This is a bid schedule document for the Freedom Park Boardwalk Repairs project issued by Collier County, Florida. The project encompasses repair and restoration services for Boardwalks 1 and 2, including replacement of deteriorated decking, damaged structural timber members, fasteners, hardware, pilings, and support beams, with new pilings installed as needed. The bid schedule itemizes work across four primary sections: Boardwalk No. 1 (three line items including pile jackets, turbidity barriers, and mobilization), Outlook No. 1 (three line items for pile jackets, concrete spall repairs, and turbidity barriers), Outlook No. 2 (ten line items including pile jackets, concrete extensions, asphalt replacement, stabilization, base group work, timber wingwall repairs, and turbidity barriers), and Boardwalk No. 2 (seven line items covering pile jackets, various timber railing repairs, and turbidity barriers). A non-mandatory pre-bid conference is scheduled for October 20, 2026 at 10:00 a.m. LOCAL TIME at Fred W. Coyle Freedom Park, 1515 Golden Gate Parkway, Naples, Florida 34105. Sealed bids must be submitted electronically through Collier County's online bidding system by 3:00 p.m. LOCAL TIME on November 6, 2026, with public opening and reading of all bids following submission.

The bid schedule currently reflects all unit costs and total costs as zero dollars, indicating this is a template awaiting contractor pricing submissions. A miscellaneous section includes trash removal and disposal and barge rental/construction pontoon services. The anticipated project budget is $1,300,000, with staff allocating $198,120 as an Owner's Allowance for unforeseen conditions or Owner-directed work, to be distributed only through change orders with proper time and materials documentation. Contractors are instructed to utilize bulk pricing for pile jackets in line items 2, 4, 7, and 14. One contract will be awarded for all work. Bidding documents are available exclusively through the Collier County Procurement Services Division Online Bidding System at https://procurement.opengov.com/portal/collier-county-fl, with copies obtained from sources other than this official website considered potentially inaccurate or outdated.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

VENDOR NAME:
Freedom Park Boardwalk Repairs (Boardwalks 1 & 2)
Bid Schedule: 26-8700
ITEM NO.DESCRIPTIONUNITQTYUNIT COSTTOTAL COST
1. Boardwalk No. 1
1MoblilizationLS1$ - 0$ - 0
2Standard Integral Pile Jacket, Structural, 16.1" to 30" (31 Piles Total) (FDOT Pay Item 0457-1-22)LF275$ - 0$ - 0
3Floating Turbidity Barrier (FDOT Pay Item 104-11)LF248$ - 0$ - 0
1. Boardwalk No. 1 - Subtotal:$ - 0
2. Outlook No. 1
4Standard Integral Pile Jacket, Structural, 16.1" to 30" (13 Piles Total) (FDOT Pay Item 0457-1-22)LF113$ - 0$ - 0
5Concrete for Spalls Repairs (5500 psi, Type IV Portland Cement) (FDOT Pay Item 0401-70-4)SF0.5$ - 0$ - 0
6Floating Turbidity Barrier (FDOT Pay Item 104-11)LF142$ - 0$ - 0
2. Outlook No. 1 -Subtotal:$ - 0
3. Outlook No. 2
7Standard Integral Pile Jacket, Structural, 16.1" to 30" (12 Piles Total) (FDOT Pay Item 0457-1-22)LF64$ - 0$ - 0
8Concrete Header Extension (5500 psi, Type IV Portland Cement) (FDOT Pay Item 0400-4-5)CY0.5$ - 0$ - 0
9Asphalt Replacement (Type SP-12.5) (FDOT Pay Item 334-1)TN9.5$ - 0$ - 0
10Type B Stabilization (FDOT Pay Item 0160-4)SY48$ - 0$ - 0
11Optional Base Group No 1. (FDOT Pay Item 0285-7-01)SY48$ - 0$ - 0
12Timber Wingwall Repair (2x4 Timber Boards)LF40$ - 0$ - 0
13Floating Turbidity Barrier (FDOT Pay Item 104-11)LF138$ - 0$ - 0
3. Outlook No. 2 - Subtotal:$ - 0
4. Boardwalk No. 2
14Standard Integral Pile Jacket, Structural, 16.1" to 30" (94 Piles Total) (FDOT Pay Item 0457-1-22)LF465$ - 0$ - 0
15Timber Railing Repair (1x4 Board)LF5.21$ - 0$ - 0
16Timber Railing Repair (2x4 Board)LF11$ - 0$ - 0
17Timber Railing Repair (2x6 Board)LF5.5$ - 0$ - 0
18Timber Railing Repair (4x4 Post)LF4.48$ - 0$ - 0
19Timber Railing Repair (Metal Mesh)SF17.5$ - 0$ - 0
20Floating Turbidity Barrier (FDOT Pay Item 104-11)LF130$ - 0$ - 0
4. Boardwalk No. 2 - Subtotal:$ - 0
5. Miscellaneous
21Trash removal and Disposal - Including Disposal FeeLS1$ - 0$ - 0
22Barge Rental/ Construction PontoonLS1$ - 0$ - 0
5. Miscellaneous - Subtotal:$ - 0
Total Base Bid Cost:$ - 0
1. Staff has allocated $198,120 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.

2. For Line items 2, 4, 7, and 14, Contractors shall utilize bulk pricing for all pile jackets.

File details come from the government source that posted it. Updated .