262847MM_Attachment_E_-_Pile_Drive_Report_Form_Sample.pdf
PDF 240 KB Posted
- Attached to
- Waterway Navigation Repairs and Maintenance
- Solicitation number
- 262847MM
- Issued by
- Sarasota County, Florida
About this file
This is a Pile Drive Report Form (Sample) attachment prepared for Sarasota County, Florida's marine navigation aids installation and maintenance project. The form serves as a documentation template that contractors must complete for each pile installation work performed throughout the county's waterways, including Sarasota Bay, Roberts Bay, Little Sarasota Bay, Dona Bay, Lemon Bay, and the Myakka River. The report captures critical technical specifications for pile installations, including project name, contractor identification, installation date, marker identification with geographic coordinates, piling type and length, driving method, pile embedment depth, substrate conditions, water depth, equipment utilized, and the length of excess pile removed. The form accommodates multiple marker entries on a single document to streamline record-keeping for projects involving multiple installations. All entries require contractor certification that the information is true, correct, and complete, with space for signature and date authentication.
The Pile Drive Report Form is a mandatory documentation requirement for all contractors operating under Sarasota County's three-year marine navigation aids contract, which is anticipated to award multiple contracts with task orders issued on an as-needed basis. Contractors must maintain these detailed records for each installation, with the county retaining all pile drive reports for a minimum of five years. This documentation requirement applies to all qualified contractors holding active Florida Department of Business and Professional Regulation licenses as Certified General Contractors, Certified Marine Specialty Contractors, or Certified Marine Pile Driving Specialty Contractors. The form ensures standardized reporting across all contractor work and provides the county with comprehensive technical records necessary for maintenance, regulatory compliance, and project management throughout the contract term.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name
Contractor
Installation Date
Marker ID Lat/Long Piling Type/Length Driving Method Pile Embedment
Depth
Substrate Water Depth Equipment Used Length of Excess Pile Removed
Marker ID Lat/Long Piling Type/Length Driving Method Pile Embedment
Depth
Substrate Water Depth Equipment Used Length of Excess Pile Removed
Marker ID Lat/Long Piling Type/Length Driving Method Pile Embedment
Depth
Substrate Water Depth Equipment Used Length of Excess Pile Removed
I certify that all the information above is to the best of my knowledge and belief true, correct, and complete.
Signature Date
ATTACHMENT E
Pile Drive Report Form (Sample)
Attachment E - Page 1
| Project Name: |
| Contractor: |
| Installation Date: |
| Marker IDRow1: |
| LatLongRow1: |
| Piling TypeLengthRow1: |
| Driving MethodRow1: |
| Pile Embedment DepthRow1: |
| SubstrateRow1: |
| Water DepthRow1: |
| Equipment UsedRow1: |
| Length of Excess Pile RemovedRow1: |
| Marker IDRow1_2: |
| LatLongRow1_2: |
| Piling TypeLengthRow1_2: |
| Driving MethodRow1_2: |
| Pile Embedment DepthRow1_2: |
| SubstrateRow1_2: |
| Water DepthRow1_2: |
| Equipment UsedRow1_2: |
| Length of Excess Pile RemovedRow1_2: |
| Marker IDRow1_3: |
| LatLongRow1_3: |
| Piling TypeLengthRow1_3: |
| Driving MethodRow1_3: |
| Pile Embedment DepthRow1_3: |
| SubstrateRow1_3: |
| Water DepthRow1_3: |
| Equipment UsedRow1_3: |
| Length of Excess Pile RemovedRow1_3: |
| Date: |
File details come from the government source that posted it. Updated .