26-8683_Exhibit_M2_Demolition_Plans.pdf
PDF 7 MB Posted
- Attached to
- SCRWTP Lime Softening Improvements - Blend Tank
- Solicitation number
- 26-8683
- Issued by
- Collier County, Florida
About this file
This is a demolition site plan document for Collier County's South County Regional Water Treatment Plant (SCRWTP) Lime Softening Improvements project, specifically detailing the blend tank demolition work. The project involves the demolition and disposal of the existing blend tank, approximately 150 linear feet of existing chemical piping (chlorine, caustic, corrosion inhibitor, and caustic soda), approximately 80 linear feet of additional chemical piping, existing chemical analyzers located at the influent and effluent sections of the blend tank, an existing abandoned duct bank, and a 2-inch fiber optic cable. The contractor is also responsible for dechlorinating and dewatering the tank prior to demolition. The sealed bid deadline is July 1, 2026 at 3:00 PM local time, with a non-mandatory pre-bid meeting scheduled for June 9, 2026 at 11:00 AM at the SCRWTP facility located at 3851 City Gate Drive, Naples, Florida 34117. Bid No. 26-8683 was advertised on June 1, 2026, and prospective bidders must register on the OpenGov procurement portal to access complete bid documents.
The demolition plans indicate that the contractor must field-verify all existing conditions and coordinate all work with the county owner prior to beginning demolition, including securing approval for equipment and materials disposal. Critical requirements include maintaining plant operations during construction, establishing temporary blinds and bulkheads at work limits, preventing debris from entering active channels and storm drains, and complying with applicable safety regulations and permits. The contractor must provide temporary supports and shoring as needed and ensure neat line sawcuts to protect adjacent active structures and piping. Record drawings used as reference were prepared in 1986 and may not fully represent current existing conditions, with yard piping depth of cover approximated at 30 inches and fiber optic conduit locations estimated from historical record information.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
h v o
DEMOLITION
SITE PLAN
00D01
204170-100000
AH
HV
BLEND TANK DEMOLITION
204170B_00D01.dgn
D02
A
1" = 30'-0"
2001 - SCRWTP - 8 MGD Reverse Osmosis Expansion Sept 2005 14
A
CUT PIPE
PIPING ARRANGEMENT AND
TIE-IN POINT BASED ON NEW
CONTRACTOR TO LOCATE
ABOVEGROUND TRANSITION
UNDERGROUND TO
HANDHOLE FOR
EXISTING 12" X 12"
EXISTING 2" FIBER OPTIC
DATEREV BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
204170
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
OFAPRIL 2026
COLLIER COUNTY
SCRWTP LIME SOFTENING IMPROVEMENTS
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
CA 00008571
PHONE: (941) 371-9832 FAX: (941) 371-9873
SARASOTA, FL. 343232
301 NORTH CATTLEMEN ROAD, SUITE 302
BID DOCUMENTS
No 93091
ELECTRONIC COPIES.
VERIFIED ON ANY
THE SIGNATURE MUST BE
ADJACENT TO THE SEAL.
HORVAT ON THE DATE
SEALED BY ANTHONY
DIGITALLY SIGNED AND
THIS ITEM HAS BEEN
P lo t
D a te
-M
A Y -2
:0
:1
P
M U s e r:
s v c P
W
M d e l:
L a y o u t1
C lo rT a b le g s h a d e .c tb
D e s ig n S c ri p t:
a ro ll o S td
P e n v .p n lo tS c a le :1
L A
S T S
A V
E D B
Y
PROJECT NO. FILE NAME:
DEPTH OF COVER OF EXISTING YARD PIPING IS APPROXIMATELY 30".6.
DRAWINGS ARE FOR REFERENCE ONLY. SEE SHEET G03, NOTE 26.
PHOTOS ON SHEET D04 FOR EXISTING CONDITIONS. RECORD
SEE DETAIL NGVD 29 (NATIONAL GEODETIC VERTICAL DATUM 1929).
SHOWN ON ALL HISTORICAL RECORD DRAWINGS ARE BASED ON
ALL ELEVATIONS AND EXTENTS OF PIPE AND VALVE REMOVAL.
CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS
ENGINEERING., 1986) AND DO NOT FULLY REPRESENT EXISTING
PROJECT (PRC CONSOER TOWNSEND, A DIVISION OF PRC
COUNTY SOUTH COUNTY WATER TREATMENT PLANT EXPANSION
RECORD DRAWINGS USED WERE PREPARED FOR THE COLLIER 5.
OF EQUIPMENT AND MATERIALS FOR APPROVAL.
CONTRACTOR TO COORDINATE WITH COUNTY PRIOR TO DISPOSAL 4.
AREAS AND SAFE ACCESS/EGRESS AT ALL TIMES.
PUMP CHANNEL OR OTHER ACTIVE FLOWS. MAINTAIN CLEAN WORK
LIMITS. PREVENT DEBRIS FROM ENTERING THE HIGH TRANSFER
NEAT LINES; DO NOT DISTURB BELOW-GRADE WORK BEYOND THE
PROVIDE TEMPORARY SUPPORTS/SHORING AS REQUIRED. SAWCUT
PROTECT ADJACENT ACTIVE STRUCTURES, CHANNELS, AND PIPING. 3.
SURFACE WATERS.
APPLICABLE REGULATIONS. NO DISCHARGE TO STORM DRAINS OR
ACCORDANCE WITH SAFETY DATA SHEET, PERMITS, AND
DEMOLITION. DECHLORINATE AND DISPOSE RESIDUALS/SLUDGE IN
DRAIN, DEWATER, CLEAN, AND NEUTRALIZE THE TANK PRIOR TO 2.
BLEND TANK.
AND DISPOSAL SHALL FOLLOW THE CONSTRUCTION OF THE NEW
BEFORE STARTING DEMOLITION. THE SEQUENCING OF DEMOLISH
(COUNTY). INSTALL TEMPORARY BLINDS/BULKHEADS AT THE LIMITS
ALL OUTAGES, ISOLATIONS, AND BYPASSES WITH THE OWNER
CONTRACTOR SHALL MAINTAIN PLANT OPERATIONS. COORDINATE 1.
CONSTRUCTION.
CONTRACTOR SHALL FIELD LOCATE EXISTING CONDUIT PRIOR TO
AND HANDHOLES APPROXIMATED FROM RECORD INFORMATION.
DEMOLISH AND DISPOSE 2" FIBER OPTIC. LOCATION OF FIBER OPTIC 9.
DEMOLISH AND DISPOSE EXISTING ABANDONED DUCT BANK. 8.
TANK.
LOCATED AT THE INFLUENT AND EFFLUENT SECTIONS OF THE BLEND
DEMOLISH AND DISPOSE OF EXISTING CHEMICAL ANALYZERS 7.
CAUSTIC SODA).
CHEMICAL PIPING (CHLORINE, CAUSTIC, CORROSION INHIBITOR AND
DEMOLISH AND DISPOSE OF APPROXIMATELY 150 LF OF EXISTING 6.
(CORROSION INHIBITOR AND CAUSTIC SODA).
REMOVE APPROXIMATELY 80 LF OF EXISTING CHEMICAL PIPING 5.
<3").
(CHLORINE SOLUTION, AMMONIA SYSTEM; VARYING DIAMETERS, ALL
REMOVE APPROXIMATELY 285 LF OF EXISTING CHEMICAL PIPING 4.
FILTER BUILDING TO THE EXISTING BLEND TANK).
SOFTENING FILTER EFFLUENT PIPING (FROM OUTSIDE OF THE
DEMOLISH AND DISPOSE OF APPROXIMATELY 190 LF OF 36" D. I. LIME 3.
PUMPS).
D.I. PIPING (FROM THE EXISTING BLEND TANK TO THE TRANSFER
INFLUENT 42" D.I. PIPING (FROM DEGASIFIERS) AND EFFLUENT 42"
DEMOLISH AND DISPOSE OF APPROXIMATELY 30 LF OF EXISTING 2.
INSTRUMENTS WITHIN THE WORK LIMITS.
ASSOCIATED CONDUITS, CABLES, SUPPORTS, AND ABANDONED
PROBES/SAMPLE LINES (PH, TEMPERATURE, CHLORINE),
AMMONIA, CAUSTIC SODA, CORROSION INHIBITOR), ANALYZER
PENETRATIONS, SAMPLE TAPS, CHEMICAL PIPING (CHLORINE, LIQUID
STAIRWAYS/LADDERS/HANDRAILS, COATINGS/LINERS, DRAINS,
TANK COVER, ACCESS HATCHES, INTERNAL BAFFLES/WEIRS,
DEMOLISH AND DISPOSE OF EXISTING 20,000-GAL BLEND TANK. 1.
GENERAL NOTES:
KEY NOTES:
NO. 4
REACTOR
00D02
204170-100000
AH
HV
BLEND TANK DEMOLITION PLAN
204170B_00D02.dgn
1/4" = 1'-0"
BLEND TANK AREA PLAN
2005_SCRWTP RO Expansion to 12 MGD 47
A
00D04
00D04
00D04
B
00D03
00D04
C
00D03
DATEREV BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
204170
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
OFAPRIL 2026
COLLIER COUNTY
SCRWTP LIME SOFTENING IMPROVEMENTS
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
CA 00008571
PHONE: (941) 371-9832 FAX: (941) 371-9873
SARASOTA, FL. 343232
301 NORTH CATTLEMEN ROAD, SUITE 302
THE SIGNATURE MUST BE
ADJACENT TO THE SEAL.
HORVAT ON THE DATE
SEALED BY ANTHONY
DIGITALLY SIGNED AND
THIS ITEM HAS BEEN
P lo t
D a
A Y -2
:0
:1
P
M U s e r:
s v c d e l:
L a y o lo rT a b le g s h a d e s ig n S c ri ro ll o S td
P e n v .p tS c a le :1
L A
S T S
A V
E D B
Y
PROJECT NO. FILE NAME:
SHEET G03, NOTE 26.
CONDITIONS. RECORD DRAWINGS ARE FOR REFERENCE ONLY. SEE
DATUM 1929). SEE PHOTOS ON SHEET D04 FOR EXISTIN
DRAWINGS ARE BASED ON NGVD 29 (NATIONAL GEODETIC VERTICAL
OF PIPE AND VALVE REMOVAL. ALL ELEVATIONS SHOWN ON RECORD
CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXTENTS 1.
SOLUTION AND AMMONIA SYSTEM PIPING).
DEMOLISH AND DISPOSE OF EXISTING CHEMICAL PIPING (CHLORINE 6.
TANK.
LOCATED AT THE INFLUENT AND EFFLUENT SECTIONS OF THE BLEND
DEMOLISH AND DISPOSE OF EXISTING CHEMICAL ANALYZERS 5.
AMMONIA SOLUTION, CAUSTIC SODA, AND CORROSION INHIBITOR.
REMOVE EXISTING CHEMICAL PIPING (CHLORINE SOLUTION, 4.
(FROM LIME SOFTENING).
DEMOLISH AND DISPOSE OF EXISTING INFLUENT 36" D.I. PIPING 3.
EXISTING BLEND TANK TO THE TRANSFER PUMPS).
(FROM DEGASIFIERS) AND EFFLUENT 42" D.I. PIPING (FROM THE
DEMOLISH AND DISPOSE OF EXISTING INFLUENT 42" D.I. PIPING 2.
INSTRUMENTS WITHIN THE WORK LIMITS.
ASSOCIATED CONDUITS, CABLES, SUPPORTS, AND ABANDONED
PROBES/SAMPLE LINES (pH, TEMPERATURE, CHLORINE), AMMONIA, CAUSTIC SODA, CORROSION INHIBITOR), ANALYZER
PENETRATIONS, SAMPLE TAPS, CHEMICAL PIPING (CHLORINE, LIQUID
STAIRWAYS/LADDERS/HANDRAILS, COATINGS/LINERS, DRAINS,
TANK COVER, ACCESS HATCHES, INTERNAL BAFFLES/WEIRS,
DEMOLISH AND DISPOSE OF EXISTING 20,000-GAL BLEND TANK. 1.
GENERAL NOTES:
KEY NOTES:
SECTIONS
00D03
204170-100000
AH
HV
BLEND TANK DEMOLITION
204170B_00D03.dgn
BLEND TANK SECTION
2001 - SCRWTP - 8 MGD Reverse Osmosis Expansion Sept 2005 125
1/2" = 1'-0"00D02
B
BLEND TANK SECTION
2001 - SCRWTP - 8 MGD Reverse Osmosis Expansion Sept 2005 125
1/2" = 1'-0"00D02
C
DATEREV BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
204170
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
OFAPRIL 2026
COLLIER COUNTY
SCRWTP LIME SOFTENING IMPROVEMENTS
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
CA 00008571
PHONE: (941) 371-9832 FAX: (941) 371-9873
SARASOTA, FL. 343232
301 NORTH CATTLEMEN ROAD, SUITE 302
THE SIGNATURE MUST BE
ADJACENT TO THE SEAL.
HORVAT ON THE DATE
SEALED BY ANTHONY
DIGITALLY SIGNED AND
THIS ITEM HAS BEEN
P lo t
D a
A Y -2
:0
:0
P
M U s e r:
s v c d e l:
L a y o lo rT a b le g s h a d e s ig n S c ri ro ll o S td
P e n v .p tS c a le :1
L A
S T S
A V
E D B
Y
PROJECT NO. FILE NAME:
SHEET G03, NOTE 26.
CONDITIONS. RECORD DRAWINGS ARE FOR REFERENCE ONLY. SEE
DATUM 1929). SEE PHOTOS ON SHEET D04 FOR EXISTING
DRAWINGS ARE BASED ON NGVD 29 (NATIONAL GEODETIC VERTICAL
OF PIPE AND VALVE REMOVAL. ALL ELEVATIONS SHOWN ON RECORD
CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXTENTS 1.
TANK.
LOCATED AT THE INFLUENT AND EFFLUENT SECTIONS OF THE BLEND
DEMOLISH AND DISPOSE OF EXISTING CHEMICAL ANALYZERS 5.
INHIBITOR.
SOLUTION, AMMONIA SOLUTION, CAUSTIC SODA, AND CORROSION
DEMOLISH AND DISPOSE OF EXISTING CHEMICAL PIPING (CHLORINE 4.
(FROM LIME SOFTENING).
DEMOLISH AND DISPOSE OF EXISTING INFLUENT 36" D.I. PIPING 3.
(FROM DEGASIFIERS) AND EFFLUENT 42" D.I. PIPING.
DEMOLISH AND DISPOSE OF EXISTING INFLUENT 42" D.I. PIPING 2.
INSTRUMENTS WITHIN THE WORK LIMITS.
ASSOCIATED CONDUITS, CABLES, SUPPORTS, AND ABANDONED
PROBES/SAMPLE LINES (pH, TEMPERATURE, CHLORINE), AMMONIA, CAUSTIC SODA, CORROSION INHIBITOR), ANALYZER
PENETRATIONS, SAMPLE TAPS, CHEMICAL PIPING (CHLORINE, LIQUID
STAIRWAYS/LADDERS/HANDRAILS, COATINGS/LINERS, DRAINS,
TANK COVER, ACCESS HATCHES, INTERNAL BAFFLES/WEIRS,
DEMOLISH AND DISPOSE OF EXISTING 20,000-GAL BLEND TANK. 1.
00D04
204170-100000
AH
HV
BLEND TANK DEMOLITION PHOTOS
204170B_00D04.dgn
FILE
00D02
FILE
00D02
FILE
00D02
FILE
00D02
3 4
DATEREV BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
204170
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
OFAPRIL 2026
COLLIER COUNTY
SCRWTP LIME SOFTENING IMPROVEMENTS
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
CA 00008571
PHONE: (941) 371-9832 FAX: (941) 371-9873
SARASOTA, FL. 343232
301 NORTH CATTLEMEN ROAD, SUITE 302
THE SIGNATURE MUST BE
ADJACENT TO THE SEAL.
HORVAT ON THE DATE
SEALED BY ANTHONY
DIGITALLY SIGNED AND
THIS ITEM HAS BEEN
P lo t
D a
A Y -2
:0
:0
P
M U s e r:
s v c d e l:
L a y o lo rT a b le g s h a d e s ig n S c ri ro ll o S td
P e n v .p tS c a le :1
L A
S T S
A V
E D B
Y
PROJECT NO. FILE NAME:
REFER TO 00D01 FOR GENERAL DEMOLITION NOTES. 1.
THE TANK AND BELOW GRADE.
CHEMICAL WASTE PIPING (1-1/2" SCH. 40 PVC.). TERMINATION IS AT
DEMOLISH AND DISPOSE OF EXISTING CHLORINE ANALYZER 11.
CHEMICAL PIPING.
DEMOLISH AND DISPOSE OF EXISTING 1" SCH. 80 PVC FLUORIDE 10.
M02.
CHEMICAL PIPING. TERMINATION OF PIPING IS PROVIDED ON SHEET
DEMOLISH AND DISPOSE OF EXISTING 2-1/2" SCH. 80 PVC CHLORINE 9.
CONTAINMENT AREA.
THE BLEND TANK AND IS TERMINATED AT THE SECONDARY
INHIBITOR CHEMICAL PIPING. THE DEMOLITION EXTENTS BEGINS AT
DEMOLISH AND DISPOSE OF EXISTING 1" SCH. 80 PVC CORROSION 8.
CONTAINMENT AREA.
BLEND TANK AND IS TERMINATED AT THE SECONDARY
SODA CHEMICAL PIPING. THE DEMOLITION EXTENTS BEGINS AT THE
DEMOLISH AND DISPOSE OF EXISTING 1/2" SCH. 80 PVC CAUSTIC 7.
M02.
CHEMICAL PIPING. TERMINATION OF PIPING IS PROVIDED ON SHEET
DEMOLISH AND DISPOSE OF EXISTING 1" SCH. 80 PVC AMMONIA 6.
AT THE EFFLUENT END OF THE BLEND TANK.
DEMOLISH AND DISPOSE OF EXISTING pH/TEMPERATURE ANALYZER 5.
TRANSMITTER TOWARDS THE EFFLUENT END OF THE BLEND TANK.
DEMOLISH AND DISPOSE OF EXISTING LEVEL INDICATING 4.
TANK.
LOCATED AT THE INFLUENT AND EFFLUENT SECTIONS OF THE BLEND
DEMOLISH AND DISPOSE OF EXISTING CHLORINE ANALYZERS 3.
CABLES, AND SUPPORTS ASSOCIATED WITH THE BLEND TANK.
DEMOLISH AND DISPOSE OF EXISTING ANALYZER CONDUITS, 2.
PROBS / SAMPLE LINES (pH, TEMPERATURE, CHLORINE), AMMONIA, CAUSTIC SODA, CORROSION INHIBITOR), ANALYZER
PENETRATIONS, SAMPLE TAPS, CHEMICAL PIPING (CHLORINE, LIQUID
WEIRS, STAIRWAYS / HANDRAILS, COATINGS/ LINERS, DRAINS,
INCLUDING TANK COVER, ACCESS HATCHES, INTERNAL BAFFLES /
DEMOLISH AND DISPOSE OF EXISTING 20,000-GAL BLEND TANK 1.
| 204170B_00D01 |
| 204170B_00D01 |
| 204170B_00D02 |
| 204170B_00D02 |
| 204170B_00D03 |
| 204170B_00D03 |
| 204170B_00D04 |
| 204170B_00D04 |
| Carollo Engineers, Inc. | |
| 2026-05-11T14:32:56-0400 | |
| Anthony Ryan Horvat | |
| I am approving this document |
File details come from the government source that posted it. Updated .