26246ITBMST_Landscape_and_Irrigation_Installation_Maintenance_and_Repair_Price_Sheet.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- 26246-ITB-MST
- Issued by
- Florida
About this file
This is a Price Sheet for an Invitation to Bid (ITB) issued by Hillsborough County Public Schools (HCPS) in Florida for Landscape and Irrigation Installation, Maintenance and Repair services. The solicitation seeks qualified contractors to provide comprehensive landscape and irrigation services including all labor, materials, supervision, equipment, and incidentals necessary to fulfill specifications. The price sheet establishes the framework for bidders to submit pricing for various landscape and irrigation-related tasks and services that will be performed across HCPS facilities.
The price sheet document functions as the pricing submission template where contractors detail costs for the identified scope of work items. This ITB allows HCPS to evaluate and compare bids from multiple qualified contractors based on pricing and technical capability to perform landscape maintenance, irrigation system installation, maintenance and repair services. Contractors submitting bids must complete the price sheet with itemized costs for all requested services to be considered for contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 26246-ITB-MST- Landscape and Irrigation Installation, Maintenance and Repair | ||||||
| Vendor Name: | ||||||
| Please complete the blue sections. No Hand Written Responses | ||||||
| DO NOT SAVE OR UPLOAD THIS DOCUMENT AS A PDF | ||||||
| Item | L # | Description | Estimated Quantity | Unit of Measure | Cost per Unit of Measure | |
| PART 1 - Irrigation Services | ||||||
| 1 | Irrigation Technician Standard Labor Rate: Includes all labor and required equipment. Monday-Friday 6:00 AM to 6:00 PM | 150 | Hour | $ - 0 | ||
| 2 | Irrigation Technician Non-Standard Labor Rate: Includes all labor and required equipment. Monday-Friday 6:00 PM to 6:00 AM Saturday/Sunday/Holidays | 24 | Hour | $ - 0 | ||
| 3 | General Laborer Standard Labor Rate: Includes all labor and required equipment. Monday-Friday 6:00 AM to 6:00 PM | 120 | Hour | $ - 0 | ||
| 4 | General Laborer Non-Standard Labor Rate: Includes all labor and required equipment. Monday-Friday 6:00 PM to 6:00 AM Saturday/Sunday/Holidays | 30 | Hour | $ - 0 | ||
| 5 | Lead Foreman / Control Technician Standard Labor Rate: Includes all labor and required equipment. Monday-Friday 6:00 AM to 6:00 PM | 32 | Hour | $ - 0 | ||
| 6 | Lead Foreman / Control Technician Non-Standard Labor Rate: Includes all labor and required equipment. Monday-Friday 6:00 PM to 6:00 AM Saturday/Sunday/Holidays | 16 | Hour | $ - 0 | ||
| 7 | Call Out Fee: Price to include 1 worker, 1 hour labor and up to forty dollars ($40) of materials. (Flat Rate Fee for quick small repairs) | |||||
| This fee is applied when the repair project is small and the unit bid amount or hourly fee will not cover the Vendor’s expenses and profit margin. This item shall not be invoiced for a work order in which any other item(s) are invoiced. | 4 | Each | $ - 0 | |||
| 8 | Irrigation Materials : Cost plus mark up based on vendors invoiced price. Cannot exceed 15%. Must submit suppliers invoice. | As Needed | % | |||
| PART 2 - Landscape Services | ||||||
| 9 | Demolition, clearing & rough grading (convert lawn to plant bed) | 26,000 | Square Foot | $ - 0 | ||
| 10 | Demolition & clearing & rough grading (existing plant bed) | 8,400 | Square Foot | $ - 0 | ||
| 11 | Provide and Install topsoil (screened) | 20 | Cubic Yard | $ - 0 | ||
| 12 | Provide and Perform Soil amendment (compost/peat/sand) | 20 | Cubic Yard | $ - 0 | ||
| 13 | Provide and Install Pinebark mulch (3" depth) | 60 | Cubic Yard | $ - 0 | ||
| 14 | Provide and Install Cypress mulch (3" depth) | 8 | Cubic Yard | $ - 0 | ||
| 15 | Provide and Install Red/Brown/Black mulch (3" depth) | 180 | Cubic Yard | $ - 0 | ||
| 16 | Provide and Install weed fabric / geotextile | 20,000 | Square Foot | $ - 0 | ||
| 17 | Provide and Install Plastic landscape edging | 1,000 | Linear Foot | $ - 0 | ||
| 18 | Provide and Install Metal/Aluminum landscape edging | 5,200 | Linear Foot | $ - 0 | ||
| 19 | Provide and Install Sod - Argentine Bahia | 12,000 | Square Foot | $ - 0 | ||
| 20 | Provide and Install Sod - St. Augustine Floratam | 1,200 | Square Foot | $ - 0 | ||
| 21 | Plant groundcover per Flat (labor only - delivery and install) | 36 | Each | $ - 0 | ||
| 22 | Install perennials - 3"-6" Pot (labor only - delivery and install) | 460 | Each | $ - 0 | ||
| 23 | Install shrubs - 1 Gal (labor only - delivery and install) | 520 | Each | $ - 0 | ||
| 24 | Install shrubs - 3 Gal (labor only - delivery and install) | 880 | Each | $ - 0 | ||
| 25 | Install shrubs - 5 Gal (labor only - delivery and install) | 420 | Each | $ - 0 | ||
| 26 | Install shrubs - 7 Gal (labor only - delivery and install) | 280 | Each | $ - 0 | ||
| 27 | Install shrubs - 15 Gal (labor only - delivery and install) | 45 | Each | $ - 0 | ||
| 28 | Install Tree - 15 Gallon (labor only - delivery and install) | 20 | Each | $ - 0 | ||
| 29 | Install Tree - 30 Gallon (labor only - delivery and install) | 15 | Each | $ - 0 | ||
| 30 | Install Tree - 45 Gallon (labor only - delivery and install) | 8 | Each | $ - 0 | ||
| 31 | Install Tree - 65 Gallon (labor only - delivery and install) | 4 | Each | $ - 0 | ||
| 32 | Palm procurement and delivery 8'-12' CT (labor only - delivery and install) | 16 | Each | $ - 0 | ||
| 33 | Provide and Install Watering bag (gator bag) (as needed) | 16 | Each | $ - 0 | ||
| 34 | Provide and Install Staking/bracing/guying (3-point system) (as needed) | 30 | Each | $ - 0 | ||
| 35 | 90 day Establishment Watering Lump Sum (Per Timer/Zone) (as needed) | 6 | Each | $ - 0 | ||
| 36 | Plant Materials : Cost plus mark up based on cost invoiced to vendor. Cannot exceed 15%. Must submit suppliers invoice. | |||||
| Invoices can NOT include any soil, mulch, landscape fabric, edging, water bags, staking materials (Items 11-20,32-34). | As Needed | % | ||||
| PART 3 - General Services | ||||||
| 37 | 2700160 | Mobilization / Demobilization | 6 | Each | $ - 0 | |
| 38 | Utility locating | 6 | Each | $ - 0 |