This document consists of engineering drawings and construction plans prepared by Alfred Benesch & Company for the Athens-Clarke County Unified Government Leisure Services Department's Heard Park Accessible Parking Improvements project. The project involves accessibility enhancements to the Heard Park Community Center parking lot, including a new switchback access path from the parking lot to the Community Center building and an ADA-accessible plaza area. The construction plans include demolition, site development, grading, detailed ramp specifications, staking, erosion control measures, and utility coordination. Multiple utility providers are identified as potentially having facilities in the project area, including ACC Public Utilities, ACC Traffic Engineering, Atlanta Gas Light, AT&T, Charter Communications, Parker Fiber Systems, Georgia Power Distribution, and Georgia Power Transmission, with contact information provided for coordination purposes.
The detailed construction plans encompass multiple sheets showing site layouts, parking space configurations with accessible permit parking and tow-away zones, concrete ramps with handrails, stairs, retaining walls, pervious concrete details, curbing, guardrails, trench drainage systems, and erosion and sediment control measures. The plans reference standard specifications and compliance requirements including Georgia Department of Transportation standards, Georgia soil and water conservation guidelines, and ADA accessibility standards. Comprehensive erosion control notes address sediment management, stabilization requirements, maintenance protocols, and contractor responsibilities throughout the construction process. The benchmark elevation is established at 713.62 feet (NAD 1983/NAVD 1988 datum) at coordinate N: 1441625.56, E: 2542676.63.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26039 BID HEARD COMM CENTER ACCESSIBLE PARKIN.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAMERA
POLE
Sheet:
C1.0
CO
VE
R
SH
EE
T
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te
Au gu st a, G A
P
6.
2.
w w
.b en es ch
.c om
LOCATION MAP
Alfred Benesch & Company 1005 Broad Street, Suite 200 Augusta, GA 30901
706.722.4114 www.benesch.com
Heard Park Accessible Parking Improvements.
The following utilities may have facilities in the project area:
ACC Public Utilities: ACC Traffic Engineering:
Hollis Terry Tim Griffeth 124 E. Hancock St 2795 Lexington Road Athens, Georgia 30601 Athens, Georgia 30605 Phone: 706-613-3476 Phone: 706-613-3460 Fax: 706-613-3476 Fax: 706-613-3463 Email: hollis.terry@accgov.com Email: tim.griffeth@accgov.com
Atlanta Gas Light: AT&T:
Michael Harrison Clay Johnson P.O. Box 1667 125 Reese Street Athens, Georgia 30603 Athens, Georgia 30613 Phone: 706-549-4512 Phone: 706-353-4301 Fax: N/A Fax: 706-548-1621 Email: mharriso@southernco.com Email: clay.johnson@att.com
Charter Communications: Parker Fiber Systems, LLC:
Robert Williams Preston Watson 495 Hawthorne Avenue 10005 Commerce Street Athens, Georgia 30606 Summerville, Georgia 30747 Phone: N/A Phone: 706-857-4646 Fax: N/A Fax: N/A Email: robert.williams@chartercom.com Email: preston@parkersystem.net
Georgia Power Distribution: Georgia Power Transmission:
Stephen Burroughs Melissa Wheeler Black 205 Dairy Park Road 3100 Kilowatt Drive, Bin #73903 Athens, Georgia 30607 Savannah, Georgia 31406
Phone: 404-989-5876 Phone: 678-464-3243 Fax: 706-357-6670 Fax: N/A Email: sburroug@southernco.com Email: mswheele@southernco.com
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
T
Project Site
PROJECT PARCEL MAP
chall Snapshot
28" Pine
17” water oak
22” water oak
22” water oak
CAMERA
POLE
Sheet:
C1.1
DE
MO
LIT
IO
N P
LA
N
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te st a, G A
P
6.
2.
w
.b en es ch
.c om
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
T
DEMOLITION PLAN DEMOLITION PLAN
BENCHMARK:
N: 1441625.56 E: 2542676.63
ELEV=713.62
TOP OF 60D NAIL SET
NAD 1983(2011) / NAVD 1988
CAMERA
POLE
Sheet:
C1.2
DE
VE
LO
PM
EN
T
PL
AN
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te st a, G A
P
6.
2.
w
.b en es ch
.c om
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
T
DEVELOPMENT PLANDEVELOPMENT PLAN
Sheet:
C1.3
UP
PE
R
PL
AZ
A
GR
AD
IN
G
PL
AN
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te st a, G A
P
6.
2.
w
.b en es ch
.c om
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
T
C1.4
DE
TA
ILE
D
RA
MP
P
LA
N
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te st a, G A
P
6.
2.
w
.b en es ch
.c om
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
T
DETAILED RAMP PLAN
BENCHMARK:
N: 1441625.56 E: 2542676.63
ELEV=713.62
TOP OF 60D NAIL SET
NAD 1983(2011) / NAVD 1988
VAN
ACCESSIBLE
PERMIT PARKING ONLY
TOW-AWAY ZONE
MAXIMUM FINE $500.00
PERMIT PARKING ONLY
TOW-AWAY ZONE
MAXIMUM FINE $500.00
P
TOW-AWAY ZONE
P
TOW-AWAY ZONE
P
TOW-AWAY ZONE
P
TOW-AWAY ZONE
CAMERA
POLE
Sheet:
C1.5
ST
AK
IN
G
PL
AN
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te st a, G A
P
6.
2.
w
.b en es ch
.c om
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
T
El ev at io n
El ev at io n
PROFILE: STORM LINE A (1)
HORIZONTAL SCALE: 1"=10'
VERTICAL SCALE: 1"=2'
Sheet:
C1.6
PR
OF
ILE
S
HE
ET
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te st a, G A
P
6.
2.
w
.b en es ch
.c om
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
T
CAMERA
POLE
Sheet:
C2.1
ES
CP
P
LA
N
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te st a, G A
P
6.
2.
w
.b en es ch
.c om
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
T
EROSION CONTROL LEGEND
DUST CONTROL ON DISTURBED AREA
MULCH
SILT FENCE - NON SENSITIVE
TEMPORARY GRASSING
PERMANENT GRASSING
SILT FENCE - SENSITIVE
INLET SEDIMENT TRAP
chall Snapshot
C3.1
ES
CP
E
DE
TA
ILS
N
OT
ES
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te st a, G A
P
6.
2.
w
.b en es ch
.c om
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
TMATERIAL QUANTITY
DRY STRAW OR HAY 2" - 4" DEPTH
WOOD WASTE (SAWDUST, 2" - 3" DEPTH
BARK, CHIPS)
CUTBACK ASPHALT 1200 GAL. PER ACRE
(SLOW CURING) (1/4 GAL PER SQ. YD.)
POLYETHYLENE FILM COMPLETELY COVERING
EXPOSED AREA. TRENCHED
IN AT OUTER EDGES.
Ds1 MULCHING
Ds2 STABILIZATION WITH TEMPORARY SEEDING
STRAW OR HAY MULCH SHALL BE ANCHORED IMMEDIATELY AFTER APPLICATION.
MULCH MAY BE ANCHORED BY MECHANICALLY PRESSING INTO SURFACE. IF
SPREAD WITH BLOWER EQIPMENT, MULCH SHALL BE ANCHORED WITH
EMULSIFIED ASPHALT (GRADE AE-5 OR SS-1)--100 GAL. ASPHALT + 100 GAL. WATER
PER TON OF MULCH. NETTING SHALL BE USED TO ANCHOR WOOD WASTE AND
CHIPS. POLYETHYLENE SHALL BE TRENCHED IN AT EDGES.
Ds3 STABILIZATION WITH PERMANENT SEEDING
FERTILIZER RATES
GENERAL EROSION & SEDIMENTATION CONTROL NOTES:
1. ALL DISTURBED AREAS SHALL HAVE EROSION CONTROL PROVIDED IN
ACCORDANCE WITH THE MANUAL FOR EROSION AND SEDIMENT CONTROL
IN GEORGIA , CURRENT EDITION.
2. ALL EROSION CONTROL MEASURES SHALL COMPLY WITH THE STATE OF
GEORGIA SOIL AND WATER CONSERVATION COMMISSION MANUAL FOR
EROSION AND SEDIMENT CONTROL IN THE STATE OF GEORGIA , CURRENT
EDITION.
4. THE NOTATION XXX AS SHOWN ON THE EROSION CONTROL PLAN SHEET(S)
AND ON THE EROSION CONTROL DETAIL SHEET FOR THE EROSION AND
SEDIMENT CONTROL BEST MANAGEMENT PRACTICES, REFERS TO THE
GEORGIA UNIFORM CODING SYSTEM AS DETAILED IN THE MANUAL FOR
EROSION AND SEDIMENT CONTROL IN GEORGIA , CURRENT EDITION.
5. GENERAL STATEMENT OF DESIGNED EROSION CONTROL SYSTEM:
(a). NO SURFACE WATER FLOWS FROM DISTURBED AREA TO BE ALLOWED INTO
THE STORM SEWER SYSTEM WITHOUT FIRST BEING FILTERED BY AN
EFFECTIVE SEDIMENT ENTRAPMENT DEVICE.
(b). SEDIMENT ENTRAPMENT DEVICES ARE TO BE MAINTAINED AT ALL POINTS
WHERE SURFACE FLOWS FROM DISTURBED AREAS CAN LEAVE THE SITE.
FLOWS ARE TO BE DIRECTED TO ENTRAPMENT DEVICES THROUGHOUT
CONSTRUCTION ACTIVITIES.
6. EROSION CONTROL MEASURES ARE TO BE INSTALLED PRIOR TO ANY
LAND DISTURBING ACTIVITIES ON-SITE AND MAINTAINED UNTIL PERMANENT
GROUND COVER IS ESTABLISHED. EROSION CONTROL MEASURES SHALL
BE INSPECTED AT THE END OF EACH WORKING DAY AND AFTER EACH STORM
EVENT TO ENSURE THAT ALL MEASURES ARE FUNCTIONING PROPERLY. ANY
REPAIRS SHALL BE MADE BY THE CONTRACTOR.
8. EROSION AND SEDIMENT CONTROL DEVICES MUST BE INSTALLED AND
INSPECTED PRIOR TO ANY LAND DISTURBANCE ON SITE. SILT BARRIER TO
BE PLACED AS SHOWN AND/OR AS DIRECTED BY THE PROJECT ENGINEER
AND/OR OWNER
9. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE
INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND
PRACTICES, PRIOR TO LAND DISTURBING ACTIVITIES.
10. EROSION AND SEDIMENTATION CONTROL MEASURES WILL BE MAINTAINED
AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT
PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND
SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR
TREAT THE SEDIMENT SOURCE.
11. ANY DISTURBED AREA LEFT IDLE/EXPOSED FOR A PERIOD GREATER THAN
14-DAYS SHALL BE STABILIZED WITH MULCH OR TEMPORARY SEEDING;
DISTURBED AREAS IDLE/EXPOSED 30-DAYS SHALL BE STABILIZED WITH
PERMANENT VEGETATION.
12. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
INSTALLED IF DETERMINED NECESSARY BY ON-SITE INSPECTION.
13. THE CONTRACTOR SHALL COMPLETELY REMOVE ALL TEMPORARY EROSION
AND SEDIMENT CONTROL DEVICES (I.E. SILT FENCE, SEDIMENT TRAPS, ETC...)
AND TREE PROTECTION FENCING ONCE PERMANENT VEGETATION IS
ESTABLISHED.
14. THE CONTRACTOR IS RESPONSIBLE FOR MONITORING DOWNSTREAM
CONDITIONS THROUGHOUT THE CONSTRUCTION PERIOD AND FOR CLEARING
ANY DEBRIS AND SEDIMENT THAT IS CAUSED BY CONSTRUCTION ACTIVITIES.
15. ALL DISTURBED AREAS SHALL BEST BE STABILIZED AS REQUIRED BY THESE
PLANS BY THE SITEWORK CONTRACTOR AS SOON AS CONSTRUCTION PHASES
16. WHEN HAND PLANTING, MULCH (HAY OR STRAW) SHOULD BE UNIFORMLY
SPREAD OVER SEEDED AREA WITHIN 24-HOURS OF SEEDING.
17. DURING UNSUITABLE GROWING SEASONS, MULCH WILL BE USED AS A
TEMPORARY COVER (Ds1). ON SLOPES 4:1 OR STEEPER, MULCH WILL BE
ANCHORED.
18. SILT FENCE SHALL MEET THE MINIMUM REQUIREMENTS OF SECTION 171
OF THE STATE OF GEORGIA DEPARTMENT OF TRANSPORTATION, STANDARD
SPECIFICATIONS, CURRENT EDITION, AND/OR GEORGIA EPD "GREEN BOOK"
AS AMENDED.
19. SEDIMENT STORAGE MAINTENANCE INDICATORS MUST BE INSTALLED IN
SEDIMENT STORAGE STRUCTURES, INDICATING THE 1/3 FULL VOLUME FOR
RETROFITS AND TEMPORARY SEDIMENT BASINS, AND THE 1/2 FULL VOLUME
FOR ALL OTHER SEDIMENT STORAGE STRUCTURES (I.E. CHECK DAMS, SILT
FENCE, ETC...).
20. ALL SEDIMENT STORAGE DEVICES ARE TO BE CONSTRUCTED COMPLETELY AND
FULLY OPERATIONAL PRIOR TO ANY OTHER CONSTRUCTION OR GRADING.
3. FULL COORDINATION SHALL BE MAINTAINED BETWEEN THE CONTRACTOR,
DESIGN PROFESSIONAL, AND THE REGULATORY INSPECTOR REGARDING
PROJECT SEQUENCE.
24. SEDIMENT SHALL NOT BE WASHED INTO INLETS. IT SHALL BE REMOVED FROM
THE SEDIMENT TRAPS AND DISPOSED OF AND STABILIZED SO THAT IT WILL NOT
ENTER THE INLETS.
26. THE CONSTRUCTION EXIT SHALL BE MAINTAINED IN A CONDITION WHICH WILL
PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHT-OF-WAY. THIS
MAY REQUIRE PERIODIC TOP DRESSING WITH 1-3" STONE, AS CONDITIONS
DEMAND, AND REPAIR AND/OR CLEAN-OUT OF ANY STRUCTURES USED TO
TRAP SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED
FROM A VEHICLE OR FROM THE SITE ONTO PUBLIC ROADWAY OR INTO STORM
DRAINS MUST BE REMOVED IMMEDIATELY.
21. CONCENTRATED FLOW AREAS AND ALL SLOPES STEEPER THAN 2.5:1 WITH A
HEIGHT OF TEN FEET OR GREATER SHALL BE STABILIZED WITH APPROPRIATE
EROSION CONTROL MATTING AND BLANKETS.
22. ALL PERMANENT GRADED EARTH SLOPES, EXCAVATION OR EMBANKMENT
(CUT AND FILL), SHALL BE GRADED TO A MAXIMUM FINISHED SLOPE OF TWO
(2) FEET HORIZONTAL TO ONE (1) FOOT VERTICAL (MAXIMUM SLOPE 2H:1V).
23. ALL DISTURBED AREAS LEFT MULCHED AFTER 30-DAYS SHALL BE STABILIZED
WITH TEMPORARY GRASSING.
25. FAILURE TO INSTALL, OPERATE, OR MAINTAIN ALL EROSION CONTROL
MEASURES WILL RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE JOB
UNTIL SUCH MEASURES ARE CORRECTED BACK TO THE APPROVED EROSION
CONTROL PLANS, I.E., MANDATORY STOP WORK ORDER!
PERMIT.
SHALL BE INSPECTED AT LEAST WEEKLY, AFTER EACH RAIN EVENT, AND REPAIRED
AS NECESSARY . THESE INSPECTIONS SHALL BE DOCUMENTED WITH COPIES
7. IN ADDITION TO THE NOTE ABOVE, EROSION AND SEDIMENT CONTROL MEASURES
SENT TO THE OWNER.
SECTION B-B
CURB INLET FILTER "PIGS IN BLANKET"
PLAN
SILT FENCE DETAIL INLET PROTECTION DETAIL
SILT FENCE - TYPE SENSITIVE
SIDE VIEW
FRONT VIEW
1. DESIGNATED WASHDOWN AREA AND EXCAVATE PIT LARGE ENOUGH
TO CONTAIN WASHDOWN WATER. THIS MUST BE AWAY FROM STORM
DRAINS AND WATERWAYS.
2. ADVISE CONCRETE TRUCK DRIVERS OF THE DESIGNATED WASH-OUT
AREAS BEFORE THEY START THE JOB.
3. WASHDOWN CHUTE, HOPPER, AND REAR OF VEHICLE ONLY. DO NOT
WASH OUT DRUM
4. ENSURE THAT ALL WASHDOWN WATER STAYS IN PIT.
5. DISPOSE OF SETTLED, HARDENED CONCRETE IN GARBAGE WITH
OTHER CONSTRUCTION DEBRIS.
6. NEVER DISPOSE OF WASHDOWN WATER IN STREETS, STORM DRAINS,
OR STREAMS.
CONCRETE WASHDOWN NOTES
C4.1
DE
TA
ILS
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te st a, G A
P
6.
2.
w
.b en es ch
.c om
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
T
STAIRS WITH TYPE 2 HANDRAIL DETAIL
TYPE 1 EXTERIOR CONCRETE
RAMP WITH TYPE 1 HANDRAIL DETAIL
TYPE 1 EXTERIOR CONCRETE
64" CONC. SWITCHBACK RETAINING WALL DETAIL 48" CONC. SWITCHBACK RETAINING WALL DETAIL
18" HEADER CURB, TYP.
CONCRETE CURB STOP
ASPHALT PAVEMENT CROSS-SECTION
PERVIOUS CONCRETE DETAIL
CONCRETE SIDEWALK W/T.D.E. DETAIL
CONCRETE ROLL CURB DETAIL
CONCRETE PAVEMENT CROSS-SECTION
REFER TO SHEET C10.4 FOR
24" CURB & GUTTER DETAIL
CONCRETE SIDEWALK DETAIL
C4.2
DE
TA
ILS
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te st a, G A
P
6.
2.
w
.b en es ch
.c om
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
T
HANDICAPPED PARKING SIGN DETAIL
HANDICAP PARKING SPACE DETAIL
WOOD GUARDRAIL DETAIL
C4.3
DE
TA
ILS
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te st a, G A
P
6.
2.
w
.b en es ch
.c om
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
TTRENCH DRAIN DETAIL
REV H7001-110-162DWG
NO.
1 OF
1SHEET1:40SCALEDWG
SIZE A
3130 VERONA AVE
BUFORD, GA 30518
PHN (770) 932-2443
FAX (770) 932-2490
www.nyloplast-us.com
DRAIN BASIN WITH 2 FT X 2 FT ROAD & HIGHWAY
GRATE
QUICK SPEC INSTALLATION DETAIL
TITLE
PROJECT NO./NAME
MATERIAL
DATE
REVISED
BY
1-23-06DATE
EBCDRAWN BY
7-22-19
NMH
(4) ADAPTER
ANGLES
VARIABLE 0° - 360°
ACCORDING TO
PLANS
12" - 36"
18" MIN WIDTH GUIDELINE
8" MIN THICKNESS GUIDELINE
(2) VARIABLE SUMP DEPTH
ACCORDING TO PLANS
(6" MIN ON 12" - 24", 10" MIN ON 30"
& 12" MIN ON 36" BASED
ON MANUFACTURING REQ.)4" MIN ON 12" - 24"
6" MIN ON 30" & 36"
MINIMUM PIPE BURIAL
DEPTH PER PIPE
MANUFACTURER
RECOMMENDATION
(MIN. MANUFACTURING
REQ. SAME AS MIN. SUMP
EXCEPT FOR 36" BASIN.
36" DRAIN BASIN REQ.
2.25 FT FROM RIM TO TOP
OF PIPE)
(2) VARIABLE INVERT HEIGHTS
AVAILABLE (ACCORDING TO
PLANS/TAKE OFF)
NYLOPLAST 2 FT X 2FT ROAD & HIGHWAY STRUCTURE: 32 _ _ AGS _ _ X
1 - 12" - 30" FRAMES & GRATES SHALL BE DUCTILE IRON PER ASTM A536
GRADE 70-50-05.
2 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN
DETAILS.
3 - DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO
ASTM D3212 FOR CORRUGATED HDPE (ADS N-12/HANCOR DUAL WALL),
N-12 HP, & PVC SEWER (4" - 36").
4 - ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0° TO 360°. TO
DETERMINE MINIMUM ANGLE BETWEEN ADAPTERS SEE DRAWING
NO. 7001-110-012.
5 - ROAD & HIGHWAY GRATE SHALL MEET H-20 LOAD RATING.
(1, 2) INTEGRATED DUCTILE IRON FRAME &
GRATE TO MATCH BASIN O.D.
(3) VARIOUS TYPES OF INLET & OUTLET ADAPTERS
AVAILABLE: 4" - 36" FOR CORRUGATED HDPE
(ADS N-12/HANCOR DUAL WALL, ADS/HANCOR
SINGLE WALL), N-12 HP, PVC SEWER (EX: SDR 35),
PVC DWV (EX: SCH 40), PVC C900/C905,
CORRUGATED & RIBBED PVC
WATERTIGHT JOINT
(CORRUGATED HDPE SHOWN)
THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER
GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS I,
CLASS II, OR CLASS III MATERIAL AS DEFINED IN ASTM D2321.
BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE
PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321.
TRAFFIC LOADS: CONCRETE SLAB DIMENSIONS ARE FOR GUIDELINE
PURPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE DESIGNED
TAKING INTO CONSIDERATION LOCAL SOIL CONDITIONS, TRAFFIC
LOADING, & OTHER APPLICABLE DESIGN FACTORS.
THIS PRINT DISCLOSES SUBJECT MATTER IN
WHICH NYLOPLAST HAS PROPRIETARY RIGHTS.
THE RECEIPT OR POSSESSION OF THIS PRINT
DOES NOT CONFER, TRANSFER, OR LICENSE THE
USE OF THE DESIGN OR TECHNICAL INFORMATION
SHOWN HEREIN REPRODUCTION OF THIS PRINT
OR ANY INFORMATION CONTAINED HEREIN, OR
MANUFACTURE OF ANY ARTICLE HEREFROM, FOR
THE DISCLOSURE TO OTHERS IS FORBIDDEN,
EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM
NYLOPLAST.
© 2013 NYLOPLAST
C4.4
DE
TA
ILS
A lfr ed B en es ch
C om pa ny
B ro ad S tre et
, S ui te st a, G A
P
6.
2.
w
.b en es ch
.c om
A th en s-
C la rk e
C ou nt y
U N
IF
IE
D G
O
VE
R N
M
EN
T
He ar d P ar k A cc es sib le Pa rki ng
Im pr ov em en ts
AC
C L
EIS
UR
E S
ER
VI
CE
S D
EP
AR
TM
EN
T
| Sheets and Views |
| 19023026E2-COVER |
| 19023026E2-DEMO PLAN |
| 19023026E2-SITE PLAN |
| 19023026E2-UPPER PLAZA GRADING |
| 19023026E2-DETAILED RAMP PLAN |
| 19023026E2-STAKING |
| 19023026E2-PROFILE |
| 19023026E2-ESCP |
| 19023026E2-ESCP DETAILS |
| 19023026E2-DETAILS 1 |
| 19023026E2-DETAILS 2 |
| 19023026E2-DETAILS 3 |
| 19023026E2-DETAILS 4 |
File details come from the government source that posted it. Updated .