This is a specification document for the Kenosha County Detention Center Building Envelope Project (#2605) in Wisconsin, detailing the installation of EPDM and Modified Bitumen roofing systems. The project comprises four primary sections: preparation for re-roofing, modified bituminous membrane roofing, EPDM roofing, and sheet metal flashing and trim. The preparation work includes removal of existing roof system membranes, flashing, and equipment down to the insulation surface, followed by cleaning and repositioning of rooftop equipment to required heights with a minimum 8-inch extension above the finished roof surface for curbs and 12 inches for vents. The modified bitumen system specifies a 2-ply hot-applied asphalt roofing installation with a 30-year manufacturer warranty and 5-year contractor warranty, while the EPDM option provides a 15-year manufacturer warranty and 5-year contractor warranty. All work must comply with NRCA and SMACNA standards, utilize products from approved manufacturers (primarily Garland Company, Inc.), and maintain a full-time supervisor on-site during all roofing operations. The installer must demonstrate a minimum of 15 years documented experience and provide a list of five comparable projects completed within a 100-mile radius.

Pricing and material specifications are subject to strict manufacturer adherence, with no changes permitted after bid opening. The specifications require two-component, no-VOC adhesives for insulation installation and establish rigorous quality assurance protocols including pre-installation meetings, manufacturer field observations at least twice weekly, and final certification of proper installation. Temporary weather protection and emergency leak response within four hours of notification are mandatory contractor responsibilities. The project mandates flood testing of completed roof areas to a depth of 2.5 inches for 24 hours and completion of all terminations and base flashings before end-of-workday to prevent water intrusion. Bidders proposing alternate products must submit complete technical data and manufacturer approvals for owner consideration, with failure to provide required substitution packages resulting in immediate disqualification.

View the file

Other files

File Type Posted
Vendor Responsibility Form Construction.pdf PDF
2605 Bid Documents.pdf PDF
2605 Drawings.pdf PDF
2605 Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KCDC Building Envelope Project Preparation for Re-Roofing

PROJECT NUMBER: #2605 07 01 55- 1

SECTION 07 01 55

PREPERATION FOR RE-ROOFING

PART 1 GENERAL

1.01 SCOPE OF WORK

A. Remove the existing roof system membrane, base flashings, sheet metal, penetration flashings; down to the existing insulation surface. Sweep and clean all debris off existing insulation surface and around penetrations. Surface of insulation must be completely clean and smooth, before installing any new material.

B. Remove all marked obsolete equipment and install new decking to match existing decking.

C. Remove and reinstall and/or disconnect and reconnect all rooftop equipment as necessary to extend the existing curb flashings to a minimum of 8 inches above the finished roof surface and 12 inches above the finished roof surface for all vents. This shall include removal and re-installation of the existing exhaust fans, ventilators and all other equipment on areas to be re-roofed. Disconnect electric surface and controls and extend wiring / controls as necessary to achieve the required minimum heights.

D. Work site and area around the work site should be cleaned at the end of each day. To ensure there is no loose debris.

1.02 PRE-INSTALLATION CONFERENCE

A. Review installation procedures and coordination required with related work.

1.03 ENVIRONMENTAL REQUIREMENTS

A. Do not remove existing roofing system or damaged decking when weather conditions threaten the integrity of the building contents or intended continued occupancy. Maintain continued temporary protection prior to installation of the new roofing system. Provide temporary weather protection to insure that the building is weather tight and that no damage occurs to the building, interior contents, furnishings, equipment and finished during re-roofing operations.

1.04 PROTECTION

A. It shall be the Contractor's responsibility to respond immediately to correction of roof leakage during construction. A four (4) hour time limit shall be given from the time of notification of emergency conditions.

In the event of water penetration during rain or a storm, the Contractor shall provide for repair of the building contents and interior including, but not limited to, all interior contents, furnishings, equipment, building systems and finishes. If the Contractor does not respond or cannot be contacted, the Owner will affect repairs or emergency action and the Contractor shall be back charged for all expenses and damages, if any.

1.05 SCHEDULING

A. Schedule work to coincide with commencement of installation of new roofing system

PART 2 PRODUCTS

2.01 MATERIALS

KCDC Building Envelope Project Preparation for Re-Roofing

PROJECT NUMBER: #2605 07 01 55- 2

A. Temporary protection; Sheet Polyethylene. Provide weights or fasteners to retain sheeting in position.

PART 3 EXECUTION

3.01 EXAMINATION

A. Roofing Contractor to verify existing site conditions, including roof dimensions. The Owner and Engineer assume no responsibility for the existing actual conditions that the Contractor may encounter during the course of work that can be reasonably foreseen during the Pre-Bid inspection. The Contractor shall verify all dimensions and conditions in the field prior to demolition and notify the Engineer should any conditions encountered vary from the Contract Documents.

B. Verify that existing roof surface is clear and ready for work.

3.02 MATERIALS REMOVAL

A. Remove all membrane, cant strips, insulation, expansion joints, base flashings, and any other items required for installation of the new roof. In addition, completely remove all nails and other debris to leave a smooth, even surface for re-roofing.

B. Under certain conditions, it will be necessary and desirable to incorporate one or more of the following methods for removal of dirt, silt, gravel, debris, roof membrane, and insulation from the roof surface in order to preserve the ecology, eliminate unsightly conditions, and protect the building surfaces:

1. Enclosed chutes with protective shrouds on the building and ground surfaces.

2. All debris dumped from the roof shall be transported from the roof via chutes into dumpsters or trucks, and this debris shall be removed from the premises when vehicles are full at the Contractors cost.

No debris shall be transported from the area being worked on over a previously finished roof without an underlayment of 3/4" plywood.

C. Perform all demolition and re-roofing work in such a manner as to not damage or affect the load carrying capacity of the existing structural system.

D. Contractor shall provide cut off (night tie in) at the end of each day's work.

E. All curbs are to be raised to a minimum height of 8” above the finished roof surface. Be sure to calculate tapered insulation + recovery board + new roof system when calculating blocking heights

F. All soil stacks must be raised a minimum of 8” above the finished roof surface. No soil stack may be sleeved with the joint facing to weather.

G. All abandoned curbs must be removed and the deck replaced with like kind materials and color.

END OF SECTION

KCDC Building Envelope Project Modified Bitumen Roofing

PROJECT NUMBER: #2605 07 50 00- 1

SECTION 07 50 00

MODIFIED BITUMINOUS MEMBRANE ROOFING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SECTION INCLUDES

A. Hot Applied 2-Ply Asphalt Roofing

1.3 SUMMARY

A. Section includes:

1. Furnish and install a complete Modified Bitumen roofing system, including:

a. Preparation of roofing substrates

b. Insulation

c. Membrane

d. Asphalt

e. Membrane flashing

f. Expansion joints

g. Other components and accessories required for a complete and proper weatherproof installation.

2. This specification includes requirements needed to ensure a 30-year warranty. The Contractor must confirm with the Roofing System Manufacturer all steps required to complete the installation of a 30-year warranted roof system prior to commencement of work.

1.4 REFERENCE STANDARDS

A. ASTM D 41 - Standard Specification for Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing.

B. ASTM D 312 - Standard Specification for Asphalt used in Roofing.

C. ASTM D 451 - Standard Test Method for Sieve Analysis of Granular Mineral Surfacing for Asphalt Roofing Products.

D. ASTM D 1970 - Specification for Sheet Materials, Self-Adhering Polymer Modified Bituminous, Used as Steep Roofing Underlayment for Ice Dam Protection.

E. ASTM D 1079 Standard Terminology Relating to Roofing, Waterproofing and Bituminous Materials.

F. ASTM D 1227 Standard Specification for Emulsified Asphalt Used as a Protective Coating for Roofing.

G. ASTM D 1863 Standard Specification for Mineral Aggregate Used as a Protective Coating for Roofing.

H. ASTM D 2178 Standard Specification for Asphalt Glass Felt Used in Roofing and Waterproofing.

I. ASTM D 2824 Standard Specification for Aluminum-Pigmented Asphalt Roof Coating.

PROJECT NUMBER: #2605 07 50 00- 2

J. ASTM D 4586 Standard Specification for Asphalt Roof Cement, Asbestos-Free.

K. ASTM D 4601 Standard Specification for Asphalt Coated Glass Fiber Base Sheet Used in Roofing.

L. ASTM D 5147 Standard Test Method for Sampling and Testing Modified Bituminous Sheet Materials.

M. ASTM D 6162 Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using a Combination of Polyester and Glass Fiber Reinforcements.

N. ASTM D 6163 Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Glass Fiber Reinforcements.

O. ASTM D 6164 - Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Polyester Reinforcements.

P. ASTM D 6754 - Standard Specification for Ketone Ethylene Ester (KEE) Sheet Roofing.

Q. ASTM D 6757 - Standard Specification for Underlayment Felt Containing Inorganic Fibers Used in Steep- Slope Roofing.

R. ASTM E 108 - Standard Test Methods for Fire Test of Roof Coverings

S. Factory Mutual Research (FM): Roof Assembly Classifications.

T. National Roofing Contractors Association (NRCA): Roofing and Waterproofing Manual.

U. Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA) - Architectural Sheet Metal Manual.

V. Underwriters Laboratories, Inc. (UL): Fire Hazard Classifications.

W. Warnock Hersey (WH): Fire Hazard Classifications.

X. ANSI-SPRI ES-1 Wind Design Standard for Edge Systems used with Low Slope Roofing Systems.

Y. ASCE 7, Minimum Design Loads for Buildings and Other Structures

Z. UL - Fire Resistance Directory.

AA. FM Approvals - Roof Coverings and/or RoofNav assembly database.

1.5 SUBMITTALS

A. Product Data: Manufacturer's data sheets on each product to be used, including:

1. Preparation instructions and recommendations.

2. Storage and handling requirements and recommendations.

3. Installation instructions.

B. Shop Drawings: Submit shop drawings including installation details of roofing, flashing, fastening, and insulation, including notation of roof slopes and fastening patterns of insulation and base modified bitumen membrane, prior to job start.

C. Design Pressure Calculations: Submit design pressure calculations for the roof area in accordance with ASCE 7 and local Building Code requirements. Include a roof system attachment analysis report, certifying the system's compliance with applicable wind load requirements before Work begin.

PROJECT NUMBER: #2605 07 50 00- 3

D. Recycled or Bio-Based Materials: Provide third party certification through UL Environment of roof System membranes containing recycled or bio based materials.

E. Verification Samples: For each modified bituminous membrane ply product specified, two samples, minimum size 6 inches (150 mm) square, representing actual product, color, and patterns.

F. Manufacturer's Certificates: Provide to certify products meet or exceed specified requirements.

G. Test Reports: Submit test reports, prepared by an independent testing agency, for all modified bituminous sheet roofing, indicating compliance with ASTM D5147.

H. Closeout Submittals: Provide manufacturer's maintenance instructions that include recommendations for periodic inspection and maintenance of all completed roofing work. Provide product warranty executed by the manufacturer. Assist Owner in preparation and submittal of roof installation acceptance certification as may be necessary in connection with fire and extended coverage insurance on roofing and associated work.

1.6 QUALITY ASSURANCE

A. Perform Work in accordance with NRCA Roofing and Waterproofing Manual.

B. Manufacturer Qualifications: Company specializing in manufacturing products specified with documented ISO 9001 certification and minimum of twelve years of documented experience and must not have been in Chapter 11 bankruptcy during the last five years.

C. Installer Qualifications: Company specializing in performing Work of this section with minimum 15 years documented experience and is a certified Pre-Approved Contractor for the roof system Manufacturer.

The installing contractor must submit a list of five projects that are 10 years old within a 100-mile radius of the current project, of equal or greater size, for owner evaluation. Evidence of compliance with these qualifications shall be provided upon request and shall be subject to the Owner’s and Manufacturer’s verification.

D. Installer's Field Supervision: Maintain a full-time Supervisor/Foreman on job site during all phases of roofing work while roofing work is in progress.

E. Product Certification: Provide manufacturer's certification that materials are manufactured in the United States and conform to requirements specified herein, are chemically and physically compatible with each other, and are suitable for inclusion within the total roof system specified herein.

F. Source Limitations: Obtain all components of roof system from a single manufacturer. Secondary products that are required shall be recommended and approved in writing by the roofing system Manufacturer. Upon request of the Architect or Owner, submit Manufacturer's written approval of secondary components in list form, signed by an authorized agent of the Manufacturer.

1.7 PRE-INSTALLATION MEETINGS

A. Convene minimum two weeks prior to commencing Work of this section.

B. Review installation procedures and coordination required with related Work.

C. Inspect and make notes of job conditions prior to installation:

1. Record minutes of the conference and provide copies to all parties present.

2. Identify all outstanding issues in writing designating the responsible party for follow-up action and the timetable for completion.

3. Installation of roofing system shall not begin until all outstanding issues are resolved to the satisfaction of the Project Owner.

PROJECT NUMBER: #2605 07 50 00- 4

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver and store products in manufacturer's unopened packaging with labels intact until ready for installation.

B. Store all roofing materials in a dry place, on pallets or raised platforms, out of direct exposure to the elements until time of application. Store materials at least 4 inches above ground level and covered with "breathable" tarpaulins.

C. Stored in accordance with the instructions of the manufacturer prior to their application or installation.

Store roll goods on end on a clean flat surface. No wet or damaged materials will be used in the application.

D. Store at room temperature wherever possible, until immediately prior to installing the roll. During winter, store materials in a heated location with a 50 degree F (10 degree C) minimum temperature, removed only as needed for immediate use. Keep materials away from open flame or welding sparks.

E. Avoid stockpiling of materials on roofs without first obtaining acceptance from the Project Owner.

F. Adhesive storage shall be between the range of above 50 degree F (10 degree C) and below 80 degree F (27 degree C). Area of storage shall be constructed for flammable storage.

1.9 COORDINATION

A. Coordinate Work with installing associated metal flashings as work of this section proceeds.

1.10 WARRANTY

A. Upon completion of the work, provide the Manufacturer's written and signed Warranty, warranting that, if a leak develops in the roof during the term of this warranty, due either to defective material or defective workmanship by the installing contractor, the manufacturer shall provide the Owner, at the Manufacturer's expense, with the labor and material necessary to return the defective area to a watertight condition. An No Dollar Limit (NDL) Warranty.

1. Manufacturer Warranty Period:

a. 30 years from date of acceptance.

2. Constractor Warranty Period:

a. 5 years from date of acceptance.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Basis of Design and Acceptable Manufacturer: Garland Company, Inc. (The); 3800 E. 91st St., Cleveland, OH 44105. ASD. Toll Free: 800-321-9336. Phone: 216-641-7500. Fax: 216-641-0633. Web Site: www.garlandco.com.

B. The Products specified are intended and the Standard of Quality for the products required for this project.

If other products are proposed, the bidder must disclose in the bid the manufacturer and the products that they intend to use on the Project. If no manufacturer and products are listed, or the Manufacturer Field Qualitiy Control Letter is not submitted, the bid may be accepted only with the use of the products specified.

2.2 Bidder will not be allowed to change materials after the bid opening date.

2.3 If alternate products are included in the bid, the products must be equal to or exceed the products specified. Supporting technical data shall be submitted to the Owner for approval http://www.garlandco.com/

PROJECT NUMBER: #2605 07 50 00- 5

prior to acceptance.

2.4 In making a request for substitution, the Bidder/Roofing Contractor represents that it has:

A. Personally investigated the proposed product or method, and determined that it is equal or superior in all respects to that specified.

B. Will provide the same guarantee for substitution as for the product and method specified.

C. Will coordinate installation of accepted substitution in work, making such changes as may be required for work to be completed in all respects.

D. Will waive all claims for additional cost related to substitution, which consequently become apparent.

E. Cost data is complete and includes all related cost under his/her contract or other contracts, which may be affected by the substitution.

F. Will reimburse the Owner for all redesign cost for accommodation of the substitution.

2.5 Owner reserves the right to be the final authority on the acceptance or rejection of any or all bids, proposed alternate roofing systems or materials that has met ALL specified requirement criteria.

2.6 Failure to submit substitution package, or any portion thereof requested, will result in immediate disqualification and consideration for that particular contractors request for manufacturer substitution.

2.7 MATERIALS

A. Modified Bitumen Roofing:

1. Base (Ply) Sheet: One ply bonded to the prepared substrate with Interply Adhesive.

2. Modified Cap (Ply) Sheet: One ply bonded to the prepared substrate with Interply Adhesive.

3. Interply Adhesive: (1 and 2) Generic Type III Aspahlt

4. Flashing Base Ply: One ply bonded to the prepared substrate with Interply Adhesive

5. Flashing Cap (Ply) Sheet: One ply bonded to the prepared substrate with Interply Adhesive

B. Insulation:

1. Roof insulation board consisting of a core of rigid, closed-cell polyisocyanurate foam faced with a universal, black, fiberglass reinforced mat. Insulation shall meet requirements of ASTM C1289.

Insulation shall be manufactured without the use of CFCs and shall comply with EPA requirements and Clean-Air Act Amendment Standards of 1990.

a. Johns-Manville "E'NRG'Y 2"

b. GAF, "Gaftemp"

c. Hunter

2. Insualtion to achieve ¼” slope in field of roof and ½” slope for crickets and saddles.

PART 3 - EXECUTION

3.1 INSPECTION

A. Do not begin installation until substrates have been properly prepared.

B. Insulation surface shall be smooth, free from frost, water, loose sand or other debris. Notify Owner of any conditions of insulation which will adversely affect installation and performance of roof system.

Commencing of work by this Contractor shall indicate Contractor’s acceptance of surfaces and acceptance of responsibility for finished results.

C. Inspect and approve the deck condition, slopes and fastener backing if applicable, parapet walls, expansion joints, roof drains, stack vents, vent outlets, nailers and surfaces and elements.

D. Verify that work penetrating the roof deck, or which may otherwise affect the roofing, has been properly completed.

PROJECT NUMBER: #2605 07 50 00- 6

3.2 PREPARATION

A. General: Clean insulation and/or roof deck. surfaces thoroughly prior to installation.

1. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

2. Fill substrate surface voids that are greater than 1/4 inch wide with an acceptable fill material.

3. Roof surface to receive roofing system shall be smooth, clean, free from loose gravel, dirt and debris, dry and structurally sound.

4. Wherever necessary, all surfaces to receive roofing materials shall be power broom and vacuumed to remove debris and loose matter prior to starting work.

5. Do not apply roofing during inclement weather. Do not apply roofing membrane to damp, frozen, dirty, or dusty surfaces.

6. Fasteners and plates for fastening components mechanically to the substrate shall provide a minimum pull-out capacity of 300 lbs. (136 k) per fastener. Base or ply sheets attached with cap nails require a minimum pullout capacity of 40 lb. per nail.

3.3 INSTALLATION - GENERAL

A. Install modified bitumen membranes and flashings in accordance with manufacturer's instructions and with the recommendations provided by the National Roofing Contractors Association's Roofing & Waterproofing Manual, the Asphalt Roofing Manufacturers Association, and applicable codes.

B. General: Avoid installation of modified bitumen membranes at temperatures lower than 40-45 degrees F. When work at such temperatures unavoidable use the following precautions:

1. Take extra care during cold weather installation and when ambient temperatures are affected by wind or humidity, to ensure adequate bonding is achieved between the surfaces to be joined. Use extra care at material seam welds and where adhesion of the applied product to the appropriately prepared substrate as the substrate can be affected by such temperature constraints as well.

2. Unrolling of cold materials, under low ambient conditions must be avoided to prevent the likelihood of unnecessary stress cracking. Rolls must be at least 40 degrees F at the time of application. If the membrane roll becomes stiff or difficult to install, it must be replaced with roll from a heated storage area.

C. Commence installation of the roofing system at the lowest point of the roof (or roof area), working up the slope toward the highest point. Lap sheets shingle fashion so as to constantly shed water

D. All slopes greater than 2:12 require back-nailing to prevent slippage of the ply sheets. Use ring or spiral-shank 1 inch cap nails, or screws and plates at a rate of 1 fastener per ply (including the membrane) at each insulation stop. Place insulation stops at 16 ft o.c. for slopes less than 3:12 and 4 feet o.c. for slopes greater than 3:12. On non-insulated systems, nail each ply directly into the deck at the rate specified above. When slope exceeds 2:12, install all plies parallel to the slope (strapping) to facilitate backnailing. Install 4 additional fasteners at the upper edge of the membrane when strapping the plies.

3.4 INSTALLATION HOT APPLIED ROOF SYSTEM

A. Insulation:

1. All joints shall be offset a minimum of 6" between insulation layers. Install in accordance with manufacturer’s specification.

2. Apply insulation over existing insulation, mechanically attached to roof deck.

3. Set Wood Fiber Recovery Board in hot asphalt applied at a nominal rate of 30 lbs/sq. All end joints shall be staggered. Board size shall be no greater than 4' x 4'.

4. Do not lay more insulation than can be covered by roofing in same day. Install water cut-offs at end of each day's work over exposed edges of insulation.

5. Install cant strips at all roof and wall intersections and tapered edge strips at gravel stops and bed in hot asphalt or mastic.

B. Base Ply(s): Install base sheet plies in twenty five (25) lbs (11.3kg) per square of bitumen shingled uniformly to achieve one or more plies over the entire prepared substrate. Shingle in direction of slope

PROJECT NUMBER: #2605 07 50 00- 7

of roof to shed water on each area of roof. Do not step on base rolls until asphalt has cooled, fish mouths should be cut and patched.

1. Lap ply sheet ends 8 inches (203 mm). Stagger end laps 2 inches (304mm) minimum.

2. Install base flashing ply to all perimeter and projection details after membrane application.

3. Extend plies 2 inches beyond top edges of cants at wall and projection bases.

4. Install base flashing ply to all perimeter and projection details.

5. Allow the one ply of base sheet to cure at least 30 minutes before installing the modified membrane. However, the modified membrane must be installed the same day as the base plies.

C. Modified Cap Ply(s): Solidly bond the modified membrane to the base layers with specified material at the rate of 25 to thirty 30 lbs. (11-13kg) per 100 square feet.

1. Roll must push a puddle of hot material in front of it with material slightly visible at all side laps.

Use care to eliminate air entrapment under the membrane. Exercise care during application to eliminate air entrapment under the membrane.

2. Apply pressure to all seams to ensure that the laps are solidly bonded to substrate.

3. Install subsequent rolls of modified membrane as above with a minimum of 4 inch (101 mm) side laps and 8 inch (203 mm) end laps. Stagger end laps. Apply membrane in the same direction as the previous layers but stagger the laps so they do not coincide with the laps of the base layers.

4. Apply hot material no more than 5 feet (1.5 m) ahead of each roll being embedded.

5. Extend membrane 2 inches (50 mm) beyond top edge of all cants in full moppings of the specified hot material.

D. Fibrous Cant Strips: Provide non-combustible perlite or glass fiber cant strips at all wall/curb detail treatments where angle changes are greater than 45 degrees. Cant may be set in approved cold adhesives, hot asphalt or mechanically attached with approved plates and fasteners.

E. Wood Blocking, Nailers and Cant Strips: Provide wood blocking, nailers and cant strips as specified in Section 06114.

1. Provide nailers at all roof perimeters and penetrations for fastening membrane flashings and sheet metal components.

2. Wood nailers should match the height of any insulation, providing a smooth and even transition between flashing and insulation areas.

3. Nailer lengths should be spaced with a minimum 1/8 inch gap for expansion and contraction between each length or change of direction.

4. Nailers and flashings should be fastened in accordance with Factory Mutual "Loss Prevention

Data Sheet 1- 49, Perimeter Flashing" and be designed to be capable of resisting a minimum force of 200 lbs/lineal foot in any direction.

F. Metal Work: Provide metal flashings, counter flashings, parapet coping caps and thru-wall flashings as specified in Section 07620 or Section 07710. Install in accordance with the SMACNA "Architectural Sheet Metal Manual" or the NRCA Roofing Waterproofing manual.

G. Termination Bar: Provide a metal termination bar or approved top edge securement at the terminus of all flashing sheets at walls and curbs. Fasten the bar a minimum of 8 inches (203 mm) o/c to achieve constant compression. Provide suitable, sealant at the top edge if required.

H. Flashing Base Ply: Install flashing sheets by the same application method used for the base ply.

1. Seal curb, wall and parapet flashings with an application of mastic and mesh on a daily basis. Do not permit conditions to exist that will allow moisture to enter behind, around or under the roof or flashing membrane.

2. Prepare all walls, penetrations, expansion joints and surfaces to be flashed with required primer at the rate of 100 square feet per gallon. Allow primer to dry tack free.

3. Adhere to the underlying base flashing ply with specified hot material unless otherwise noted in these specifications. Nail off at a minimum of 8 inches (203 mm) o.c. from the finished roof at all vertical surfaces.

4. Solidly adhere the entire sheet of flashing membrane to the substrate.

5. Seal all vertical laps of flashing membrane with a three-course application of trowel-grade mastic and mesh.

6. Coordinate counter flashing, cap flashings, expansion joints, and similar work with modified bitumen roofing work as specified.

PROJECT NUMBER: #2605 07 50 00- 8

7. Coordinate roof accessories, miscellaneous sheet metal accessory items, including piping vents and other devices with the roofing system work.

I. Flashing Cap Ply: Install flashing cap sheets by the same application method used for the cap ply.

1. Seal curb, wall and parapet flashings with an application of mastic and mesh on a daily basis. Do not permit conditions to exist that will allow moisture to enter behind, around or under the roof or flashing membrane.

2. Prepare all walls, penetrations, expansion joints and where shown on the Drawings to be flashed with required primer at the rate of 100 square feet per gallon. Allow primer to dry tack free.

3. Adhere to the underlying base flashing ply with specified flashing ply adhesive unless otherwise specified. Nail off at a minimum of 8 inches (203 mm) o.c. from the finished roof at all vertical surfaces.

4. Coordinate counter flashing, cap flashings, expansion joints and similar work with modified bitumen roofing work as specified.

5. Coordinate roof accessories, miscellaneous sheet metal accessory items with the roofing system work.

6. All stripping shall be installed prior to flashing cap sheet installation.

7. Heat and scrape granules when welding or adhering at cut areas and seams to granular surfaces at all flashings.

8. Secure the top edge of the flashing sheet using a termination bar only when the wall surface above is waterproofed, or nailed 4 inches on center and covered with an acceptable counter flashing.

3.5 PROTECTION

A. Provide traffic ways, erect barriers, fences, guards, rails, enclosures, chutes and the like to protect personnel, roofs and structures, vehicles and utilities.

B. Protect exposed surfaces of finished walls with tarps to prevent damage.

C. Plywood for traffic ways required for material movement over existing roofs shall be not less than 5/8 inch (16 mm) thick.

D. In addition to the plywood listed above, an underlayment of minimum 1/2 inch (13 mm) recover board is required on new roofing.

E. Special permission shall be obtained from the Manufacturer before any traffic shall be permitted over new roofing.

3.6 FIELD QUALITY CONTROL

A. Installation Inspections: Provide manufacturer's field observations at start-up and at minimum 2 working days per week. Provide a final inspection upon completion of the Work.

1. Warranty shall be issued upon manufacturer's acceptance of the installation.

2. Field observations shall be performed by a representative employed full-time by the manufacturer and whose primary job description is to assist, inspect, and approve membrane installations for the manufacturer.

3. Provide observation reports from the Manufacturer Representative indicating procedures followed, weather conditions and any discrepancies found during inspection, sent weekly to the Owner.

4. Provide a final report from the Manufacturer Representative, certifying that the roofing system has been satisfactorily installed according to the project specifications, approved details and good general roofing practice.

PROJECT NUMBER: #2605 07 50 00- 9

3.7 CLEANING

A. Clean-up and remove daily from the site all wrappings, empty containers, paper, loose particles and other debris resulting from these operations.

B. Daily, during progress of work, as directed by Owner and at completion of work, remove all rubbish, debris, dirt, equipment and unused materials from the site and clean all adjoining surfaces which have been soiled with roofing materials. Use extreme care during roofing operations to avoid staining of wall facing. In raising hot pitch or asphalt alongside finished wall surfaces, protect adjoining walls with tarpaulins or solid wood covering to prevent possibility of splashing or damage. Remove all bitumen from exposed masonry surfaces.

C. Remove asphalt markings from finished surfaces.

D. Repair or replace defaced or disfigured finishes caused by Work of this section.

3.8 SCHEDULES

A. Base (Ply) Sheet:

1. 80 mil SBS (Styrene-Butadiene-Styrene) rubber modified roofing base sheet reinforced with a fiberglass scrim, performance requirements according to ASTM D 5147.

a. Tensile Strength, ASTM D 5147

1) 2 in/min. @ 0 +/- 3.6 deg. F MD 140 lbf/in XD 100 lbf/in

2) 50mm/min. @ -17.78 +/- 2 deg. C MD 24.5 kN/m XD 17.5 kN/m

b. Tear Strength, ASTM D 5147

1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 130 lbf XD 100 lbf

2) 50mm/min. @ 23 +/- 2 deg. C MD 578 N XD 444 N

c. Elongation at Maximum Tensile, ASTM D 5147

1) 2 in/min. @ 0 +/- 3.6 deg. F MD 4 % XD 4 %

2) 50mm/min@ -17.78 +/- 2 deg. C MD 4 % XD 4 %

d. Low Temperature Flexibility, ASTM D 5147, Passes -40 deg. F ( -40 deg. C)

B. Modified Cap (Ply) Sheet:

1. 105 mil SBS (Styrene-Butadiene-Styrene) rubber modified roofing membrane incorporating recycled rubber and reinforced with a fiberglass and polyester composite scrim. ASTM D 6162, Type III Grade S

a. Tensile Strength, ASTM D 5147

1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 310 lbf/in XD 310 lbf/in

2) 50 mm/min. @ 23 +/- 2 deg. C MD 54.25 kN/m XD 54.25 kN/m

b. Tear Strength, ASTM D 5147

1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 500 lbf XD 500 lbf

2) (50 mm/min. @ 23 +/- 2 deg. C MD 2224 N XD 2224 N

c. Elongation at Maximum Tensile, ASTM D 5147

1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 8% XD 8%

2) 50 mm/min. @ 23 +/- 2 deg. C MD 8% XD 8%

d. Low Temperature Flexibility, ASTM D 5147, Passes -30 deg. F (-34 deg. C)

C. Interply Adhesive:

1. Hot Bitumen, ASTM D 312, Type III steep asphalt having the following characteristics:

a. Softening Point 185 deg. F - 205 deg. F

b. Flash Point 500 deg. F

c. Penetration @ 77 deg. F 15-35 units

d. Ductility @ 77 deg. F 2.5 cm

D. Flashing Base Ply:

1. 80 mil SBS (Styrene-Butadiene-Styrene) rubber modified roofing base sheet reinforced with a fiberglass scrim, performance requirements according to ASTM D 5147.

a. Tensile Strength, ASTM D 5147

1) 2 in/min. @ 0 +/- 3.6 deg. F MD 140 lbf/in XD 100 lbf/in

2) 50mm/min. @ -17.78 +/- 2 deg. C MD 24.5 kN/m XD 17.5 kN/m

PROJECT NUMBER: #2605 07 50 00- 10

b. Tear Strength, ASTM D 5147

1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 130 lbf XD 100 lbf

2) 50mm/min. @ 23 +/- 2 deg. C MD 578 N XD 444 N

c. Elongation at Maximum Tensile, ASTM D 5147

1) 2 in/min. @ 0 +/- 3.6 deg. F MD 4 % XD 4 %

2) 50mm/min@ -17.78 +/- 2 deg. C MD 4 % XD 4 %

d. Low Temperature Flexibility, ASTM D 5147, Passes -40 deg. F ( -40 deg. C)

E. Flashing Ply Adhesive:

1. Hot Bitumen, ASTM D 312, Type III steep asphalt having the following characteristics:

a. Softening Point 185 deg. F - 205 deg. F

b. Flash Point 500 deg. F

c. Penetration @ 77 deg. F 15-35 units

d. Ductility @ 77 deg. F 2.5 cm

F. Flashing Cap (Ply) Sheet:

1. 160 mil SBS and SIS (Styrene-Butadiene-Styrene and Styrene-Isoprene-Styrene) rubber modified membrane incorporating post-consumer recycled rubber, fire retardant additives and reinforced with a fiberglass and polysester compostite scrim. Surfaced with a highly reflective white mineral. ASTM D 6162, Type III Grade G

a. Tensile Strength, ASTM D 5147

1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 700 lbf/in XD 750 lbf/in

2) 50 mm/min. @ 23 +/- 2 deg. C MD 122.5 kN/m XD 131.25 kN/m

b. Tear Strength, ASTM D 5147

1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 1300 lbf XD 1400 lbf

2) (50 mm/min. @ 23 +/- 2 deg. C MD 5783 N XD 6227 N

c. Elongation at Maximum Tensile, ASTM D 5147

1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 6% XD 6%

2) 50 mm/min. @ 23 +/- 2 deg. C MD 6% XD 6%

d. Low Temperature Flexibility, ASTM D 5147, Passes -30 deg. F (-34 deg. C)

e. Reflectivy, ASTM C 1549: 73%

KCDC Building Envelope Project EPDM Roofing

PROJECT NUMBER: #2605 07 53 23- 1

SECTION 07 53 23

ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SECTION INCLUDES

A. Adhered EPDM Roofing

1.3 SUMMARY

A. Section Includes:

1. Furnish and install a complete Adhered EPDM roofing system, including:

a. Preparation of roofing substrates

b. Insulation

c. Membrane

d. Adhesives

e. Flashing

f. Expansion Joints

g. Walkways

2. This specification includes requirements needed to ensure a 15-year warranty. The Contractor must confirm with the Roofing System Manufacturer all steps required to complete the installation of a 15-year warranted roof system prior to commencement of work.

B. Related Requirements:

1. Section 061000 "Rough Carpentry" for wood nailers, curbs, and blocking.

2. Section 076200 "Sheet Metal Flashing and Trim" for metal roof flashings and counterflashings.

3. Section 079200 "Joint Sealants" for joint sealants, joint fillers, and joint preparation.

1.4 REFERENCE STANDARDS

A. ASTM E 108 - Standard Test Methods for Fire Test of Roof Coverings

B. Factory Mutual Research (FM): Roof Assembly Classifications.

C. National Roofing Contractors Association (NRCA): Roofing and Waterproofing Manual.

D. Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA) - Architectural Sheet Metal Manual.

E. Underwriters Laboratories, Inc. (UL): Fire Hazard Classifications.

F. Warnock Hersey (WH): Fire Hazard Classifications.

G. ANSI-SPRI ES-1 Wind Design Standard for Edge Systems used with Low Slope Roofing Systems.

H. ASCE 7, Minimum Design Loads for Buildings and Other Structures

I. UL - Fire Resistance Directory.

J. FM Approvals - Roof Coverings and/or RoofNav assembly database.

PROJECT NUMBER: #2605 07 53 23- 2

1.5 SUBMITTALS

A. Product Data: Manufacturer's data sheets on each product to be used, including:

1. Preparation instructions and recommendations.

2. Storage and handling requirements and recommendations.

3. Installation instructions.

B. Shop Drawings: Submit shop drawings including installation details of roofing, flashing, fastening, and insulation, including notation of roof slopes and fastening patterns of insulation and base modified bitumen membrane, prior to job start.

C. Design Pressure Calculations: Submit design pressure calculations for the roof area in accordance with ASCE 7 and local Building Code requirements. Include a roof system attachment analysis report, certifying the system's compliance with applicable wind load requirements before Work begin.

D. Recycled or Bio-Based Materials: Provide third party certification through UL Environment of roof System membranes containing recycled or bio based materials.

E. Verification Samples: For each modified bituminous membrane ply product specified, two samples, minimum size 6 inches (150 mm) square, representing actual product, color, and patterns.

F. Manufacturer's Certificates: Provide to certify products meet or exceed specified requirements.

G. Test Reports: Submit test reports, prepared by an independent testing agency, for all modified bituminous sheet roofing, indicating compliance with ASTM D5147.

H. Closeout Submittals: Provide manufacturer's maintenance instructions that include recommendations for periodic inspection and maintenance of all completed roofing work. Provide product warranty executed by the manufacturer. Assist Owner in preparation and submittal of roof installation acceptance certification as may be necessary in connection with fire and extended coverage insurance on roofing and associated work.

1.6 QUALITY ASSURANCE

A. Perform Work in accordance with NRCA Roofing and Waterproofing Manual.

B. Manufacturer Qualifications: Company specializing in manufacturing products specified with documented ISO 9001 certification and minimum of twelve years of documented experience and must not have been in Chapter 11 bankruptcy during the last five years.

C. Installer Qualifications: Company specializing in performing Work of this section with minimum 15 years documented experience and is a certified Pre-Approved Contractor for the roof system Manufacturer. The installing contractor must submit a list of five projects that are 10 years old within a 100-mile radius of the current project, of equal or greater size, for owner evaluation. Evidence of compliance with these qualifications shall be provided upon request and shall be subject to the Owner’s and Manufacturer’s verification.

D. Installer's Field Supervision: Maintain a full-time Supervisor/Foreman on job site during all phases of roofing work while roofing work is in progress.

E. Product Certification: Provide manufacturer's certification that materials are manufactured in the United States and conform to requirements specified herein, are chemically and physically compatible with each other, and are suitable for inclusion within the total roof system specified herein.

F. Source Limitations: Obtain all components of roof system from a single manufacturer. Secondary products that are required shall be recommended and approved in writing by the roofing system Manufacturer. Upon request of the Architect or Owner, submit Manufacturer's written approval of secondary components in list form, signed by an authorized agent of the Manufacturer.

1.7 PRE-INSTALLATION MEETINGS

A. Convene minimum two weeks prior to commencing Work of this section.

B. Review installation procedures and coordination required with related Work.

C. Inspect and make notes of job conditions prior to installation:

PROJECT NUMBER: #2605 07 53 23- 3

1. Record minutes of the conference and provide copies to all parties present.

2. Identify all outstanding issues in writing designating the responsible party for follow-up action and the timetable for completion.

3. Installation of roofing system shall not begin until all outstanding issues are resolved to the satisfaction of the Project Owner.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver and store products in manufacturer's unopened packaging with labels intact until ready for installation.

B. Store all roofing materials in a dry place, on pallets or raised platforms, out of direct exposure to the elements until time of application. Store materials at least 4 inches above ground level and covered with "breathable" tarpaulins.

C. Stored in accordance with the instructions of the manufacturer prior to their application or installation.

Store roll goods on end on a clean flat surface except store KEE-Stone FB 60 rolls flat on a clean flat surface. No wet or damaged materials will be used in the application.

D. Store at room temperature wherever possible, until immediately prior to installing the roll. During winter, store materials in a heated location with a 50 degree F (10 degree C) minimum temperature, removed only as needed for immediate use. Keep materials away from open flame or welding sparks.

E. Avoid stockpiling of materials on roofs without first obtaining acceptance from the Project Owner.

F. Adhesive storage shall be between the range of above 50 degree F (10 degree C) and below 80 degree F (27 degree C). Area of storage shall be constructed for flammable storage.

1.9 COORDINATION

A. Coordinate Work with installing associated metal flashings as work of this section proceeds.

1.10 WARRANTY

A. Upon completion of the work, provide the Manufacturer's written and signed NDL Warranty, warranting that, if a leak develops in the roof during the term of this warranty, due either to defective material or defective workmanship by the installing contractor, the manufacturer shall provide the Owner, at the Manufacturer's expense, with the labor and material necessary to return the defective area to a watertight condition.

1. Manufacturer Warranty Period:

a. 15 years from date of acceptance.

2. Contractor Warranty Period:

a. 5 years from date of acceptance.

PART 2 PRODUCTS

A. Basis of Design and Acceptable Manufacturer: Garland Company, Inc. (The); 3800 E. 91st St., Cleveland, OH 44105. ASD. Toll Free: 800-321-9336. Phone: 216-641-7500. Fax: 216-641-0633. Web Site:

www.garlandco.com.

B. The Products specified are intended and the Standard of Quality for the products required for this project. If other products are proposed, the bidder must disclose in the bid the manufacturer and the products that they intend to use on the Project. If no manufacturer and products are listed, or the Manufacturer Field Quality Control Letter is not submitted, the bid may be accepted only with the use of the products specified.

1. Bidder will not be allowed to change materials after the bid opening date.

2. If alternate products are included in the bid, the products must be equal to or exceed the products specified.

Supporting technical data shall be submitted to the Owner for approval prior to acceptance.

PROJECT NUMBER: #2605 07 53 23- 4

3. In making a request for substitution, the Bidder/Roofing Contractor represents that it has:

a. Personally investigated the proposed product or method, and determined that it is equal or superior in all respects to that specified.

b. Will provide the same guarantee for substitution as for the product and method specified.

c. Will coordinate installation of accepted substitution in work, making such changes as may be required for work to be completed in all respects.

d. Will waive all claims for additional cost related to substitution, which consequently become apparent.

e. Cost data is complete and includes all related cost under his/her contract or other contracts, which may be affected by the substitution.

f. Will reimburse the Owner for all redesign cost for accommodation of the substitution.

4. Owner reserves the right to be the final authority on the acceptance or rejection of any or all bids, proposed alternate roofing systems or materials that has met ALL specified requirement criteria.

5. Failure to submit substitution package, or any portion thereof requested, will result in immediate disqualification and consideration for that particular contractors request for manufacturer substitution.

2.2 PERFORMANCE REQUIREMENTS

A. EPDM: ASTM D 4637, Type I, nonreinforced, uniform, flexible EPDM sheet.

B. Thickness: 60 mils (1.5 mm), nominal.

C. Exposed Face Color: Black.

D. Material Compatibility: Roofing materials shall be compatible with one another and adjacent materials under conditions of service and application required, as demonstrated by roofing manufacturer based on testing and field experience.

E. FM Global Listing: Roofing, base flashings, and component materials shall comply with requirements in FM

Global 4450 or FM Global 4470 as part of a roofing system, and shall be listed in FM Global's "RoofNav" for Class 1 or noncombustible construction, as applicable. Identify materials with FM Global markings.

2.3 AUXILIARY ROOFING MATERIALS

A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with roofing.

1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.

2. Sheet Flashing: 60-mil- (1.5-mm-) thick EPDM, partially cured or cured, according to application.

B. Bonding Adhesive: Manufacturer's standard.

C. Seaming Material: Manufacturer's standard, synthetic-rubber polymer primer and 3-inch- (75-mm-) wide minimum, butyl splice tape with release film.

D. Lap Sealant: Manufacturer's standard, single-component sealant.

E. Water Cutoff Mastic: Manufacturer's standard butyl mastic sealant.

F. Metal Termination Bars: Manufacturer's standard, predrilled stainless-steel or aluminum bars, approximately 1 by 1/8 inch (25 by 3 mm) thick; with anchors.

G. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Global 4470, designed for fastening membrane to substrate, and acceptable to roofing system manufacturer.

H. Miscellaneous Accessories: Provide pourable sealers, preformed cone and vent sheet flashings, molded pipe boot flashings, preformed inside and outside corner sheet flashings, reinforced EPDM securement strips, T-joint covers, in-seam sealants, termination reglets, cover strips, and other accessories.

2.4 ROOF INSULATION

A. General: Preformed roof insulation boards manufactured or approved by EPDM roofing manufacturer, selected from manufacturer's standard sizes suitable for application, of thicknesses indicated and that produce

1. Roof insulation board consisting of a core of rigid, closed-cell polyisocyanurate foam faced with a universal, black, fiberglass reinforced mat. Insulation shall meet requirements of ASTM C1289. Insulation shall be

PROJECT NUMBER: #2605 07 53 23- 5

manufactured without the use of CFCs and shall comply with EPA requirements and Clean-Air Act Amendment Standards of 1990.

a. Johns-Manville "E'NRG'Y 2"

b. GAF, "Gaftemp"

c. Hunter

2. Insulation to achieve ¼” slope in field of roof and ½” slope for crickets and saddles.

B. Tapered Insulation: Provide factory-tapered insulation boards fabricated to slope of 1/4 inch per 12 inches (1:48) unless otherwise indicated.

C. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where indicated for sloping to drain. Fabricate to slopes indicated.

D. Insulation Adhesive: Two-component, No-VOC, high-rise insulation adhesive, designed and approved for binding approved roof insulation boards.

a. Tensile Strength, ASTM D 412: 250 psi

b. Density, ASTM D 1875: 8.5 lbs./gal.

c. Viscosity, ASTM D 2556: 22,000-60,000 cP

d. Peel Strength, ASTM D 903: 17 lb./in.

e. Flexibility, ASTM D 816: Pass @ -70 degrees F (-56.7 degrees C)

f. VOC: 0 g/L

2.5 WALKWAYS

A. Coated Walkways: Two-component, 100% solids, aliphatic polyurea chemical cure elastomeric coated walkways, with the following characteristics:

a. Elongation, ASTM D 412: 800%

b. Tensile Strength, ASTM D 412: 2500 psi

c. Tear Resistance, ASTM D 624: 449 lbs./in

d. Low Temperature Flexibility, ASTM D 522: -60 degrees F (-51.1 degrees C)

e. Tensile-Tear Resistance: ASTM D 4073, 274 lbf.

f. Tensile Load Strain: ASTM D 4073, 135 lbf.in.

g. Dry Film Thickness: 70-80 mils

h. VOC: 0 g/l

2. Mineral broadcasted to refusal within coated walkway

a. Coating color: Selected by Owner, white or grey

b. Mineral color: Selected by Owner, white, grey, or yellow

PART 3 - EXECUTION

3.1 INSPECTION

A. General: Clean insulation and/or roof deck. surfaces thoroughly prior to installation.

1. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

2. Fill substrate surface voids that are greater than 1/4 inch wide with an acceptable fill material.

3. Roof surface to receive roofing system shall be smooth, clean, free from loose gravel, dirt and debris, dry and structurally sound.

4. Wherever necessary, all surfaces to receive roofing materials shall be power broom and vacuumed to remove debris and loose matter prior to starting work.

5. Do not apply roofing during inclement weather. Do not apply roofing membrane to damp, frozen, dirty, or dusty surfaces.

6. Fasteners and plates for fastening components mechanically to the substrate shall provide a minimum pull-out capacity of 300 lbs. (136 k) per fastener. Base or ply sheets attached with cap nails require a minimum pullout capacity of 40 lb. per nail.

3.2 INSTALLATION - GENERAL

A. Install roofing system according to roofing system manufacturer's written instructions.

PROJECT NUMBER: #2605 07 53 23- 6

B. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at…