26005-Asphaltic_Concrete_Products_-_Attachment_A.xlsx
XLSX spreadsheet 53 KB Posted
- Attached to
- Asphaltic Concrete Products (2026)
- Solicitation number
- 2026-RFB-005
- Issued by
- Dane County, Mattoon Village, Wisconsin
About this file
This is a cost proposal form for asphaltic concrete products issued by a Wisconsin county for the 2026 fiscal year (RFB 2026-005). The bid solicitation seeks pricing for hot mix asphalt (HMA) pavement in various specifications, cold mix materials for seasonal patching, asphaltic prime and tack coats, and other specialty asphaltic materials. HMA pavement line items are categorized by thickness (3, 4, and 5 inches), mix temperature (low, medium, and high), and binder grade (58-28). Cold mix materials are specified for both summer and winter patching applications at multiple county shop locations including Madison, Badger Salt Shed, East Side Facility, Springfield, and Mt. Horeb. The cost proposal template allows vendors to submit pricing for materials picked up at the plant or delivered to specified locations, with an additional charge option for materials picked up during off-peak hours (7 p.m. to 1 a.m.). Bidders are required to identify all plant locations from which they will supply materials and provide corresponding plant information including addresses, phone numbers, and hours of operation.
Pricing shall be all-inclusive of labor, delivery costs, and all other expenses necessary to provide products in accordance with specifications and contract terms. All pricing is quoted per unit of measure (ton for HMA and cold mix materials, gallon for prime/tack coat) with the unit of measure picked up at the plant as the baseline. Vendors must complete all required cells in the proposal form and indicate "no bid" for any line items they cannot fulfill. The cost proposal must be submitted in Microsoft Excel format to the designated section of the bid package. All vendors bidding from multiple plant locations must complete a separate pricing section for each additional plant location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Asphaltic_Concrete_Products_(2026).pdf | ||
| Asphaltic_Concrete_Products_(2026).pdf | ||
| 26005-Asphaltic_Concrete_Products_-_Attachment_A.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Proposal
| Cost Proposal | |
| Asphaltic Concrete Products (2026) | |
| 2026-RFB-005 | |
| Instructions: |
1. Pricing shall be inclusive of all labor, delivery costs and other expenses necessary to provide product in accordance with the specifications and terms and conditions of this bid document and your proposal.
2. Bidders must complete all cells in orange.
A. If not bidding on a line the vendor must enter "no bid" in the No Bid column.
3. Bidders must comlete Plant Location table for all plants that are listed in their bid.
4. Upload completed Price Proposal in MS Excel format to Section 1.2.
| Vendor Name: |
| Hot Mix Material- |
Price per Unit Picked Up at Plant
| Line Item | Description | UOM | Unit Cost | Plant Name(s) | No Bid |
| 1 | HMA Pavement: 3 LT, 58-28, S | TON | $ - 0 | ||
| 2 | HMA Pavement: 4 LT, 58-28, S | TON | $ - 0 | ||
| 3 | HMA Pavement: 5 LT, 58-28, S | TON | $ - 0 | ||
| 4 | HMA Pavement: 3 MT, 58-28, S | TON | $ - 0 | ||
| 5 | HMA Pavement: 4 MT, 58-28, S | TON | $ - 0 | ||
| 6 | HMA Pavement: 5 MT, 58-28, S | TON | $ - 0 | ||
| 7 | HMA Pavement: 3 MT, 58-28, H | TON | $ - 0 | ||
| 8 | HMA Pavement: 4 MT, 58-28, H | TON | $ - 0 | ||
| 9 | HMA Pavement: 5 MT, 58-28, H | TON | $ - 0 | ||
| 10 | HMA Pavement: 3 HT, 58-28, H | TON | $ - 0 | ||
| 11 | HMA Pavement: 4 HT, 58-28, H | TON | $ - 0 | ||
| 12 | HMA Pavement: 5 HT, 58-28, H | TON | $ - 0 | ||
| 13 | Asphaltic Prime or Tack Coat | GAL | $ - 0 | ||
| 14 | Additional charge per ton for material picked-up between 7 p.m. and 1 a.m. (special projects) | TON | $ - 0 | ||
| Cold Mix Material- |
Price per Unit Picked Up at Plant
| Line Item | Description | UOM | Unit Cost | Plant Name(s) | No Bid |
| 15 | Cold Mix (Summer Patch) – Madison Shop | TON | $ - 0 | ||
| 16 | Cold Mix (Winter Patch) – Madison Shop | TON | $ - 0 | ||
| 17 | Cold Mix Special – Madison Shop* QPR 2000 or approved equal | TON | $ - 0 | ||
| 18 | Cold Mix Special – Badger Salt Shed * QPR 2000 or approved equal | TON | $ - 0 | ||
| 19 | Cold Mix Special – East Side Facility* QPR 2000 or approved equal | TON | $ - 0 | ||
| 20 | Cold Mix Special – Springfield Shop* QPR 2000 or approved equal | TON | $ - 0 | ||
| 21 | Cold Mix Special – Mt. Horeb Shop* QPR 2000 or approved equal | TON | $ - 0 | ||
| Cold Mix Material- |
Delivered to Location Listed
| Line Item | Description | UOM | Unit Cost | Plant Name(s) | No Bid |
| 22 | Cold Mix (Summer Patch) – Madison Shop | TON | $ - 0 | ||
| 23 | Cold Mix (Winter Patch) – Madison Shop | TON | $ - 0 | ||
| 24 | Cold Mix Special – Madison Shop* QPR 2000 or approved equal | TON | $ - 0 | ||
| 25 | Cold Mix Special – Badger Salt Shed * QPR 2000 or approved equal | TON | $ - 0 | ||
| 26 | Cold Mix Special – East Side Facility* QPR 2000 or approved equal | TON | $ - 0 | ||
| 27 | Cold Mix Special – Springfield Shop* QPR 2000 or approved equal | TON | $ - 0 | ||
| 28 | Cold Mix Special – Mt. Horeb Shop* QPR 2000 or approved equal | TON | $ - 0 | ||
| Other Special Asphaltic Materials |
Vendor to enter item description in description column
| Line Item | Description | UOM | Price Picked Up at Plant | Plant Name(s) | No Bid |
| 29 | TON | $ - 0 | |||
| 30 | TON | $ - 0 | |||
| 31 | TON | $ - 0 | |||
| 32 | TON | $ - 0 | |||
| 33 | TON | $ - 0 |
Additional Plant Location- Hot Mix Material Price per Unit Picked Up at Plant If only bidding from one plant location leave the below table blank.
| Line Item | Description | UOM | Unit Cost | Plant Name(s) | No Bid |
| 34 | HMA Pavement: 3 LT, 58-28, S | TON | $ - 0 | ||
| 35 | HMA Pavement: 4 LT, 58-28, S | TON | $ - 0 | ||
| 36 | HMA Pavement: 5 LT, 58-28, S | TON | $ - 0 | ||
| 37 | HMA Pavement: 3 MT, 58-28, S | TON | $ - 0 | ||
| 38 | HMA Pavement: 4 MT, 58-28, S | TON | $ - 0 | ||
| 39 | HMA Pavement: 5 MT, 58-28, S | TON | $ - 0 | ||
| 40 | HMA Pavement: 3 MT, 58-28, H | TON | $ - 0 | ||
| 41 | HMA Pavement: 4 MT, 58-28, H | TON | $ - 0 | ||
| 42 | HMA Pavement: 5 MT, 58-28, H | TON | $ - 0 | ||
| 43 | HMA Pavement: 3 HT, 58-28, H | TON | $ - 0 | ||
| 44 | HMA Pavement: 4 HT, 58-28, H | TON | $ - 0 | ||
| 45 | HMA Pavement: 5 HT, 58-28, H | TON | $ - 0 | ||
| 46 | Asphaltic Prime or Tack Coat | GAL | $ - 0 | ||
| 47 | Additional charge per ton for material picked-up between 7 p.m. and 1 a.m. (special projects) | TON | $ - 0 | ||
| Additional Plant Location- Cold Mix Material- |
If Only Bidding From One Plant Location Select No Bid For Line Items Below - Price per Unit Picked Up at Plant
| Line Item | Description | UOM | Unit Cost | Plant Name(s) | No Bid |
| 48 | Cold Mix (Summer Patch) – Madison Shop | TON | $ - 0 | ||
| 49 | Cold Mix (Winter Patch) – Madison Shop | TON | $ - 0 | ||
| 50 | Cold Mix Special – Madison Shop* QPR 2000 or approved equal | TON | $ - 0 | ||
| 51 | Cold Mix Special – Badger Salt Shed * QPR 2000 or approved equal | TON | $ - 0 | ||
| 52 | Cold Mix Special – East Side Facility* QPR 2000 or approved equal | TON | $ - 0 | ||
| 53 | Cold Mix Special – Springfield Shop* QPR 2000 or approved equal | TON | $ - 0 | ||
| 54 | Cold Mix Special – Mt. Horeb Shop* QPR 2000 or approved equal | TON | $ - 0 | ||
| Plant Names |
List the Plant Name(s) with street address, phone numbers and hours of operations for each plant listed above.
Plant Name Plant Address Hours of Operation Phone number image1.tiff
File details come from the government source that posted it. Updated .