2605 Drawings.pdf

PDF 3 MB Posted

Attached to
Kenosha County Detention Center Building Envelope Project
Solicitation number
2605
Issued by
Kenosha County, Wisconsin

About this file

This is a technical drawings document for the Kenosha County Detention Center Building Envelope Project located at 4777 88th Avenue, Kenosha, Wisconsin 53144. The project encompasses roof replacement and building envelope improvements across six distinct roof sections of the detention center facility. The drawings, prepared by The Garland Company (Cleveland, Ohio), present specifications for two roofing system options: adhered EPDM (ethylene propylene diene monomer) membrane systems for Sections 1-6 and modified bitumen roof systems for the same sections, allowing bidders to propose either system type. Common work across all sections includes removal of existing ballasted EPDM roofing systems down to the insulation surface, removal and replacement of wet insulation as identified by infrared scanning, installation of mechanical and adhered PolyISO insulation layers (varying between 1 inch to 1.5 inches of high-density material plus 5 inches of standard insulation), installation of roof membranes with complete flashing systems, installation of new cast iron drains with tapered sumps, replacement of sheet metal perimeter details, and installation of elastomeric-coated walkways at five-foot widths in designated areas. All roof penetrations must maintain minimum eight-inch flashing heights, and contractors are required to provide tapered insulation drawings for approval and schedule any interior exposure work with 48-hour advance notice to the owner.

The drawings include comprehensive detail sheets addressing specific roof conditions and penetrations, including inside corners, curb flashings, membrane splices, pipe penetrations, pitch pockets, raised metal edges, heat stacks, roof drains, parapet flashings, and metal counter flashings. Contractors are required to manage all electrical, plumbing, and HVAC disconnections and reconnections, while lightning protection systems must be detached and reattached by a licensed third-party contractor. The document emphasizes that roof fields must be uniform with positive water flow to drains, and roof sections vary slightly in existing insulation depths (5 inches for Sections 1-2 and 6.5 inches for Sections 3-6). Detail requirements specify that one-piece sheet metal fascia is limited to eight inches maximum, with any extensions requiring two-piece metal and keeper strips. The project file includes 13 pages of technical drawings with multiple detail sheets referenced throughout the specifications.

View the file

Other files

File Type Posted
Vendor Responsibility Form Construction.pdf PDF
2605 Specifications.pdf PDF
2605 Addendum 1.pdf PDF
2605 Bid Documents.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ISSUED:

K E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

COVER

PAGE

DETENTION CENTER BUILDING

ENVELOPE PROJECT

Project No: #2605

COMMUNICATIONS

BUILDING

C-1

ROOF SECTION 1

ROOF SECTION 2

ROOF SECTION 3

ROOF SECTION 4

ROOF SECTION 5ROOF SECTION 6

E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

ROOF SECTION

1 & 2 - EPDM

KCDC – Roof Section 1 & 2 – Adhered EPDM Roof Systems

Roof Preparation & Installation

1. Remove Existing Roof System down to Insulation Surface.

2. Remove wet insulation per IR Scan and replace with matching. Sweep clean surface of insulation of all dirt and debris.

3. Mechanically attach 1 – 1" layer of PolyISO insulation to Metal Deck

4. Install 1 – 1/2” Layer of High Density PolyISO insulation, adhered in insulation adhesive

5. Install 60 Mil Adhered EPDM for Field and Flashings, fully adhered

6. Install New 24ga Sheet Metal to Perimeters, Flashings, Counter Flashings, Coping Caps, etc

7. Install new cast iron drains, taper into roof with 8' x 8' sumps

8. Install Elastomeric Coated Walkways in Denoted areas, at 5' widths

EXISTING ROOF MAKEUP

• Ballasted EPDM

• 5" PolyISO Insulation

• Gypsum Board

• Metal Deck

NEW ROOF MAKEUP

• Adhered EPDM

• ½” HD PolyISO

• 1” PolyISO

• 5" PolyISO Insulation

• Gypsum Board

• Metal Deck

Project Notes

1. All roof penetrations shall have a min. of 8" flashing heights.

2. Field of roof is to be uniform and will ensure positive water flow to roof drains.

3. Contractor to provide tapered insulation drawings for approval. Crickets to be installed at Corners, Curbs, Etc, as Required.

4. All Electrical, Plumbing, and HVAC Disconnect/Reconnects shall be provided by the

“Contractor”.

5. Lightning Protection to be detached and reattached, by a licensed 3rd party Lightning

Protection contractor.

6. Any work being done at the roof deck level or an area with exposed interior, must get approval by owner and must be scheduled 48 hours in advance.

Expansion Joint

Equipment Support

Roof Curb

Roof Drain

Pitch Pocket

Plumbing Stack

Roof Hatch

Penetration Box

Remove Penetration

Walkway

Throughwall Scupper

Insulation Slope

Insulation Cricket

Heat Stack

Roof Section 1

Roof Section 2

A-1

D1

D1

D1

D1

D1

D1

D1

D2

D2

D1

D1

E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

KCDC – Roof Section 3 & 4 – Adhered EPDM Roof Systems

Roof Preparation & Installation

1. Remove Existing Roof System down to Insulation Surface.

2. Remove wet insulation per IR Scan and replace with matching. Sweep clean surface of insulation of all dirt and debris.

3. Mechanically attach 1 – 1" layer of PolyISO insulation to Metal Deck

4. Install 1 – 1/2” Layer of High Density PolyISO insulation, adhered in insulation adhesive

5. Install 60 Mil Adhered EPDM for Field and Flashings, fully adhered

6. Install New 24ga Sheet Metal to Perimeters, Flashings, Counter Flashings, Coping Caps, etc

7. Install new cast iron drains, taper into roof with 8' x 8' sumps

8. Install Elastomeric Coated Walkways in Denoted areas, at 5' widths

EXISTING ROOF MAKEUP

• Ballasted EPDM

• 6.5" PolyISO Insulation

• Gypsum Board

• Metal Deck

NEW ROOF MAKEUP

• Adhered EPDM

• ½” HD PolyISO

• 1” PolyISO

• 5" PolyISO Insulation

• Gypsum Board

• Metal Deck

Project Notes

1. All roof penetrations shall have a min. of 8" flashing heights.

2. Field of roof is to be uniform and will ensure positive water flow to roof drains.

3. Contractor to provide tapered insulation drawings for approval. Crickets to be installed at Corners, Curbs, Etc, as Required.

4. All Electrical, Plumbing, and HVAC Disconnect/Reconnects shall be provided by the

“Contractor”.

5. Lightning Protection to be detached and reattached, by a licensed 3rd party Lightning

Protection contractor.

6. Any work being done at the roof deck level or an area with exposed interior, must get approval by owner and must be scheduled 48 hours in advance.

Expansion Joint

Equipment Support

Roof Curb

Roof Drain

Pitch Pocket

Plumbing Stack

Roof Hatch

Penetration Box

Remove Penetration

Walkway

Throughwall Scupper

Insulation Slope

Insulation Cricket

Heat Stack

Roof Section 3

Roof Section 4

ROOF SECTION

3 & 4 - EPDM

A-2

D1

D1

D2

D2

D1

D1

D1

D1

D1

D1

E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

KCDC – Roof Section 5 – Adhered EPDM Roof Systems

Roof Preparation & Installation

1. Remove Existing Roof System down to Insulation Surface.

2. Remove wet insulation per IR Scan and replace with matching. Sweep clean surface of insulation of all dirt and debris.

3. Mechanically attach 1 – 1" layer of PolyISO insulation to Metal Deck

4. Install 1 – 1/2” Layer of High Density PolyISO insulation, adhered in insulation adhesive

5. Install 60 Mil Adhered EPDM for Field and Flashings, fully adhered

6. Install New 24ga Sheet Metal to Perimeters, Flashings, Counter Flashings, Coping Caps, etc

7. Install new cast iron drains, taper into roof with 8' x 8' sump

8. Install Elastomeric Coated Walkways in Denoted areas, at 5' widths

EXISTING ROOF MAKEUP

• Ballasted EPDM

• 6.5" PolyISO Insulation

• Gypsum Board

• Metal Deck

NEW ROOF MAKEUP

• Adhered EPDM

• ½” HD PolyISO

• 1” PolyISO

• 5" PolyISO Insulation

• Gypsum Board

• Metal Deck

Project Notes

1. All roof penetrations shall have a min. of 8" flashing heights.

2. Field of roof is to be uniform and will ensure positive water flow to roof drains.

3. Contractor to provide tapered insulation drawings for approval. Crickets to be installed at Corners, Curbs, Etc, as Required.

4. All Electrical, Plumbing, and HVAC Disconnect/Reconnects shall be provided by the

“Contractor”.

5. Lightning Protection to be detached and reattached, by a licensed 3rd party Lightning

Protection contractor.

6. Any work being done at the roof deck level or an area with exposed interior, must get approval by owner and must be scheduled 48 hours in advance.

Expansion Joint

Equipment Support

Roof Curb

Roof Drain

Pitch Pocket

Plumbing Stack

Roof Hatch

Penetration Box

Remove Penetration

Raise Curb

Throughwall Scupper

Insulation Slope

Insulation Cricket

Heat Stack

Roof Section 5

ROOF SECTION

5 - EPDM

A-3

D2

D2

D1

D1

E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

KCDC – Roof Section 6 – Adhered EPDM Roof Systems

Roof Preparation & Installation

1. Remove Existing Roof System down to Insulation Surface.

2. Remove wet insulation per IR Scan and replace with matching. Sweep clean surface of insulation of all dirt and debris.

3. Mechanically attach 1 – 1" layer of PolyISO insulation to Metal Deck

4. Install 1 – 1/2” Layer of High Density PolyISO insulation, adhered in insulation adhesive

5. Install 60 Mil Adhered EPDM for Field and Flashings, fully adhered

6. Install New 24ga Sheet Metal to Perimeters, Flashings, Counter Flashings, Coping Caps, etc

7. Install new cast iron drains, taper into roof with 8' x 8' sumps

8. Install Elastomeric Coated Walkways in Denoted areas, at 5' widths

EXISTING ROOF MAKEUP

• Ballasted EPDM

• 6.5" PolyISO Insulation

• Gypsum Board

• Metal Deck

NEW ROOF MAKEUP

• Adhered EPDM

• ½” HD PolyISO

• 1” PolyISO

• 5" PolyISO Insulation

• Gypsum Board

• Metal Deck

Project Notes

1. All roof penetrations shall have a min. of 8" flashing heights.

2. Field of roof is to be uniform and will ensure positive water flow to roof drains.

3. Contractor to provide tapered insulation drawings for approval. Crickets to be installed at Corners, Curbs, Etc, as Required.

4. All Electrical, Plumbing, and HVAC Disconnect/Reconnects shall be provided by the

“Contractor”.

5. Lightning Protection to be detached and reattached, by a licensed 3rd party Lightning

Protection contractor.

6. Any work being done at the roof deck level or an area with exposed interior, must get approval by owner and must be scheduled 48 hours in advance.

Expansion Joint

Equipment Support

Roof Curb

Roof Drain

Pitch Pocket

Plumbing Stack

Roof Hatch

Penetration Box

Remove Penetration

Raise Curb

Throughwall Scupper

Insulation Slope

Insulation Cricket

Heat Stack

Roof Section 6

ROOF SECTION

6 - EPDM

A-4

D2

D1

D2

D1

E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

KCDC – Roof Section 1 & 2 – Modified Bitumen Roof

Systems

Roof Preparation & Installation

1. Remove Existing Roof System down to Insulation Surface

2. Remove wet insulation per IR Scan and replace with matching. Sweep clean surface of insulation of all dirt and debris.

3. Mechanically attach 1 - 1" layer of PolyISO insulation to Metal Deck

4. Install Wood Fiber Recovery Board in Hot Asphalt

5. Install (1) One Layer of Modified Base Sheet to Field and Flashings, in Hot Asphalt

6. Install (1) One Layer of Smooth Surface Modified Cap Sheet to Field and (1) One Layer of Mineral Surface Cap Sheet to Flashings, in Hot Asphalt

7. Install Flood and Gravel Surface in Hot Asphalt

8. Install New 24ga Sheet Metal to Perimeters, Flashings, Counter Flashings, Coping Caps, etc

9. Install cast iron drains, taper into roof with 8' x 8' sumps

EXISTING ROOF MAKEUP

• Ballasted EPDM

• 5" PolyISO Insulation

• Gypsum Board

• Metal Deck

NEW ROOF MAKEUP

• Flood and Gravel Surface

• Modified Bitumen Roof

• Woodfiber Recovery Board

• 1" PolyISO

• 5" PolyISO Insulation

• Gypsum Board

• Metal Deck

Project Notes

1. All roof penetrations shall have a min. of 8" flashing heights.

2. Field of roof is to be uniform and will ensure positive water flow to roof drains.

3. Contractor to provide tapered insulation drawings for approval. Crickets to be installed at Corners, Curbs, Etc, as Required.

4. All Electrical, Plumbing, and HVAC Disconnect/Reconnects shall be provided by the

“Contractor”.

5. Lightning Protection to be detached and reattached, by a licensed 3rd party Lightning

Protection contractor.

6. Any work being done at the roof deck level or an area with exposed interior, must get approval by owner and must be scheduled 48 hours in advance.

Expansion Joint

Equipment Support

Roof Curb

Roof Drain

Pitch Pocket

Plumbing Stack

Roof Hatch

Penetration Box

Remove Penetration

Raise Curb

Throughwall Scupper

Insulation Slope

Insulation Cricket

Heat Stack

Roof Section 1

Roof Section 2

ROOF SECTION

1 & 2 – MOD BIT

A-5

D4

D4

D4

D4

D4

D4

D4

D4

D4

D4

E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

KCDC – Roof Section 3 & 4 – Modified Bitumen Roof

Systems

Roof Preparation & Installation

1. Remove Existing Roof System down to Insulation Surface

2. Remove wet insulation per IR Scan and replace with matching. Sweep clean surface of insulation of all dirt and debris.

3. Mechanically attach 1 - 1" layer of PolyISO insulation to Metal Deck

4. Install Wood Fiber Recovery Board in Hot Asphalt

5. Install (1) One Layer of Modified Base Sheet to Field and Flashings, in Hot Asphalt

6. Install (1) One Layer of Smooth Surface Modified Cap Sheet to Field and (1) One Layer of Mineral Surface Cap Sheet to Flashings, in Hot Asphalt

7. Install Flood and Gravel Surface in Hot Asphalt

8. Install New 24ga Sheet Metal to Perimeters, Flashings, Counter Flashings, Coping Caps, etc

9. Install cast iron drains, taper into roof with 8' x 8' sumps

EXISTING ROOF MAKEUP

• Ballasted EPDM

• 6.5" PolyISO Insulation

• Gypsum Board

• Metal Deck

NEW ROOF MAKEUP

• Flood and Gravel Surface

• Modified Bitumen Roof

• Woodfiber Recovery Board

• 1" PolyISO

• 5" PolyISO Insulation

• Gypsum Board

• Metal Deck

Project Notes

1. All roof penetrations shall have a min. of 8" flashing heights.

2. Field of roof is to be uniform and will ensure positive water flow to roof drains.

3. Contractor to provide tapered insulation drawings for approval. Crickets to be installed at Corners, Curbs, Etc, as Required.

4. All Electrical, Plumbing, and HVAC Disconnect/Reconnects shall be provided by the

“Contractor”.

5. Lightning Protection to be detached and reattached, by a licensed 3rd party Lightning

Protection contractor.

6. Any work being done at the roof deck level or an area with exposed interior, must get approval by owner and must be scheduled 48 hours in advance.

Expansion Joint

Equipment Support

Roof Curb

Roof Drain

Pitch Pocket

Plumbing Stack

Roof Hatch

Penetration Box

Remove Penetration

Raise Curb

Throughwall Scupper

Insulation Slope

Insulation Cricket

Heat Stack

Roof Section 3

Roof Section 4

ROOF SECTION

3 & 4 – MOD BIT

A-6

D4

D4

D4

D4

D4

D4

D4

D4

D4

D4

D4

KCDC – Roof Section 3 & 4 – Modified Bitumen Roof

Systems

Roof Preparation & Installation

1. Remove Existing Roof System down to Insulation Surface

2. Remove wet insulation per IR Scan and replace with matching. Sweep clean surface of insulation of all dirt and debris.

3. Mechanically attach 1 - 1" layer of PolyISO insulation to Metal Deck

4. Install Wood Fiber Recovery Board in Hot Asphalt

5. Install (1) One Layer of Modified Base Sheet to Field and Flashings, in Hot Asphalt

6. Install (1) One Layer of Smooth Surface Modified Cap Sheet to Field and (1) One Layer of Mineral Surface Cap Sheet to Flashings, in Hot Asphalt

7. Install Flood and Gravel Surface in Hot Asphalt

8. Install New 24ga Sheet Metal to Perimeters, Flashings, Counter Flashings, Coping Caps, etc

9. Install cast iron drains, taper into roof with 8' x 8' sumps

EXISTING ROOF MAKEUP

• Ballasted EPDM

• 6.5" PolyISO Insulation

• Gypsum Board

• Metal Deck

NEW ROOF MAKEUP

• Flood and Gravel Surface

• Modified Bitumen Roof

• Woodfiber Recovery Board

• 1" PolyISO

• 5" PolyISO Insulation

• Gypsum Board

• Metal Deck

Project Notes

1. All roof penetrations shall have a min. of 8" flashing heights.

2. Field of roof is to be uniform and will ensure positive water flow to roof drains.

3. Contractor to provide tapered insulation drawings for approval. Crickets to be installed at Corners, Curbs, Etc, as Required.

4. All Electrical, Plumbing, and HVAC Disconnect/Reconnects shall be provided by the

“Contractor”.

5. Lightning Protection to be detached and reattached, by a licensed 3rd party Lightning

Protection contractor.

6. Any work being done at the roof deck level or an area with exposed interior, must get approval by owner and must be scheduled 48 hours in advance.

Expansion Joint

Equipment Support

Roof Curb

Roof Drain

Pitch Pocket

Plumbing Stack

Roof Hatch

Penetration Box

Remove Penetration

Raise Curb

Throughwall Scupper

Insulation Slope

Insulation Cricket

Heat Stack

Roof Section 3

Roof Section 4

ROOF SECTION

3 & 4 – MOD BIT

A-6

D4

D4

D4

D4

D4

D4

D4

D4

D4

D4

E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

KCDC – Roof Section 5 – Modified Bitumen Roof Systems

Roof Preparation & Installation

1. Remove Existing Roof System down to Insulation Surface

2. Remove wet insulation per IR Scan and replace with matching. Sweep clean surface of insulation of all dirt and debris.

3. Mechanically attach 1 - 1" layer of PolyISO insulation to Metal Deck

4. Install Wood Fiber Recovery Board in Hot Asphalt

5. Install (1) One Layer of Modified Base Sheet to Field and Flashings, in Hot Asphalt

6. Install (1) One Layer of Smooth Surface Modified Cap Sheet to Field and (1) One Layer of Mineral Surface Cap Sheet to Flashings, in Hot Asphalt

7. Install Flood and Gravel Surface in Hot Asphalt

8. Install New 24ga Sheet Metal to Perimeters, Flashings, Counter Flashings, Coping Caps, etc

9. Install cast iron drains, taper into roof with 8' x 8' sumps

EXISTING ROOF MAKEUP

• Ballasted EPDM

• 6.5" PolyISO Insulation

• Gypsum Board

• Metal Deck

NEW ROOF MAKEUP

• Flood and Gravel Surface

• Modified Bitumen Roof

• Woodfiber Recovery Board

• 1" PolyISO

• 5" PolyISO Insulation

• Gypsum Board

• Metal Deck

Project Notes

1. All roof penetrations shall have a min. of 8" flashing heights.

2. Field of roof is to be uniform and will ensure positive water flow to roof drains.

3. Contractor to provide tapered insulation drawings for approval. Crickets to be installed at Corners, Curbs, Etc, as Required.

4. All Electrical, Plumbing, and HVAC Disconnect/Reconnects shall be provided by the

“Contractor”.

5. Lightning Protection to be detached and reattached, by a licensed 3rd party Lightning

Protection contractor.

6. Any work being done at the roof deck level or an area with exposed interior, must get approval by owner and must be scheduled 48 hours in advance.

Expansion Joint

Equipment Support

Roof Curb

Roof Drain

Pitch Pocket

Plumbing Stack

Roof Hatch

Penetration Box

Remove Penetration

Raise Curb

Throughwall Scupper

Insulation Slope

Insulation Cricket

Heat Stack

Roof Section 5

ROOF SECTION

5 – MOD BIT

A-7

D4

D4

D4

E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

KCDC – Roof Section 6 – Modified Bitumen Roof Systems

Roof Preparation & Installation

1. Remove Existing Roof System down to Insulation Surface

2. Remove wet insulation per IR Scan and replace with matching. Sweep clean surface of insulation of all dirt and debris.

3. Mechanically attach 1 - 1" layer of PolyISO insulation to Metal Deck

4. Install Wood Fiber Recovery Board in Hot Asphalt

5. Install (1) One Layer of Modified Base Sheet to Field and Flashings, in Hot Asphalt

6. Install (1) One Layer of Smooth Surface Modified Cap Sheet to Field and (1) One Layer of Mineral Surface Cap Sheet to Flashings, in Hot Asphalt

7. Install Flood and Gravel Surface in Hot Asphalt

8. Install New 24ga Sheet Metal to Perimeters, Flashings, Counter Flashings, Coping Caps, etc

9. Install cast iron drains, taper into roof with 8' x 8' sumps

EXISTING ROOF MAKEUP

• Ballasted EPDM

• 6.5" PolyISO Insulation

• Gypsum Board

• Metal Deck

NEW ROOF MAKEUP

• Flood and Gravel Surface

• Modified Bitumen Roof

• Woodfiber Recovery Board

• 1" PolyISO

• 5" PolyISO Insulation

• Gypsum Board

• Metal Deck

Project Notes

1. All roof penetrations shall have a min. of 8" flashing heights.

2. Field of roof is to be uniform and will ensure positive water flow to roof drains.

3. Contractor to provide tapered insulation drawings for approval. Crickets to be installed at Corners, Curbs, Etc, as Required.

4. All Electrical, Plumbing, and HVAC Disconnect/Reconnects shall be provided by the

“Contractor”.

5. Lightning Protection to be detached and reattached, by a licensed 3rd party Lightning

Protection contractor.

6. Any work being done at the roof deck level or an area with exposed interior, must get approval by owner and must be scheduled 48 hours in advance.

Expansion Joint

Equipment Support

Roof Curb

Roof Drain

Pitch Pocket

Plumbing Stack

Roof Hatch

Penetration Box

Remove Penetration

Raise Curb

Throughwall Scupper

Insulation Slope

Insulation Cricket

Heat Stack

Roof Section 6

ROOF SECTION

6 – MOD BIT

A-8

D4

D4

D4

E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

DETAILS

INSIDE CORNER

KENOSHA COUNTY

D1

INSIDE CORNER

KENOSHA COUNTY

D1

CURB FLASHING

KENOSHA COUNTY

2 CURB FLASHING

KENOSHA COUNTY

2 MEMBRANE SPLICE WITH SPLICE ADHESIVE

KENOSHA COUNTY

3 MEMBRANE SPLICE WITH SPLICE ADHESIVE

KENOSHA COUNTY

PIPE PENETRATION

KENOSHA COUNTY

4 PIPE PENETRATION

KENOSHA COUNTY

4 PITCH POCKET

KENOSHA COUNTY

5 PITCH POCKET

KENOSHA COUNTY

5 RAISED METAL EDGE

KENOSHA COUNTY

6 RAISED METAL EDGE

KENOSHA COUNTY

D1 D1

D1 D1 D1 D-1

E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

DETAILS

HEAT STACK

KENOSHA COUNTY

1 HEAT STACK

KENOSHA COUNTY

1 ROOF DRAIN

KENOSHA COUNTY

2 ROOF DRAIN

KENOSHA COUNTY

D2 D2

D-2

PARAPET/WALL FLASHING

KENOSHA COUNTY

3 PARAPET/WALL FLASHING

KENOSHA COUNTY

D2

METAL COUNTER FLASHING

KENOSHA COUNTY

4 METAL COUNTER FLASHING

KENOSHA COUNTY

D2

E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

DETAILS

ROOF PROFILE - MOD BIT

KENOSHA COUNTY

1 ROOF PROFILE - MOD BIT

KENOSHA COUNTY

1 HEAT STACK

KENOSHA COUNTY

2 HEAT STACK

KENOSHA COUNTY

2 PITCH POCKET WITH UMBRELLA

KENOSHA COUNTY

3 PITCH POCKET WITH UMBRELLA

KENOSHA COUNTY

CURB/AIR HANDLING STATION

KENOSHA COUNTY

4 CURB/AIR HANDLING STATION

KENOSHA COUNTY

4 SKYLIGHT

KENOSHA COUNTY

5 SKYLIGHT

KENOSHA COUNTY

5 EXHAUST FAN

KENOSHA COUNTY

6 EXHAUST FAN

KENOSHA COUNTY

D3 D3 D3

D3D3D3

D-3

E

N O

S H

A C

O U

N T

Y

D e te n ti o n C e n te r

B u ild in g E n v e lo p e P ro je c t th A v e

K e n o s h a W

I

SHEET NO.

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

12/31/2025

DETAILS

DETAIL REQUIRMENTS

1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.

2) All one piece sheet metal fascia is limited to a maximum of 8". Any face metal extending beyond 8" must have two piece metal and two keeper strips.

RAISED METAL EDGE

KENOSHA COUNTY

2 RAISED METAL EDGE

KENOSHA COUNTY

2ROOF DRAIN

KENOSHA COUNTY

1 ROOF DRAIN

KENOSHA COUNTY

D4 D4

D-4

SURFACED MOUNTED COUNTER FLASHING

KENOSHA COUNTY

3 SURFACED MOUNTED COUNTER FLASHING

KENOSHA COUNTY

Kenosha County - KCDC Building Envelope Project - Drawings 12.4.2025.vsdm
Page-1
Page-2
Page-3
Page-4
Page-5
Page-6
Page-7
Page-8
Page-9
Page-10
Page-11
Page-12
Page-13

File details come from the government source that posted it. Updated .