This is an Environmental, Health and Safety (EHS) Contractor Requirements document for Collier County, Florida construction projects, specifically applicable to Bid No. 26-8701 for the Naples Beach Renourishment Project. The document outlines comprehensive safety and regulatory compliance standards that all contractors must follow on Collier County construction sites. Contractors are required to comply with all applicable federal, state, and local regulations from agencies including OSHA, DOT, EPA, DHS, ANSI, FDEP, and NFPA, as well as Collier County's own EHS Standard Operating Procedures and Job Safety Analysis requirements. Key operational requirements include wearing vendor badges on county property, obtaining powered industrial vehicle certifications, implementing daily incident reporting and weekly safety inspections, using fall protection devices for work above six feet, following electrical safety and lockout/tagout procedures, and properly maintaining equipment and ladders. The sealed bid deadline for the Naples Beach Renourishment Project is September 4, 2026 at 3:00 p.m., with a non-mandatory pre-bid meeting scheduled for August 25, 2026 at 9:00 a.m. at Procurement Services Division in Naples, Florida.
Contractors must develop and submit site-specific safety plans addressing general safety, security, hurricane preparedness, pandemic safety, respirable crystalline silica hazards, confined space entry, asbestos management, mold remediation, and environmental protection as applicable to project scope. When working in rights-of-way including roads, sidewalks, and bike paths, contractors must comply with FDOT and MUTCD requirements, including use of ANSI/ISEA 107-2010 compliant Class 2 or 3 hi-visibility garments and appropriate work zone signage and traffic control plans. Contractors must also implement comprehensive jobsite safeguarding measures including protective barriers around damaged sidewalks and excavations, proper signage indicating closures, and evaluation of hazards to prevent public access to dangerous conditions when work is not actively occurring. All work must meet or exceed Collier County Vertical Construction Standards and Collier County IT Construction Standards unless specifically exempted in writing by the Facilities Management Division Director and Risk Management Director. Risk management must be integrated into all pre-activity, activity, and post-activity construction meetings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Environmental, Health and Safety
Contractor Requirements for all BCC Construction Projects
1. Contractors will be required to understand and comply with all applicable laws and regulations of any governmental entity (OSHA, DOT, EPA, DHS, ANSI, FDEP. NFPA, etc.) and
Collier County CMA’s, EHS Standard Operating Procedures (SOP’s) or Job Safety Analysis
(JSA’s) that that pertain to environmental, health and safety standards and/or work practices applicable to the activities they perform for Collier County. These include but are not limited to:
• Must wear a BCC provided Vendor Badge at all times while on BCC property.
• Powered Industrial Vehicle Certifications (Heavy Equipment, Cranes, etc.)
• Storage, handling, and use of flammable liquids and hazardous materials, including fuels and compressed gas cylinders.
• Daily reporting of any incidents/accidents or any OSHA safety inspections of equipment and worksites.
• Weekly reporting of at least one internal safety inspection of equipment and worksite.
• Use of Personal Fall Protection Devices while working at heights above 6 feet.
• Following Electrical Safety Practices, Arc Flash and Lockout/Tagout procedures.
• Proper use of Personal Protective Equipment. (PPE)
• Proper maintenance and use of ladders and other equipment.
• Guarding of wall and floor openings, open trenches, and excavations.
• Environmental Requirements (Permitting, Tanks, etc.)
2. Required Site EHS Plans for:
• Site Specific Safety Plan
• Site Specific Security Plan
• Site Specific Hurricane Plan
• Site Specific Pandemic Safety Plan (COVID-19) (If Applicable)
• Site Specific Respirable Crystalline Silica Plan (If Applicable)
• Site Specific Confined Space Entry Plan (If Applicable)
• Site Specific Asbestos Management Plan (If Applicable)
• Site Specific Mold Testing and Remediation Management Plan (If Applicable)
• Site Specific Environmental Protection Plan (Spill Cleanup, SPCC, etc.) (If
Applicable)
3. When working within a right-of-way (i.e. roads, sidewalks, bike paths, etc) – All applicable
FDOT and/or MUTCD requirements are to be followed at all times. Specifics include but are not limited to:
• ANSI/ISEA 107-2010 Compliant Class 2 or 3 Hi-Visibility Safety Garments.
• Applicable work zone signage, cones, barricades or barrels, arrow panels, flagging personnel and Stop/Slow Paddles, where necessary, required by law or the BCC.
• An applicable work zone (Maintenance of traffic) plan based on FDOT and/or
MUTCD designs on site.
4. Risk Management is included in all Pre-Activity/Construction, Activity/Construction and
Post Activity/Construction Meetings.
5. Safeguarding construction sites – Protecting the jobsite and preventing or inhibiting public access after activities are finished for the day is equally important. Therefore, all hazardous locations within construction sites and rights-of-ways are to be adequately protected.
Specifics include but are not limited to:
• Damaged, blocked, or missing sections of sidewalks, bike paths or other pedestrian access zones shall be protected with orange barricade fencing, barricades with yellow or red tape (depending on the hazard) or an equivalent means of protection. Sidewalks must also be posted as being closed on both sides with a white sign with black letters.
• Excavations must be protected in a similar manner as listed above if they must be left open overnight, during weekend hours, etc.
• All other hazards shall be evaluated by the contractor to ensure there are no dangerous conditions remaining that could be inadvertently encountered by collier county employees and/or the public while the construction site is not active (i.e., when no construction work is taking place).
6. Contractor must agree that all work must meet or exceed the standards set forth in the
Collier County Vertical Construction Standards and Collier County IT Construction Standards
(if applicable) unless specifically exempted in writing by Facilities Management Division