2611 Drawings.pdf
PDF 6 MB Posted
- Solicitation number
- 2611
- Issued by
- Kenosha County, Kellnersville Village, Wisconsin
About this file
This is a bid set drawing document for the Kenosha County Detention Center (KCDC) Paving Rehabilitation Phase 3 project located at 4777 88th Avenue in Kenosha, Wisconsin. The project encompasses pavement and parking lot rehabilitation work organized into three construction stages. The drawings include a cover sheet, general notes, proposed overview map, stage-specific site plans for Stages 1, 2, and 3, and a proposed parking lot site plan. The project involves HMA pavement replacement with a 3-inch surface course and 2.5-inch binder course, concrete pavement removal and replacement, milling operations, aggregate base installation, and storm water pond modifications. The contractor must provide 72-hour notice before commencing work on each stage, maintain continuous construction once a stage begins, and ensure the Sally Port remains accessible via either entrance or exit. All erosion control measures require inspection at minimum weekly and within 24 hours after rainfall of 0.5 inches or more, with necessary repairs completed within 24 hours of inspection.
The contractor is responsible for conducting a field survey to verify existing drainage patterns, utility locations, and site conditions prior to construction. A proof roll using a fully-loaded three-axle dump truck is required after milling or pavement removal to identify soft spots and unsuitable materials requiring undercut removal. All structures within pavement limits must be adjusted, including manhole and inlet cover replacements with new adjustment rings. Asphalt and concrete mix designs require engineer approval prior to placement. The contractor must contact the Diggers Hotline to locate utilities and is responsible for protecting existing utilities during construction. For Stage 3 work, the contractor must provide temporary chain-link fencing for vehicle storage and allow the owner four days to relocate impounded vehicles after fence installation. Parking lot markings require yellow paint for stalls and white paint for no-parking cross-hatching. Pond modifications require stripping and stockpiling the first four inches of topsoil, which must be reused after excavation and prior to restoration work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vendor Responsibility Form Construction.pdf | ||
| 2611 Bid Documents.pdf | ||
| 2611 Specifications - Project Manual.pdf | ||
| 2611 Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
SHEET INDEX
SHEET
NUMBER SHEET TITLE
1 COVER SHEET
2 GENERAL NOTES
3 PROPOSED OVERVIEW MAP
4 PROPOSED SITE PLAN - STAGE 1
5 PROPOSED SITE PLAN - STAGE 2
6 PROPOSED SITE PLAN - STAGE 3
7 PROPOSED PARKING LOT - SITE PLAN
PROJECT LOCATION
KENOSHA COUNTY
GENERAL LOCATION MAP PROJECT LOCATION MAP
PROJECT AREA MAP
52ND ST (STH 158)
88TH
A
VE (C
TH
H
38TH ST (CTH S)KENOSHA COUNTY
DETENTION CENTER
KENOSHA COUNTY
DETENTION CENTER
(KCDC)
KENOSHA REGIONAL
AIRPORT
DATE REVISION
PROJECT No.
DRAWING No.
P R O J E C T
T I T L E
D R A W I N G
T I T L E
K E
N O
S H
A C
O U
N
TY
D E
TE
N
TI
O
N C
E N
TE
R
K
C D
C
P A
V
IN
G R
E H
A B
IL
IT
A
TI
O N
P H
A S
E
K04525004
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING.
"BID SET"
C O
V E
R S
H E
E T
DESIGNED BY: AJA
DRAWN BY: AJA
CHECKED BY: BWM
DATE CHECKED: 4/14/26
T H
S T R E E T
T H
F L O O R
K E N O S H A
W I
P H O N E w w c l a r k d i e t z c o m
DWG 1 OF 7 DWGS
4/14/26 BID SET
G E
N E
R A
L N
O
TE
S
DESIGNED BY: AJA
DRAWN BY: AJA
T H
S T R E E T
T H
F L O O R
K E N O S H A
W I
P H O N E w c l a r k d i e t z c o m
DWG 2 OF 7 DWGS
DATE REVISION
PROJECT No.
DRAWING No.
P R O J E C T
T I T L E
D R A W I N G
T I T L E
K E
N O
S H
A C
O U
N
TY
D E
TE
N
TI
O
N C
E N
TE
R
K
C D
C
P A
V
IN
G R
E H
A B
IL
IT
A
TI
O N
P H
A S
E
K04525004
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING.
"BID SET"
AC
ANTENNA
CATTLE
PASS
DS
LIFT
STATION
MB
PK
PUMP
N__T
R__E__ __
RISER
_T _ N
_ E_ R
SEPTIC
TANK
SEPTIC
VENT
TANK
W
VENT
W
WC
W
W
W
CO
G
G
GR
CTV
T
T
T
E
E
E
E
XF
SPRINKLER CONTROL BOX
YARD LIGHT
TRANSFORMER BOX
STREET LIGHT
POWER POLE W/TRANSFORMER & LIGHT
POWER POLE W/TRANSFORMER
POWER POLE WITH LIGHT
POWER POLE
PARKING LOT LIGHT SINGLE
PARKING LOT LIGHT DOUBLE
ORNAMENTAL STREET LIGHT
HANDHOLE
FLOOD LIGHT
ELECTRIC PEDESTAL
ELECTRIC MANHOLE
ELECTRIC METER
ELECTRIC BOX
WATER VALVE
WATER MANHOLE
WATER METER
WELL
WATER SERVICE BOX
FLUSH OUT HYDRANT
FIRE HYDRANT
TELEPHONE PEDESTAL PAY PHONE
TELEPHONE PEDESTAL
TELEPHONE MANHOLE
TELEPHONE POLE
TELEPHONE BOOTH
TELEPHONE BOX
SATELLITE DISH
CABLE TV PEDESTAL
SECTION CORNER
RIGHT-OF-WAY MARKER
QUARTER CORNER
TRAVERSE POINT
PK NAIL
MONUMENT
DATA COLLECTION POINT
CHISLED X
BENCHMARK
STORM MANHOLE
INLET AT CURB
END SECTION CONCRETE
DOWNSPOUT
CATCH BASIN SQUARE
CATCH BASIN
END SECTION METAL
SEPTIC TANK VENT
SEPTIC TANK
SANITARY MANHOLE
LIFT STATION
CLEANOUT
RAILROAD CROSSBUCK
RAILROAD CROSSING GATE
RAILROAD FLASHING SIGNAL
REFLECTIVE PAVEMENT MARKER 2 WAY
REFLECTIVE PAVEMENT MARKER 1 WAY
GAS VENT PIPE
GAS VALVE
GAS REGULATOR
GAS METER
GAS SERVICE BOX
SPRINKLER HEAD
DRAINAGE MARKER
DELINEATOR
CATTLE PASS
BOLLARD
ANTENNA
AIR CONDITIONER
SOIL BORING
CORES IN PAVEMENT
TRAFFIC SIGNAL PED. PUSH BUTTON
TRAFFIC SIGNAL PED. SIGNAL HEAD
TRAFFIC SIGNAL POST 3 WAY
TRAFFIC SIGNAL POST 2 WAYTRAFFIC SIGNAL POST 1 WAY
TRAFFIC SIGNAL MAST ARM
STRAIN POLE
JUNCTION BOX
VENT PIPE
VALVE UNKNOWN
UTILITY WARNING SIGN
UTILITY RISER AT POLE
PUMP
MANHOLE
METER UNKNOWN
INSPECTION WELL
STUMP
DECIDUOUS TREE
CONIFEROUS TREE
BUSH
TRAFFIC SIGN
STREET SIGN
PRIVATE SIGN POST
WITNESS CORNER
SET PK NAIL
SET #10 REBAR
SET 3/4" REBAR
FOUND/SET SECTION CORNER
FOUND/PLACE CHIS "X"
FOUND SPIKE
FOUND PK NAIL
FOUND MISC
FOUND MISC
FOUND RR SPIKE
FOUND 2' IP
FOUND 1/4" IR
FOUND 3/4" REBAR
IRON PIN FOUND
GATE POST
TANK
POST OR MISC. POLE
PARKING METER
PILLAR
PARKING BLOCK
MAILBOX
GUY WIRE
FLAG POLE
SYMBOL LEGEND
TRAFFIC SIGNAL CONTROLLER
GAS TANK FILLER CAP
GUY POLE
SPIGOT WATER SPIGOT
CABLE TV (FIBER OPTIC) LINE
CABLE TV LINE
BREAK
PROPOSED ACCESS CONTROL
EXISTING ACCESS CONTROL
PROPERTY LINE
PM CROSSWALK
PERMANENT EASEMENT
SANITARY LATERAL
KEYWAY
HEDGE LINE
HEATED WATER
PROPOSED HAND RAIL
EXISTING HAND RAIL
PROPOSED GUARD RAIL
EXISTING GUARD RAIL
GAS (SIZE)
EXISTING FLOW LINE
FIBER OPTIC LINE
FENCE
OVERHEAD ELECTRIC LINE
ELECTRIC CONDUIT
DITCH RIGHT (PROFILE)
DITCH LEFT (PROFILE)
COMMUNICATION LINE
OVERHEAD CABLE TV LINE
AC
AC
CATV
CATV(FO)
OHCATV
COM
OHE
UGE
X X X
FO
G 12''
HW
LAT LAT LAT
REVERSE SLOPE
REMOVAL - 2
REMOVAL - 1
RAW WATER LINE (SIZE)
RAIL ROAD TRACKS
WATER IRRIGATION LINE
WATER LINE (SIZE)
UNDERDRAIN LINE
TREE LINE
PROPOSED TOP/BOTTOM OF SLOPE
EXISTING TOP/BOTTOM OF SLOPE
TEMPORARY TREE EASEMENT
TEMPORARY CONSTRUCTION EASEMENT - 2
TEMPORARY CONSTRUCTION EASEMENT - 1
UNDERGROUND TELEPHONE
OVERHEAD TELEPHONE
UNDERGROUND TELEPHONE (FIBER OPTIC)
OVERHEAD TELEPHONE (FIBER OPTIC)
STORM EXISTING
STAGE CONSTRUCTION JOINT
SILT FENCE
DWG PILING
SECTION LINE
SANITARY PIPE
SANITARY FORCE MAIN
RW 24''
X X X X X X X X X X X X X X X X X X X X X X X X X X X X
OHT(FO)
UGT(FO)
OHT
UGT
W 10''
IRRW
UNDERGROUND ELECTRIC LINE
PROPOSED RIGHT-OF-WAY
EXISTING RIGHT-OF-WAY
STORM PROPOSED
COMBINATION SEWER PIPE
UTILITIES
Know what'sbelow.
before you dig.Call
R
DIGGER'S HOTLINE
(800) 242-8511 (TOLL FREE)
KENOSHA COUNTY
MATT STURINO
DIRECTOR
DIV. OF FACILITIES MAINTENANCE
19600 75TH STREET
BRISTOL, WI 53104
(262) 653-2548 OFFICE
CLARK DIETZ, INC.
BEN METZLER, P.E.
625 57TH STREET, 6TH FLOOR
KENOSHA, WI 53140
(262) 650-1550
WE ENERGIES - ELECTRIC
JASON CHAPIN
(920) 621-6903
JASON.CHAPIN@WE-ENERGIES.COM
WE ENERGIES - GAS
CHRIS DEGRAVE
500 SOUTH 116TH STREET
WEST ALLIS, WI 53214
(262) 886-7018
CHRIS.DEGRAVE@WE-ENERGIES.COM
AT&T
MICHAEL VANBOVEN
411 7TH STREET
RACINE, WI 53403
(262) 636-0514
MV3658@ATT.COM
SPECTRUM / CHARTER COMMUNICATIONS
PETE KRUZELA
(414) 908-1339
PETE.KRUZELA@CHARTER.COM
ABBREVIATIONS
AGG. AGGREGATE
BC, BOC, B/C BACK OF CURB
CL, C/L CENTER LINE
EP, EOP, E/P EDGE OF PAVEMENT
FL, F/L FLOW LINE
R/L REFERENCE LINE
RP RADIUS POINT
RW, R/W, ROW RIGHT-OF-WAY
NML NORMAL
EB EAST BOUND
WB WEST BOUND
SPCL SPECIAL
1. A FIELD VISIT WAS CONDUCTED BY THE ENGINEER (CLARK DIETZ, INC.) ON AUGUST 2024 TO VISUALLY INSPECT THE EXISTING SITE CONDITIONS FOR THE MILL AND OVERLAY PARTS OF THE PROJECT. A TOPOGRAPHIC SURVEY OF THE PROPOSED PARKING LOT AREA AND POND MODIFICATIONS WAS COMPLETED IN MARCH 2026.
THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING A SURVEY TO LOCATE AND RECORD THE EXACT POSITION, ELEVATION, AND RELEVANT DETAILS OF THE EXISTING DRAINAGE PATTERNS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES. THIS SURVEY INFORMATION MUST BE VERIFIED AND INCLUDED IN THE CONSTRUCTION RECORDS. ANY DISCREPANCIES OR ISSUES IDENTIFIED SHOULD BE REPORTED TO THE ENGINEER IMMEDIATELY.
2. ALL EROSION CONTROL MEASURES AND STRUCTURES SERVING THE SITE MUST BE INSPECTED BY THE CONTRACTOR AT LEAST WEEKLY AND WITHIN 24 HOURS AFTER A RAINFALL OF 1/2-INCH OR MORE. ANY NECESSARY MAINTENANCE, INCLUDING REPAIRS OR ADJUSTMENTS, SHALL BE COMPLETED WITHIN 24 HOURS OF
INSPECTION.
3. ALL DISTURBED AREAS WITHIN THE PROJECT AREA SHALL BE RESTORED TO A CONDITION SIMILAR TO THAT OF THE SURROUNDING UNDISTURBED AREAS, INCLUDING VEGETATION, GRADING, AND SURFACE TREATMENTS.
4. ALL CONCRETE AND ASPHALT SCHEDULED FOR REMOVAL SHALL BE SAW CUT AT THE REMOVAL LIMITS TO MINIMIZE DAMAGE TO ADJACENT SURFACES. ASPHALT PAVEMENT REMOVAL SHALL INCLUDE BUTT-JOINTS AT LOCATIONS WHERE THE NEW PAVEMENT IS TO MATCH THE EXISTING PAVEMENT.
5. SUBMIT ASPHALT AND CONCRETE MIX DESIGN INFORMATION FOR APPROVAL PRIOR TO PLACING ANY PAVEMENT.
6. EXISTING UTILITIES ARE NOT SHOWN IN THE PLANS. CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING CONSTRUCTION. CONTRACTOR SHALL CONTACT DIGGERS HOTLINE FOR UTILITY LOCATES AND SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATIONS OF THE UTILITY MAINS AND SERVICES DURING
CONSTRUCTION.
7. WHEN PROPOSED WORK IS SHOWN FOR WHICH NO PAY ITEM IS PROVIDED, SAID WORK SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT.
GENERAL NOTES
1. CONTRACTOR TO GIVE A MINIMUM OF 72 HOUR NOTICE TO THE
OWNER BEFORE WORK BEGINS FOR EACH STAGE.
2. THE SALLY PORT MUST BE ACCESSIBLE AT ALL TIMES BY EITHER
THE ENTRANCE OR EXIT.
3. ONCE CONSTRUCTION BEGINS ON A STAGE, THE WORK MUST BE
CONTINUOUS UNTIL THE WORK IS COMPLETE. A STAGE MUST BE
COMPLETED BEFORE THE NEXT STAGE MAY BEGIN.
SEQUENCE OF CONSTRUCTION
DATE REVISION
PROJECT No.
DRAWING No.
P R O J E C T
T I T L E
D R A W I N G
T I T L E
K E
N O
S H
A C
O U
N
TY
D E
TE
N
TI
O
N C
E N
TE
R
K
C D
C
P A
V
IN
G R
E H
A B
IL
IT
A
TI
O N
P H
A S
E
K04525004
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING.
"BID SET"
P R
O P
O S
E D
O V
E R
V
IE
W M
A P
DESIGNED BY: AJA
DRAWN BY: AJA
T H
S T R E E T
T H
F L O O R
K E N O S H A
W I
P H O N E w c l a r k d i e t z c o m
DWG 3 OF 7 DWGS
120'0' 60'
VISITATION LOT NORTH
VISITATION LOT SOUTH
ADMINISTRATION
LOT
HUBER LOT
SALLY PORT DRIVE
LOOP DRIVE (NORTH)
LOOP DRIVE (SOUTH)
EVIDENCE YARD
LOADING DOCKS
EMPLOYEE LOT
LEGEND
STAGE 3
STAGE 2
STAGE 1
PROPOSED PARKING LOT
STORM WATER POND
PROPOSED PARKING LOT
685 68
68568
069069
690 690 69
0 69
69069
DATE REVISION
PROJECT No.
DRAWING No.
P R O J E C T
T I T L E
D R A W I N G
T I T L E
K E
N O
S H
A C
O U
N
TY
D E
TE
N
TI
O
N C
E N
TE
R
K
C D
C
P A
V
IN
G R
E H
A B
IL
IT
A
TI
O N
P H
A S
E
K04525004
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING.
"BID SET"
P R
O P
O S
E D
S
IT
E P
LA
N
S
TA
G
E
DESIGNED BY: AJA
DRAWN BY: AJA
T H
S T R E E T
T H
F L O O R
K E N O S H A
W I
P H O N E w c l a r k d i e t z c o m
DWG 4 OF 7 DWGS
LEGEND SUMMARY OF QUANTITIES SHEET NOTES
PULVERIZE ASPHALTIC SURFACE
HMA PAVEMENT, 3 LT 58-28 S (2.5", BINDER COURSE)
HMA PAVEMENT, 5 LT 58-28 S (1.5", SURFACE COURSE)
1. CONTRACTOR SHALL MAKE NOTE OF EXISTING JOINT PATTERNS PRIOR TO THE REMOVAL OF CONCRETE
PAVEMENT AND SHALL MATCH IT AS CLOSELY AS PRACTICABLE IN PROPOSED PAVEMENT.
2. INSTALL 1-INCH PREFORMED EXPANSION JOINTS AT LOCATIONS WHERE CONCRETE IS INSTALLED
ADJACENT TO BUILDINGS OR CURB.
3. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND LABOR NECESSARY TO PERFORM A PROOF ROLL
OF THE AGGREGATE BASE / SUB-GRADE (TO REMAIN) AFTER MILLING OR PAVEMENT REMOVAL
OPERATIONS. USE A FULLY-LOADED THREE-AXLE DUMP TRUCK TO CHECK FOR SURFACE STABILITY AND IDENTIFY ANY SOFT SPOTS OR AREAS REQUIRING ADDITIONAL COMPACTION OR REMOVAL OF UNSUITABLE MATERIALS (UNDERCUTS). ALL WORK ASSOCIATED WITH UNDERCUTS WILL BE MEASURED AND PAID FOR IN
ACCORDING WITH 01 29 76 - PAYMENT PROCEDURES, LOCATED IN THE PROJECT MANUAL.
4. ALL STRUCTURES WITHIN PAVEMENT LIMITS SHALL BE ADJUSTED. MANHOLE AND INLET COVER ADJUSTMENTS SHALL INCLUDE THE REPLACEMENT OF ALL ADJUSTMENTS RINGS. CONTRACTOR TO VERIFY
SIZE AND SHAPE OF THE RINGS REQUIRED TO PERFORM THE WORK.
5. CONTRACTOR SHALL GRADE THE PROPOSED PAVEMENT TO ENSURE POSITIVE DRAINAGE WITHIN THE
LIMITS OF THE PROJECT SITE.
WISDOT ITEM - 646.6105 MARKING STOP LINE PAINT 18-INCHS
100'0' 50'
S
HMA PAVEMENT, 5 LT 58-28 S (3", SURFACE COURSE)
REMOVING CONCRETE PAVEMENT (FULL DEPTH)
CONCRETE PAVEMENT (7")
SHOWN ELSEWHERE IN PLANS
PAVEMENT REPLACEMENT FROM A DIFFERENT STAGE
REMOVING CONCRETE SURFACE MILLING (3")
68568
5690690
069069
690 690 69
0 69
26'
12'
LEGEND
SUMMARY OF QUANTITIES
PROJECT No.
DRAWING No.
P R O J E C T
T I T L E
D R A W I N G
T I T L E
K E
N O
S H
A C
O U
N
TY
D E
TE
N
TI
O
N C
E N
TE
R
K
C D
C
P A
V
IN
G R
E H
A B
IL
IT
A
TI
O N
P H
A S
E
K04525004
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING.
"BID SET"
P R
O P
O S
E D
S
IT
E P
LA
N
S
TA
G
E
DESIGNED BY: AJA
DRAWN BY: AJA
T H
S T R E E T
T H
F L O O R
K E N O S H A
W I
P H O N E w c l a r k d i e t z c o m
DWG 5 OF 7 DWGS
SHEET NOTES
1. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND LABOR NECESSARY TO PERFORM A PROOF ROLL
OF THE AGGREGATE BASE / SUB-GRADE (TO REMAIN) AFTER MILLING OR PAVEMENT REMOVAL
OPERATIONS. USE A FULLY-LOADED THREE-AXLE DUMP TRUCK TO CHECK FOR SURFACE STABILITY AND IDENTIFY ANY SOFT SPOTS OR AREAS REQUIRING ADDITIONAL COMPACTION OR REMOVAL OF UNSUITABLE MATERIALS (UNDERCUTS). ALL WORK ASSOCIATED WITH UNDERCUTS WILL BE MEASURED AND PAID FOR IN
ACCORDING WITH 01 29 76 - PAYMENT PROCEDURES, LOCATED IN THE PROJECT MANUAL.
2. ALL STRUCTURES WITHIN PAVEMENT LIMITS SHALL BE ADJUSTED. MANHOLE AND INLET COVER ADJUSTMENTS SHALL INCLUDE THE REPLACEMENT OF ALL ADJUSTMENTS RINGS. CONTRACTOR TO VERIFY
SIZE AND SHAPE OF THE RINGS REQUIRED TO PERFORM THE WORK.
3. CONTRACTOR SHALL GRADE THE PROPOSED PAVEMENT TO ENSURE POSITIVE DRAINAGE WITHIN THE
LIMITS OF THE PROJECT SITE.
WISDOT ITEM - 646.6105 MARKING STOP LINE PAINT 18-INCHS
100'0' 50'
2 FT WIDE GRAVEL SHOULDERG
S
G
BASE AGGREGATE DENSE 1 1/4-INCH (12")
HMA PAVEMENT, 5 LT 58-28 S (1.5", SURFACE COURSE)
COMMON EXCAVATION (12")
HMA PAVEMENT, 3 LT 58-28 S (2.5", BINDER COURSE)
SHOWN ELSEWHERE IN PLANS
PAVEMENT REPLACEMENT FROM A DIFFERENT STAGE
PULVERIZE ASPHALTIC SURFACE
HMA PAVEMENT, 3 LT 58-28 S (2.5", BINDER COURSE)
HMA PAVEMENT, 5 LT 58-28 S (1.5", SURFACE COURSE)
68568
X
X X
X X
X X
X X
XXXXX
X X
X X
X X
X
X
X X
X X
X X
X X
X X
XXXXXX
X X
X X
X X
X X
X X
LEGEND
SUMMARY OF QUANTITIES
PROJECT No.
DRAWING No.
P R O J E C T
T I T L E
D R A W I N G
T I T L E
K E
N O
S H
A C
O U
N
TY
D E
TE
N
TI
O
N C
E N
TE
R
K
C D
C
P A
V
IN
G R
E H
A B
IL
IT
A
TI
O N
P H
A S
E
K04525004
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING.
"BID SET"
P R
O P
O S
E D
S
IT
E P
LA
N
S
TA
G
E
DESIGNED BY: AJA
DRAWN BY: AJA
T H
S T R E E T
T H
F L O O R
K E N O S H A
W I
P H O N E w c l a r k d i e t z c o m
DWG 6 OF 7 DWGS
40'0' 20'
SHEET NOTES
HMA PAVEMENT, 3 LT 58-28 S (2.5", BINDER COURSE)
HMA PAVEMENT, 5 LT 58-28 S (1.5", SURFACE COURSE)
1. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND LABOR NECESSARY TO PERFORM A PROOF ROLL
OF THE AGGREGATE BASE / SUB-GRADE (TO REMAIN) AFTER MILLING OR PAVEMENT REMOVAL
OPERATIONS. USE A FULLY-LOADED THREE-AXLE DUMP TRUCK TO CHECK FOR SURFACE STABILITY AND IDENTIFY ANY SOFT SPOTS OR AREAS REQUIRING ADDITIONAL COMPACTION OR REMOVAL OF UNSUITABLE MATERIALS (UNDERCUTS). ALL WORK ASSOCIATED WITH UNDERCUTS WILL BE MEASURED AND PAID FOR IN
ACCORDING WITH 01 29 76 - PAYMENT PROCEDURES, LOCATED IN THE PROJECT MANUAL.
2. ALL STRUCTURES WITHIN PAVEMENT LIMITS SHALL BE ADJUSTED. MANHOLE AND INLET COVER ADJUSTMENTS SHALL INCLUDE THE REPLACEMENT OF ALL ADJUSTMENTS RINGS. CONTRACTOR TO VERIFY
SIZE AND SHAPE OF THE RINGS REQUIRED TO PERFORM THE WORK.
3. CONTRACTOR SHALL GRADE THE PROPOSED PAVEMENT TO ENSURE POSITIVE DRAINAGE WITHIN THE
LIMITS OF THE PROJECT SITE.
4. CONTRACTOR TO PROVIDE TEMPORARY CHAIN LINK FENCE ONSITE AT A LOCATION APPROVED BY THE OWNER FOR TEMPORARY STORAGE OF IMPOUNDED VEHICLES. CONTRACTOR SHALL GIVE OWNER 4 DAYS
TO RELOCATE THE VEHICLES ONCE THE TEMPORARY FENCE IS INSTALLED.
REMOVE, SALVAGE, AND REINSTALL EXISTING FENCE, ADDITIONAL NEW FENCE PANELS REQUIRED F
BASE AGGREGATE DENSE 1 1/4-INCH (12")
HMA PAVEMENT, 5 LT 58-28 S (1.5", SURFACE COURSE)
COMMON EXCAVATION (12")
HMA PAVEMENT, 3 LT 58-28 S (2.5", BINDER COURSE)
SHOWN ELSEWHERE IN PLANS
PAVEMENT REPLACEMENT FROM A DIFFERENT STAGE
HMA PAVEMENT, 3 LT 58-28 S (2.5", BINDER COURSE)
HMA PAVEMENT, 5 LT 58-28 S (1.5", SURFACE COURSE)
F
PULVERIZE ASPHALTIC SURFACE
RELOCATE EXISTING GATE
PAVEMENT MARKINGS
FOR DESIGNATED
CLEAR AREA
WISDOT ITEM - 646.1005 MARKING LINE PAINT 4-INCH - WHITEW
W
8.0
7.6
8.3
689.20
8.3
7.6
7.9
687.67
0.0
687.40
687.65
91'
20'
9'
2'
8'
20'
PROJECT No.
DRAWING No.
P R O J E C T
T I T L E
D R A W I N G
T I T L E
K E
N O
S H
A C
O U
N
TY
D E
TE
N
TI
O
N C
E N
TE
R
K
C D
C
P A
V
IN
G R
E H
A B
IL
IT
A
TI
O N
P H
A S
E
K04525004
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING.
"BID SET"
P R
O P
O S
E D
P A
R K
IN
G
L O
T
S
IT
E P
LA
N
DESIGNED BY: AJA
DRAWN BY: AJA
T H
S T R E E T
T H
F L O O R
K E N O S H A
W I
P H O N E w c l a r k d i e t z c o m
DWG 7 OF 7 DWGS
LEGEND SUMMARY OF QUANTITIES SHEET NOTES
1. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND LABOR NECESSARY TO PERFORM A PROOF ROLL
OF THE AGGREGATE BASE / SUB-GRADE (TO REMAIN) AFTER MILLING OR PAVEMENT REMOVAL
OPERATIONS. USE A FULLY-LOADED THREE-AXLE DUMP TRUCK TO CHECK FOR SURFACE STABILITY AND IDENTIFY ANY SOFT SPOTS OR AREAS REQUIRING ADDITIONAL COMPACTION OR REMOVAL OF UNSUITABLE MATERIALS (UNDERCUTS). ALL WORK ASSOCIATED WITH UNDERCUTS WILL BE MEASURED AND PAID FOR IN
ACCORDING WITH 01 29 76 - PAYMENT PROCEDURES, LOCATED IN THE PROJECT MANUAL.
2. ALL STRUCTURES WITHIN PAVEMENT LIMITS SHALL BE ADJUSTED. MANHOLE AND INLET COVER ADJUSTMENTS SHALL INCLUDE THE REPLACEMENT OF ALL ADJUSTMENTS RINGS. CONTRACTOR TO VERIFY
SIZE AND SHAPE OF THE RINGS REQUIRED TO PERFORM THE WORK.
3. CONTRACTOR SHALL GRADE THE PROPOSED PAVEMENT TO ENSURE POSITIVE DRAINAGE WITHIN THE
LIMITS OF THE PROJECT SITE.
4. PAVEMENT MARKINGS FOR PARKING STALLS SHALL BE YELLOW. PAVEMENT MARKINGS FOR CROSS
HATCHING FOR NO PARKING SHALL BE WHITE.
5. WHILE PERFORMING POND MODIFICATIONS, THE FIRST 4" OF TOPSOIL SHALL BE STRIPPED AND STOCKPILED PRIOR TO EXCAVATING MATERIAL OFF SITE. ONCE EXCVATION IS COMPLETE, TOPSOIL SHALL
BE REUSED PRIOR TO RESTORATION WORK.
W
Y
BASE AGGREGATE DENSE 1 1/4-INCH (12")
HMA PAVEMENT, 5 LT 58-28 S (1.5", SURFACE COURSE)
COMMON EXCAVATION (12")
HMA PAVEMENT, 3 LT 58-28 S (2.5", BINDER COURSE)
SHOWN ELSEWHERE IN PLANS
PAVEMENT REPLACEMENT FROM A DIFFERENT STAGE
WISDOT ITEM - 646.1005 MARKING LINE PAINT 4-INCH - WHITE
WISDOT ITEM - 646.1005 MARKING LINE PAINT 4-INCH - YELLOW
Y
W
REMOVE MATERIAL TO
CREATE AN ADDITIONAL
60CY OF STORAGE
AND RESTORE
20'0' 10'
40'0' 20'
| Sheets and Views |
| 1 COVER SHEET |
| 2 GENERAL NOTES |
| 3 PROPOSED OVERVIEW MAP |
| 4 PROPOSED SITE PLAN - STAGE 1 |
| 5 PROPOSED SITE PLAN - STAGE 2 |
| 6 PROPOSED SITE PLAN - STAGE 3 |
| 7 PROPOSED PARKING LOT - SITE PLAN |
File details come from the government source that posted it. Updated .