2627-01 ITB OIR_Addendum1_FINAL.pdf
PDF 495 KB Posted
- Attached to
- Installation of Window Shades
- Solicitation number
- ITB-17054
- Issued by
- Leon County, Florida
About this file
This Addendum No. 1 is issued by the Florida Department of Financial Services, Office of Insurance Regulation, in response to the Invitation to Bid (ITB) for the purchase and installation of window shades at the Larson Building in Tallahassee. The addendum addresses nine questions submitted by potential respondents and clarifies specifications and requirements for the project. The scope includes 277 custom Skandia Kleenscreen 3% Color 2354R Alloy window shades with Rollease Acmeda OEM components across multiple floors, with window dimensions ranging from 27.5" W × 69" H to 41" W × 81" H. Responses are due October 27, 2026, at 3:30 p.m., with a mandatory pre-response conference held on September 30, 2026, at 1:00 p.m. The project completion deadline is February 1, 2027, with an estimated 120 calendar days of work, and the contract term is one year from issuance.
Key modifications to the ITB clarify that fabric specifications require 26% polyester and 74% PVC composition treated with Sanitized antimicrobial technology; no substitutions or equivalent manufacturers are permitted, though respondents may fabricate shades themselves using the exact OEM components and materials. E-Verify enrollment is mandatory for all vendors. The Office will prepare the facility by removing obstacles to facilitate installation, and contractors may stand on desks to install shades. All window shades and windowsills will be inspected daily within five business days of installation, with any corrections completed within five business days of notification. Paint touch-up is not required; contractors must use drop cloths to protect carpeting. The contract is awarded to the single lowest-cost responsive and responsible bidder on a fixed-price basis, with the Office reserving the right to award to multiple vendors or make no award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB Document Final Packet.pdf | ||
| Appendix B- Questions Template.xlsx | XLSX spreadsheet | |
| Appendix C- Mandatory CC Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2627-01 ITB OIR
Installation of Window Shades
Addendum No. 1
Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.
This Addendum consists of the following sections:
A. Questions and Answers
B. Modifications to the ITB
A. Below are the questions and answers related to this solicitation. In the table below, the Office of Insurance Regulation (Office) has answered each of the questions submitted by potential respondents.Below are the questions and answers related to this solicitation. In the table below, the Office of Insurance Regulation (Office) has answered each of the questions submitted by potential respondents.
No. Attachment
Identifier
Section
Number
Sub-Section
Reference
Item Reference Page No. Question Office Response
1. Attachment 2, Statement of
Work
4. Contractor
Responsibili ties -
Window
Shades
Installation and
Removal
4.c. 1 of 3 Would the Agency allow
DECOFACTORY to manufacture the roller shades, provided that the finished products comply exactly with all specifications stated in the solicitation, including the specified Skandia Kleenscreen
3%, Color 2354R Alloy fabric and all other required components and specifications?
In other words, we would not be proposing a substitute fabric or an equivalent product. We would manufacture the shades to the
No exact specifications required by the solicitation.
2. Attachment 2, Statement of
Work
4. Contractor
Responsibili ties -
Window
Shades
Installation and
Removal
4.c. 1 of 3 I was just digging through the packet for this project and it is calling out Skandia shades - is it a hard NO on the "no substitutions"? We are local
Tallahassee small business and would love to bid the project, but we do not carry Skandia.
We do have several comparable vendors.
3. Attachment 2 4. Contractor
Responsibilities
c. Window
Shades
Installation and Removal i.1. Manufacturer:
Skandia Window
Fashions
2 of 3 Attachment 2, Statement of
Work, Section 4.c.i. identifies
“Skandia Window Fashions” as the manufacturer and states that substitutions or equivalents will not be accepted. The specified
Skandia shade is fabricated using
OEM components and shade cloth manufactured by Rollease
Acmeda. American Blind &
Shade can obtain the same
Rollease Acmeda OEM hardware, components, fascia, operating system, and specified
Kleenscreen 3% openness shade cloth in Alloy (Color 2354R), and would perform the final fabrication and assembly of the shades to the exact dimensions, configuration, color, appearance, and performance requirements stated in the ITB, in the same manner that Skandia performs final assembly. Would the Office permit a Respondent to fabricate and assemble the finished roller shades itself using these exact same Rollease Acmeda OEM components and materials, rather than requiring final assembly by
Skandia Window Fashions, provided the finished shades conform exactly to all ITB specifications?
Appendix C, Mandatory
Criteria
Certification
Form
Attachment 1, Special
Contract
Conditions
Attachment 2, SOW
E-Verify
The PUR 7801 (Vendor
Certification form) requires vendor to certify they are enrolled in the E-Verify system.
Attachment 1, Special Contract
Conditions, also requires enrollment in E-Verify. However, Attachment 2, section 10 states that Section 5.d.iii, E-Verify, is not applicatble to this contract.
Please confirm if E-Verify enrollment is required.
Yes. As stated in the ITB, vendors must confirm that they are enrolled in the e-verify system.
8 a
Office's
Responsibilities
Page 3 of
Regarding 8.a, please confirm that office will eremove all obstacles, barriers, partitions, etc that will hinder use of a ladder/installation of window shades. Question was asked during the site visit, but no answer was provided.
All offices will be emptied of obstacles or personal items that will hinder installation of window shades. Contractors will be able to stand on the desks to install window shades.
4 c.i. Shade Material
Page 2 of
Section 4.c.i.1.a states the shade's material is 26%vpolyester and
74% PVC. However, Skandia's current catalog shows only 37%
Fiberglass and 63% polyester material is available for your chosen shade. Has the material you're requiring been confirmed as current/available to vendors? If not, will the shade requirements be updated accordingly?
See revised section
4.c.i.1.a. of the Attachment
2, Statement of Work.
Completion
Criteria and Date
Page 3 of
If optional services are provided, must those also be completed within the 120 day requirement?
Yes. The Office will determine before the award is made as to whether the optional services will be included in the award notice. Contractors will receive a Purchase Order for all requested services, which will include optional services if approved.
Completion
Criteria and Date
Page 3 of
Please clarify what project closeout requirements must be facilitiated.
See revised section 7 of the
Attachment 2, Statement of
Work.
4 d.i. Clean-Up
Page 2 of
Please confirm vendors are not required to touch up paint. It is not mentioned as a responsibility in the SOW, but the mention of touchup paint in this section does make it unclear.
No touch up paint is required. See revised section 4.d.i of the
Attachment 2, Statement of
Work.
Performance
Measures
Page 3 of
Will inspection occur 5 days within the day they are installed day by day, as they are installed floor by floor, or upon completion of all areas?
See revised section 5 of the
Attachment 2, Statemment of Work.
B. Modifications to the ITB: Insertations to the ITB are indicated by an underscore, deletions are indicated by a strikethrough.
1. Section 4.c.i.1.a. Window Shades Installation and Removal
Fabric: Kleenscreen 3% openness basketweave (26% polyester, 74% PVC) in Alloy (Color 2354R) treated with Sanitized antimicrobial technology.
2. Section 4.c.i.4 Window Shades Installation and Removal
Installation methods and materials shall be in accordance with standard commercial practices. All shades must be mounted at the top of the silver window frame (i.e., valance/fascia begins at the original ceiling, regardless of any drop ceilings or gaps above windows) as referenced in Exhibit 3.
3. Secction 4.d.i. Clean-Up, Precautions, and Protection
The Contractor will use drop cloths and take all necessary precautions to ensure any touchup paint and/or caulking does not mark the carpet.
4. Section 5 Performance Measures
All window shades and windowsills will be inspected daily to ensure proper installation has occurred within five (5) Business
Days of installation. Any needed corrections will be made by the Contractor within five (5) Business Days of notification.
Contract Manager acceptance is required before the Office will issue payment to the Contractor.
5. Section 7 Completion Critieria and Date
The project work duration is estimated to be approximately 120 calendar days from the date the Contractor receives the Purchase
Order. Additional coordination will be required after the completion of work to facilitate project closeout requirements. to include inspection of all work, receipt of invoice for the entire project, and processing of payment.
-Remainder of this Page is Intentionally Left Blank-
Exhibit 3
Window without Shade Window with Shade
Top of Silver
Window
Frame