26-8700_Scope_of_Work.pdf
PDF 122 KB Posted
- Solicitation number
- 26-8700
- Issued by
- Collier County, Florida
About this file
This Scope of Work document pertains to the Freedom Park Boardwalk Repairs Phase 1 project in Collier County, Florida. The project encompasses construction-related services for the repair and restoration of Boardwalks 1 and 2 at Fred W. Coyle Freedom Park, located at 1515 Golden Gate Parkway, Naples, Florida. The scope of work includes replacement of deteriorated boardwalk decking, replacement of damaged boardwalk structural supporting timber and members including all fasteners and associated hardware per plans and specifications, and replacement of damaged pilings and support beams with installation of new pilings as needed. A non-mandatory pre-bid conference will be held on October 20, 2026, at 10:00 a.m. local time at the project site. Sealed electronic bids will be received until 3:00 p.m. local time on November 6, 2026, through the County's online bidding system at https://procurement.opengov.com/portal/collier-county-fl, with all bids to be publicly opened and read aloud. One contract will be awarded for all work. Contractors are required to become familiar with the project location and working environmental conditions prior to bid submission.
The anticipated project budget is $1,300,000. Bidding documents are available exclusively through the Collier County Procurement Services Division Online Bidding System website, and bidders are cautioned that documents obtained from other sources may not be accurate or current. Bids must be submitted on unaltered bid forms included in the official bidding documents. Any bids received after the specified deadline will not be accepted and shall be returned unopened to the bidder.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Freedom Park Boardwalk Repairs Phase 1 (Boardwalks 1 & 2) #26-8700
Scope of Work
The project includes construction-related services for the repair and restoration of boardwalks 1-2. The repairs include the replacement of the existing deteriorated boardwalk decking, replacement of all damaged boardwalk structural supporting timber and members including all fasteners and associated hardware as per the plans and specifications, and the replacement of all damaged pilings and support beams including the installation of new pilings as needed. The contractors are required to become familiar with the location of the project and the working environmental conditions.
File details come from the government source that posted it. Updated .