26-RFQ-001-Appendix-A-Cost-Model.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
Wireline Ethernet or Fixed Wireless Services
Solicitation number
26-RFQ-001
Issued by
Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington

About this file

This is a Cost Model Evaluation spreadsheet (26-RFQ-001-Appendix-A-Cost-Model.xlsx) for WaTech's Wireline Ethernet or Fixed Wireless Services solicitation. The document outlines a procurement opportunity for telecommunications services across multiple state facilities in Washington, with two specific sites detailed: an example site at 1500 Lincoln Ave SW in Olympia and a DSHS (Department of Social and Health Services) site at 1651 S Market Blvd in Chehalis. The solicitation seeks vendors to provide network connectivity services, with specific requirements including installation intervals, bandwidth options (10M and 100M), and detailed site-specific installation instructions.

The cost model incorporates a scoring mechanism that evaluates vendors across multiple dimensions, including timeline points, cost points, and local loop type (with preferences for fiber at 40 points, wireless at 20 points, and copper at 10 points). Vendors must provide monthly recurring costs (MRC) and non-recurring costs (NRC) for different bandwidth levels. Special mandatory requirements include specific installation details, such as extended handoff specifications, proximity to existing infrastructure, and potential future upgrade capabilities. The solicitation requires vendors to have both an NSA (likely a Network Services Agreement) and applicable addenda on file to participate, with a focus on precise technical and logistical requirements for network service deployment at state facilities.

View the file

Other files

File Type Posted
26-RFQ-001 Amendment 1.docx DOCX document
26-RFQ-001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Model

Evaluation Model for Solicitation Number 26-RFQ-001 Wireline Ethernet or Fixed Wireless Services
WaTech to CompleteVendor To Complete
ScoringSupplemental Bandwidth Examples (M) See Section 4 of the RFQ
Evaluation Values
Site NameSite AddressSite Contact(s)Service to terminate to this location:Floor Map Included (Y/N)Guaranteed Install Interval (days)Initial Proposed BandwidthLocal Loop Type Fiber = 40

Wireless = 20

Copper = 10Timeline Points
Cost Points
Special Mandatory Requirements- (such as special term length, E-rate site, background check needed, optical handoff type, diverse path, site survey required, etc.)(MS) If Vendor can commit to a shorter Install Interval, please state the number of days.(M) Local loop type to the site address (fiber, copper, or fixed wireless)(MS) MRC(MS) NRCMRC (100M)MRC (1G)TimelineCostLocal Loop Type Fiber = 40

Wireless = 20

Copper = 10Timeline Points
Cost Points
Example12341500 Lincoln Ave SW
Olympia, WA 98504Mr. John Doe

360-555-1234

email@email.comInstall extended handoff per attached site map (DOLC0518 Floor plan.pdf)YES15010M40,20,1010501. The Vendor shall:150$ - 001050
1DSHS60161651 S Market Blvd Chehalis, WA 98532-3826Liz Leona

360-789-9211

liz.leona@dshs.wa.govInstall extended handoff to Telco/LAN room 117 per attached site map (DSHS6016_Chehalis floor plan.pdf). Demarc/Vendor NID/Ethernet switch to be located no further than 10 feet from DSHS router in the same room as the current circuit. This is an Area Agency on Aging (AAA) facility. Refer to the local point of contact for building contact information.YES150100M40,20,101050DSHS requires the use of existing pathways and requires vendor's installation drawing prior to work being done. Customer is requesting installation of vendor equipment capable for future upgrade.N/A150$ - 001050
20$ - 0000
30$ - 0000
40$ - 0000
50$ - 0000
60$ - 0000
70$ - 0000
80$ - 0000
90$ - 0000
100$ - 0000
110$ - 0000
120$ - 0000
130$ - 0000
140$ - 0000
150$ - 0000
160$ - 0000
170$ - 0000
180$ - 0000
190$ - 0000
200$ - 0000
210$ - 0000
220$ - 0000
230$ - 0000
240$ - 0000
250$ - 0000
260$ - 0000
270$ - 0000
280$ - 0000
290$ - 0000
300$ - 0000
310$ - 0000
320$ - 0000
330$ - 0000
340$ - 0000
350$ - 0000
360$ - 0000
370$ - 0000
380$ - 0000
390$ - 0000
400$ - 0000
410$ - 0000
420$ - 0000
430$ - 0000
440$ - 0000
450$ - 0000
460$ - 0000
470$ - 0000
480$ - 0000
490$ - 0000
500$ - 0000
510$ - 0000
520$ - 0000
530$ - 0000
540$ - 0000
550$ - 0000

ESRI_MAPINFO_SHEET

DO NOT EDIT

For Esri use only

File details come from the government source that posted it. Updated .