Addendum Summary

This is Addendum Number 1 to a Small Procurement Request for Proposals issued by the Alaska Department of Family and Community Services (DFCS), Direct Support Services Division, Facilities section for professional architectural and engineering design services related to Court Plaza Building Floor Renovations and Upgrades (Project Number 2626005) located at 240 Main Street, Juneau, Alaska. The addendum clarifies and modifies the scope of professional services to specify that services include architectural design and structural engineering with code design review, development of plan specifications and cost estimates for bidding, and construction administration services including design support during construction, submittal reviews, RFI evaluations, and change order guidance. The design phase deliverables have been restructured from four phases (30%, 60%, 90%, 100%) to three phases (45%, 95%, 100%), with the 45% preliminary design package including basis of design, site analysis, preliminary drawings, code review strategy, engineering narratives, and stakeholder review documentation; the 95% near-final design package including fully developed documents, final specifications in CSI format, constructability reviews, and value engineering updates; and the 100% final design package including stamped drawings, complete bid package, final engineering calculations, and permit-ready documents. A prebid walk-through is scheduled for Thursday, April 2, 2026, from 10 a.m. to 2 p.m., with RFP questions due Friday, April 3, 2026, at 3:00 p.m., and the proposal due date extended to Friday, April 10, 2026, at 3:00 p.m. The state requires at least two working days to respond to inquiries. The period of performance is 30 days from Notice to Proceed, with final bid-ready construction documents due by May 15, 2026.

The addendum specifies that a price estimate is not required with the proposal and modifies technical specifications to require CSI MasterFormat 50-Division structure with standard formatting conventions. Standard software programs required include AutoCAD Civil 3D 2024 and Microsoft Office Suite (Word, Excel, PowerPoint, Project), with AKDOT&PF's C3D template file to be provided by the Agency Contact as needed. The standards, guidelines, and references are established by AKDOT&PF rather than DFCS. The agency contact is Jose R Torres, Facility Manager I, reachable at 907-465-1465 or fcs.facilities@alaska.gov. All other terms and conditions from the original RFP remain unchanged.

View the file

Other files

File Type Posted
2626005 Approved Bid Opening Worksheet.pdf PDF
DFCS RFP 2626005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

sp-adn (January 2018) DOT&PF Small Procurement Addendum 1

ALASKA DEPARTMENT OF FAMILY & COMMUNITY SERVICES

FMS FACILITIES

SMALL PROCUREMENT DOCUMENTS

For Construction Related Professional Services – RFP, Proposal & Award per

AS 36.30.320 and 2 AAC 12.40

ADDENDUM NUMBER 1

Project Title: Court Plaza Building Floor Renovations and Upgrades

Project Number(s): 2626005 RFP #: 2626005

Project Site (City, Village, etc.) Juneau, AK

Contracting Agency:

Alaska Department of Family and Community Services (DFCS), Direct Support Services Division, Facilities section fcs.facilities@alaska.gov Agency Contact: Jose R Torres, Facility Manager I Phone: 907-465-1465

The RFP Package is hereby clarified or changed as follows:

1. The Scope of Professional services has been changed from “may include” to “Services include but, are not limited to”

2. The Architectural design bullet under the “SCOPE OF PROFESSIONAL SERVICES” section list of services listed has been changed from “Architectural design” to “Architectural design and Structural engineering and code design review”

3. The Construction documentation bullet under the "SCOPE OF PROFESSIONAL SERVICES” section list of services listed has been changed from “Construction Documentation” to “Development of the Plan Specifications and Cost Estimate for bidding”

4. The Construction administration bullet under the “SCOPE OF PROFESSIONAL SERVICES” section list of services listed has been changed from “Construction administration” to “Architect shall provide Construction Administration Services, including design support during construction, review of submittals, evaluation and response to RFIs and change order requests, and guidance to maintain alignment with the design intent”

5. The Technical specifications bullet under the “Deliverables” section has been changed from “Technical specifications” to “Specifications shall be provided in the current CSI MasterFormat (50-Division) structure. All sections shall follow standard CSI formatting conventions and be organized accordingly”

6. The Standards, Guidelines, References, and software listed under “ADMINISTRATIVE REQUIREMENTS” section has been changed from “adopted by DFCS” to “DFCS is utilizing the AKDOT&PF standards”

7. The Standard software programs used by AKDOT&PF include, but are not limited to listed under “ADMINISTRATIVE REQUIREMENTS” section has been changed from listing seven (7) softwares to listing two (2) softwares: AutoCAD Civil 3D 2024 and Microsoft Office Suite: Word, Excel, PowerPoint, Project mailto:fcs.facilities@alaska.gov sp-adn (January 2018) DOT&PF Small Procurement Addendum 2

8. The most current version of AutoCAD paragraph has been changed from “DOT&PF’s C3D template file” to “AKDOT&PF’s C3D template file, provided by Agency Contact, as needed”

9. The option of “A price estimate is required with your proposal” under the PROPOSAL FORMAT section is changed to “A Price Estimate is NOT required with your proposal”

10. The last four digits for the phone number listed for The Agency Contact under “Contract Award & Notice to Proceed” section is changed from 1275 to 1465

11. The “DESIGN PHASE DELIVERABLES” under the “DESIGN PHASE DELIVERABLES” is changed from 30%, 60%, 90% and, 100% to 45%, 95% and, 100%

45% Deliverables – Preliminary Design Package

The Consultant shall provide a 45% design submittal that include but not limited to:

• Preliminary basis of design (BOD)

• Preliminary site analysis / existing conditions assessment

• 45% drawings (floor plans, site plans, key sections, major systems layouts)

• Preliminary code review and permitting strategy

• Preliminary engineering narratives (structural, mechanical, electrical, civil)

• Preliminary project schedule

• Design assumptions, constraints, and unresolved issues

• Risk items and value-engineering opportunities

• Stakeholder review meeting and comment log

95% Deliverables – Near-Final Design Package

The Consultant shall provide a 95% design submittal that includes but not limited to:

• Fully developed design documents, 95% complete

• Updated basis of design

• 95% drawings: plans, sections, elevations, details, system diagrams

• Near-final technical specifications (CSI format or owner standard)

• Final code review and permitting documents

• Updated engineering calculations and system sizing

• Updated project schedule

• Updated cost estimate (Class B or equivalent) sp-adn (January 2018) DOT&PF Small Procurement Addendum 3

• Constructability review comments resolved or marked for discussion

• Value engineering updates

• Quality control/quality assurance (QA/QC) documentation

• Response matrix showing how 45% comments were addressed

100% Deliverables – Final Design Package (Issue for Bid/Construction)

The Consultant shall provide a 100% design package that includes but not limited to:

• Final stamped drawings and specifications

• Complete IFC/IFB bid package (Divisions 00 and 01 included if required)

• Final engineering calculations and system designs

• Final project schedule

• Final cost estimate (Class A or equivalent)

• Permit-ready documents and approvals (as applicable)

• Final QA/QC certification

• Final response-to-comments matrix (95% comments fully resolved)

• Digital files (PDF, native CAD/Revit, specs) in Owner-required format

• Any required appendices, reports, or supporting documentation

12. The addition of schematics to show current floor plan and desired floor plan

13. The state requires at least 2 working days to respond to inquiry (ies)

14. No change to questions due date. RFP questions remain due on Friday, April 3rd, 2026, at 3:00 p.m.

15. RFP proposal due date has changed from Tuesday, April 7th, 2026, at 3:00 p.m. to Friday, April 10th, 2026, at 3:00 p.m

All other terms and conditions remain the same. End of Addendum 1