, 2026 Page 4 of 4

CUMMINS CEDERBERG, INC. | Miami | Fort Lauderdale | Jupiter | Sarasota | St. Petersburg | Gainesville |Jacksonville | Tallahassee

Mr. Morgan inquired if dredging began within the 30-foot-wide section under the WCIND per, if would that interfere with the modification process. Mr. Garcia noted that the USACE evaluates each proposal independently. Currently, both permits are active and authorized. The long-term intent is to reduce the WCIND permit and expand the County permit. Until that occurs, work must remain within each permittee’s authorized limits.

Mr. Morgan noted there has been discussion about potentially exceeding 50-foot-width in certain areas of the creek depending on hydraulic needs. In most areas, it would remain 50 feet or less with appropriate offsets. He asked if widening beyond 50 feet would be allowable. Mr. Garcia pointed out that any expansion beyond currently authorized widths would need to be clearly justified in the application and evaluated accordingly. Ms. Alexander added that once final dredge quantities are submitted, the USACE will determine whether additional consultation is required. If impacts to benthic resources are limited or not applicable, review is streamlined and would involve a standard 30-day comment period. All drawings and modification requests must be submitted through the USACE Regulatory Portal.

Next Steps

• Cummins Cederberg to prepare permit modification packages for the administrative modification and the full project scope, including channel widening and oxbow maintenance dredging. USACE confirmed this can be submitted through the Regulatory

Request System (RRS) portal.

Attachments

Attachment A – USACE Pre-App Slide Deck www.CumminsCederberg.com

Phillippi Creek -

Dredge Expansion Project:

Oxbow Maintenance and Channel Widening

USACE Pre-Application Meeting February 12, 2026 www.CumminsCederberg.com

Project Site Location

Phillippi Creek Sarasota, Florida

Gulf of Mexico

N

~13,800 LF Creek Currently permitted to 30’ wide

~ 7,230 LF of Oxbows (not included in active permits)

~ 8,450 LF

Currently permitted as bank-to-bank dredge

Active Permits

• Sarasota County Permits (blue outline)

• USACE SAJ-2025-01036

• FDEP ERP 464168-001-EE

• To maintenance dredge 1.6 miles of drainage rights-of-way/easement to a depth of -4’ MLW, removing approximately 49,299 CY of material from 12,855 SF

• ≥50’-wide channel cuts

• WCIND Permits (orange outline)

• USACE SAJ-1999-00532

• FDEP ERP 151152-006-EE

• To maintenance dredge approximately 19,141 CY of material from 557,850 SF of area within the navigational channel of Phillippi Creek to a previously authorized depth of -4.0 MLW by either hydraulic or mechanical dredging

• Channel width limited to 30’-wide

1) Oxbow Maintenance

• Dredge three existing oxbow canals to a 30’ bottom width at -4’ MLW

• This scope should qualify for a maintenance dredge based on historic permits and aerials

1) Oxbows – Proposed Maintenance Dredge

Seclusion Drive Oxbow

Existing Bathy - Mineola Drive Oxbow (south)

Estimated volume to be removed: 9,000 CY

Existing Bathy – Seclusion Drive

Oxbow (middle)

Estimated volume to be removed:

9,000 CY

Existing Bathy - River Ridge Drive Oxbow (north)

Estimated volume to be removed: 8,500 CY

Oxbow Typical Cross-section Proposed Maintenance Dredging

30 ft

Permit History - Mineola Drive Oxbow (south) Agency Permit No. Date Applicant Authorized Work

FDEP No FDEP permits located for oxbows

USACE 199806140 1/5/2000 WCIND

Maintenance dredge approx. 7,025

CY of material to maintain a 30’-wide channel at -4.0’ MLW

1948 19691957

Oxbows – Historical Aerials

Dredged from uplands – should qualify for maintenance dredging.

1) Oxbow Maintenance

• Dredge three existing oxbow canals to a

30’ bottom width at -4’ MLW

• This scope should qualify for a…