261109 RFQ Design Services Repair Replace Terminal and Garage Escalators and Elevators FINAL knf.pdf

PDF 358 KB Posted

Attached to
Repair and Replace Terminal and Garage Escalators and Elevators
Solicitation number
148219
Issued by
Marion County, Indiana

About this file

This is a Request for Qualifications (RFQ) issued by the Indianapolis Airport Authority (IAA) for professional engineering and design services related to the repair and replacement of terminal and garage escalators and elevators at Indianapolis International Airport (Project No. I-24-018). The project encompasses design services for hydraulic and traction elevators, escalators, and moving walks across multiple facilities including the Terminal, Parking Garage, Ground Transportation Center, connecting Pedestrian Bridge, and Concourses A and B, with a total of 17 elevators, 20 escalators, and 14 moving walks requiring attention. The RFQ was issued on November 10, 2026, with a deadline for questions by November 20, 2026, and Statement of Qualifications due by December 11, 2026, at 3:00 PM ET. A pre-SOQ submittal meeting is scheduled for November 18, 2026, at 1:00 PM at the Planning and Development Office in Indianapolis. Contract award is anticipated in February or March 2027. The contract term will be dictated by the project scope, with the selected firm expected to collaborate with a Construction Manager as Constructor (CMc) team throughout all phases of the project.

Professional services are anticipated to include survey work, utility evaluation, field investigation, design services across architectural, structural, and MEP disciplines, cost estimating, permitting support, and construction administration. Deliverables are expected to include schematic design documentation, design packages at 30%, 75%, and 90% completion stages with cost estimates, final plans and specifications, and bidding services. The project will be funded through IAA capital funds, with no federal disadvantaged business enterprise (DBE) set-aside established, as indicated by the 0% DBE goal. Respondents must demonstrate experience with CMc-driven projects, provide detailed resumes for project management and discipline leads, submit recent similar project examples with references, and address workforce development and economic development initiatives. Respondents must also comply with insurance requirements including worker's compensation, bodily injury and property damage liability of $5,000,000 to $10,000,000 depending on work location, comprehensive automobile liability, and professional liability of $2,000,000. SOQs are limited to 24 pages and must be submitted electronically via PlanetBids.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Professional Services

REPAIR AND REPLACE TERMINAL AND GARAGE ESCALATORS AND ELEVATORS

Due: December 11, 2026 Page 1 of 18

Request for Qualifications:

PROFESSIONAL SERVICES

for

REPAIR AND REPLACE TERMINAL AND GARAGE

ESCALATORS AND ELEVATORS

at

Indianapolis International Airport (Project No. I-24-018)

Issued:

November 10, 2026

Due:

December 11, 2026 No later than 3:00 PM ET

Due: December 11, 2026 Page 2 of 16

REQUEST FOR QUALIFICATIONS

PROFESSIONAL SERVICES

REPAIR AND REPLACE TERMINAL AND GARAGE

ESCALATORS AND ELEVATORS

at Indianapolis International Airport

TABLE OF CONTENTS

Description Section General Information 1 SOQ Procedures 2

Exhibits:

Project Scope and Deliverables Exhibit A Business Information Document Exhibit B Outstanding Disputes or E/O Claims Form Exhibit C Insurance Requirements Exhibit D Selection Committee Exhibit E

Due: December 11, 2026 Page 3 of 16

1 GENERAL INFORMATION

1.1 PROJECT DETAILS

The Indianapolis Airport Authority (IAA/OWNER) is seeking the professional services of a qualified firm, or team of firms, (RESPONDENT) to provide professional engineering and design services associated with the Project(s) listed below. The RESPONDENT is invited to submit a Statement of Qualifications (SOQ) relative to the Project(s) listed below per the requirements in Section 2.

Project(s):

Professional Design Services Repair and Replace Terminal and Garage Escalators and Elevators Indianapolis International Airport (Project No. I-24-018)

The above referenced Project will ultimately be delivered utilizing the provisions of IC 5- 32 Employment of Construction Managers as Constructors (CMc) for Projects. The RESPONDENT deemed the most qualified from this Request for Qualifications (RFQ) solicitation will be expected to collaborate with the selected CMc team during all phases of the project.

1.2 CONTRACT TERM

The contract term for professional services will be dictated by the scope of services as shown in Exhibit A.

1.3 INQUIRIES ABOUT THE RFQ

All inquiries and requests for information regarding this RFQ must be submitted via PlanetBids under the Q&A tab. Questions are due November 5, 2026 at 3:00 P.M. ET.

The solicitation management system will not allow late submissions.

Inquiries are not to be directed to any consultant or staff member of the OWNER. Such action may disqualify RESPONDENT from further consideration. The OWNER reserves the right to judge whether any questions should be answered. If responses are provided, the responses will be posted on the IAA's solicitation management system, PlanetBids (www.PlanetBids.com). If you are a registered vendor, you will receive automatic e-mail notifications. To register for PlanetBids, go to http://bit.ly/IAAPlanetBids.

1.4 TIMELINE

The following key dates illustrate the anticipated timeline for the Request for Qualifications

(RFQ).

ACTIVITY DATE (all times are ET) RFQ available November 10, 2026 Pre-SOQ submittal meeting November 18, 2026 – 1:00 PM Questions due November 20, 2026 – 3:00 PM http://www.planetbids.com/ http://bit.ly/IAAPlanetBids

Due: December 11, 2026 Page 4 of 16

Written responses to questions released November 24, 2026 SOQs due December 11, 2026 – 3:00 PM Interviews (if requested by the IAA) TBD – (Jan 2026) Contract award anticipated February/March 2027

LOCATION

The pre-SOQ submittal meeting will be held at the Auditorium of the Planning and Development Office located at 3747 S. High School Road, Indianapolis, IN 46241.

1.5 MODIFICATION OR WITHDRAWAL OF OFFERS

RESPONDENT may modify or withdraw their SOQ prior to the exact hour and date specified for receipt of the SOQs by contacting the OWNER via e-mail at PDAdmins@ind.com.

The RESPONDENT'S authorized representative may also withdraw the SOQ by notifying the Owner at PDAdmins@ind.com. SOQs may not be withdrawn after the SOQ due date and time has passed.

Modification to or withdrawal of a SOQ received by the OWNER after the exact hour and date specified for receipt of SOQs will render the SOQ void. If it becomes necessary to revise any part of this RFQ or if additional data is necessary for an exact interpretation of provisions of this RFQ prior to the due date for SOQs, an addendum will be issued by the OWNER. If such addendum(a) issuance is necessary, the OWNER reserves the right to extend the due date and time of the SOQs to accommodate such interpretations or additional data requirements.

1.6 RFQ COMPLIANCE

It is the responsibility of each RESPONDENT to thoroughly examine this RFQ to ensure their SOQ clearly and directly responds to the requirements listed in Section 2.

1.7 CONTRACT OBLIGATIONS AND RELATIONSHIPS BETWEEN RESPONDENTS

The OWNER expects to receive the highest level of professional services available, and thus encourages RESPONDENTs to jointly reply via the SOQ so as to avail the OWNER of the requisite professional services; however, the SOQ must clearly identify to the OWNER the "prime" (lead firm) and its relationship to all other team members, as well as the specific role(s) each team member is to perform. Business participation should be considered during the formation of the RESPONDENT's team (see Section 1.11 Business Participation). The OWNER also assumes careful consideration will be paid to not only which firm will be the "prime," but whom from the "prime" firm will be identified as the Project Manager.

Any subcontracts entered into by the RESPONDENT must be in compliance with all applicable State of Indiana statutes and be subject to the provisions thereof. For each portion of the proposed products and services to be provided by a subconsultant, the technical proposal must include the identification of the functions to be provided by the subconsultant and the subconsultant's related qualifications and experience.

mailto:PDAdmins@ind.com mailto:PDAdmins@ind.com

Due: December 11, 2026 Page 5 of 16

All subcontracts held by the RESPONDENT must be made available for inspection and examination by appropriate IAA officials and such relationships must meet with the approval of the OWNER.

1.8 CONFIDENTIAL INFORMATION

RESPONDENTS are advised materials contained in the SOQs are subject to the Indiana Public Records Act, IC 5-14-3 et seq., and, after the contract award, may be viewed and copied by any member of the public, including news media and competitors.

RESPONDENTS claiming a statutory exception to the Indiana Public Records Act shall identify confidential documents. Confidential documents shall not be shared with other persons or entities.

The OWNER reserves the right to make determinations of confidentiality. If the OWNER does not agree that the information designated is confidential under one of the disclosure exceptions to the Indiana Public Records Act, it may either reject the SOQ or discuss its interpretation of the allowable exceptions with the RESPONDENT. If agreement can be reached, the SOQ will be considered. If agreement cannot be reached, the OWNER will remove the SOQ from consideration for award and return the SOQ to the RESPONDENT.

1.9 CONTRACT DOCUMENTS

Any or all portions of this RFQ and normally any or all portions of the RESPONDENT's response may be incorporated by reference as part of the final Contract. Proprietary or confidential material submitted properly (see Section 1.8) will not be disclosed.

1.10 SOQ LIFE

All SOQs made in response to this RFQ must remain open and in effect for a period of not less than one hundred eighty (180) days after the due date for the SOQs. Any SOQ accepted by the OWNER for the purpose of contract negotiations shall remain valid until superseded by a contract or until rejected by the OWNER.

1.11 BUSINESS PARTICIPATION

The IAA encourages RESPONDENTs to consider community business partnerships, mentoring, and other meaningful opportunities as part of their submission.

The RESPONDENT shall identify in their SOQ all subconsultant utilization efforts the IAA should expect to see as part of this Project. This information should include the name(s) of anticipated subconsultant(s), subconsultants' area(s) of expertise and role(s) on this Project, and subconsultants’ percentage of participation on this Project. The IAA reserves the right to verify all of the SOQ’s information identified in Exhibit B ‘Business Information Document.’

RESPONDENTs will be evaluated on their ability to deliver public value. This includes meaningful workforce development efforts, economic development outcomes, and business participation strategies that support long-term community impact. Commitments should be measurable and relevant to the Project.

Due: December 11, 2026 Page 6 of 16

For questions, please contact the IAA Strategic Alliance Department via e-mail at business@ind.com.

The Indianapolis Airport Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4), 28 CFR § 50.3, and 49 CFR Part 21, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, all contractors will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of the owner’s race, color, national origin, sex, creed, age, or disability in consideration for an award.

1.12 CONE OF SILENCE

The IAA has established a cone of silence to be applied to all competitive procurement processes, including this RFQ. The cone of silence prohibits any communications regarding this RFQ between a potential RESPONDENT and their team member representatives (which includes vendors, service providers, bidders, proposers, lobbyists, and consultants) with the IAA's Selection Committee. Unless specifically provided otherwise, the cone of silence does not apply to oral communications at the Pre-SOQ submittal meeting. Any violation of the cone of silence will render the SOQ response void and, if awarded, the Contract.

1.13 DISCUSSION FORMAT

The OWNER reserves the right to conduct discussions, either oral or written, with RESPONDENTS the OWNER has determined to be reasonably viable of being selected for award.

The OWNER reserves the right to reject any or all SOQs received, or to award, without discussions or clarifications, a contract based on the initial SOQs received. The OWNER also reserves the right to conduct clarifications to resolve minor issues.

1.14 CONTRACT NEGOTIATIONS

After the recommendation of a selected RESPONDENT by the selection committee, contract negotiations may commence. As part of the contract negotiations, the selected RESPONDENT will be provided a copy of the OWNER'S standard Professional Services Contract and an IAA specific man-hour justification spreadsheet for use in fee preparations.

If, at any time, contract negotiations are judged ineffective by the OWNER, all activities with that RESPONDENT will cease and contract negotiations with the next highest qualified RESPONDENT will commence. This process may continue until either both the RESPONDENT and the OWNER execute a contract or the OWNER determines no acceptable alternative SOQ exists.

mailto:business@ind.com

Due: December 11, 2026 Page 7 of 16

2 SOQ PROCEDURES

2.1 SOQ SUBMITTAL

All SOQs shall be submitted electronically via PlanetBids. Any SOQ received after the SOQ Due Date and Time will not be considered for this Project. To submit your SOQ via PlanetBids, do the following:

o Download all RFQ documents o Acknowledged all addenda o Select Place Ebid (located at the bottom right) o Read each message and agree o Once the above is completed, RESPONDENT will be in the ebid form Complete all tabs as listed for the solicitation

• Please note: A legal submission requires all data to be transferred successfully from the RESPONDENT's server to the PlanetBids' server BEFORE time expires. If the solicitation closes during transfer, the SOQ will be rejected.

• When selecting Submit, the system will do validations to ensure RESPONDENT has completed all the information required for submission. If a pop-up notice is received, please read the notice carefully to ascertain what information is needed.

• RESPONDENT may delete and re-submit their SOQ, if needed prior to the submission deadline.

Click Save if warranted Click Submit to officially submit the SOQ to the IAA

For support: Click the red question mark (?) located at the top right corner for FAQs and to submit a support ticket.

2.2 SOQ FORMAT AND CRITERIA

All SOQs shall be standard letter-sized (8 1/2" x 11") sheets. A specific sheet limit requirement is outlined in Section 2.2. Covers, section tabs and the cover letter are excluded from the sheet limit requirements. Unnecessarily elaborate brochures or other presentations, beyond what is sufficient to present a complete and effective SOQ, are not desired. Fonts should be easily readable and be no smaller than 10 point.

All RESPONDENTS shall identify the contact person for each SOQ and include the contact information in their cover letter.

In order to facilitate the OWNER's reviews of the SOQs, the RESPONDENTS are strongly encouraged to follow the SOQ outline provided below and thus provide the information requested in an orderly fashion. Page limits are to be adhered to, but it is not required to provide the maximum pages per section; only those needed by the RESPONDENT to convey an effective response. The SOQ shall be limited to a total of 24 pages.

• Cover Letter (up to two pages, not included in page limit) (no points available)

Due: December 11, 2026 Page 8 of 16

• Organizational Chart & Areas of Responsibility: Explain the Organizational relationship of the Firm/Team, emphasizing the roles each individual/team member identified in the SOQ will fulfill for this Project, as well as the Team's experience working together in a CMc driven project. Identify the Principal-in- Charge for this project and key factors considered in forming the project team (no more than 6 pages) NOTE: The Organizational Chart and Areas of Responsibility should align (points available: 15)

• Project Management Team: The Owner expects ONE point of contact (POC) throughout the entire duration of the project. This POC is assumed to be the Team’s Project Manager. Provide detailed resumes for the Project Manager and the discipline leads whom will be assigned to this project. All resumes should emphasize their experience in representative CMc projects providing the professional services needed to successfully complete the role assigned to each individual/team member (no more than 6 pages) NOTE: The information included in the resumes should correspond to the individual's role (points available: Project Manager 30 – Discipline Leads 20)

• Recent Similar Experience, with References: Recent experience of the Firm/Team's STAFF on similar CMc projects clearly identifying each staff member's role on the Project. Include the following for each project: proposed staff and their role on the project, construction estimate and total project costs, project schedule, Construction Manager, owner and project references (Owner and Contractor) required. A summary of the Firm/Team’s philosophy regarding the management of project costs and quality through similar CMc driven projects shall also be included. (no more than 10 pages) (points available: 30)

• Workforce Development: A narrative explaining the RESPONDENT’s approach to workforce development during this Project. This should include any planned efforts to hire, train, and retain workers, support upskilling opportunities, and/or collaborate with workforce development agencies. In addition, any workforce development commitments and measurable results obtained on other projects should be included. The RESPONDENT should also highlight any mentoring, internship, or apprenticeship programs previously implemented. (no more than 1 page) (points available: 20)

• Economic Development: A narrative explaining the RESPONDENT’s proposed approach to supporting economic development through this Project. This should include any planned initiatives to engage businesses, create job opportunities, support small or emerging firms, and invest in the local economy. RESPONDENT should describe how their business practices, procurement strategies, or community partnerships contribute to sustained economic impact. Examples of economic development outcomes from past projects — including the use of suppliers and/or workforce investments should also be provided. (no more than 1 page) (points available: 20)

Due: December 11, 2026 Page 9 of 16

• Business Information Document: Fill-in and insert an Exhibit B to be included in the project. Business Information Document should be completed for prime RESPONDENT and all subcontractors. (not counted in page limit) (no points available/Exhibit B must be included for prime and all subconsultants)

• Outstanding Disputes or Errors and Omissions (E/O) Claims: Fill-in and insert an Exhibit C for each Firm within the Team in order to provide a brief explanation of any disputes or E/O claims they are currently involved. (not counted in page limit) (no points awarded/Exhibit C must be included)

• Ability to meet Insurance Requirements as listed in Exhibit D:

Acknowledge Team's ability to meet insurance requirements by inserting Exhibit D. Only Prime is required to provide Exhibit D. (not counted in page limit) (no points available/Exhibit D must be included)

2.3 SELECTION AND RECOMMENDATION

The IAA has selected a group of personnel to act as a SOQ selection committee. The selection committee will be comprised of members of the IAA Staff. As noted earlier, a cone of silence will prevail regarding contact with the selection committee, beginning upon release of this RFQ and terminating at contract execution. The members of the selection committee are identified in Exhibit E.

The selection will be based on the best overall SOQ as determined by the selection committee. All committee personnel will use the evaluation criteria stated above.

Following a review of the SOQs, the OWNER may conduct interviews; however, the OWNER reserves the right, at its sole and absolute discretion, to make a selection based solely upon the SOQs.

The RESPONDENT identified via their SOQ as being the most qualified to perform the professional services associated with the Project included within this RFQ will be contacted by the OWNER for further action, such as contract negotiations. If, however, the OWNER decides no SOQ is sufficiently advantageous to the OWNER, the OWNER may take whatever further action is deemed necessary to fulfill its needs.

If, for any reason, the RESPONDENT and OWNER cannot reach agreement nor execute a contract, OWNER may begin negotiations with the next highest qualified RESPONDENT or opt to re-issue the RFQ.

2.4 DISCLAIMER

Nothing contained in this RFQ constitutes an offer to the RESPONDENT(S). The OWNER reserves the right to reject any and all submissions. SOQs shall become property of the OWNER. RESPONDENTS shall not be compensated or reimbursed for costs incurred in preparing a response to this RFQ.

Due: December 11, 2026 Page 10 of 18

EXHIBIT A

PROJECT SCOPE AND DELIVERABLES

Project Name: Repair and Replace Terminal and Garage Escalators and

Elevators Indianapolis International Airport (Project No. I-24-018)

Background: The Indianapolis Airport Authority (Owner) is seeking a qualified firm, or team of firms, to provide professional design and construction administration services for the project.

The IAA has identified the need to embark on a program of upgrades, replacement and modernization of the conveyance infrastructure throughout multiple buildings including; the Terminal Parking Garage, Ground Transportation Center, connecting Pedestrian Bridge, Terminal and Concourses A & B. This infrastructure has been in place since the Midfield Terminal and the surrounding campus was built in the early 2000’s.

Scope: The scope of work will encompass hydraulic passenger and freight elevators, traction elevators, escalators, and moving walks, together with applicable architectural, structural and MEP modifications necessary to support the successful completion of the conveyance modernization. See the following breakdown of the intended program:

In addition to the conveyance scope, this project will incorporate select upgrades to the building infrastructure designed to mitigate moisture exposure for vertical transportation equipment located in outdoor areas.

Funding: The professional services and construction will be funded using IAA capital funds.

Schedule: A Professional Services Contract is anticipated to be awarded in the 1st quarter of 2027.

Business Participation: Pursuant to the Final Rule issued by USDOT on September 25, 2026, the following is the goal for this opportunity: 0%.

Terminal Ped Bridge GTC Concourse A Concourse B Garage Elevators 17 2 4 3 8 Escalators 9 4 1 4 Moving Walks 2 4 4 4

Due: December 11, 2026 Page 11 of 16

Anticipated Professional Services:

The general scope of professional services may consist of various type of consultant services which will be determined during project scoping. However, the services are aniticpated to include, but not be limited to:

• Survey

• Review of Record Information

• Utility Evaluation in close coordination with IAA

• Field Investigation

• Design including Architectural, Structural and MEP Services

• Coordination of Environmental Elements

• Sustainability Design/Coordination

• Collaboration with the CMc

• Detailed Cost Estimates

• Permitting Plan

• Attendance at Bi-weekly Design Meetings with the Owner/CMc

These services shall be provided in conjunction with the services of the CMc and additionally include:

• Guaranteed Maximum Price reconciliation

• Support for Contractor Outreach

• Bid Reviews and Recommendations for Award

• Change Management reviews

Construction Testing and Inspection services are not part of this RFQ.

Expected Deliverables:

Deliverables will be defined during project scoping and are aniticpated to include, but not limited to:

• Design Deliverables o 10% Schematic Design Documentation o 30% Design Documentation with planning level Cost Estimates o 75% Design Documentation for CMc Final Guaranteed Maximum Price

(GMP) with updated Cost Estimates for reconciliation of the GMP o 90% Design Documentation with detailed engineering Cost Estimates

• Final Plans, Specifications, and Request for Bid Packages (Multiple Packages anticipated dependent upon CMc Construction Delivery Schedule)

• Bidding Services including recommendations and/or GMP Reconciliation/reviews

• Construction Administration Services

• The OWNER will request a proposal for the full range of services necessary for the project but will retain the option to cancel, delay or defer phases subsequent to Schematic Design as it may determine in its singular discretion.

Due: December 11, 2026 Page 12 of 16

EXHIBIT B

BUSINESS INFORMATION DOCUMENT

This form must be completed and submitted with all bids, proposals, and SOQ’s, by the Prime and all subcontractors/subconsultants in accordance with 49 CFR 26.11 (c) Record Keeping Requirements – Bidders List.

Prime Firm Name:_________________________________________________________________

Please complete the following for the prime respondent and each subcontractors proposed for this project. Submit additional copies as needed.

Firm/Business Information ☐ Prime ☐ Subcontractor/Subconsultant

1. Firm/Subcontractor Name:_________________________________________________________

2. Firm Address (Street, City, State, Zip Code): ☐ HQ ☐ Indiana Office ☐ Both ☐ N/A

3. Firm Headquarters (HQ) Address (Street, City, State, Zip Code): ☐ Same as above (if HQ)

4. Firm Contact Name & Title:

5. Phone: ___________________________ Email: ________________________________________

6. Applicable NAICS Code(s). Include all that apply to scope of work for project:

7. Scope of Work to be performed on this project:

8. Age of Firm (Years in Operation): __________________________Years

9. Annual Gross Receipts (select one):

☐ < $500,000 ☐ $500,000 – $1M ☐ $1M – $2M ☐ $2M – $5M ☐ > $5M

Authorized Representative _____________________________________________(Signature)

Authorized Representative _______________________________________________(Printed)

Due: December 11, 2026 Page 13 of 16

EXHIBIT C

OUTSTANDING DISPUTES OR ERRORS AND OMISSIONS CLAIMS FORM

(To be filled out by each Firm)

Indianapolis International Airport Repair and Replace Terminal and Garage Escalators and Elevators

Project I-24-018

_________ Our Firm is not currently involved in any disputes or E/O claims (Initials)

– OR –

Provide an explanation of any disputes or E/O claims any member of the Firm is currently involved:

Company Explanation

Use additional sheets as needed

NAME:_________________________ SIGNATURE:_______________________

COMPANY: ____________________________________________________________

Due: December 11, 2026 Page 14 of 16

EXHIBIT D

INSURANCE REQUIREMENTS

(Prime Only)

1. Worker's Compensation Insurance. RESPONDENT shall file with Owner prior to the execution of the Contract, a certification that RESPONDENT carries Worker's Compensation Insurance as required by Indiana law.

2. Bodily Injury and Property Damage. RESPONDENT, prior to execution of the Contract, shall file with Owner copies of completed Certificates of Insurance, as evidence that RESPONDENT carries adequate insurance, satisfactory to Owner, to provide protection against all claims for damages to public or private property, and for bodily injury to persons arising out of and during the performance of the Contract, and to protect Owner's premises on or near the location on which construction operations are to be performed.

a. Bodily Injury and Property Damage Other Than Automobile. Unless otherwise specifically required by provisions in the proposal, the minimum limits of property damage and bodily injury liability covering each Contract shall be:

Indianapolis International Airport (IND) $5,000,000 per occurrence for work outside the Airport Operations Area (AOA) $10,000,000 per occurrence for work inside the Airport Operations Area (AOA) Reliever Facilities: Metropolitan (UMP), Indianapolis Regional (MQJ), Eagle Creek (EYE), Hendricks County (2R2) & Heliport (8A4) $3,000,000 per occurrence for work outside the Airport Operations Area (AOA) $5,000,000 per occurrence for work inside the Airport Operations Area (AOA)

b. Comprehensive Automobile Liability Insurance Includes coverage for any vehicle owned by the entity or used for the benefit of the operation on airport (including, but not limited to, all owned, non-owned, hired, licensed or unlicensed, vehicles or leased vehicles, and providing automatic coverage for newly acquired vehicle, covering Bodily Injury (including death) and Property Damage Liability with a combined single limit of not less than the limits set forth below:

Indianapolis International Airport (IND) $5,000,000 per occurrence for work outside the Airport Operations Area (AOA) $10,000,000 per occurrence for work inside the Airport Operations Area (AOA) Reliever Facilities: Metropolitan (UMP), Indianapolis Regional (MQJ), Eagle Creek (EYE), Hendricks County (2R2) & Heliport (8A4) $3,000,000 per occurrence for work outside the Airport Operations Area (AOA) $5,000,000 per occurrence for work inside the Airport Operations Area (AOA)

c. Umbrella or Excess Liability.

In lieu of the total limits of liability being provided under the primary Commercial

General Liability and Automobile Liability insurance, the entities or outside parties may provide the liability limit specified by means of a combination of primary and Umbrella/Excess Liability insurance. The Umbrella/Excess Liability coverage must be as broad as or broader than the primary insurance policies.

If Umbrella policies are utilized to meet any limits as prescribed above, all applicable Umbrella policies are required to be endorsed to meet the requirements of coverage

Due: December 11, 2026 Page 15 of 16 as outlined for Worker's Compensation, Automobile Liability, and Commercial General Liability.

d. Owner's Protective Liability. Where required as an incident to compliance with Federal laws and regulations, bodily injury and property damage protection shall be extended to Owner and Engineer and its agents.

e. Professional Liability. $2,000,000 limits.

3. Notice. RESPONDENT shall not cancel or reduce the coverage of any insurance required by this Section without providing thirty (30) day prior written notice to Owner.

RESPONDENT and its Insurer or its broker shall notify Owner immediately of any reduction by RESPONDENT. RESPONDENT shall cease operations on the occurrence of any such cancellation or reduction, and shall not resume operations until new insurance is in force.

4. Reports. At the request of Owner or its agent, RESPONDENT or his insurance carrier shall report claims received, inspections made, and disposition of claims.

NAME: ___________________________ SIGNATURE:________________________

COMPANY: ____________________________________________________________

Due: December 11, 2026 Page 16 of 16

EXHIBIT E

SELECTION COMMITTEE

- Keith Berlen – Senior Director, Operations & Public Safety

- Drew Genneken – Deputy Senior Director, Planning and Development

- Todd Cavender – Director, Environment and Sustainability

- Rebecca Fiscus – Director, Capital Program

Request for Qualifications:
PROFESSIONAL SERVICES
for
PROFESSIONAL SERVICES
Firm/Business Information ☐ Prime ☐ Subcontractor/Subconsultant

File details come from the government source that posted it. Updated .