This is a final specifications and contract document issued by the Macon Water Authority in Georgia for the Amerson Water Treatment Plant Generator Fueling System Replacement project. The project involves replacing the existing underground fuel oil system with a new above-ground system. Sealed bids will be received until 2:00 P.M. local time on August 11, 2026, at the Macon Water Authority offices located at 537 Hemlock Street, Human Resources Training Room, Macon, Georgia 31201. A mandatory pre-bid meeting will be held on July 28, 2026, at 10:00 A.M. at the Amerson Water Treatment Plant, 703 Riverbend Drive, Macon, Georgia 31211, in the second floor conference room. All bid questions must be submitted by 10:00 A.M. on August 04, 2026. The contract will be awarded on a lump sum basis to a single contractor, with the successful bidder required to self-perform a minimum of 51 percent of the work. The contractor must complete all work within one year (365 consecutive calendar days) from the date specified in the Notice to Proceed, with liquidated damages assessed at $250.00 per calendar day for unexcused delays in achieving substantial completion.
Bidders must submit a bid bond in the amount of 5 percent of the bid and must hold a valid Georgia Utility Contractor License, which must be affixed to the outside of the sealed bid envelope. The contract documents, including drawings and specifications covering divisions 01 through 46, are available for purchase at ARC Document Solutions for a non-refundable fee of $150.00 per set. The successful contractor will be required to furnish performance and payment bonds, each in the amount of 100 percent of the contract price. A minimum of 10 percent of the contract price must be subcontracted to Disadvantaged Business Enterprises (DBE), and bidders must demonstrate good faith efforts to achieve this goal. Contract documents must be purchased to be eligible to bid, and bidders must comply with federal work authorization requirements through the E-Verify program, equal employment opportunity requirements, and all applicable federal, state, and local laws and regulations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MACON WATER AUTHORITY
CONTRACT FOR
Amerson Water Treatment Plant Generator Fueling System Replacement
Issue for Construction June 1, 2026
Designed by
PROPRIETARY NOTICE
This document is prepared by the Macon Water Authority for the sole purpose of communicating to our vendors. The proprietary information contained herein is based on the requirements of the project. None of the information in this document is to be shared with any third parties without the expressed written consent of the Macon Water Authority.
MWA Amerson Water Treatment Plant Generator Fueling System Replacement
CN #10709-100
Division Section Title
00020 Invitation to Bid 00100 Instructions to Bidders 00210 Federal Employment Affidavits 00300 Bid 00410 Bid Bond 00420 Statement of Bidder’s Qualifications 00421 Statement of Equipment 00422 Corporate Certificate 00423 Statement of Disadvantaged Firm Utilization 00425 Contractor’s License Certification 00430 Contractor’s Certification of Authority 00480 Non-Collusion Affidavit of Prime Bidder 00500 Contract Agreement 00550 Pre-Award Oath 00600 Performance Bond 00601 Blank Page – Performance Bond Surety Location 00610 Payment Bond 00611 Blank Page – Payment Bond Surety Location 00700 General Conditions 00800 Supplementary Conditions 00805 Material Pick-up Acknowledgement Form 00810 Pay Estimate Summary Sheet
TECHNICAL SPECIFICATIONS
DIVISION 03 - CONCRETE
031000 CONCRETE FORMING AND ACCESSORIES
032000 CONCRETE REINFORCING
033000 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
055000 METAL FABRICATIONS
DIVISION 09 – FINISHES
099113 EXTERIOR PAINTING
099123 INTERIOR PAINTING
DIVISION 22 - PLUMBING
220500 COMMON WORK RESULTS FOR PLUMBING
220523 GENERAL-DUTY VALVES FOR PLUMBING PIPING
220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
Division Section Title
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230923 FUEL OIL DELIVERY PROGRAMMABLE LOGIC CONTROLLER (PLC)
230923.11 CONTROL VALVES
230923.14 FLOW INSTRUMENTS
230923.17 LEVEL INSTRUMENTS
230923.18 LEAK DETECTION INSTRUMENTS
231113 231213
FACILITY FUEL-OIL PIPING
FACILITY FUEL-OIL PUMPS
231323 FACILITY ABOVEGROUND FUEL-OIL STORAGE TANKS
DIVISION 26 - ELECTRICAL
260010 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
262213 LOW-VOLTAGE DISTRIBUTION TRANSFORMERS
262416 PANELBOARDS
262716 ELECTRICAL CABINETS AND ENCLOSURES
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
262913.03 MANUAL AND MAGNETIC MOTOR CONTROLLERS
263213.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS
DIVISION 27 - COMMUNICATIONS
271513 COMMUNICATIONS COPPER HORIZONTAL CABLING
271523 COMMUNICATIONS OPTICAL FIBER HORIZONTAL CABLING
DIVISION 31 - EARTHWORK
312000 EARTH MOVING
END OF INDEX
00020-1 Invitation to Bid
Rev. 01/26 June 1, 2026 Amerson Water Treatment Plant Generator
SECTION 00020
INVITATION TO BID
THE MACON WATER AUTHORITY
MACON, GEORGIA
Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the installation of Amerson Water Treatment Plant Generator Fueling System Replacement (the “Project”) will be received by the Macon Water Authority (the “Owner”), at the Macon Water Authority, 537 Hemlock Street, Human Resources Training Room, Macon, Georgia 31201 until 2:00 P. M., local time, August 11, 2026, and then at said office publicly opened and read aloud.
All bidders must attend a mandatory pre-bid meeting at the Amerson Water Treatment Plant, 703 Riverbend Drive, Macon, GA 31211 at 10:00 A.M. on July 28, 2026 in the second floor conference room. All bid questions must be submitted to the Owner by 10:00A.M. on August 04, 2026. The Bidder should attend the pre-bid meeting in its entirety.
The Project consists of replacing the existing underground fuel oil system with a new above-ground system.
The Project will be awarded in one Contract. Fifty-one percent (51%) of the Work under the Contract Documents must be self-performed by the General Contractor. The Project will be awarded by base bid on a lump sum basis for the performance and completion of all Work required by the Contract Documents.
The Contract Documents include, but may not be limited to, the Instructions to Bidders, the Contract Agreement, the General Conditions, the Drawings, the Specifications (Divisions 01 through 46, inclusive, where applicable), and the forms of Bid Bond, Performance Bond, and Payment Bond. These and any other Contract Documents may be examined at the following location:
Engineering Department Macon Water Authority
537 Hemlock Street Macon, GA 31201
Copies of Contract Documents may be obtained at ARC Document Solutions, (152 Spring St.
Macon, GA 3121, Phone: (478)-746-3331, email: macon.jobs@e-arc.com) upon a non-refundable payment of $150.00 for each set, payable to Clark Nexsen at 3920 Arkwright Rd, Ste. 385, Macon, GA 31210. A street address must be provided to ensure prompt delivery. No partial sets of bidding documents shall be issued. Bidders must purchase the Contract Documents in order to be eligible to submit a bid. Bid documents on the MWA website are for informational purposes only.
Each Bid must be accompanied by a Bid Bond in the amount of 5% of the Bid, prepared on the form of Bid Bond that is part of the Contract Documents, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and mailto:macon.jobs@e-arc.com
00020-2 Invitation to Bid listed in the latest issue of U.S. Treasury Circular 570.
Bidders must comply with the Disadvantaged Business Enterprise Participation Requirements specified in the Instructions to Bidders.
The Bidder shall affix to the outside of its Bid envelope the Bidder’s Georgia Utility Contractor License Number. A license number of a Utility Manager or a subcontractor is insufficient, and any Bid that fails to affix to the outside of its Bid envelope the Bidder’s Georgia Utility Contractor License Number may be rejected.
The successful Bidder for this Project shall be required to furnish a Performance Bond and Payment Bond, satisfactory to the Owner, each in the amount of 100 % of the Contract Price.
Employment of Local Businesses and Contractors: It is the desire of the Owner that local businesses--including disadvantaged, minority, and women enterprise subcontractors-- be given the opportunity to participate on the various parts of the Work.
The Owner’s encouragement of participation of disadvantaged, minority, and women enterprises and of locally owned businesses and contractors is not intended to restrict or limit competitive bidding or to increase the cost of the Work. The Owner supports a healthy, free market system that seeks to include responsible local businesses and provide ample opportunities for local business growth and development.
In an effort to assist minority-owned businesses, Georgia law permits an income tax adjustment on the state tax return of any company that subcontracts with a certified minority-owned firm to furnish goods, property or services to the State of Georgia pursuant to O.C.G.A. §48-7-38. Suppliers should consult with their tax advisors to find out how to take advantage of these tax credits.
The Owner reserves the right to reject any or all Bids. The Owner reserves the right to waive informalities and technicalities.
The Macon Water Authority Michel Wanna
Interim Executive Director & President
END OF SECTION
Rev. 4/26 June 1, 2026 Amerson Water Treatment Plant Generator Fueling System Replacement
SECTION 00100
INSTRUCTIONS TO BIDDERS
1.01 CONTRACT DOCUMENTS
A. The Bidder’s attention is directed to the General Conditions and other Contract Documents, all of which should be reviewed and studied by the Bidders before submitting a Bid.
B. The Contract Documents shall define and describe the complete Work to which they relate.
1.02 DEFINITIONS
The Bidder’s attention is called to the definitions set forth in Article 41 of the General Conditions.
1.03 PREPARATION AND EXECUTION OF BID
A. Each Bid must be prepared to represent that it is based solely upon the materials and equipment specified in the Contract Documents.
1. Trade Names.— When reference is made in the Contract Documents to trade names, brand names, or to the names of manufacturers, such references are made solely to indicate that products of that description may be furnished and are not intended to restrict competitive bidding. Unless requests for approvals of other products have been received and approvals have been published by addendum in accordance with the procedure described below in this Section, the successful Bidder may furnish no products of any trade names, brand names, or manufacturers’ names except those designated in the Contract Documents.
2. Use of other products.—If a Bidder desires to use products of trade or brand names or of manufacturers’ names which are different from those specified in the Contract Documents, application for the approval of the use of such products must be received by the Engineer at least ten (10) days prior to the date set for the opening of Bids. The application to the Engineer for approval of a proposed product must be accompanied by:
a. a schedule setting forth in which respects the materials or equipment submitted for consideration differ from the materials or equipment designated in the Contract Documents; and
b. a copy of the published recommendations of the manufacturer for the installation of the product together with a complete schedule of changes in the drawings and specifications, if any, which must be made in other work in order to permit the use and installation of the proposed product in accordance with the recommendations of the manufacturer of the product.
In addition, the Engineer will give consideration to reports from reputable independent testing laboratories, verified experience records showing the reputation
00100-2 Instructions to Bidders
Rev. 4/26 June 1, 2026 Amerson Water Treatment Plant Generator Fueling System Replacement of the proposed product with previous users, evidence of reputation of the manufacturer for prompt delivery, evidence of reputation of the manufacturer for efficiency in servicing its products, or any other written information that is helpful in the circumstances. To be approved, a proposed product must also meet or exceed all express requirements of the Contract Documents.
3. Burden of proof.— The degree of proof required for approval of a proposed product as acceptable for use in place of a named product or products is that amount of proof necessary to convince a reasonable person beyond all doubt.
4. Request for conference.—Any Bidder who alleges that rejection of a submittal is the result of bias, prejudice, caprice, or error on the part of the Engineer may request a conference with a representative of the Owner: PROVIDED, that the request for said conference, submitted in writing, shall be received by the Owner at least five (5) days prior to the date set for the opening of Bids, time being of the essence.
5. Issuance of addenda.— If the submittal is approved by the Engineer, an addendum will be issued to all prospective Bidders. Issuance of an addendum is a representation to all Bidders that the Engineer, in the exercise of its professional judgment and discretion, established that the product submitted for approval is acceptable and meets or exceeds all express requirements.
B. Each Bid must be submitted on the Bid forms which are a part of the Contract Documents. All blank spaces for Bid prices, both words and figures, must be filled in and completed in ink. In case of discrepancy, the amount shown in words will govern. All required enclosed certifications or other documents must be fully completed and executed when submitted.
C. In case of discrepancies between the figures shown in the unit prices and the totals, the unit prices shall apply and the totals shall be corrected to correspond with the unit prices. In case of discrepancies between written amounts and figures, written amounts shall take precedence over figures and the sum of all Bid extensions (of unit prices) plus lump sum items shall take precedence over the Bidders input of the Bid Total.
D. Each Bid must be submitted in a sealed envelope, addressed to the Macon Water Authority (the “Owner”). Each sealed envelope containing a Bid must be plainly marked on the outside as, “Amerson Water Treatment Plant Generator Fueling System Replacement”.
E. The Bidder shall provide on the outside of the sealed envelope the following information:
1. Bidder's Name;
2. Bidder's Georgia Utility Contractor License Number (if applicable); and,
3. The words, “SEALED BID”
F. Any Bid submitted which does not contain the above information on the outside of the sealed envelope will not be opened and will be returned to the Bidder.
00100-3
Rev. 4/26 June 1, 2026 Amerson Water Treatment Plant Generator Fueling System Replacement
G. If forwarded by mail, the sealed envelope containing the Bid must be enclosed in another envelope addressed as follows:
THE MACON WATER AUTHORITY
Attn: Heather Veal 790 Second Street Post Office Box 108 Macon, Georgia 31202-0108
H. Any and all Bids not meeting the aforementioned criteria for Bid submittal may be declared non-responsive, and subsequently returned to the Bidder unopened.
I. The Bidder, in signing a Bid on the whole or any portion of the Project, shall conform to the following requirements:
1. Bids which are not signed by individuals making the Bid shall have attached thereto a power of attorney evidencing authority to sign the Bid in the name of the person for whom it is signed.
2. Bids which are signed for a partnership shall be signed by all of the partners or by an attorney-in-fact. If a Bid is signed by an attorney-in-fact, there should be attached to the Bid a power of attorney executed by the partners evidencing authority to sign the Bid.
3. Bids which are signed for a corporation shall have the correct, legal corporate name thereof, as reflected in the records of the Georgia Secretary of State, and the signature of the president or other authorized officer of the corporation manually written below the corporate name following the wording “By .” If applicable, the corporate seal shall be affixed to the Bid.
4. The Bidder shall complete, execute and submit the following documents, (if applicable to the Bidder) which are a part of the Contract Documents:
a. The Bid;
b. The Bid Bond;
c. Statement of Bidder’s Qualifications;
d. Statement of Equipment;
e. Corporate Certificate, if the Bidder is a corporation;
f. Statement of Disadvantaged Business Enterprise (“DBE”) compliance;
g. Contractor's License Certification;
h. Photocopy of State of Georgia Utility Contractor’s License;
i. Photocopy of Certificate of Authority from Georgia Secretary of State’s
Office to do work in Georgia (if out of state contractor);
j. Non-Collusion Affidavit of Prime Bidder;
k. Any and all forms, certifications or other documentation required by the
Georgia Department of Natural Resources Environmental Protection Division.
00100-4
Rev. 4/26 June 1, 2026 Amerson Water Treatment Plant Generator Fueling System Replacement
1.04 METHOD OF BIDDING
The unit or lump sum price for each of the several items in the Bid of each Bidder shall include its pro rata share of overhead and profit so that the sum of the products, obtained by multiplying the quantity shown for each item by the unit price, represents the total Bid. Any Bid not conforming to this requirement may be rejected.
Additionally, unbalanced Bids (including unbalanced unit prices) may be rejected.
Conditional Bids shall not be accepted. The special attention of all Bidders is called to this provision, for should conditions make it necessary to revise the quantities, no limit will be fixed for such increased or decreased quantities, nor extra compensation allowed.
1.05 ADDENDA AND INTERPRETATIONS
A. No interpretation of the meaning of the Drawings, Specifications or other pre-bid documents or Contract Documents shall be made to any Bidder orally.
B. Any and all such interpretations and any supplemental instructions will be in the form of written Addenda to the Contract Documents which, if issued, will be mailed, shipped or faxed to all prospective Bidders (at the respective addresses furnished) at least seventy-two (72) hours (exclusive of weekends and holidays) prior to the date fixed for the opening of Bids.
C. Failure of Bidders to receive or acknowledge any Addendum shall not relieve them of any obligation under the Bid or the Contract Documents. All Addenda shall become part of the Contract Documents and obligations there under binding.
1.06 BID MODIFICATIONS
Bidders may modify their Bid by facsimile communication at any time prior to the scheduled closing time for receipt of Bids, provided such facsimile communication is received by the Owner prior to the time Bids are required, and provided further that the Owner is satisfied that a written confirmation of the facsimile modification over the signature of the Bidder was mailed by the Bidder to the Owner prior to the time Bids are required. The facsimile communication should not reveal the Bid price but should provide the addition or subtraction or other modification so that the final prices or terms will not be known by the Owner until the sealed Bid is opened. If written confirmation from the Bidder is not received by the Owner within two business days from the time Bids are required, no consideration will be given to the facsimile modification and the facsimile modification shall be rejected.
1.07 BID SECURITY
A. Each Bid must be accompanied by a Bid Bond, prepared on the form of Bid Bond included herein, duly executed by the Bidder as principal and having as surety thereon a surety company authorized to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570, in the amount of five (5%) percent of the
00100-5
Rev. 4/26 June 1, 2026 Amerson Water Treatment Plant Generator Fueling System Replacement
Bid. Attorneys-in-fact who sign Bonds must file with each Bond a currently dated and valid original of their power of attorney. Where validity and currentness of a power of attorney are established by certification executed by a corporate officer, the certification shall be made and executed by a corporate officer of record, as reflected in the records of the Georgia Secretary of State, or by valid corporate resolution or authorization identifying such corporate officer.
B. Except as provided in O.C.G.A. §§ 36-91-52 and 36-91-53, if for any reason whatsoever the successful Bidder withdraws from the competition after opening of the Bids, or if Bidder refuses to execute and deliver the Contract and Bonds required in Article 2 of the General Conditions, the provisions of the Bid Bond may be enforced.
C. Except as provided in O.C.G.A. §§ 36-91-52 and 36-91-53, a Bid may not be revoked or withdrawn until sixty (60) days after the time set for opening the Bids. Upon expiration of this time period, the Bid will cease to be valid, unless the Bidder provides written notice to the Owner prior to the scheduled expiration date that the Bid will be extended for a time period specified by the Owner.
1.08 RECEIPT AND OPENING OF BIDS
The Owner may consider a technicality and informality in any Bid not prepared and submitted in strict accordance with the provisions hereof and may waive any technicality and informality or reject any and all Bids. Any Bid may be withdrawn prior to the above scheduled time for the opening of Bids or authorized postponement thereof. Any Bid received after the time and date specified shall not be opened.
1.09 CONDITIONS OF THE PROJECT
A. Each Bidder must be informed fully of the conditions relating to the construction of the Project and the employment of labor thereon. Failure to do so will not relieve a successful Bidder of the obligation to furnish all material and labor necessary to carry out the provisions of the Contract Documents. Insofar as possible, the Bidder, in carrying out the Work, must employ such methods or means as will not cause any interruption of or interference with the work of any other contractor.
B. The Bidder is advised to examine the location of the Project and to be informed fully as to its conditions; access requirements, the conformation of the ground; the character, quality and quantity of the products needed preliminary to and during the prosecution of the work; the general and local conditions and all other matters which can in any way affect the work to be done under the Contract Documents. Failure to examine the site will not relieve the successful Bidder of an obligation to furnish all products and labor necessary to carry out the provisions of the Contract Documents.
C. The Bidder shall notify the Owner of the date and time Bidder proposes to examine the location of the Project. The Bidder shall confine examination to the specific areas designated for the proposed construction, including easements and public right-of-ways.
If, due to some unforeseen reason, the proceedings for obtaining the proposed construction site (including easements), have not been completed, the Bidder may enter
00100-6
Rev. 4/26 June 1, 2026 Amerson Water Treatment Plant Generator Fueling System Replacement the site only with the express consent of the property owner. The Bidder is solely responsible for any damages caused by examination of the site.
C. All anticipated federal, state and local permits required for the Project __shall be obtained before the start of construction.
D. All rights of way and easements anticipated for the Project NA been obtained.
E.
1.10 EQUAL EMPLOYMENT OPPORTUNITY
A. During the performance of the Contract, the Bidder agrees as follows:
1. The Bidder shall not discriminate against any employee or applicant for employment, or in any employment action during employment, based upon any applicable, legally-recognized and protected basis, including, but not limited to, veteran status, uniformed service member status, race, color, religion, sex, sexual orientation, gender identity, age (40 and over), pregnancy (including childbirth, lactation and related medical conditions), national origin or ancestry, citizenship status, physical or mental disability, genetic information (including testing and characteristics), or any other consideration protected by federal, state, or local law.
2. The Bidder shall, in all solicitation or advertisement for employees placed by or on behalf of Bidder, state that all qualified applicants will receive consideration for employment without regard to any applicable, legally-recognized and protected consideration, including, but not limited to veteran status, uniformed service member status, race, color, religion, sex, sexual orientation, gender identity, age (40 and over), pregnancy (including childbirth, lactation and related medical conditions), national origin or ancestry, citizenship status, physical or mental disability, genetic information (including testing and characteristics), or any other characteristic or basis protected by federal, state, or local law.
3. The Bidder shall send to each labor union or representative of the workers, with which the Bidder has a collective bargaining agreement or other contract or understanding, a notice advising the labor union or worker's representative of the Bidder's commitments under the Equal Employment Opportunity Program of the Owner and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
4. The Bidder and its subcontractors, if any, shall file compliance reports at reasonable times and intervals with the Owner in the form and to the extent prescribed by the Owner or the Georgia Department of Natural Resources. Compliance reports filed at such times as directed shall contain information as to the employment practices, policies, programs and statistics of the Bidder and its subcontractors.
5. The Bidder shall demonstrate by the documentation required in Paragraph C, below, that a “Good Faith Effort” has been made to achieve compliance with the Owner’s goal that a minimum of ten percent (10%) of the Contract Price shall be
00100-7
Rev. 4/26 June 1, 2026 Amerson Water Treatment Plant Generator Fueling System Replacement subcontracted to a Disadvantaged Business Enterprise (DBE). “DBE” shall have the meaning as is defined in applicable federal law, including the current rules and regulations of the United States Department of Transportation More specifically, the term “DBE” means a firm or business which is at least fifty-one percent (51%) owned, operated, capitalized, and controlled by one or more United States citizens or lawfully admitted residents who are socially and economically disadvantaged.
As used herein, the term “subcontracted” means providing subcontracting services or furnishing products or materials to be utilized in the performance of the Work.
6. The Bidder shall include the provisions of paragraphs 1 through 6 of this Section 1.10.A in every subcontract or purchase order so that such provisions will be binding upon each subcontractor or vendor.
B. In determining whether a Bidder has made “Good Faith Efforts”, the Owner will look effort that a Bidder has made.
C. The following list of kinds of efforts is provided for consideration, but this is not an exhaustive list of efforts that may be considered by the Owner:
1. Whether the Bidder attended any pre-solicitation or pre-bid meetings that were scheduled by the Agent to inform DBEs of contracting and subcontracting opportunities;
2. Whether the Bidder advertised in general circulation, trade association, and DBE-focus media concerning the sub-contracting opportunities;
3. Whether the Bidder provided written notice to DBEs that their interest in the Contract was being solicited, in sufficient time to allow the DBEs to participate effectively;
4. Whether the Bidder followed up initial solicitations of interest by contacting DBEs to determine with certainty whether the DBEs were interested;
5. Whether the Bidder selected portions of the Work to be performed by DBEs in order to increase the likelihood of meeting the DBE goals (including, where appropriate, breaking down contracts into economically feasible units to facilitate DBE participation);
6. Whether the Bidder provided interested DBEs with adequate information about the Drawings, Specifications and requirements of the Contract Documents;
7. Whether the Bidder negotiated in good faith with interested DBEs, not rejecting DBEs as unqualified without sound reasons based on a thorough investigation of their capabilities;
8. Whether the Bidder made efforts to assist interested DBEs in obtaining bonding, lines of credit, or insurance required by the Contract Documents or Contractor; and
00100-8
Rev. 4/26 June 1, 2026 Amerson Water Treatment Plant Generator Fueling System Replacement
D. Each Bidder shall include with his or her Bid a Statement of Disadvantaged Firm Utilization. Such statement shall include, as a minimum, the names and addresses of all DBE firms providing subcontracting services, furnishing products or materials, etc., the nature of the work to be contracted; and the anticipated cost of the services by each named firm as a percentage of the total Contract Price set forth in the Bid. The percentage participation should be calculated on the basis of the proportion of total dollar value of the Bid, including bulk purchase materials supplied by DBEs.
E. It is the desire of the Owner that DBEs be given the opportunity to bid on the various parts of the Work, and that to the extent feasible, DBE firms in the Middle Georgia area will be solicited and used. However, this desire is not intended to restrict or limit competitive bidding or to increase the cost of the Work. The Owner supports a healthy, free market system that seeks to include responsible businesses and provide ample opportunities for business growth and development.
In an effort to assist minority-owned businesses, Georgia law permits an income tax adjustment on the state tax return of any company that subcontracts with a certified minority-owned firm to furnish goods, property or services to the State of Georgia pursuant to O.C.G.A. § 48-7-38. Suppliers should consult with their tax advisors to find out how to take advantage of these tax credits.
1.11 NOTICE OF SPECIAL CONDITIONS
If any special federal, state, county or city laws, municipal ordinances, and the rules and regulations of any authorities having jurisdiction over construction of the Project, enclosed, herein referred to, or applicable by law to the Project, conflict with requirements of the Contract Documents, then the federal, state, county or city laws, municipal ordinances, and the rules and regulations of any authorities having jurisdiction over construction of the Project shall prevail and supersede the conflicting requirements of the Contract Documents.
1.12 OBLIGATION OF BIDDER
A. By submission of a Bid, each Bidder warrants that Bidder has inspected the site and has read and is thoroughly familiar with the Contract Documents (including all addenda).
The failure or omission of any Bidder to examine any form, instrument or document shall in no way relieve any Bidder from any obligation in respect to the Bid.
00100-9
Rev. 4/26 June 1, 2026 Amerson Water Treatment Plant Generator Fueling System Replacement
C. Special attention is directed to Article 4, “Insurance” contained at pages 00700-3 through 00700-6 in the General Conditions. The Owner requires (1) “Worker’s Compensation and Employer’s Liability Insurance,” (2) “Commercial General and Umbrella Liability Insurance,” (3) “Business Auto and Umbrella Liability Insurance,” and (4) “Materials and Floater” Insurance. For each of the required policies, the Owner requires a certificate of insurance at least quarterly, a copy of the endorsement of the insurance company showing the Owner as an additional insured, and a copy of the insurance policy declaration and any necessary endorsements.
D. Attention is further directed to Paragraph 6 of 00500, Contract Agreement and Article 9 of 00700, General Conditions regarding assignments. Prior written consent of the Owner is required for any assignment of any portion of this Contract, including any assignment due to “buyout” of Bidder or other acquisition of Bidder where the Bidder is a corporation or where Bidder is 50 percent or more owned by a corporation, firm, or person.
1.13 METHOD OF AWARD
A. The Contract, if awarded, will be awarded to the lowest responsible and responsive Bidder whose Bid meets the requirements and criteria set forth in the Contract Documents. The Contract, if awarded, will be awarded by base bid comprised of unit prices, for the performance and completion of all Work required by the Contract Documents.
B. The Bidder to whom the award is made will be notified. The Owner reserves the right to reject any and all Bids and to waive any technicalities and informalities in Bids received whenever such rejection or waiver is in the Owner’s interest.
C. A responsive Bidder shall be one who submits a Bid in the proper form without qualification or intent other than as called for in the Contract Documents, and who binds itself on behalf of the Bid to the Owner with the proper Bid Bond completed and attached, and who properly completes all forms required to be completed and submitted at the time of the Bidding. The Bidder shall furnish all data, documents, forms, and certifications required by the Contract Documents. Failure to do so may result in the Bid being declared non-responsive.
D. A responsible Bidder shall be one who can fulfill the following requirements:
1. The Bidder shall maintain a permanent place of business. This requirement applies to the Bidder where the Bidder is a division of a corporation, or where the Bidder is 50 percent or more owned by a person, corporation or firm.
2. The Bidder shall demonstrate adequate construction experience and sufficient equipment resources to properly perform the work under and in conformance with the Contract Documents. This evaluation will be based upon a list of completed or active projects and a list of construction equipment available to the Bidder to perform the work. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the Work, and
00100-10
Rev. 4/26 June 1, 2026 Amerson Water Treatment Plant Generator Fueling System Replacement the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may reasonably request. The Owner reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Contract Documents and to complete the Project contemplated therein.
3. The Bidder shall demonstrate financial resources of sufficient strength to meet the obligations incident to the performance of the Work covered by the Contract Documents. The ability to obtain the required Performance and Payment Bonds will not alone demonstrate adequate financial capability.
1.14 EMPLOYMENT OF LOCAL LABOR
Preference in employment on the Project shall, insofar as practical, be given to qualified local labor.
Rev 01/26 June 1, 2026 Amerson Water Treatment Plant Generator
FEDERAL WORK AUTHORIZATION PROGRAM AFFIDAVITS
EACH BIDDER MUST PROVIDE THE OWNER WITH THE
PROPERLY COMPLETED AND PROPERLY SIGNED FEDERAL
WORK AUTHORIZATION PROGRAM AFFIDAVITS AS
REQUIRED BY O.C.G.A. § 13-10-91
THIS FORM MUST BE COMPLETED BY ALL CONTRACTORS, ALL
SUBCONTRACTORS AND ALL SUB-SUBCONTRACTORS
THE FORMS ARE ATTACHED HERETO.
Contractor Affidavit under O.C.G.A. § 13-10-91(b)(1)
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of the Macon Water Authority has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number Date of Authorization Name of Contractor Name of Project
Name of Public Employer: the Macon Water Authority
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on _______________, ___, 20___ in ______________ (city), ______ (state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE ______ DAY OF ______________, 20___.
NOTARY PUBLIC
My Commission Expires: __________________, 20___.
Subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(3)
By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with ____________________ __________________ [insert name of contractor] on behalf of the Macon Water Authority has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A. § 13-10-91(b). Additionally, the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub-subcontractor to the contractor within five business days of receipt. If the undersigned subcontractor receives notice that a sub-subcontractor has received an affidavit from any other contracted sub-subcontractor, the undersigned subcontractor must forward, within five business days of receipt, a copy of the notice to the contractor. Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number Date of Authorization Name of Subcontractor Name of Project
Name of Public Employer: Macon Water Authority
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on ______________, ___, 20___ in ______________ (city), __________ (state).
Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE ______ DAY OF ______________, 20____.
My Commission Expires: ___________________, 20____.
Sub-subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(4)
By executing this affidavit, the undersigned sub-subcontractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract for __________________________________ [insert name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract] and ______________________________________ [insert name of contractor] on behalf of the Macon Water Authority has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned sub-subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned sub-subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the sub-subcontractor with the information required by O.C.G.A. § 13-10-91(b). The undersigned sub-subcontractor shall submit, at the time of such contract, this affidavit to ______________________________ [insert name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract]. Additionally, the undersigned sub-subcontractor will forward notice of the receipt of any affidavit from a sub-subcontractor to _____________________________ [insert name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract]. Sub-subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number Date of Authorization Name of Sub-subcontractor Name of Project Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on ____________, ___, 20___ in _____________ (city), ___________ (state).
Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE ______ DAY OF ______________, 20___.
My Commission Expires: ___________________, 20___.
00300-1 Bid
SECTION 00300
BID
TO: MACON WATER AUTHORITY
FROM:
(Bidder's Name)
FOR: Amerson Water Treatment Plant Generator Fueling System Replacement
Submitted: , 20__
The undersigned Bidder, in compliance with your Invitation to Bid for the construction of this Project, having examined the Contract Documents and the site of the proposed Work, and being familiar with all of the conditions surrounding the construction of the proposed Project, including the availability of materials and labor, hereby proposes to construct the Project in accordance with the Contract
Documents.
The Bidder proposes and agrees, if this Bid is accepted, to contract with the Macon Water Authority, in the form of Contract Agreement specified, and to furnish all necessary products, machinery, tools, apparatus, means of transportation and labor necessary to complete the construction of the Work in full and complete accordance with the reasonably intended requirements of the Contract Documents to the full and entire satisfaction of the Macon Water Authority with a definite understanding that no money will be allowed for extra work except as set forth in the Contract Documents, for the following prices:
00300-2
Item No. Quantity Unit Description Unit Price Total Price
BASE BID: For furnishing all products, materials, and equipment and performing all labor necessary to complete the Amerson Water Treatment Plant Generator Fuel System Replacement; including all work shown on the drawings and documents for the total amount of:
a. 1 LS
a. Civil
b. Structural
c. Plumbing
d. Electrical
e. Controls
f. Contingency
Total Bid inclusive in the amount of
____________________________________________________________________________ Dollars
($______________________________________) which sum hereinafter is called the “Base Bid”.
The Bidder agrees hereby to commence Work under this Contract, with adequate personnel and equipment, on a date to be specified in a written order of the Engineer, and to fully complete all Work under this Contract within One Year (365) consecutive calendar days from and including said date specified in the written order of the Engineer. Bidder understands that time is of the essence for the work under this Contract, and timely completion of the Work is important for MWA’s operations.
Therefore, Bidder further agrees to pay as damages, the sum of $250.00 for each calendar day thereafter required to achieve substantial completion of all Work which Bidder agrees is a reasonable and good faith estimate of the damages that MWA would incur as a result in Bidder’s delay in achieving substantial completion of the Work.
The Bidder declares an understanding that the quantities shown for unit price items are subject to either increase or decrease, and that should the quantities of any of the items of Work be increased, the Bidder proposes to do the additional Work at the unit prices stated herein; and should the quantities be decreased, the Bidder also understands that payment will be made on the basis of actual quantities at the unit price bid and will make no claim for additional costs or anticipated profits for any decrease in
00300-3 quantities; and that actual quantities will be determined upon completion of Work, at which time adjustment will be made to the Contract Price by direct increase or decrease.
In case of discrepancies between the figures shown in the unit prices and the totals, the unit prices shall apply and the totals shall be corrected to agree with the unit prices. In case of discrepancies between written amounts and figures, written amounts shall take precedence over figures and the sum of all Bid extensions (of unit prices) plus lump sum items shall take precedence over the Bidder’s represented
BID TOTAL.
The Bidder furthermore agrees that, in the case of a failure to execute the Contract Agreement and Bonds within ten days after receipt of conformed Contract Documents for execution, the attached Bid Bond accompanying this Bid and the monies payable thereon shall be paid into the funds of the Macon Water Authority as damages for such failure.
00300-4
Attached hereto is a Bid Bond for the sum of _________
Dollars ($ ) according to the conditions of "Instructions to Bidders" and provisions thereof.
Bidder acknowledges receipt of the Following Addenda:
Addendum No. 1, dated:
Addendum No. 2, dated:
Addendum No. 3, dated:
Addendum No. 4, dated:
Remainder of Page Left Blank
[Signatures, attestations, and seal on following page]
00300-5
BIDDER:
By:
Name:
(Print or Type)
Title:
Address:
Phone:
Attest:
Name:
(Print or Type)
(SEAL)
Note: Attest for a corporation must be by the secretary of record for the corporation, as reflected in the records of the Georgia Secretary of State; for a partnership by another partner; for an individual by a notary.
Note: If the Bidder is a corporation, the Bid shall be signed by an officer of the corporation; if a partnership, it shall be signed by a partner. If signed by others, authority for signature shall be attached.
The full names and addresses of persons or parties interested in the foregoing Bid, as principals, are as follows:
{PRIVATE }Name Address
00410-1 Bid Bond
SECTION 00410
BID BOND
STATE OF GEORGIA
COUNTY OF MACON-BIBB
KNOW ALL MEN BY THESE PRESENTS, that we, , as Principal, and , as Surety, are held and firmly bound unto the Owner, the Macon Water Authority, in the sum of ________________ Dollars ($ ) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, personal representatives, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted to the Owner a Bid for the Amerson Water Treatment Plant Generator Fueling System Replacement.
NOW THEREFORE, the conditions of this obligation are such that if the Bid be accepted, the Principal shall, within ten days after receipt of conformed Contract Documents, execute a Contract in accordance with the Bid upon the terms, conditions and prices set forth therein, and in the form and manner required by the Contract Documents and execute sufficient and satisfactory separate Performance and Payment Bonds payable to the Owner, each in an amount of 100 percent of the total Contract Price, in form satisfactory to the Owner , then this obligation shall be void; otherwise, it shall be and remain in full force and effect in law; and the Surety shall, upon failure of the Principal to comply with any or all of the foregoing requirements within the time specified above, immediately pay to the aforesaid Owner, upon demand, the amount hereof in good and lawful money of the United States of America, not as a penalty, but as delay damages.
This bond is given pursuant to and in accordance with the provisions of the Georgia Procurement Manual and Georgia Local Government Public Works Construction Law, O.C.G.A. § 36-91-1 et.
seq. All the provisions of the law referring to this character of bond as set forth in said Manual or Code Sections or as may be hereinafter enacted and these are hereby made a part hereof to the same extent as if set out herein in full.
[Signatures, attestations, and seals on following page]
00410-2
IN WITNESS WHEREOF, the said Principal has hereunder affixed its signature and seal, and said Surety has hereunto caused to be affixed its corporate signature and seal, by its duly authorized officers, on this day of ____________ , 20___.
CONTRACTOR - PRINCIPAL:
By:
Name:
Address:
Phone:
Name:
(Print or Type)
Title:
(SEAL)
Note: Attest for a corporation must be by the secretary of record for the corporation, as reflected in the records of the Georgia Secretary of State; for a partnership by another partner; for an individual by a notary.
SURETY:
By:
Name:
(Print or Type)
Title:
Phone:
Attest:
Name:
00410-3
Note: Surety companies executing bonds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the state where the Project is located.
00420-1 Statement of Bidder’s Qualifications
SECTION 00420
STATEMENT OF BIDDER’S QUALIFICATIONS
All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets.
The Bidder may submit any additional information desired. Attach all additional sheets to this statement.
1. Name of Bidder:
2. Permanent main office address:
3. When organized:
4. If a Corporation, where incorporated:
5. How many years have you been engaged in the contracting business under your present firm or trade name?
6. Contracts on hand: (Schedule these, showing amount of each contract and the appropriate anticipated dates of completion):
7. General description of type of work performed by your company:
8. Have you ever failed to complete any work awarded to you? If so, where and why?
9. Have you ever defaulted on a contract? If so, where and why?
10. Attach a list of the most important projects recently completed by your company which are similar in scope to this Project. For each project, list its: official name and owner, a contact person's name, company and position, address and phone number; completion date; and contract amount.
11. Names, background and experience of the principal members of your organization, including officers:
00420-2 Statement of Bidder’s Qualifications
12. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the Owner in verification of the recitals comprising this Statement of Bidder’s Qualifications.
Dated this day of , 20___.
BIDDER:
By:
State of
County of being duly sworn deposes and says that he or she is of and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this day of , 20___.
Notary Public:
My Commission Expires:
(Date)
SECTION 00421
STATEMENT OF EQUIPMENT
Show machinery and other equipment available to the Bidder for prosecuting the…