Summary of KCDC Rooftop Equipment Replacement Project Phase 3 Drawings
These are the construction drawings for the Kenosha County Detention Center Rooftop Equipment Replacement Project Phase 3, located at 4777 88th Avenue, Kenosha, Wisconsin. The project encompasses the replacement of existing rooftop HVAC equipment and VAV boxes across four dormitory areas (E, F, G, and H). The scope includes installation of four new rooftop air conditioning units (RACU 05-1 through RACU 08-1), multiple new exhaust fans (EF 05-1 through EF 08-2), new smoke exhaust fans (SEF 05-1 through SEF 08-2), new supply fans (SF 05-1 through SF 08-2), and replacement of numerous VAV boxes with and without reheat capabilities. The project also involves booster coils for supplemental heating in Dormitory H, integration with existing boiler systems, and implementation of a new smoke control system with a firefighter smoke control station (FSCS). All work includes ductwork modifications, hot water piping connections using 35% propylene glycol solution, and integration with a Building Automation System (BAS) utilizing Schneider Electric controls. The drawings specify a phased construction approach beginning with Dormitory G, followed by F, E, and H to minimize operational disruption.
The electrical scope includes providing disconnect switches and connections for all new HVAC equipment, installation of new circuit breakers in existing electrical panels, modification of the existing lightning protection system to accommodate equipment replacement, and coordination with existing building systems. New 480/3-phase electrical service is required for rooftop units, supply fans, and smoke exhaust fans, while 277-volt service supplies individual exhaust fans and controlled equipment. The project requires coordination of all utility outages with the detention center staff with a minimum 72-hour advance notice. Hot water connections operate at design conditions of 140°F/120°F entering and leaving water temperatures with actual operation at 180°F/160°F. All work must comply with the 2017 National Electrical Code and applicable Wisconsin regulations, with the contractor responsible for disposal of all existing equipment and materials and patching of all wall, floor, and ceiling penetrations to match existing conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2306 Bid Documents.pdf | ||
| Vendor Responsibility Form Construction.pdf | ||
| Background Check Form.docx | DOCX document | |
| 2306 Addendum 1.pdf | ||
| 2603 Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
PROJECT
LOCATION
PROJECT
LOCATION
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:0
:4 P
M
G0.01
K0450150
T
IT
L E
S H
E E
T K
C D
C R
O O
F T
O P
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T P
R O
J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : TAS
P H
O N
E
.6
.1 w w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
STATE MAP
COUNTY OF KENOSHA
KCDC ROOFTOP EQUIPMENT
REPLACEMENT PROJECT PHASE 3
4777 88TH AVE, KENOSHA, WI 53144
FEBRUARY 17, 2023
ISSUED FOR BID
BID #2306
PROJECT AREA MAP PROJECT LOCATION MAP
SHEET LIST
NUMBER SHEET NAME
G0.01 TITLE SHEET
G0.02 OVERALL REFERENCE PLAN
S1.01 ROOF JOIST STRENGTHENING PLAN
H0.01 HVAC GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
H1.01 DORMITORY E FIRST FLOOR HVAC DEMOLITION PLAN
H1.02 DORMITORY F FIRST FLOOR HVAC DEMOLITION PLAN
H1.03 DORMITORY G FIRST FLOOR HVAC DEMOLITION PLAN
H1.04 DORMITORY H HVAC DEMOLITION PLAN
H1.05 DORMITORY E ROOF HVAC DEMOLTION PLAN
H1.06 DORMITORY F ROOF HVAC DEMOLITION PLAN
H1.07 DORMITORY G ROOF HVAC DEMOLITION PLAN
H1.08 DORMITORY H ROOF HVAC DEMOLITION PLAN
H2.01 DORMITORY E FIRST FLOOR HVAC PLAN
H2.02 DORMITORY F FIRST FLOOR HVAC PLAN
H2.03 DORMITORY G FIRST FLOOR HVAC PLAN
H2.04 DORMITORY H HVAC PLAN
H2.05 BOILER ROOM HVAC PLAN
H2.06 DORMITORY E ROOF HVAC PLAN
H2.07 DORMITORY F ROOF HVAC PLAN
H2.08 DORMITORY G ROOF HVAC PLAN
H2.09 DORMITORY H ROOF HVAC PLAN
H3.01 HVAC SECTIONS
H4.01 HVAC SCHEDULES
H4.02 HVAC SCHEDULES
H4.03 HVAC SCHEDULES
H5.01 HVAC DETAILS
H5.02 HVAC DETAILS
H5.03 HVAC CONTROL SCHEMATICS
H5.04 HVAC CONTROL SCHEMATICS
H5.05 HVAC CONTROL SCHEMATICS
H5.06 HVAC CONTROL SCHEMATICS
H5.07 HVAC CONTROL SCHEMATICS
H5.08 HVAC CONTROL SCHEMATICS
E0.01 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
E0.02 OVERALL ELECTRICAL PLAN
E1.01 DORMITORY E FIRST FLOOR ELECTRICAL DEMOLITION PLAN
E1.02 DORMITORY F FIRST FLOOR ELECTRICAL DEMOLITION PLAN
E1.03 DORMITORY G FIRST FLOOR ELEC DEMOLITION PLAN
E1.04 DORMITORY H ELECTRICAL DEMOLITION PLAN
E1.05 DORMITORY E ROOF ELECTRICAL DEMOLITION PLAN
E1.06 DORMITORY F ROOF ELECTRICAL DEMOLITION PLAN
E1.07 DORMITORY G ROOF ELECTRICAL DEMOLITION PLAN
E1.08 DORMITORY H ROOF ELECTRICAL DEMOLITION PLAN
E2.01 DORMITORY E FIRST FLOOR ELECTRICAL PLAN
E2.02 DORMITORY F FIRST FLOOR ELECTRICAL PLAN
E2.03 DORMITORY G FIRST FLOOR ELECTRICAL PLAN
E2.04 DORMITORY H FIRST FLOOR ELECTRICAL PLAN
E2.05 DORMITORY E ROOF ELECTRICAL PLAN
E2.06 DORMITORY F ROOF ELECTRICAL PLAN
E2.07 DORMITORY G ROOF ELECTRICAL PLAN
E2.08 DORMITORY H ROOF ELECTRICAL PLAN
E5.01 EQUIPMENT CONNECTION SCHEDULE
E5.02 ELECTRICAL PANEL SCHEDULES
E5.03 ELECTRICAL PANEL SCHEDULES
NO. DATE REVISION
1 02/17/23 ISSUED FOR BID
A
B
C
D
E
F F
G G
H H
J J
K K
K.5 K.5
L L
M M
N N
P P
Q Q
S
T
U
G.5 G.5
E.5 E.5
R R
141516
H
J
K
K.5
G.5
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:0
:5 P
M
G0.02
K0450150
O V
E R
A L L
R E
F E
R E
N C
E P
L A
N K
C D
C R
O O
F T
O P
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T P
R O
J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : KRP
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
0 8' 16' 32' 64'
OVERALL REFERENCE PLAN
NOTES (THIS SHEET)
1. SEE FLOOR PLANS AND SECTIONS FOR DETAILS OF EACH AREA.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THEIR WORK
AROUND ALL EXISTING CONDITIONS.
3. EXISTING WALL FIRE RATINGS TO BE MAINTAINED. CONTRACTOR TO CONFIRM
EXISTING WALL RATINGS IN FIELD. SMOKE COMPARTMENTS DESIGNATIONS
PROVIDED ON OVERALL PLAN FOR REFERENCE.
4. SUGGESTED PHASING FOR CONSTRUCTION SEQUENCE. ALL WORK SHALL BE
COMPLETED AT EACH AREA INCLUDING TESTING AND BALANCING PRIOR TO
WORKING IN A DIFFERENT AREA. PLAN FOR SINGLE ENTRY AT EACH
DORMITORY AREA. CONTRACTOR SHALL VERIFY FINAL SEQUENCING OF
CONSTRUCTION WITH KENOSHA COUNTY DENTENTION CENTER STAFF PRIOR
TO COMMENCING WORK:
I. DORMITORY G
II. DORMITORY F
III. DORMITORY E
IV. DORMITORY H
AREA 1: DORMITORY E
MATCHLINE
MATCHLINE
MATCHLINE
MATCHLINEMATCHLINE
AREA 2: DORMITORY FAREA 3: DORMITORY G
AREA 4: DORMITORY H EXISTING SMOKE COMPARTMENT (TYP.)
AREA 5: DORMITORY H MEZZANINE
MATCHLINE
MATCHLINE
NO. DATE REVISION
1 02/17/23 ISSUED FOR BID
AREA 6: BOILER ROOM
EXISTING FSCS
INSTALLED
DURING KCDC
ROOFTP
EQUIPMENT
REPLACEMENT
PROJECT PHASE 2
1. THE LOCATIONS AND SIZES OF EXISTING DUCTWORK, PIPING AND EQUIPMENT HAS BEEN
TAKEN FROM PREVIOUS DESIGN DRAWINGS OR AS BUILT DRAWINGS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO START OF WORK.
2. DUCTWORK AND PIPING IS SHOWN IN SCHEMATIC FORM ONLY, CHANGES IN ELEVATION
ARE NOT NECESSARILY SHOWN. ROUTE DUCTWORK AND PIPING IN AN ORDERLY
MANNER AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS. COORDINATE
LOCATION OF DUCTWORK AND PIPING WITH OTHER TRADES PRIOR TO INSTALLATION.
WHERE POSSIBLE, RACK PIPING HORIZONTALLY OR VERTICALLY.
3. COORDINATE LOCATIONS AND SIZES OF DUCTWORK AND PIPING CONNECTIONS TO
EQUIPMENT BEING SHOWN. CONTRACTOR SHALL COORDINATE ALL WORK WITH ALL
TRADES.
4. ALL CONNECTIONS TO, OR SHUTDOWNS OF, EXISTING SYSTEMS SHALL BE
COORDINATED WITH THE OWNER MINIMUM OF 72 HOURS PRIOR TO CONSTRUCTION TO
PROVIDE MINIMUM INTERFERENCE WITH THEIR OPERATION AND DOWNTIME OF THE
SYSTEM. PROVIDE PROPOSED PHASING PLAN FOR CONNECTIONS TO EXISTING
SERVICES TO OWNER FOR APPROVAL PRIOR TO STARTING OF WORK.
5. CONNECTIONS TO EQUIPMENT SHALL BE PROVIDED WITH ISOLATION VALVES AND
UNIONS TO FACILITATE EQUIPMENT REMOVAL.
6. UNLESS OTHERWISE NOTED, CONCEAL ALL DUCTWORK AND PIPING ABOVE CEILINGS, IN
WALLS, OR INSIDE CHASES.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SUPPORTING
SYSTEMS AND DEVICES FOR ALL DUCTWORK, PIPING, EQUIPMENT, AND ACCESSORIES.
8. PROVIDE SLEEVES FOR ALL DUCTWORK AND PIPING PASSING THROUGH WALLS AND
FLOORS.
9. PROVIDE FIRE STOPPING OR FIRE CAULK AT ALL PENETRATIONS OF FIRE AND/OR
SMOKE RATED WALLS, CEILINGS, AND FLOORS. WALLS THAT DO NOT GO TO THE
BOTTOM OF THE DECK DO NOT REQUIRE FIRE STOPPING.
10. LOCATE AND INSTALL ALL EQUIPMENT TO PROVIDE MANUFACTURER'S MINIMUM SERVICE
CLEARANCES.
11. FOR DUCT CONNECTIONS TO TERMINAL DEVICES, FANS, AND OTHER EQUIPMENT SEE
DETAILS.
12. LOCATE ALL MANUAL BALANCING DAMPERS IN AN ACCESSIBLE LOCATION. WHERE
DAMPERS ARE NOT ACCESSIBLE PROVIDE MINIMUM 18x18 ACCESS DOOR.
13. PROVIDE MANUAL BALANCING DAMPERS IN ALL BRANCH DUCTWORK AND AT EACH AIR
INLET AND OUTLET.
14. PROVIDE A LINE ITEM PRICE TO REPLACE (10) EXISTING BALANCING DAMPER WITH NEW.
CONTRACTOR TO CONFIRM FINAL QUANTITY REQUIRED IN FIELD DURING
CONSTRUCTION. COORDINATE FINAL PRICING WITH OWNER AT THE END OF THE
PROJECT.
15. CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY HEATING AND/OR COOLING
DURING TIMES WHEN THE BUILDING HEATING AND COOLING SYSTEMS ARE NOT
FUNCTIONAL.
16. CONTRACTOR SHALL VERIFY THAT BALANCING VALVES CAN BE ADJUSTED TO MEET
FLOW REQUIREMENTS WITHOUT THE PRODUCTION OF UNACCEPTABLE NOISE.
17. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING ALL CEILING
TILES & GRID AS REQUIRED TO INSTALL THEIR WORK. PROVIDE NEW MATCHING CEILING
TILES & GRID WHERE EXISTING CEILING TILES OR GRID ARE DAMAGED DURING WORK.
18. CONTRACTOR SHALL REVIEW CONDITION AND ARRANGEMENT OF EXISTING EQUIPMENT
INCLUDING ALL DUCTWORK, PIPING, AND ACCESSORIES TO ENSURE MODIFICATIONS
MADE DO NOT REQUIRE REMOVAL/REPLACEMENT OF ANY EXISTING CONDUITS, WIRES,
OR LIGHT FIXTURES. ANY MODIFICATIONS REQUIRED TO AUXILIARY SYSTEMS SHALL BE
COMMUNICATED TO OWNER/ENGINEER PRIOR TO COMMENCING ANY WORK.
19. HOT WATER SOLUTION IS 35% PROPYLENE GLYCOL. HOT WATER SHALL BE DRAINED
AND REFILL AS REQUIRED FOR SCOPE OF WORK.
20. REUSE OF EXISTING TEMPERATURE CONTROL CONDUIT AND PANEL ENCLOSURES ARE
ACCEPTABLE. CONTRACTOR SHALL COORDIANTE WITH TEMPERATURE CONTROLS AND
ELECTRICAL CONTRACTOR.
SA SUPPLY AIR
RA RETURN AIR
EA EXHAUST AIR
OA OUTSIDE AIR
TA TRANSFER AIR
AHU AIR HANDLING UNIT
GPM GALLONS PER MINUTE
IH INTAKE HOOD
EF EXHAUST FAN
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
REFG REFRIGERANT GAS
REFL REFRIGERANT LIQUID
PC PUMPED CONDENSATE
BTUH BRITISH THERMAL UNITS PER HOUR
CFM CUBIC FEET PER MINUTE
DP DIFFERENTIAL PRESSURE
DDC DIRECT DIGITAL CONTROLS
DI DIGITAL INPUT
DO DIGITAL OUTPUT
AI ANALOG INPUT
AO ANALOG OUTPUT
BAS BUILDING AUTOMATION SYSTEM
SP STATIC PRESSURE
ERV ENERGY RECOVERY VENTILATOR
G NATURAL GAS
MBH THOUSAND BTUH
NG NATURAL GAS
RTU ROOFTOP UNIT
UH UNIT HEATER
ESP EXTERNAL STATIC PRESSURE
CAP. CAPACITY
WC WATER COLUMN
HP HORSEPOWER
RPM REVOLUTION PER MINUTE
WPD WATER PRESSURE DROP
EAT ENTERING AIR TEMPERATURE
LAT LEAVING AIR TEMPERATURE
NC NOISE CRITERIA
VOL VOLUME
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
TYP. TYPICAL
MANUF. MANUFACTURER
1. VERIFY EXACT SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF
DEMOLITION.
2. DISCONNECT ALL HEATING DUCTWORK AND PIPING CONNECTIONS TO EQUIPMENT
BEING REMOVED. CONTRACTOR SHALL COORDINATE WORK WITH ALL TRADES.
3. UNLESS OTHERWISE NOTED, REMOVAL DUCTWORK, PIPING AND/OR EQUIPMENT
SHALL INCLUDE ALL INSULATION, DAMPERS, VALVES, HANGERS, SUPPORTS,
EQUIPMENT PADS, FLASHING, CONTROLS, CONTROLS TUBING/WIRING AND
ASSOCIATED ACCESSORIES.
4. UNLESS OTHERWISE NOTED, REMOVAL OF PIPING SHALL BE BACK TO THE MAIN
OR LAST ACTIVE SERVICE.
5. ALL OPENINGS OR HOLES LEFT IN EXISTING WALLS, FLOORS, AND CEILINGS TO
REMAIN, INCLUDING CHASES, SHALL BE PATCHED TO MATCH EXISTING
CONDITIONS.
6. THE CONTRACTOR SHALL DISCONNECT EXISTING BUILDING TEMPERATURE
CONTROL SYSTEM FROM THE NETWORK AND PROVIDE ALL WORK ASSOCIATED
WITH DEMOLITION.
7. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED WORK TO MAINTAIN THE
CONTINUITY OF THE EXISTING NETWORK UNTIL NEW NETWORK HAS BEEN
ESTABLISHED.
P
FS
TC
S
AD
EF-X
24x24
RETURN DUCT UP OR TOWARD
RETURN DUCT DOWN OR AWAY
EXHAUST DUCT UP OR TOWARD
EXHAUST DUCT DOWN OR AWAY
SUPPLY DUCT UP OR TOWARD
SUPPLY DUCT DOWN OR AWAY
SUPPLY DIFFUSER (WITH HARD DUCT)
SUPPLY DIFFUSER (WITH FLEXDUCT)
RETURN GRILLE OR REGISTER
RETURN GRILLE OR REGISTER
(WITH HARD DUCT)
(WITH FLEXDUCT)
EXHAUST GRILLE OR REGISTER
EXHAUST GRILLE OR REGISTER
(WITH HARD DUCT)
(WITH FLEXDUCT)
RECTANGULAR DUCT (FIRST FIGURE IS
SIDE SHOWN) ALL DUCT DIMENSIONS
ARE INSIDE CLEAR DIMENSIONS
X∅ ROUND DUCTWORK
FLEXIBLE DUCTWORK
90° ELBOW WITH TURNING VANES
BRANCH DUCT TAP
ACCESS DOOR (HORIZONTAL/VERTICAL)
SMOKE DAMPER
TRANSITION FROM RECTANGULAR TO ROUND DUCT
ROOF MOUNTED EXHAUST FAN
W/ EQUIPMENT NUMBER
DIRECTION OF AIRFLOW
HWS HOT WATER HEATING SUPPLY
HWR HOT WATER HEATING RETURN
TEE DOWN OR AWAY
ELBOW DOWN OR AWAY
ELBOW UP OR TOWARD
TEE UP OR TOWARD
RISE OR DROP
90° ELBOW
PIPE TEE
PIPE TAKEOFF (FROM TOP OF MAIN)
45° ELBOW
PIPE TAKEOFF (FROM BOTTOM OF MAIN)
PITCH PIPING IN DIRECTION OF ARROW
45° BRANCH
RPZ
BALANCING VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
HOSE END VALVE
GATE VALVE
REDUCER
CONCENTRIC REDUCER
ECCENTRIC REDUCER
END CAP
GAUGE - PRESSURE
PIPE FLANGE
STRAINER
NEW EQUIPMENT
FLOW SWITCH
TEMPERATURE CONTROLLER
T TEMPERATURE SENSOR
(NAME) EXISTING PIPING
NEW CONNECTION TO EXISTING
TO BE REMOVED
XX XX-XX EQUIPMENT TAG
CONTROL VALVE - TWO WAY
CONTROL VALVE - THREE WAY
PRESSURE REDUCING VALVE
SOLENOID
TRIPLE DUTY VALVE
PRESSURE RELIEF VALVE
THERMOSTATIC VALVE
REFG REFRIGERANT GAS
REFL REFRIGERANT LIQUID
PC PUMPED CONDENSATE
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:0
:5 P
M
H0.01
K0450150
H V
A C
G E
N E
R A
L N
O T
E S
S
Y M
B O
L S
A N
D A
B B
R E
V
IA
T
IO
N S
K C
D C
R O
O F
T O
P E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
P R
O J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : KRP
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
GENERAL HVAC NOTESHVAC ABBREVIATIONS
GENERAL DEMOLITION HVAC NOTES
HVAC LEGEND
T
T T
T
T
T
T
TTT
T T T T
T
T
TT
Ƨ
Ƨ Ƨ
Ƨ
H
J
K
K.5
M
N
P
/SEE 1 H1.02
/SEE 1 H1.02
DORMITORY
E037
DORMITORY
E029
MULTI-PURPOSE
E026
SHOWER
E035
MULTI-PURPOSE
E025
RESTROOM
E034
JANITORS
E033
CHASE
E024
RESTROOM
E032
MULTI-PURPOSE
E023
SHOWER
E031
MULTI-PURPOSE
E022
ISOL.
E030
MULTI-PURPOSE
E021
CORRIDOR
E001
DORMITORY
E017
DORMITORY
E010
DAYROOM
E009
DAYROOM
E016
SHOWER
E013
ISOL.
E012
ISOL.
E011
RESTROOM
E014
JANITORS
E015
CHASE
E004
RESTROOM
E018
SHOWER
E019
MULTI-PURPOSE
E006
ELEC.
E007
MULTI-PURPOSE
E020
MULTI-PURPOSE
E002
MULTI-PURPOSE
E003
OUTDOOR EXERCISE
E038
OUTDOOR EXERCISE
E039
CORRIDOR
F001
OFFICER STATION
E008
OFFICER STATION
E027
DAYROOM
E036
DAYROOM
E028
(S A
(RA)
(SA)
(SA)
(SA)
(S A
(E A
(EA) (EA)
(RA)
(RA)
(SA)
(SA)
(SA)
(RA)
(SA)
(R A
(R
A
(E A
(E A
(EA)
(RA)
(RA)
(SA)
(SA)
(HWS)
(HWR)
(HWS)
(HWR)
HWS
HWR
(HWS)
(HWR)
AREA 1:
DORMITORY E
1. SEE SHEET H0.01 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED FOR DEMOLITION AND TO
INSTALL THEIR WORK.
3. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
4. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
DEMOLITION OF EXISTING DUCTWORK AND INSTALLATION OF NEW
DUCTWORK.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARILY REMOVING
LIGHT FIXTURES TO FACILITATE WORK AND REPLACING LIGHT
FIXTURES WHEN WORK IS COMPLETE.
6. EXISTING TRANSFER OPENINGS THROUGHOUT TO REMAIN.
7. ONCE NEW CONTROLS WORK IS COMPLETE, REMOVE ALL EXISTING
TRANSFORMERS LOCATED IN THE CEILING THAT SERVE THE TERMINAL
UNITS TO BE REMOVED.
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:1
:0 P
M
H1.01
K0450150
D O
R M
IT
O
R Y
E F
IR
S
T F
L O
O R
H V
A C
D E
M O
L
IT
IO
N
P L
A N
K C
D C
R O
O F
T O
P E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
P R
O J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : KRP
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
0 2' 4' 8' 16'
DORMITORY E FIRST FLOOR HVAC DEMOLITION PLAN
NOTES (THIS SHEET)
N.T.S.
KEYPLAN
DEMOLITION KEYNOTES#
KEYNOTES#
MATCHLINE
MATCHLINE
3 9
1. REMOVE EXISTING SA DUCT UP TO EXISTING ROOFTOP EQUIPMENT TO
BE DEMOLISHED.
2. REMOVE EXISTING RA DUCT UP TO EXISTING ROOFTOP EQUIPMENT TO
BE DEMOLISHED.
3. REMOVE EXISTING EA DUCT UP TO EXHAUST FAN.
4. REMOVE EXISTING HWS/R PIPING UP TO EXISTING ROOFTOP
EQUIPMENT TO BE DEMOLISHED. SEE DETAIL 1/H5.02 FOR PIPING
DEMOLITION.
5. REMOVE EXISTING FAN POWERED VAV BOX. REMOVE EXISTING
DUCTWORK AND HWS/R PIPING AS REQUIRED TO INSTALL NEW FAN
POWERED BOX. SEE DETAIL 1/H5.02 FOR PIPING DEMOLITION.
6. REMOVE EXISTING VAV BOX WITH REHEAT. REMOVE EXISTING
DUCTWORK AND HWS/R PIPING AS REQUIRED TO INSTALL NEW VAV
BOX WITH REHEAT. SEE DETAIL 1/H5.02 FOR PIPING DEMOLITION.
7. REMOVE EXISTING VAV BOX. REMOVE EXISTING DUCTWORK AS
REQUIRED TO INSTALL NEW VAV BOX.
8. PRESERVE EXISTING DUCT SMOKE DETECTORS FOR REUSE. REMOVE
FROM DUCTWORK TO BE DEMOLISHED. INSTALL IN NEW DUCTWORK
DROPS FROM NEW ROOFTOP UNIT.
9. REMOVE EXISTING VAV BOX WITH REHEAT ABOVE GYPSUM CEILING.
REMOVE EXISTING DUCTWORK AND HWS/R PIPING AS REQUIRED TO
INSTALL NEW VAV BOX WITH REHEAT. SEE DETAIL 1/H5.02 FOR PIPING
DEMOLITION.
10. REMOVE EXISTING VAV BOX ABOVE GYPSUM CEILING. ACCESS BOX
THROUGH EXISTING ACCESS PANEL, LIGHT FIXTURE, OR ABOVE
CEILING OF RM E002.
11. REMOVE EXISTING 3-WAY CONTROL VALVE SERVING ROOFTOP UNIT.
12. REMOVE THERMOSTAT ASSOCIATED WITH TERMINAL UNIT SHOWN AS
DEMOLISHED.
NO. DATE REVISION
1 02/17/23 ISSUED FOR BID
1. EXISTING SA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
2. EXISTING RA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
3. EXISTING EA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
4. EXISTING SMOKE DAMPER TO REMAIN UNLESS OTHERWISE NOTED.
5. EXISTING HWS/R PIPING TO REMAIN UNLESS OTHERWISE NOTED.
6. EXISTING DUCT UP IN EXISTING CHASE. DUCTWORK AND CHASE TO
REMAIN.
7. EXISTING SA GRILLES TO REMAIN.
8. EXISTING RA GRILLES TO REMAIN.
9. EXISTING EA GRILLES TO REMAIN.
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
TT
T
T
T T T T
T
T T
T
T
T
T
Ƨ Ƨ
Ƨ Ƨ
T
H
J
K
K.5
M
N
P
/SEE 1 H1.03 /SEE 1 H1.01
/SEE 1 H1.03 /SEE 1 H1.01
DORMITORY
F030
DORMITORY
F028
DAYROOM
F027
DAYROOM
F029
DORMITORY
F012
DORMITORY
F010
DAYROOM
F009
DAYROOM
F011
OFFICER STATION
F008
MULTI-PURPOSE
F007
ISOL.
F018
SHOWER
F017
RESTROOM
F016
JANITORS
F015
CHASE
F004
RESTROOM
F014
SHOWER
F013
MULTI-PURPOSE
F002
CORRIDOR
F001
MULTI-PURPOSE
F019
MULTI-PURPOSE
F020
MULTI-PURPOSE
F021
RESTROOM
F033
CHASE
F022
RESTROOM
F035
COMM. HUB
F023
MULTI-PURPOSE
F024MULTI-PURPOSE
F025
STORAGE
F037
SHOWER
F036
JANITORS
F034
SHOWER
F032
ISOL.
F031
CORRIDOR
F001
MULTI-PURPOSE
F006
MULTI-PURPOSE
F005
OFFICER STATION
F026
WOMENS TOILET
F003A
STAFF TOILET CORR.
F003
MENS TOILET
F003B
(SA)
(SA)
(SA)
(RA) (SA)
(SA)
(SA)
(SA)
(SA)
(EA)(EA)
(EA) (EA)
(SA)
(RA)
(RA)
(RA)
(RA)
(R A
(R
A
(S A
(S
A
(S A
(S
A
(HWS)
(HWR)
(HWS)
(HWR)
(HWS)
(HWR)
AREA 2:
DORMITORY F
1. SEE SHEET H0.01 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED FOR DEMOLITION AND TO
INSTALL THEIR WORK.
3. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
4. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
DEMOLITION OF EXISTING DUCTWORK AND INSTALLATION OF NEW
DUCTWORK.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARILY REMOVING
LIGHT FIXTURES TO FACILITATE WORK AND REPLACING LIGHT
FIXTURES WHEN WORK IS COMPLETE.
6. EXISTING TRANSFER OPENINGS THROUGHOUT TO REMAIN.
7. ONCE NEW CONTROLS WORK IS COMPLETE, REMOVE ALL EXISTING
TRANSFORMERS LOCATED IN THE CEILING THAT SERVE THE TERMINAL
UNITS TO BE REMOVED.
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:1
:0 P
M
H1.02
K0450150
D O
R M
IT
O
R Y
F F
IR
S
T F
L O
O R
H V
A C
D E
M O
L
IT
IO
N
P L
A N
K C
D C
R O
O F
T O
P E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
P R
O J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : KRP
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
0 2' 4' 8' 16'
DORMITORY F FIRST FLOOR HVAC DEMOLITION PLAN
NOTES (THIS SHEET)
N.T.S.
KEYPLAN
DEMOLITION KEYNOTES#
MATCHLINE MATCHLINE
MATCHLINE MATCHLINE
1. REMOVE EXISTING SA DUCT UP TO EXISTING ROOFTOP EQUIPMENT TO
BE DEMOLISHED.
2. REMOVE EXISTING RA DUCT UP TO EXISTING ROOFTOP EQUIPMENT TO
BE DEMOLISHED.
3. REMOVE EXISTING EA DUCT UP TO EXHAUST FAN.
4. REMOVE EXISTING HWS/R PIPING UP TO EXISTING ROOFTOP EQUIPMENT
TO BE DEMOLISHED. SEE DETAIL 1/H5.02 FOR PIPING DEMOLITION.
5. REMOVE EXISTING FAN POWERED VAV BOX. REMOVE EXISTING
DUCTWORK AND HWS/R PIPING AS REQUIRED TO INSTALL NEW FAN
POWERED BOX. SEE DETAIL 1/H5.02 FOR PIPING DEMOLITION.
6. REMOVE EXISTING VAV BOX WITH REHEAT. REMOVE EXISTING
DUCTWORK AND HWS/R PIPING AS REQUIRED TO INSTALL NEW VAV BOX
WITH REHEAT. SEE DETAIL 1/H5.02 FOR PIPING DEMOLITION.
7. REMOVE EXISTING VAV BOX. REMOVE EXISTING DUCTWORK AS
REQUIRED TO INSTALL NEW VAV BOX.
8. PRESERVE EXISTING DUCT SMOKE DETECTORS FOR REUSE. REMOVE
FROM DUCTWORK TO BE DEMOLISHED. INSTALL IN NEW DUCTWORK
DROPS FROM NEW ROOFTOP UNIT.
9. REMOVE EXISTING VAV BOX WITH REHEAT ABOVE GYPSUM CEILING.
REMOVE EXISTING DUCTWORK AND HWS/R PIPING AS REQUIRED TO
INSTALL NEW VAV BOX WITH REHEAT. SEE DETAIL 1/H5.02 FOR PIPING
DEMOLITION. ACCESS BOX THROUGH EXISTING ACCESS PANEL AND
LIGHT FIXTURE.
10. GYPSUM CEILING IN THIS AREA. CONTRACTOR SHALL CONFIRM THE
LOCATION AND VAV SERVING RM F003. REMOVE EXISTING VAV BOX.
REPORT FINDINGS BACK TO ENGINEER.
11. REMOVE EXISTING 3-WAY CONTROL VALVE SERVING ROOFTOP UNIT.
12. REMOVE THERMOSTAT ASSOCIATED WITH TERMINAL UNIT SHOWN AS
DEMOLISHED.
KEYNOTES#
NO. DATE REVISION
1 02/17/23 ISSUED FOR BID
1. EXISTING SA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
2. EXISTING RA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
3. EXISTING EA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
4. EXISTING SMOKE DAMPER TO REMAIN UNLESS OTHERWISE NOTED.
5. EXISTING HWS/R PIPING TO REMAIN UNLESS OTHERWISE NOTED.
6. EXISTING DUCT ROUTES UP IN EXISTING CHASE. DUCTWORK AND CHASE
TO REMAIN.
7. EXISTING SA GRILLES TO REMAIN.
8. EXISTING RA GRILLES TO REMAIN.
9. EXISTING EA GRILLES TO REMAIN.
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
T
T
T T
T
T
TT
T T
T
T
TT
TT
T
T
T
T
T T
TT
T
T
T
T
Ƨ Ƨ
Ƨ Ƨ
T
101112
H
J
K
K.5
M
N
P
/SEE 1 H1.02
/SEE 1 H1.04 /SEE 1 H1.02
DORMITORY
G046
DORMITORY
G044
DAYROOM
G045
DAYROOM
G043
OFFICER STATION
G042
VEST.
G033 VEST.
G030
SALLY PORT
G029
SALLY PORT
G032
SHOWER
G037
CORRIDOR
G031
STORAGE
G038
CORRIDOR
G028
OFFICER STATION
G034
MULTI-PURPOSE
G027
CORRIDOR
G001
RESTROOM
G049 RESTROOM
G047
MULTI-PURPOSE
G039
JANITORS
G048
MULTI-PURPOSE
G041
CHASE
G040
CORR.
G051
SALLY PORT
G052
CORRIDOR
H001
STORAGE
G017E
HOLD
G017C
HOLD
G017D
HOLD
G017B
HOLD
G017A
DAYROOM
G017
RESTROOM
G026
CHASE
G016
JANITORS
G025
RESTROOM
G024 MULTI-PURPOSE
G023
ELEC.
G015
MULTI-PURPOSE
G014
CORRIDOR
G006
DAYROOM
G021
DAYROOM
G019
DORMITORY
G020
DORMITORY
G022
VEST.
G005
VEST.
G008
SALLY PORT
G004
SALLY PORT
G007
OFFICER STATION
G009
SHOWER
G012
CORRIDOR
G003
CORRIDOR
G006
STORAGE
G013
MULTI-PURPOSE
G002
(SA)
(SA)
(SA)
(EA)
(EA)
(RA)
(RA)
(RA)
(SA)
(SA)
(RA)
(SA)
(EA)
(SA)
(SA)
(RA)
(SA)
(SA)
(EA)
(EA)
(R A
(S A
(SA)
(SA)
(S A
(S
A
(SA) (SA)
(S A
(S A
(S A
(S A
(R A
(S A
(E A
(E A
(S A
(S A
(S A
(E A
(E
A
(S A
(S A
(S A
(R A
(R
A
(HWS)
(HWR)
HWS
HWR
(H W
R
(H W
S
HWS
HWR
AREA 3:
DORMITORY G
1. SEE SHEET H0.01 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED FOR DEMOLITION AND TO
INSTALL THEIR WORK.
3. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
4. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
DEMOLITION OF EXISTING DUCTWORK AND INSTALLATION OF NEW
DUCTWORK.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARILY REMOVING
LIGHT FIXTURES TO FACILITATE WORK AND REPLACING LIGHT
FIXTURES WHEN WORK IS COMPLETE.
6. EXISTING TRANSFER OPENINGS THROUGHOUT TO REMAIN.
7. ONCE NEW CONTROLS WORK IS COMPLETE, REMOVE ALL EXISTING
TRANSFORMERS LOCATED IN THE CEILING THAT SERVE THE TERMINAL
UNITS TO BE REMOVED.
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:1
:2 P
M
H1.03
K0450150
D O
R M
IT
O
R Y
G F
IR
S
T F
L O
O R
H V
A C
D E
M O
L
IT
IO
N
P L A
N
K C
D C
R O
O F
T O
P E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
P R
O J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : KRP
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
0 2' 4' 8' 16'
DORMITORY G FIRST FLOOR HVAC DEMOLITION PLAN
NOTES (THIS SHEET)
N.T.S.
KEYPLAN
DEMOLITION KEYNOTES#
MATCHLINE MATCHLINE
MATCHLINE
6 7
KEYNOTES#
NO. DATE REVISION
1 02/17/23 ISSUED FOR BID
1. EXISTING SA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
2. EXISTING RA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
3. EXISTING EA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
4. EXISTING SMOKE DAMPER TO REMAIN UNLESS OTHERWISE NOTED.
5. EXISTING HWS/R PIPING TO REMAIN UNLESS OTHERWISE NOTED.
6. EXISTING DUCT ROUTES UP IN EXISTING CHASE. DUCTWORK AND
CHASE TO REMAIN.
7. EXISTING SA GRILLES TO REMAIN.
8. EXISTING RA GRILLES TO REMAIN.
9. EXISTING EA GRILLES TO REMAIN.
10. EXISTING CABINET UNIT HEATER TO REMAIN.
1(TYP.)
1(TYP.)
(TYP.)
(TYP.)
3(TYP.)
3(TYP.)
(TYP.)
(TYP.)
5 (TYP.)5(TYP.)
7 (TYP.)
7 (TYP.)
8 (TYP.)
8(TYP.)
9(TYP.)
9 (TYP.)
1. REMOVE EXISTING SA DUCT UP TO EXISTING ROOFTOP EQUIPMENT TO
BE DEMOLISHED.
2. REMOVE EXISTING RA DUCT UP TO EXISTING ROOFTOP EQUIPMENT TO
BE DEMOLISHED.
3. REMOVE EXISTING EA DUCT UP TO EXISTING ROOF MOUNTED EXHAUST
FAN TO BE DEMOLISHED.
4. REMOVE EXISTING HWS/R PIPING UP TO EXISTING ROOFTOP
EQUIPMENT TO BE DEMOLISHED. SEE DETAIL 1/H5.02 FOR PIPING
DEMOLITION.
5. REMOVE EXISTING FAN POWERED VAV BOX. REMOVE EXISTING
DUCTWORK AND HWS/R PIPING AS REQUIRED TO INSTALL NEW FAN
POWERED BOX. SEE DETAIL 1/H5.02 FOR PIPING DEMOLITION.
6. REMOVE EXISTING VAV BOX WITH REHEAT. REMOVE EXISTING
DUCTWORK AND HWS/R PIPING AS REQUIRED TO INSTALL NEW VAV BOX
WITH REHEAT. SEE DETAIL 1/H5.02 FOR PIPING DEMOLITION.
7. REMOVE EXISTING VAV BOX. REMOVE EXISTING DUCTWORK AS
REQUIRED TO INSTALL NEW VAV BOX.
8. PRESERVE EXISTING DUCT SMOKE DETECTORS FOR REUSE. REMOVE
FROM DUCTWORK TO BE DEMOLISHED. INSTALL IN NEW DUCTWORK
DROPS FROM NEW ROOF TOP UNIT.
9. REMOVE EXISTING VAV BOX ABOVE GYPSUM CEILING. REMOVE
EXISTING DUCTWORK AS REQUIRED TO INSTALL NEW VAV BOX. ACCESS
BOX THROUGH EXISTING ACCESS PANEL AND LIGHT FIXTURE.
10. REMOVE EXISTING 3-WAY CONTROL VALVE SERVING ROOFTOP UNIT.
11. REMOVE THERMOSTAT ASSOCIATED WITH TERMINAL UNIT SHOWN AS
DEMOLISHED.
(TYP.)
13141516
H
J
K
K.5
/SEE 1 H1.03
/SEE 1 H1.03
LOCKSMITH
H037 CELL
H048
CELL
H049
OUTDOOR EXERCISE
H008
CELL
H020
CELL
H019
EQUIPMENT
H003
CELL
H018
CELL
H017
CELL
H016
CELL
H015
DAYROOM
H009
CELL
H013
CELL
H012
CELL
H011
CELL
H010
SINGLE RESTROOM
H005
JANITORS
H006
SALLY PORT
H004
CONTROL
H007
MULTI-PURPOSE
H036
CELL
H039
CELL
H040
CELL
H041
CELL
H042
DAYROOM
H038
CELL
H044
CELL
H045
CELL
H046
CELL
H047
AREA 4:
DORMITORY H
1. SEE SHEET H0.01 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED FOR DEMOLITION AND TO
INSTALL THEIR WORK.
3. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
4. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
DEMOLITION OF EXISTING DUCTWORK AND INSTALLATION OF NEW
DUCTWORK.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARILY REMOVING
LIGHT FIXTURES TO FACILITATE WORK AND REPLACING LIGHT
FIXTURES WHEN WORK IS COMPLETE.
6. EXISTING TRANSFER OPENINGS THROUGHOUT TO REMAIN.
7. ONCE NEW CONTROLS WORK IS COMPLETE, REMOVE ALL EXISTING
TRANSFORMERS LOCATED IN THE CEILING THAT SERVE THE TERMINAL
UNITS TO BE REMOVED.
141516
H
J
K
K.5
CELL
H057
CELL
H056
CELL
H055
CELL
H054
CELL
H053
CELL
H052
CELL
H023
CELL
H024
CELL
H025
CELL
H026
CELL
H027
CELL
H028
BALCONY
H022
CELL
H030
CELL
H031
CELL
H032
CELL
H033
CELL
H034
CELL
H035
CELL
H064
CELL
H063
MEZZANINE
H065
CELL
H062
CELL
H061
CELL
H060
CELL
H059
BALCONY
H051
MEZZANINE
H066
(E A
(E A
(S A
(RA)
(RA)
(SA)
(S A
(E A
(EA)
(EA)(EA)
(HWR)
(HWS)
(H W
R
(H W
S
H W
R H
W S
1. REMOVE EXISTING SA DUCT UP TO EXISTING ROOFTOP EQUIPMENT
TO BE DEMOLISHED.
2. REMOVE EXISTING RA DUCT UP TO EXISTING ROOFTOP EQUIPMENT
TO BE DEMOLISHED.
3. REMOVE EXISTING EA DUCT UP TO EXISTING ROOF MOUNTED
EXHAUST FAN TO BE DEMOLISHED.
4. REMOVE EXISTING HWS/R PIPING UP TO EXISTING ROOFTOP
EQUIPMENT TO BE DEMOLISHED. SEE DETAIL 1/H5.02 FOR PIPING
DEMOLITION.
5. REMOVE EXISTING FAN POWERED VAV BOX AND ASSOCIATED
DUCTWORK AND DIFFUSERS. REMOVE EXISTING HWS/R PIPING AS
REQUIRED TO INSTALL NEW FAN POWERED BOX. SEE DETAIL 1/H5.02
FOR PIPING DEMOLITION.
6. PRESERVE EXISTING DUCT SMOKE DETECTORS FOR REUSE.
REMOVE FROM DUCTWORK TO BE DEMOLISHED. INSTALL IN NEW
DUCTWORK DROPS FROM NEW ROOF TOP UNIT.
7. REMOVE EXISTING BOOSTER COIL AND ASSOCIATED PIPING
ACCESSORIES.
8. REMOVE EXISTING SA DUCTWORK FOR REZONING OF HVAC SYSTEM.
REFER TO SHEET H2.04 FOR NEW DUCTWORK SCOPE.
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:1
:3 P
M
H1.04
K0450150
D O
R M
IT
O
R Y
H H
V A
C D
E M
O L
IT
IO
N
P L
A N
K C
D C
R O
O F
T O
P E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
P R
O J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : KRP
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
0 2' 4' 8' 16'
DORMITORY H FIRST FLOOR HVAC DEMOLITION PLAN
NOTES (THIS SHEET)
2 N.T.S.
KEYPLAN
KEYNOTES#
MATCHLINE
2 2
(TYP.)
(TYP.) (TYP.)
(TYP.)
1. EXISTING EA DUCT AND DIFFUSER TO REMAIN. DUCTWORK CONTINUES
UP TO FLOOR ABOVE.
2. EXISTING SA DUCT AND DIFFUSER TO REMAIN. DUCTWORK CONTINUES
UP TO FLOOR ABOVE.
3. EXISTING RA DUCT AND DIFFUSER TO REMAIN. DUCTWORK CONTINUES
UP TO FLOOR ABOVE.
4. EXISTING SA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
5. EXISTING RA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
6. EXISTING EA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
7. EXISTING SA GRILLES TO REMAIN.
8. EXISTING RA GRILLES TO REMAIN.
9. EXISTING EA GRILLES TO REMAIN.
10. EXISTING HWS/R PIPING TO REMAIN UNLESS OTHERWISE NOTED.
NO. DATE REVISION
1 02/17/23 ISSUED FOR BID
MATCHLINE
0 2' 4' 8' 16'
DORMITORY H MEZZANINE HVAC DEMOLITION PLAN
DEMOLITION KEYNOTES#
10(TYP.)
10 (TYP.)
8 8
9(TYP.)
9 (TYP.)
5(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
6(TYP.)
6 (TYP.)
H
J
K
K.5
M
N
P
/SEE 1 H1.06
AREA 1:
DORMITORY E
1. REMOVE EXISTING ROOF TOP UNIT, EXISTING ROOF CURB
AND ASSOCIATED CONTROLS. DISCONNECT SA, RA, AND
HWS/R.
2. REMOVE EXISTING EXHAUST FAN, EXISTING ROOF CURB AND
ASSOCIATED CONTROLS.
1. SEE SHEET H0.01 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. PATCH ROOF AS REQUIRED FOR INSTALLATION OF NEW EQUIPMENT IN
ACCORDANCE WITH ROOF MANUFACTURER'S WARRANTY.
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:1
:3 P
M
H1.05
K0450150
D O
R M
IT
O
R Y
E R
O O
F H
V A
C D
E M
O L
T
IO
N P
L A
N
K C
D C
R O
O F
T O
P E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
P R
O J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : KRP
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
NOTES (THIS SHEET)
0 2' 4' 8' 16'
DORMITORY E ROOF HVAC DEMOLITION PLAN
2 N.T.S.
KEYPLAN
DEMOLITION KEYNOTES#MATCHLINE
J
K
K.5
M
N
P
/SEE 1 H1.05/SEE 1 H1.07
AREA 2:
DORMITORY F
1. REMOVE EXISTING ROOF TOP UNIT, EXISTING ROOF CURB
AND ASSOCIATED CONTROLS. DISCONNECT SA, RA, AND
HWS/R.
2. REMOVE EXISTING EXHAUST FAN, EXISTING ROOF CURB AND
ASSOCIATED CONTROLS.
1. SEE SHEET H0.01 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. PATCH ROOF AS REQUIRED FOR INSTALLATION OF NEW EQUIPMENT IN
ACCORDANCE WITH ROOF MANUFACTURER'S WARRANTY.
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:1
:3 P
M
H1.06
K0450150
D O
R M
IT
O
R Y
F R
O O
F H
V A
C D
E M
O L
IT
IO
N P
L A
N
K C
D C
R O
O F
T O
P E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
P R
O J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : KRP
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
NOTES (THIS SHEET)
0 2' 4' 8' 16'
DORMITORY F ROOF HVAC DEMOLITION PLAN
N.T.S.
KEYPLAN
DEMOLITION KEYNOTES#
MATCHLINE
MATCHLINE
AREA 3:
DORMITORY G
10111213
H
J
K
K.5
M
N
P
/SEE 1 H1.06
/SEE 1 H1.08
1. REMOVE EXISTING ROOF TOP UNIT, EXISTING ROOF CURB
AND ASSOCIATED CONTROLS. DISCONNECT SA, RA, AND
HWS/R.
2. REMOVE EXISTING EXHAUST FAN, EXISTING ROOF CURB AND
ASSOCIATED CONTROLS.
1. SEE SHEET H0.01 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. PATCH ROOF AS REQUIRED FOR INSTALLATION OF NEW EQUIPMENT IN
ACCORDANCE WITH ROOF MANUFACTURER'S WARRANTY.
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:1
:4 P
M
H1.07
K0450150
D O
R M
IT
O
R Y
G R
O O
F H
V A
C D
E M
O L
IT
IO
N
P L A
N
K C
D C
R O
O F
T O
P E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
P R
O J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : KRP
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
N.T.S.
KEYPLAN
0 2' 4' 8' 16'
DORMITORY G ROOF HVAC DEMOLITION PLAN
DEMOLITION KEYNOTES#
NOTES (THIS SHEET)
MATCHLINE
MATCHLINE
141516
J
K
K.5
/SEE 1 H1.07
AREA 4:
DORMITORY H
1. REMOVE EXISTING ROOF TOP UNIT, EXISTING ROOF CURB
AND ASSOCIATED CONTROLS. DISCONNECT SA, RA, AND
HWS/R.
2. REMOVE EXISTING EXHAUST FAN, EXISTING ROOF CURB AND
ASSOCIATED CONTROLS.
1. SEE SHEET H0.01 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. PATCH ROOF AS REQUIRED FOR INSTALLATION OF NEW EQUIPMENT IN
ACCORDANCE WITH ROOF MANUFACTURER'S WARRANTY.
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:1
:4 P
M
H1.08
K0450150
D O
R M
IT
O
R Y
H R
O O
F H
V A
C D
E M
O L
IT
IO
N
P L
A N
K C
D C
R O
O F
T O
P E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
P R
O J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : KRP
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
NOTES (THIS SHEET)
0 2' 4' 8' 16'
DORMITORY H ROOF HVAC DEMOLITION PLAN
N.T.S.
KEYPLAN
DEMOLITION KEYNOTES#
MATCHLINE
T
T
T
T
TTT
T T T T
T
T
TT
Ƨ
Ƨ Ƨ
Ƨ
H
J
K
K.5
M
N
P
/SEE 1 H2.02
/SEE 1 H2.02
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
VC 05-5
VF 05-2
VC 05-6
V 05-6 V 05-7
V 05-8 V 05-9
VC 05-3
VF 05-1
V 05-4
V 05-5
VC 05-1
V 05-1
V 05-2 V 05-3
VC 05-4
VC 05-2
DORMITORY
E037
DORMITORY
E029
MULTI-PURPOSE
E026
SHOWER
E035
MULTI-PURPOSE
E025
RESTROOM
E034
JANITORS
E033
CHASE
E024
RESTROOM
E032
MULTI-PURPOSE
E023
SHOWER
E031
MULTI-PURPOSE
E022
ISOL.
E030
MULTI-PURPOSE
E021
CORRIDOR
E001
DORMITORY
E017
DORMITORY
E010
DAYROOM
E009
DAYROOM
E016
SHOWER
E013
ISOL.
E012
ISOL.
E011
RESTROOM
E014
JANITORS
E015
CHASE
E004
RESTROOM
E018
SHOWER
E019
MULTI-PURPOSE
E006
ELEC.
E007
MULTI-PURPOSE
E020
MULTI-PURPOSE
E002
MULTI-PURPOSE
E003
OUTDOOR EXERCISE
E038
OUTDOOR EXERCISE
E039
CORRIDOR
F001
OFFICER STATION
E008
OFFICER STATION
E027
S 280S 280S 280S 280S 280S 280
S 280 S 280 S 280 S 50
S 280 S 280 S 280
S 140
S 180
S 140
S 80
S 140
S 150S 150
S 150
S 150S 80
S 140S 140
S 140
S 240
S 240
S 340 S 340 S 340 S 340 S 340
S 340S 340S 340S 340S 340
S 270
S 270
S 270
S 140
R 950R 950
R 965 R 965
R 180
R 140
R 140
R 140
R 140
R 540
R 300
R 140R 140
R 300
R 140
E 90
E 230
E 400 E 400
E 400 E 400
E 230
E 90
E 50
E 230
R 480
E 230
8"x8" SA
22"x12" SA
8"x8" SA
22"x12" SA
8"x8" SA8"x8" SA
8"x8" SA
12"x8" SA
12"x12" EA
8"x8" SA
12"x12" SA
14"x12" EA
8"x8" SA 8"x8" SA
8"x8" SA
10"x8" SA
MULTI-PURPOSE
E005
6 7
DAYROOM
E036
DAYROOM
E028
(TYP.)
10 (TYP.)
10 (TYP.)
(TYP.)
11 (TYP.)
12 (TYP.)
12 (TYP.)
13(TYP.)
13 (TYP.)
8"x8" SA
E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400
1550"x26" EA
26"x18" EA
26"x28" EA
26"x28" EA
26"x18" EA
26"x24" SA
24"x18" SA26"x24" SA24"x18" SA
42"x26" SA
(TYP.)
17(TYP.)
E1 1500
E1 1500 E1 1500 E1 1500 E1 1500 E1 1500 E1 1500E1 1500 E1 1500
E1 1500
17 (TYP.)
(TYP.)
26"x24" SA 24"x14" SA
26"x14" EA
26"x20" EA
20"x26" EA
26"x24" SA
24"x14" SA
26"x14" EA
26"x20" EA
20"x26" EA
8"x8" SA
E 100
E 100
S2 1500
S2 1500 S2 1500 S2 1500 S2 1500 S2 1500 S2 1500 S2 1500
S2 1500S2 1500S2 1500S2 1500S2 1500 S2 1500 S2 1500 S2 1500
VC 05-2
VC 05-3
VC 05-5
VC 05-5
VC 05-4
38"x12" SA
38"x12" (SA)
SEF 05-1
SF 05-1
EF 05-2
EF 05-1
SF 05-3
SEF 05-3
SF 05-2
SEF 05-2
24"x12" (SA)
40"x12" (SA)
(S A
(SA)
(S A
(S
A
(SA)
(S A
(SA)
(RA)
(R A
(R
A
(R A
(RA)
(S A
(HWS)
(HWR)(HWR)
(HWS)
(HWS)
(HWR)
(HWS)
(HWR)
CV 05-1
AREA 1:
DORMITORY E
1. SEE SHEET H0.01 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED TO INSTALL THEIR WORK.
3. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
4. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
INSTALLATION OF NEW DUCTWORK.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARILY REMOVING
LIGHT FIXTURES TO FACILITATE WORK AND REPLACING LIGHT
FIXTURES WHEN WORK IS COMPLETE.
6. REBALANCE ALL EXISTING DIFFUSERS TO AIR FLOW RATES SHOWN.
7. COORDINATE ALL NEW DUCTWORK FROM ROOF MOUNTED EQUIPMENT
BETWEEN STRUCTURAL JOISTS.
8. EXISTING TRANSFER OPENINGS THROUGHOUT TO REMAIN. PIPING,
DUCTWORK, ETC SHALL NOT BE ROUTED THROUGH EXISTING
TRANSFER OPENINGS.
9. LOCATE ALL VALVES AND DAMPERS AT ACCESSIBLE LOCATION.
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:1
:5 P
M
H2.01
K0450150
D O
R M
IT
O
R Y
E F
IR
S
T F
L O
O R
H V
A C
P L A
N
K C
D C
R O
O F
T O
P E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
P R
O J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : TAS
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
1 NEW SA DUCT UP TO RACU 05-1. SEE DETAIL 1/H3.01.
2 NEW RA DUCT UP TO RACU 05-1. SEE DETAIL 1/H3.01.
3 NEW EA DUCT UP TO NEW ROOF MOUNTED EXHAUST FAN. MAKE NEW
CONNECTION TO EXISTING EA DUCT. SEE 2/H5.01
4 ROUTE NEW HWS/R PIPING TO RACU 05-1. MAKE CONNECTION TO EXISTING
HWS/R PIPING. PROVIDE NEW HWS/R CONTROL VALVES ABOVE ACCESSIBLE
CEILING. SEE 1/H3.01.
5 NEW PARALLEL FAN POWERED VAV BOX ABOVE CEILING. MAKE NEW
CONNECTION TO EXISTING SUPPLY DUCT AND HWS/R PIPING. SEE DETAILS.
6 NEW VAV BOX WITH REHEAT ABOVE CEILING. MAKE NEW CONNECTION TO
EXISTING SUPPLY DUCT AND HWS/R PIPING. SEE DETAILS.
7 NEW VAV BOX ABOVE CEILING. MAKE NEW CONNECTION TO EXISTING SUPPLY
DUCT. SEE DETAILS.
8 NEW 3-WAY CONTROL VALVE FOR RACU HW COIL. REFER TO DETAIL 3/H5.02.
9 REINSTALL EXISTING DUCT SMOKE DETECTORS IN NEW DUCTWORK DROPS
FROM ROOF TOP UNIT.
10 NEW ZONE TEMPERATURE SENSOR FOR ASSOCIATED TERMINAL UNIT. LOCATE
SENSOR ABOVE CEILING AT RETURN GRILLE UNLESS OTHERWISE NOTED.
11 EXISTING HWS/R PIPING TO REMAIN UNLESS OTHERWISE NOTED.
12 EXISTING SA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
13 EXISTING RA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
14 NEW VAV BOX WITH REHEAT ABOVE GYPSUM CEILING. ACCESS BOX THROUGH
EXISTING ACCESS PANEL AND LIGHT FIXTURE. REMOVE AND REPLACE CEILING
AS REQUIRED FOR INSTALLATION OF NEW VAV. PATCH TO MATCH EXISTING.
15 NEW EA DUCT UP TO NEW ROOF MOUNTED SMOKE EXHAUST FAN. COORDINATE
EXACT LOCATION WITH STRUCTURAL JOISTS. SEE DETAIL 6/H5.01.
16 NEW SA DUCT UP TO NEW ROOF MOUNTED SUPPLY FAN. COORDINATE EXACT
LOCATION WITH STRUCTURAL JOISTS. SEE DETAIL 9/H5.01.
17 NEW DIFFUSERS FOR SMOKE EVACUATION SYSTEM. REFER TO SHEET H4.03
FOR SCHEDULE. COORDINATE LOCATIONS WITH EXISTING CEILING GRID.
NOTES (THIS SHEET)
0 2' 4' 8' 16'
DORMITORY E FIRST FLOOR HVAC PLAN
N.T.S.
KEYPLAN
KEYNOTES#
MATCHLINE
MATCHLINE
TT
T
T
T T T T
T
T T
T
T
T
T
Ƨ Ƨ
Ƨ Ƨ
T
H
J
K
K.5
M
N
P
/SEE 1 H2.01/SEE 1 H2.03
/SEE 1 H2.01/SEE 1 H2.03
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
V 06-8
V 06-7
V 06-6
VC 06-4
VC 06-3
VF 06-2
V 06-5
VF 06-1
V 06-1
VC 06-1
V 06-4 V 06-3
VC 06-2
V 06-2
V 06-9
DORMITORY
F030
DORMITORY
F028
DAYROOM
F027
DAYROOM
F029
DORMITORY
F012
DORMITORY
F010
DAYROOM
F009
DAYROOM
F011
OFFICER STATION
F008
MULTI-PURPOSE
F007
ISOL.
F018
SHOWER
F017
RESTROOM
F016
JANITORS
F015
CHASE
F004
RESTROOM
F014 SHOWER
F013 MULTI-PURPOSE
F002
CORRIDOR
F001
MULTI-PURPOSE
F019
MULTI-PURPOSE
F020
MULTI-PURPOSE
F021
RESTROOM
F033
CHASE
F022
RESTROOM
F035
COMM. HUB
F023
MULTI-PURPOSE
F024MULTI-PURPOSE
F025
STORAGE
F037
SHOWER
F036
JANITORS
F034
SHOWER
F032
ISOL.
F031
CORRIDOR
F001
MULTI-PURPOSE
F006
MULTI-PURPOSE
F005
OFFICER STATION
F026
S 140 S 140
R 140
S 240
S 240
S 80
R 140
R 480
S 270
S 270
S 150
S 240
S 240
S 360S 360S 360S 360S 360
S 360S 360S 360S 360
S 360
R 1065
R 561
R 300
S 80
S 150
S 150
R 140
S 150
S 140
R 140
R 40
R 480
S 150 S 140
S 150
S 140 S 140
R 140 R 140
R 300
R 140
S 360 S 360 S 360 S 360 S 360
S 360 S 360 S 360 S 360 S 360
R 1065
R 1065
E 90
E 230
E 400
E 400
E 280
E 400
E 400
E 90
E 100
E 280
R1 540
E 100
8"x8" SA
8"x8" SA
16"x14" EA
10"x8" SA
8"x8" SA 8"x8" SA
8"x8" SA 12"x8" SA
32"x14" SA
8"x8" SA
8"x8" SA
8"x8" SA
16"x12" EA
12"x12" SA
STAFF TOILET CORR.
F003
10 (TYP.)
10(TYP.)
11 (TYP.)11(TYP.)
12 (TYP.)
12(TYP.)
13 (TYP.)
13 (TYP.)
12"x8" SA
E 280
26"x24" SA24"x18" SA
26"x24" SA
24"x18" SA
26"x18" EA26"x28" EA
26"x28" EA
26"x18" EA
42"x26" SA
50"x26" EA
E1 1400 E1 1400 E1 1400 E1 1400 E1 1400 E1 1400 E1 1400 E1 1400 E1 1400
E1 1400
(TYP.)
(TYP.)
17 (TYP.)
(TYP.)
E1 1400
E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400
26"x24" SA
24"x18" SA26"x24" SA24"x18" SA
26"x18" EA
26"x28" EA
26"x28" EA
26"x18" EA
50"x26" EA
42"x26" SA
E 75
E 75
S2 1500 S2 1500 S2 1500 S2 1500 S2 1500 S2 1500 S2 1500 S2 1500
S2 1500 S2 1500 S2 1500 S2 1500 S2 1500 S2 1500 S2 1500 S2 1500
V 06-9
10"x8" SA
36"x14" (SA)
10"x10" (SA)
8"x8" (SA)
32"x14" (SA)
(RA)
(R A
(R
A
(RA)
(S A
(SA)
(SA)
(S A
(S
A
(S A
(SA)
(SA)
(HWS)
(HWR)
(HWS)
(HWR)
(HWS)
(HWR)
32"x14" SA
CV 06-1
AREA 2:
DORMITORY F
1. SEE SHEET H0.01 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED TO INSTALL THEIR WORK.
3. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
4. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
INSTALLATION OF NEW DUCTWORK.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARILY REMOVING
LIGHT FIXTURES TO FACILITATE WORK AND REPLACING LIGHT
FIXTURES WHEN WORK IS COMPLETE.
6. REBALANCE ALL EXISTING DIFFUSERS TO AIR FLOW RATES SHOWN.
7. COORDINATE ALL NEW DUCTWORK FROM ROOF MOUNTED EQUIPMENT
BETWEEN STRUCTURAL JOISTS.
8. EXISTING TRANSFER OPENINGS THROUGHOUT TO REMAIN. PIPING,
DUCTWORK, ETC SHALL NOT BE ROUTED THROUGH EXISTING
TRANSFER OPENINGS.
9. LOCATE ALL VALVES AND DAMPERS AT ACCESSIBLE LOCATION.
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:1
:1 P
M
H2.02
K0450150
D O
R M
IT
O
R Y
F F
IR
S
T F
L O
O R
H V
A C
P L A
N
K C
D C
R O
O F
T O
P E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
P R
O J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : KRP
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
NOTES (THIS SHEET)
0 2' 4' 8' 16'
DORMITORY F FIRST FLOOR HVAC PLAN
N.T.S.
KEYPLAN
KEYNOTES#
1 NEW SA DUCT UP TO RACU 06-1. SEE DETAIL 2/H3.01.
2 NEW RA DUCT UP TO RACU 06-1. SEE DETAIL 2/H3.01.
3 NEW EA DUCT UP TO NEW ROOF MOUNTED EXHAUST FAN. MAKE NEW
CONNECTION TO EXISTING EA DUCT. SEE 2/H5.01
4 ROUTE NEW HWS/R PIPING TO RACU 06-1. MAKE CONNECTION TO EXISTING
HWS/R PIPING. PROVIDE NEW HWS/R CONTROL VALVES ABOVE ACCESSIBLE
CEILING. SEE 2/H3.01.
5 NEW PARALLEL FAN POWERED VAV BOX ABOVE CEILING. MAKE NEW
CONNECTION TO EXISTING SUPPLY DUCT AND HWS/R PIPING. SEE DETAILS.
6 NEW VAV BOX WITH REHEAT ABOVE CEILING. MAKE NEW CONNECTION TO
EXISTING SUPPLY DUCT AND HWS/R PIPING. SEE DETAILS.
7 NEW VAV BOX ABOVE CEILING. MAKE NEW CONNECTION TO EXISTING
SUPPLY DUCT. SEE DETAILS.
8 NEW 3-WAY CONTROL VALVE FOR RACU HW COIL. REFER TO DETAIL 3/H5.02.
9 REINSTALL EXISTING DUCT SMOKE DETECTORS IN NEW DUCTWORK DROPS
FROM ROOF TOP UNIT.
10 NEW ZONE TEMPERATURE SENSOR FOR ASSOCIATED TERMINAL UNIT.
LOCATE SENSOR ABOVE CEILING AT RETURN GRILLE UNLESS OTHERWISE
NOTED.
11 EXISTING HWS/R PIPING TO REMAIN UNLESS OTHERWISE NOTED.
12 EXISTING SA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
13 EXISTING RA DUCTWORK TO REMAIN UNLESS OTHERWISE NOTED.
14 NEW VAV BOX WITH REHEAT ABOVE GYPSUM CEILING. ACCESS BOX
THROUGH EXISTING ACCESS PANEL AND LIGHT FIXTURE. REMOVE AND
REPLACE CEILING AS REQUIRED FOR INSTALLATION OF NEW VAV. PATCH TO
MATCH EXISTING.
15 NEW EA DUCT UP TO NEW ROOF MOUNTED SMOKE EXHAUST FAN.
COORDINATE EXACT LOCATION WITH STRUCTURAL JOISTS. SEE DETAIL
6/H5.01.
16 NEW SA DUCT UP TO NEW ROOF MOUNTED SUPPLY FAN. COORDINATE
EXACT LOCATION WITH STRUCTURAL JOISTS. SEE DETAIL 9/H5.01.
17 NEW DIFFUSERS FOR SMOKE EVACUATION SYSTEM. REFER TO SHEET H4.03
FOR SCHEDULE. COORDINATE LOCATIONS WITH EXISTING CEILING GRID.MATCHLINE MATCHLINE
MATCHLINE MATCHLINE
NO. DATE REVISION
1 02/17/23 ISSUED FOR BID
VC 06-1
VC 06-1
VC 06-3
VC 06-3
SF 06-1
SEF 06-1
EF 06-2
EF 06-2
SEF 06-2
SF 06-2
T
T
T T
T
T
TT
T T
T
T
TT
TT
T
T
T
T
T T
TT
T
T
T
T
Ƨ Ƨ
Ƨ Ƨ
T
AREA 3:
DORMITORY G
1. SEE SHEET H0.01 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED TO INSTALL THEIR WORK.
3. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
4. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
INSTALLATION OF NEW DUCTWORK.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARILY REMOVING
LIGHT FIXTURES TO FACILITATE WORK AND REPLACING LIGHT
FIXTURES WHEN WORK IS COMPLETE.
6. REBALANCE ALL EXISTING DIFFUSERS TO AIR FLOW RATES SHOWN.
7. COORDINATE ALL NEW DUCTWORK FROM ROOF MOUNTED EQUIPMENT
BETWEEN STRUCTURAL JOISTS.
8. EXISTING TRANSFER OPENINGS THROUGHOUT TO REMAIN. PIPING,
DUCTWORK, ETC SHALL NOT BE ROUTED THROUGH EXISTING
TRANSFER OPENINGS.
9. LOCATE ALL VALVES AND DAMPERS AT ACCESSIBLE LOCATION.
101112
H
J
K
K.5
M
N
P/SEE 1 H2.02
/SEE 1 H2.04
/SEE 1 H2.02
(TYP.)(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
VF 07-5
V 07-15
V 07-16
VF 07-4
V 07-13 V 07-14
V 07-12
VC 07-4
V 07-5
VC 07-1
V 07-3
V 07-4
V 07-2
VF 07-2
VF 07-1
V 07-1
VF 07-3
V 07-17
V 07-20
VC 07-2
V 07-6
V 07-7 V 07-8
V 07-9
VC 07-3
V 07-10
V 07-18
VC 07-5
DORMITORY
G046
DORMITORY
G044
DAYROOM
G045
DAYROOM
G043
OFFICER STATION
G042
VEST.
G033
VEST.
G030
SALLY PORT
G029
SALLY PORT
G032
SHOWER
G037
CORRIDOR
G031
STORAGE
G038
CORRIDOR
G028
OFFICER STATION
G034
MULTI-PURPOSE
G027
CORRIDOR
G001
RESTROOM
G049
RESTROOM
G047
MULTI-PURPOSE
G039
JANITORS
G048
MULTI-PURPOSE
G041
CHASE
G040
CORR.
G051
SALLY PORT
G052
CORRIDOR
H001
STORAGE
G017E
HOLD
G017C
HOLD
G017D
HOLD
G017B
HOLD
G017A
DAYROOM
G017
RESTROOM
G026
CHASE
G016
JANITORS
G025
RESTROOM
G024 MULTI-PURPOSE
G023
ELEC.
G015
MULTI-PURPOSE
G014
DAYROOM
G021
DAYROOM
G019
DORMITORY
G020
DORMITORY
G022
VEST.
G005
VEST.
G008
SALLY PORT
G004
SALLY PORT
G007
OFFICER STATION
G009
SHOWER
G012
CORRIDOR
G003
CORRIDOR
G006
STORAGE
G013
MULTI-PURPOSE
G002
S 170 S 170
S 80S 80 S 310
S 310S 310
S 190
S 190
S 310 S 310
S 120
S 120
S 120S 120
S 310 S 310
S 190
S 190
S 310 S 310
S 80
S 310
S 80
S 170 S 170
S 320 S 320 S 320 S 320
S 320
S 320S 320S 320S 320S 320
S 270
S 70
R 1145 R 1145
R 1145R 1145
S 200
S 200
S 200 S 200
S 200S 200
S 200S 200
S 50
S 200 S 200
S 200S 200 S 200
S 200 S 200
S 200
S 120
S 160
S 120
S 110
S 100
S 110
S 190 S 190
S 270
S 70
S 150 S 150
S 150S 150
S 150 S 150
S 150S 150
R 230
R 270
R 110
R 60
R 170 R 170
R 20 R 20
R 85
R 190 R 190
R 190 R 190
R 85
R 20
R 20
R 170 R 170
R 600R 600
R 160
R 240
R 270
R 70
R 110
E 60
E 60
E 60 E 60
S 50
S 50
S 50
S 50
E 80
E 415 E 415
E 335
E 335E 335
E 335 E 335
E 155
E 155
E 335
E 335
E 335
E 335
E 335
E 415 E 415
E 80
E 50
S 190
R 570
10"x8" SA
8"x8" SA
12"x10" SA
26"x16" SA
8"x8" SA
8"x8" SA
8"x8" SA
16"x14" SA
8"x8" SA
8"x8" SA
8"x8" SA
8"x8" SA
26"x16" SA 8"x8" SA
8"x8" SA 8"x8" SA
8"x8" SA
8"x8" SA
16"x14" SA
8"x8" SA
8"x8" SA
8"x8" SA
12"x6" SA
8"x8" SA
8"x8" SA 10"x6" SA
14"x12" EA
16"x10" EA
8"x8" SA
16"x10" EA
V 07-11
OFFICER STATION
G018
SALLY PORT
H002
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
V 07-19
8"x8" SA
8"x8" SA
(TYP.)
(TYP.)
E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400E1 1400
E1 1400
E1 1500E1 1500
E1 1500
E1 1500E1 1500E1 1500E1 1500E1 1500E1 1500
E1 1500
20"x26" EA 20"x26" EA
24"x26" SA
24"x26" SA
26"x20" EA
26"x14" EA 26"x14" EA
26"x20" EA
26"x24" SA
24"x14" SA 26"x24" SA
24"x14" SA
26"x24" SA
24"x18" SA
26"x18" EA26"x28" EA26"x28" EA26"x18" EA
26"x24" SA
24"x18" SA 42"x26" SA
50"x26" EA
S2 1500 S2 1500 S2 1500 S2 1500 S2 1500 S2 1500 S2 1500 S2 1500
S2 1500S2 1500S2 1500
S2 1500
S2 1500 S2 1500 S2 1500 S2 1500
VC 07-2VC 07-2
VC 07-3
VC 07-3
3 EF 07-2
EF 07-3
EF 07-1
EF 07-2
14"x12" EA
EF 07-4
SF 07-1
SF 07-2
SEF 07-1 SEF 07-2
SF 07-3
SEF 07-3
26"x16" (SA)
44"x18" (SA)
8"x8" (SA)
8"x8" (SA)
8"x8" (SA)
8"x8" (SA)
(SA)
(S A
(S A
(S A
(E A
(E A
(S A
(S A
(R A
(E A
(E A
(E A
(S A
(SA) (SA)
(SA)
(RA)(RA)
(S A
(S A
(S A
(SA)
(SA)
(R A
(R
A
(RA)
(R A
(R
A
(S A
(SA)
(SA)
(HWS)
(HWR)
(HWS)
(HWR)
(H W
S
(H W
R
(HWR)
(HWS)
12"x10" SA
16"x14" SA
CV 07-1
NOTE: DIMENSIONAL DATA IS TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING
PROJECT No.
DRAWING No.
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E th S tr e e t
K e n o s h a W
I
C U s e rs
\m b e h re n s \D o c u m e n ts
\K C e n tr a l_ m a ri a .b e h re n s X
D C
S B
.r v t
/1
/2
:1
:3 P
M
H2.03
K0450150
D O
R M
IT
O
R Y
G F
IR
S
T F
L O
O R
H V
A C
P L A
N
K C
D C
R O
O F
T O
P E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
P R
O J E
C T
P H
A S
E
DESIGNED : MCB
DRAWN BY : MCB
CHECKED BY : KRP
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m
DATE CHECKED : 2023.02.06
K e n o s h a W
I th
S tr e e t, th F lo o r
N.T.S.
KEYPLAN
NOTES (THIS SHEET)
KEYNOTES#
0 2' 4' 8' 16'
DORMITORY G FIRST FLOOR HVAC PLAN
MATCHLINE
MATCHLINE
MATCHLINE
1 NEW SA DUCT UP TO RACU 07-1. SEE DETAIL 3/H3.01.
2 NEW RA DUCT UP TO RACU 07-1. SEE DETAIL 3/H3.01.
3 NEW EA DUCT UP TO NEW ROOF MOUNTED EXHAUST FAN. MAKE
NEW CONNECTION TO EXISTING EA DUCT. SEE 2/H5.01
4 ROUTE NEW HWS/R PIPING TO RACU 07-1. MAKE CONNECTION TO
EXISTING HWS/R PIPING. PROVIDE NEW HWS/R CONTROL VALVES
ABOVE ACCESSIBLE CEILING. SEE 3/H3.01.
5 NEW VAV BOX WITH REHEAT ABOVE CEILING. MAKE NEW
CONNECTION TO EXISTING SUPPLY DUCT AND HWS/R PIPING.
SEE DETAILS.
6 NEW PARALLEL FAN POWERED VAV BOX ABOVE CEILING. MAKE
NEW CONNECTION TO EXISTING SUPPLY DUCT AND HWS/R
PIPING. SEE DETAILS.
7 NEW VAV BOX ABOVE CEILING. MAKE NEW CONNECTION TO
EXISTING SUPPLY DUCT. SEE DETAILS.
8 NEW 3-WAY CONTROL VALVE FOR RACU HW COIL. REFER TO
DETAIL 3/H5.02.
9 REINSTALL EXISTING DUCT SMOKE DETECTORS IN NEW
DUCTWORK DROPS FROM ROOF TOP UNIT.
10 NEW ZONE TEMPERATURE SENSOR FOR ASSOCIATED TERMINAL
UNIT. LOCATE SENSOR ABOVE CEILING AT RETURN GRILLE
UNLESS OTHERWISE NOTED.
11 EXISTING HWS/R PIPING TO REMAIN UNLESS OTHERWISE NOTED.
12 EXISTING SA DUCTWORK TO REMAIN UNLESS OTHERWISE
NOTED.
13 EXISTING RA DUCTWORK TO REMAIN UNLESS OTHERWISE
NOTED.
14 NEW VAV BOX ABOVE GYPSUM CEILING. ACCESS BOX THROUGH
EXISTING ACCESS PANEL AND LIGHT FIXTURE. CONTRACTOR
SHALL CONFIRM IN FIELD ANY CEILING WORK REQUIRED FOR
VAV INSTALLATION.
15 NEW EA DUCT UP TO NEW ROOF MOUNTED SMOKE EXHAUST
FAN. COORDINATE EXACT LOCATION WITH STRUCTURAL JOISTS.
SEE DETAIL 6/H5.01.
16 NEW SA DUCT UP TO NEW ROOF MOUNTED SUPPLY FAN.
COORDINATE EXACT LOCATION WITH STRUCTURAL JOISTS. SEE
DETAIL 9/H5.01.
17 NEW DIFFUSERS FOR SMOKE EVACUATION SYSTEM. REFER TO
SHEET H4.03 FOR SCHEDULE. COORDINATE LOCATIONS WITH
EXISTING CEILING GRID.
AREA 4:
DORMITORY H
1. SEE SHEET H0.01 FOR GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED TO INSTALL THEIR WORK.
3. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
4. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
INSTALLATION OF NEW DUCTWORK.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARILY REMOVING
LIGHT FIXTURES TO FACILITATE WORK AND REPLACING LIGHT
FIXTURES WHEN WORK IS COMPLETE.
6. REBALANCE ALL EXISTING DIFFUSERS TO AIR FLOW RATES SHOWN.
7. COORDINATE ALL NEW DUCTWORK FROM ROOF MOUNTED EQUIPMENT
BETWEEN STRUCTURAL JOISTS.
8. EXISTING TRANSFER OPENINGS THROUGHOUT TO REMAIN. PIPING,
DUCTWORK, ETC SHALL NOT BE ROUTED THROUGH EXISTING
TRANSFER OPENINGS.
9. LOCATE ALL VALVES AND DAMPERS AT ACCESSIBLE LOCATION.
13141516
H
J
K
K.5
/SEE 1 H2.03
/SEE 1 H2.03
OUTDOOR EXERCISE
H008
CONTROL
H007
SALLY PORT
H004
MULTI-PURPOSE
H036
CELL
H039
CELL
H040
CELL
H041
CELL
H042
CELL
H044
DAYROOM
H038
DAYROOM
H009
CELL
H045
CELL
H046
CELL
H047
LOCKSMITH
H037
CELL
H048
CELL
H049
CELL
H020
CELL
H019
EQUIPMENT
H003
CELL
H018
CELL
H017
CELL
H016
CELL
H015
SHOWER
H014
SHOWER
H043
CELL
H013
CELL
H012
CELL
H011
CELL
H010
JANITORS
H006
SINGLE RESTROOM
H005
CORRIDOR
H001
SALLY PORT
H002
R 230
R 230
E 75E 140
E 75 E 75 E 75 E 75
E 75
E 75
E 75
E 75
S 130S 65
S 65
S 65
S 65
S 65 S 65 S 65 S 65…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .