262847MM_Attachment_C_-_Task_Order_Sheet_Sample.pdf
PDF 346 KB Posted
- Attached to
- Waterway Navigation Repairs and Maintenance
- Solicitation number
- 262847MM
- Issued by
- Sarasota County, Florida
About this file
This is a Task Order Sheet sample form related to a Request for Qualifications issued by Sarasota County, Florida, for the establishment of a contractor pool to perform marine navigation aids installation, maintenance, and removal throughout the county's bays, rivers, and connected waterways. The form serves as a template for documenting specific tasks associated with waterway navigation repairs and maintenance work. The Task Order Sheet includes columns for task numbering, FWC (Florida Fish and Wildlife Conservation Commission) reference numbers, sign identification numbers and descriptions, geographic coordinates (latitude and longitude), sign facing direction, work completion requirements, and depth specifications in feet. The sample form shows rows numbered 1 through 20 to accommodate multiple tasks that may be assigned under the contract. Sarasota County anticipates an initial contract term of 3 years with this qualified contractor pool.
The attachment provides the standardized format that contractors and county personnel will use to organize and track individual work assignments within the broader marine navigation aids maintenance program. This task order structure enables clear communication of specific project locations, physical parameters, and work scope between the county and contracted service providers. The form does not specify pricing terms, set-asides, or funding amounts within its content, as it functions solely as an administrative tool for task documentation and assignment management under the larger contract framework.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task # FWC# Sign Number / Description Latitude (N) Longitude (W) Sign Facing Direction Work To Be Completed Depth (ft)
Task Order Sheet - EXAMPLE
ATTACHMENT C
Task Order Sheet (Sample)
Attachment C - Page 1
Sheet1
File details come from the government source that posted it. Updated .