26-31_Exhibit_3_Construction_Plans.pdf
PDF 12 MB Posted
- Attached to
- City of Bartow Holiday Lighting Project
- Solicitation number
- 26-31
- Issued by
- Bay County, Florida
About this file
McKenzie Boat Ramp Project Construction Plans Summary
This document is a set of construction plans prepared by Gortemoller Engineering, Inc. for the Bay County Board of County Commissioners in Florida (ITB 26-31). The project involves constructing a new boat ramp at the McKenzie Boat Ramp location on McKenzie Road in Panama City, Florida. The construction plans include nine sheets detailing site plans, erosion control measures, grading, boat ramp and dock profiles, and construction details. Key work items include clearing and grubbing of 0.35 acres, excavation of 1,700 cubic yards of regular material and 350 cubic yards of subsoil, installation of two 20-foot by 20-foot precast concrete deck panels at 8 inches thick, construction of a wooden dock measuring 76 linear feet, placement of 85 tons of riprap, installation of 1,259 square yards of asphalt pavement, sediment and turbidity barriers totaling 743 linear feet, and performance turf sodding of 270 square yards. The plans are digitally signed and sealed by Professional Engineer Blake R. Furbee (License No. 88505) as of January 27, 2026, and govern construction activities by reference to Florida Department of Transportation FY 2024-25 Standard Specifications and the Florida Green Book standards.
The project requires compliance with stormwater pollution prevention plans, erosion control measures, and multiple environmental permits including Bay County Development Order permits (0298623-002-003-EE/03 for boat ramp construction) and U.S. Army Corps of Engineers wetland permits (SAJ-2009-03923 for riprap installation). Contractors must maintain all erosion control devices throughout construction, conduct inspections every seven days or within 24 hours of rainfall exceeding 0.25 inches, and provide qualified personnel certified in Florida stormwater erosion and sediment control inspection. The contractor bears responsibility for all material disposal, site cleanup, and disposal of debris in compliance with Bay County Municipal Code. Construction must be phased and sequenced according to a detailed schedule submitted by the contractor, with all work performed in accordance with permits obtained by regulatory agencies and any permits obtained by the contractor. Site benchmarks are established with elevations at 4.61 and 4.66 feet, and mean high water and mean low water levels are defined at 0.76 feet and -0.44 feet respectively.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 3
GORTEMOLLER ENGINEERING CONSTRUCTION PLANS
ITB 26-31 McKenzie Boat Ramp Project 57 of 84
INDEX OF BOAT RAMP PLANS
SHEET NO.
8-9
DESCRIPTION
KEY SHEET
SUMMARY OF PAY ITEMS
PROJECT AERIAL
SITE PLAN
EROSION CONTROL
GRADING PLAN
BOAT RAMP & DOCK PROFILE
CONSTRUCTION DETAILS
CHIPLEY
TALLAHASSEE
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA
DELAND 4
NEW PORT RICHEY
TAMPA
LAKELAND
MELBOURNE -
COCOA
ORLANDO
BARTOWST PETERSBURG
FT PIERCE
FT MYERS
FT LAUDERDALE
MIAMI
NAPLES
KEY WEST
FORT WALTON
BEACH
PENSACOLA
WEST PALM
BEACH
FLORIDA
TURNPIKE
PANAMA
CITY
LAKE
CITY
DAYTONA
BEACH
SARASOTA -
BRADENTON
BEE LINE
EXPRESSWAY
COUNTY MANAGER
ROBERT MAJKA JR.
COMMISSIONERS
DISTRICT 1 - DANIEL RAFFIELD - VICE CHAIRMAN
DISTRICT 2 - ROBERT CARROLL
DISTRICT 3 - DOUG CROSBY
DISTRICT 4 - DOUGLAS MOORE
DISTRICT 5 - CLAIR PEASE - CHAIRMAN
GortemollerGE Engineering, Inc.
MCKENZIE BOAT RAMP PROJECT
MCKENZIE ROAD
PROJECT NUMBER:23-02
GOVERNING STANDARDS SPECIFICATIONS:
Florida Department of Transportation, FY 2024-25 Standard Specifications for Road and Bridge Construction can be found at the following website:
https://www.fdot.gov/programmanagement/implemented/specbooks/default.shtm
BAY COUNTY
BOARD OF COUNTY COMMISSIONERS
Plans Prepared By
708 THOMAS DRIVE
PANAMA CITY BEACH, FLORIDA 32408
PHONE (850) 249-2425 * FAX (850) 249-2426
FLORIDA CERTIFICATE OF AUTHORIZATION. NO. 09505
VENDOR NO. 30-0133572
Manual of Uniform Minimum Standards for Design, Construction, and Maintenance for Streets and Highways (commonly referred to as the "Florida Green Book") can be found at the following website:
https://www.fdot.gov/roadway/floridagreenbook/fgb.shtm
PROJECT MANAGER: BLAKE R. FURBEE, PE
CONTRACT PLANS
N O
TI
C
E : T
H E
O
FF
IC
IA
L R
E C
O R
D O
F
TH
IS
S
H E
E T
IS
T
H E
E
LE
C
TR
O N
IC
F
IL
E
S
IG
N E
D A
N D
S E
A
LE
D U
N D
E R
R U
LE
1G
.0
, F .A
.C
JANUARY 2026
PROJECT LOCATION
1":2500'
- PERMIT PLANS -
COMPONENTS OF CONTRACT PLANS SET
BOAT RAMP PLANS
GOVERNING DESIGN STANDARDS:
THIS ITEM HAS BEEN DIGITALLY
SIGNED AND SEALED BY
ON THE DATE ADJACENT TO THE SEAL
SIGNATURE MUST BE VERIFIED
ON ANY ELECTRONIC COPIES.
GORTEMOLLER ENGINEERING, INC.
708 THOMAS DRIVE
PANAMA CITY BEACH, FL 32408
REGISTRY NO. 09505
BLAKE R. FURBEE, P.E. NO. 88505
STATE OF
No.
PR
O
FESSIONAL ENGIN
EE
R
BL
AKE
R. FURBEE
FLORIDA
88505
L I CENSE
M C
K
EN
=I E
B O
A T
R A
M P
PR
O
JE
C
T N
O
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE
FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
PROJECT PLANS
SHEET NO. SHEET DESCRIPTION
1 KEY SHEET
2 SUMMARY OF PAY ITEMS
3 PROJECT AERIAL
4 SITE PLAN
5 EROSION CONTROL
6 GRADING PLAN
7 BOAT RAMP & DOCK PROFILE
8-9 CONSTRUCTION DETAILS
ITB 26-31 McKenzie Boat Ramp Project 58 of 84
AutoCAD SHX Text
PROJECT LOCATION
Su m m ar y of
P ay
I te m s
G E
B ay
C ou nt y
B oa rd o f C ou nt y
C om m is si on er s
W
1t h st re et , P an am a C ity , F l
(8
)7
-6
C L
IE
N
T
IF
T
H
IS
L
IN
E D
O
ES
N O
T M
EA
SU
R E
O N
E
IN
C H
IN
LE
N G
TH
, T
H E
SC
AL
ES
O
N T
H
IS
D R
AW
IN
G A
R E
N O
T
VA
LI
D
1"
D
AT
E
C H
EC
KE
D
JO
B
N O
D R
AW
N
-0
SH
EE
T R
EV
IS
IO
N
M cK en zi e B oa t R am p
So ut hp or t, F
L
G
SA
/2
7/
G :\C iv il3
D Pr oj ec ts \2
\C
AD
_F in al \0
2- Pr oj ec tA er ia l.d w g;
J an ua ry
7,
- 4
:0
PM
PR
O
JE
C
T
N O
TI
C
E : T
H E
O
FF
IC
IA
L R
E C
O R
D O
F
TH
IS
S
H E
E T
IS
T
H E
E
LE
C
TR
O N
IC
F
IL
E
S
IG
N E
D A
N D
S E
A
LE
D U
N D
E R
R U
LE
1G
.0
, F .A
.C
G or te m ol le r E ng in ee ri ng , I nc
T ho m as
D ri ve Pa na m a C ity B ea ch
, F L
(8
9-
R eg is tr y N o.
B la ke
R . F ur be e, P
.E
P.
E
. L ic en se
N um be r
BR
F
SUMMARY OF PAY ITEMS
ITEM NUMBER ITEM DESCRIPTION UNITS QUANTITY TOTAL
0101-1 MOBILIZATION LS 1.000
0102-1 MAINTENANCE OF TRAFFIC LS 1.000
0104-10-3 SEDIMENT BARRIER LF 543.000
0104-11 FLOATING TURBIDITY BARRIER LF 160.000
0104-12 STAKED TURBIDITY BARRIER - NYLON REINFORCED PVC LF 40.000
0104-18 INLET PROTECTION EA 2.000
0110-1-1 CLEARING & GRUBBING AC 0.350
0120-1 REGULAR EXCAVATION CY 1700.000
0120-4 SUBSOIL EXCAVATION CY 350.000
0120-6 EMBANKMENT CY 15.000
0145-2 GEOSYNTHETIC REINFORCED FOUNDATION OVER SOFT SOIL SY 210.000
0160-4 TYPE B STABILIZATION SY 1350.000
0285-704 OPTIONAL BASE, OBG 4 - GRADED AGGREGATE BASE 6" SY 100.000
0285-706 OPTIONAL BASE, OBG 6 - GRADED AGGREGATE BASE 8" SY 1300.000
0334-1-13 SUPERPAVE ASPHALTIC CONC, TRAFFIC C, 2" TN 140.000
0404-5-21 PRECAST DECK PANEL, PRETENSIONED, 8" LS 1.000
0425-4 INLETS, ADJUST EA 1.000
0530-3-3 RIPRAP-RUBBLE, BANK AND SHORE TN 85.000
0530-74 BEDDING STONE TN 40.000
0570-1-2 PERFORMANCE TURF, SOD SY 270.000
Misc. 1 PAVEMENT MARKINGS LS 1.000
Misc. 2 W6X20 BEAM RAIL GALVANIZED LS 1.000
Misc. 3 DOCK CONSTRUCTION LS 1.000
PAY ITEMS NOTES:
1. THE CONTRACTOR SHALL HAVE ALL REQUIRED PERMITS IN-HAND PRIOR TO BEGINNING CONSTRUCTION, AND SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE PERMITS OBTAINED BY THE NECESSARY
REGULATORY AGENCIES AND THOSE PERMITS OBTAINED BY THE CONTRACTOR.
2. PAY ITEM MISC. 1 SHALL INCLUDE ALL MATERIAL, AND WORK NECESSARY FOR THE INSTALLATION OF THE PAVEMENT MARKINGS.
2. PAY ITEM MISC. 2, (W6X20 BEAM RAIL GALVANIZED) LUMP SUM PRICE MUST INCLUDE PROJECT LAYOUT AND DETAIL CONSTRUCTION SCHEDULE(S). INCLUDES ALL MATERIAL, WORK AND INSTALLATION.
3. PAY ITEM MISC. 3, LUMP SUM PRICE INCLUDES PROJECT LAYOUT AND DETAILS CONSTRUCTION SCHEDULE(S). THE CONSTRUCTION SCHEDULE SHALL DESCRIBE IN DETAIL HOW THE CONSTRUCTION IS TO BE PHASED, ESTABLISH START AND FINISH DATES FOR ALL SIGNIFICANT CONSTRUCTION ACTIVITIES, AND IDENTIFY ALL CONTROLLING ITEMS OF WORK. INCLUDES ALL MATERIAL, WORK AND INSTALLING PER COASTLINE ENGINEERING & CONSTRUCTION -
PROPOSED BOAT RAMP PLAN AND NOTES & SECTIONS, SHEETS S1 - S2.
4. PAY ITEM 102-1, SHALL INCLUDE ALL LABOR, MATERIAL, EQUIPMENT AND INCIDENTALS NECESSARY TO PROVIDE SUFFICIENT MOT TO PREVENT UNAUTHORIZED ACCESS TO THE WORK ZONE.
5. PAY ITEM 110-1-1, SHALL INCLUDE ALL LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY TO REMOVE THE EXISTING BOAT RAMP AND DOCK IDENTIFIED IN THE CONTRACT DOCUMENTS.
6. PAY ITEM 0404-5-21, SHALL INCLUDE LABOR, MATERIAL, EQUIPMENT, AND INCIDENTALS NECESSARY FOR THE INSTALLATION OF 2 20'X20' PRECAST CONCRETE SLABS OF 8" THICKNESS INCLUDING MEANS AND METHODS OF ANY
DEWATERING AND/OR COFFER DAMS NECESSARY FOR THE INSTALLATION.
FOR INFORMATIONAL PURPOSES ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL QUANTITIES.
ITB 26-31 McKenzie Boat Ramp Project 59 of 84
Pr oj ec t A er ia l
G E
B ay
C ou nt y
B oa rd o f C ou nt y
C om m is si on er s
W
1t h st re et , P an am a C ity , F l
(8
)7
-6
C L
IE
N
T
IF
T
H
IS
L
IN
E D
O
ES
N O
T M
EA
SU
R E
O N
E
IN
C H
IN
LE
N G
TH
, T
H E
SC
AL
ES
O
N T
H
IS
D R
AW
IN
G A
R E
N O
T
VA
LI
D
1"
D
AT
E
C H
EC
KE
D
JO
B
N O
D R
AW
N
-0
SH
EE
T R
EV
IS
IO
N
M cK en zi e B oa t R am p
So ut hp or t, F
L
G
SA
/2
7/
G :\C iv il3
D Pr oj ec ts \2
\C
AD
_F in al \0
2- Pr oj ec tA er ia l.d w g;
J an ua ry
7,
- 4
:0
PM
PR
O
JE
C
T
N O
TI
C
E : T
H E
O
FF
IC
IA
L R
E C
O R
D O
F
TH
IS
S
H E
E T
IS
T
H E
E
LE
C
TR
O N
IC
F
IL
E
S
IG
N E
D A
N D
S E
A
LE
D U
N D
E R
R U
LE
1G
.0
, F .A
.C
G or te m ol le r E ng in ee ri ng , I nc
T ho m as
D ri ve Pa na m a C ity B ea ch
, F L
(8
9-
R eg is tr y N o.
B la ke
R . F ur be e, P
.E
P.
E
. L ic en se
N um be r
BR
F
FA
NN
IN
G
BA
YO
U
McKENZIE RD
GROENDYKE
TRANSPORT
SRM
CONCRETE
EL
LI
S R
D
W S
M
IT
H R
D
AN
D
ER
SO
N A
VE
C
AM
PB
EL
L R
D
COX RD
BUCHANAN ST
CALLAHAN RD
SOUTHERN
MARINA
PROJECT AREA
ITB 26-31 McKenzie Boat Ramp Project 60 of 84
AutoCAD SHX Text
NORTH
AutoCAD SHX Text 1 inch = ft.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text b b a a
C C
D
D
RIPARIAN RIGHTS
RIPARIAN RIGHTS
RIGHT OF WAY
RIGHT OF WAY
EX. DBI
EX. CHAIN LINK FENCE
EX. BOAT RAMP SIGN
EX. 18"
DRAINAGE PIPE
25' RIPARIAN RIGHTS OFFSET
EX. HEADWALL
MHWL 0.76'
EX. 18"
DRAINAGE PIPE
EX. HEADWALL
EX. RETAINING WALL
MLWL -0.44'
ADJACENT PARCEL
PARCEL ID: 08477-000-000
INDUSTRIAL: IND-2
McKENZIE ROAD
FANNING BAYOU
ADJACENT PARCEL
PARCEL ID: 08476-000-000
INDUSTRIAL: IND-2
31'
45'
50' 60'
10'
25'
6'
27'
25'
30'
55'
76'
21'
-4 .0
-3 .0
-2 .0
-1 .0
0.
1.
2.
EX. CHAIN LINK FENCE
± 15.3 CY BELLOW
MHL LINE
MHWL 0.76'
MLWL -0.44'
CONST. RIP RAP PERMITTED
UNDER SAJ-2009-03923
CONST. 20'X20' CONCRETE SLABS PERMITTED
UNDER 0298623-002-003-EE/03 PERMIT
CONST. ASPHALT RECONSTRUCTION
PERMITTED UNDER
0298623-002-003-EE/03 PERMIT
CONST. WOODED DOCK (PERMITTED
UNDER 0298623-002-003-EE/03 PERMIT)
CONST. THERMOPLASTIC
6" SOLID WHITE (TYP)
CONST. THERMOPLASTIC
6" SOLID WHITE (TYP)
6'
4'
SITE BENCHMARK
SET NAIL IN POWER POLE
ELEV. = 4.61
SITE BENCHMARK
SET NAIL IN POWER POLE
ELEV. = 4.66
Si te
P la n G
E B ay C ou nt y B oa rd o f C ou nt y C om m is si on er s
W
1t h st re et
, P an am a
C ity
, F l
(8
)7
-6
C L
IE
N
T
IF
T
H
IS
L
IN
E D
O
ES
N O
T M
EA
SU
R E
O N
E
IN
C H
IN
LE
N G
TH
, T
H E
SC
AL
ES
O
N T
H
IS
D R
AW
IN
G A
R E
N O
T
VA
LI
D
1"
D
AT
E
C H
EC
KE
D
JO
B
N O
D R
AW
N
-0
SH
EE
T R
EV
IS
IO
N
M cK en zi e B oa t R am p
So ut hp or t, F
L
G
SA
/2
7/
G :\C iv il3
D Pr oj ec ts \2
\C
AD
_F in al \0
3- Si te Pl an .d w g;
J an ua ry
7,
- 4
:0
PM
PR
O
JE
C
T
N O
TI
C
E : T
H E
O
FF
IC
IA
L R
E C
O R
D O
F
TH
IS
S
H E
E T
IS
T
H E
E
LE
C
TR
O N
IC
F
IL
E
S
IG
N E
D A
N D
S E
A
LE
D U
N D
E R
R U
LE
1G
.0
, F .A
.C
G or te m ol le r E ng in ee ri ng , I nc
T ho m as
D ri ve Pa na m a C ity B ea ch
, F L
(8
9-
R eg is tr y N o.
B la ke
R . F ur be e, P
.E
P.
E
. L ic en se
N um be r
BR
F 4
PROPOSED CONCRETE SLAB
RIGHT OF WAY
PROPOSED GRADING AREA
PROPOSED DOCK
PROPOSED ASPHALT
PROPOSED MEAN HIGH
WATER LINE
EX. MEAN HIGH LINE
EX. CHAIN LINK FENCE
EX. RIPARIAN RIGHTS
EX. DRAINAGE PIPE
EX. DRAINAGE STRUCTURES
ITB 26-31 McKenzie Boat Ramp Project 61 of 84
AutoCAD SHX Text
NORTH
AutoCAD SHX Text 1 inch = ft.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LEGEND
CONST. ± 260 LF
SILT FENCE
McKENZIE ROAD
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB TB TB
TB
TB
TB
TB
TB
TB
TB
CONST. ± 160 LF FLOATING
TURBIDITY BARRIER
REMOVE ± 23 SY OF EX. DOCK
REMOVE EX. PAVEMENT AND REPLACE
± 1,259 SY ASPHALT PAVEMENT
CONST. ± 40 LF STAKED
TURBIDITY BARRIER (TYP)
CLEARING AND GRUBBING
± 0.35 AC
INLET PROTECTION (TYP)
ADJACENT NORTH
CONSTRUCTION LIMIT
GROENDYKE TRANSPORT
ADJACENT SOUTH
CONSTRUCTION LIMIT
SRM CONCRETE
ADJACENT WEST
CONSTRUCTION LIMIT
FANNING BAYOU
ADJACENT EAST
CONSTRUCTION LIMIT
McKENZIE ROAD
EX. POWER POLE
(TO REMAIN)
EX. POWER POLE
(TO REMAIN)
CONST. ± 283 LF
SILT FENCE
REMOVE EX. BOAT RAMP
± 80 SY (APPROX. LIMITS. CONTRACTOR
SHALL FIELD VERIFY EX. LIMITS AND
REMOVE ENTIRE BOAT RAMP)
SITE BENCHMARK
SET NAIL IN POWER POLE
ELEV. = 4.61
SITE BENCHMARK
SET NAIL IN POWER POLE
ELEV. = 4.66
EX. CONCRETE BARRIERS
(TO BE REMOVED/RELOCATED PER COUNTY DIRECTION) EX. BOAT RAMP SIGN
RIGHT OF WAY
RIGHT OF WAY
EX. HEADWALL
(TO REMAIN)
EX. HEADWALL
EX. RETAINING WALL
E ro si on
C on tr ol
EXISTING BOAT RAMP
PROPERTY LINE
PR. FLOATING TURBIDITY BARRIER
REMOVE EXISTING DOCK
PR. SILT FENCE
NOTES:
1. SET THE POSTS AND EXCAVATE A 4"x4" TRENCH UPSLOPE ALONG THE LINE OF POSTS. POSTS SHALL BE SPACED
A MAX. OF 10' APART AT THE BARRIER LOCATION & DRIVEN INTO THE GROUND A MIN. OF 12". WHEN EXTRA STRENGTH FABRIC IS USED WITHOUT THE WIRE SUPPORT FENCE, POST SPACING SHALL NOT EXCEED 6'.
2. WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE SHALL BE FASTENED TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST 1" LONG, TIE WIRES OR HOG RINGS. THE WIRE MESH SHALL EXTEND INTO THE TRENCH A MIN. OF 2" & SHALL NOT EXTEND MORE THAN 36"
ABOVE THE ORIGINAL GROUND SURFACE.
3. ATTACH THE FILTER FABRIC TO THE WIRE MESH FENCE & EXTEND IT INTO THE TRENCH A MIN. OF 8".
4. BACKFILL AND COMPACT THE EXCAVATED SOIL.
5. WHEN ATTACHING TWO SILT FENCES TOGETHER, PLACE THE END POST OF THE SECOND FENCE INSIDE THE END
POST OF THE FIRST FENCE. ROTATE BOTH POSTS TOGETHER @ LEAST 180 DEGREES ON A CLOCKWISE DIRECTION TO CREATE A TIGHT SEAL WITH THE FILTER FABRIC & DRIVE BOTH POSTS INTO THE GROUND.
6. ALL DISTURBED COUNTY'S RIGHT-OF-WAY SHALL BE SODDED.
7. THERE SHALL BE NO LANDSCAPING WITHIN THE COUNTY'S RIGHT-OF-WAY.
8. IT IS UNLAWFUL FOR ANY PERSON TO DUMP, LEAVE, OR BURY ANY SOLID WASTE ON PUBLIC OR PRIVATE PROPERTY.
FAILURE TO DISPOSE OF SOLID WASTE AS SPECIFIED IN SECTION 22-149 OF BAY COUNTY MUNICIPAL CODE OF
ORDINANCE IS PUNISHABLE UNDER SECTION 1-6.
SINGLE ROW SILT FENCE
FILTER FABRIC
FLOW
FLOW
TRENCH FLOW
WIRE INTO TRENCH
EXTEND FABRIC AND
FILTER FABRIC
STAKE
4" (T
YP
8' (TYP)
FABRIC
(T
YP
(M
IN
1.
5'
4"
2.
5'
STAKE
FILTER
(TYP)
TYP
(TYP)
(TYP)
1.0'
TYP
PROPERTY LINE
CLEARING AND SITE PREPARATION NOTES:
1. NO CONSTRUCTION ACTIVITIES SHALL BEGIN UNTIL THE EROSION CONTROL
PLAN HAS BEEN APPROVED BY THE ENGINEER AND GOVERNING REGULATORY
AGENCY, AS NEEDED. WHERE AN NPDES PERMIT IS REQUIRED, UNDER NO
CIRCUMSTANCES CAN ANY EARTH BE DISTURBED UNTIL THE PRIME
CONTRACTOR(S) AND ANY SUBCONTRACTOR(S) THAT WILL INSTALL, MAINTAIN
OR MONITOR EROSION CONTROL DEVICES TO IMPLEMENT THE STORM WATER
POLLUTION PREVENTION PLAN (SWPPP) SIGN THE CERTIFICATION STATEMENT.
2. A COPY OF THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) MUST BE
KEPT ON THE CONSTRUCTION SITE FOR THE LIFE OF THE PROJECT.
3. A COPY OF THE NOTICE OF INTENT (NOI) SHALL BE POSTED IN A PROMINENT
LOCATION ON THE CONSTRUCTION SITE FOR PUBLIC VIEWING.
4. EROSION/SEDIMENTATION CONTROLS SHALL BE PLACED PRIOR TO EARTH
DISTURBING ACTIVITIES. THESE DEVICES SHALL BE MAINTAINED DURING THE
ENTIRE DURATION OF CONSTRUCTION.
5. WHEN AN NPDES PERMIT IS REQUIRED, ROUTINE INSPECTIONS SHALL BE MADE
EVERY SEVEN DAYS OR WITHIN 24 HOURS OF A 0.50 INCH OR GREATER
RAINFALL, OF ALL EROSION PREVENTION AND SEDIMENT CONTROL DEVICES
INSTALLED ON THE PROJECT AND DOCUMENT ALL DEFICIENCIES. CONDUCT
INSPECTIONS USING QUALIFIED PERSONNEL WHO HAVE SUCCESSFULLY
COMPLETED THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION'S
FLORIDA STORMWATER EROSION AND SEDIMENT CONTROL INSPECTOR
TRAINING.
6. CONSTRUCTION OPERATIONS SHALL BE CONDUCTED IN A MANNER THAT
PREVENTS SOIL EROSION RUNOFF OR SILTATION IN ANY OFF-SITE LOCATION.
7. THE AREA IN WHICH CLEARING AND GRUBBING, AND EXCAVATION AND FILLING
OPERATIONS ARE BEING PERFORMED SHALL BE LIMITED SO THAT THE CAPACITY
TO PREVENT STORMWATER POLLUTION IS NOT EXCEEDED.
8. IF PROVIDED, SITE PREPARATION SHALL BE PERFORMED IN ACCORDANCE WITH
THE GEOTECHNICAL EXPLORATION REPORT PROVIDED FOR THE PROJECT.
9. ALL TREES SHOWN TO REMAIN, OR THOSE DEEMED AS PROTECTED, SHALL BE
PROTECTED IN ACCORDANCE WITH THE LOCAL REGULATORY AGENCY'S TREE
ORDINANCE AND DETAILS, AS APPLICABLE. ALL PROTECTED TREES SHALL BE
MAINTAINED IN GOOD CONDITION AND NO TREES SCHEDULED TO REMAIN
SHALL BE REMOVED WITH WRITTEN APPROVAL. ONLY “GRADING BY HAND”
SHALL BE PERMITTED WITHIN THE CANOPY LINE OF TREES SCHEDULED TO
REMAIN.
10. UNLESS OTHERWISE SCHEDULED FOR SALVAGE OR RE-USE, ALL MATERIALS
REMOVED SHALL BE BECOME THE PROPERTY OF THE CONTRACTOR. DISPOSAL
OF ALL MATERIALS SHALL BE DONE SO IN ACCORDANCE WITH ALL APPLICABLE
FEDERAL, STATE, AND LOCAL AGENCY REQUIREMENTS.
11. IN ALL AREAS WHERE EXCAVATION OR EMBANKMENT IS TO BE PERFORMED OR
CONSTRUCTED, THE SURFACE SHALL BE PLOWED TO A DEPTH OF 6 INCHES AND
ALL ROOTS AND OTHER DEBRIS SHALL THEN BE REMOVED TO A DEPTH OF 12
INCHES BELOW THE GROUND SURFACE.
11. COMPLETELY REMOVE AND DISPOSE OF ALL BUILDINGS, TIMBER, BRUSH, TREES,
STUMPS, ROOTS, RUBBISH, DEBRIS, EXISTING FLEXIBLE PAVEMENT AND BASE,
DRAINAGE STRUCTURES, CULVERTS, AND PIPES NECESSARY TO PREPARE THE
AREA FOR THE PROPOSED CONSTRUCTION. REMOVE AND DISPOSE OF ALL
PRODUCTS AND DEBRIS NOT REQUIRED TO BE SALVAGED OR NOT REQUIRED TO
COMPLETE THE CONSTRUCTION.
12. ALL ROOTS AND OTHER DEBRIS SHALL BE REMOVED FROM ALL EXCAVATED
MATERIAL ANTICIPATED OR SCHEDULED TO BE USED IN THE CONSTRUCTION OF
EMBANKMENTS OR ROADWAY BASE.
13. BACKFILLING REQUIRED TO RESTORE THE BOTTOM OF EXCAVATIONS RESULTING
FROM THE REMOVAL OF STUMPS, STRUCTURES, PIPES, OR ANY OTHER VOIDS
CREATED DURING CLEARING SHALL BE RESTORED TO GRADE UTILIZING
APPROVED MATERIAL IN ACCORDANCE WITH THE EARTHWORK AND GRADING
REQUIREMENTS OF THIS PROJECT.
G E
B ay
C ou nt y
B oa rd o f C ou nt y
C om m is si on er s
W
1t h st re et , P an am a C ity , F l
(8
)7
-6
C L
IE
N
T
IF
T
H
IS
L
IN
E D
O
ES
N O
T M
EA
SU
R E
O N
E
IN
C H
IN
LE
N G
TH
, T
H E
SC
AL
ES
O
N T
H
IS
D R
AW
IN
G A
R E
N O
T
VA
LI
D
1"
D
AT
E
C H
EC
KE
D
JO
B
N O
D R
AW
N
-0
SH
EE
T R
EV
IS
IO
N
M cK en zi e B oa t R am p
So ut hp or t, F
L
G
SA
/2
7/
G :\C iv il3
D Pr oj ec ts \2
\C
AD
_F in al \0
4- Er os io n C on tro l.d w g;
J an ua ry
7,
- 4 :0
PM
PR
O
JE
C
T
N O
TI
C
E : T
H E
O
FF
IC
IA
L R
E C
O R
D O
F
TH
IS
S
H E
E T
IS
T
H E
E
LE
C
TR
O N
IC
F
IL
E
S
IG
N E
D A
N D
S E
A
LE
D U
N D
E R
R U
LE
1G
.0
, F .A
.C
G or te m ol le r E ng in ee ri ng , I nc
T ho m as
D ri ve Pa na m a C ity B ea ch
, F L
(8
9-
R eg is tr y N o.
B la ke
R . F ur be e, P
.E
P.
E
. L ic en se
N um be r
BR
F
4. INSPECTION
3. MAINTENANCE
Contractor shall maintain all erosion and sediment control measures throughout the construction process.
6. EROSION AND SEDIMENT CONTROLS FOR SITE
I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY WITH THE
TERMS AND CONDITIONS OF THE STATE OF FLORIDA GENERIC PERMIT FOR STORMWATER
DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES AND THIS STORMWATER
POLLUTION PREVENTION PLAN PREPARED THEREUNDER. I WILL MAINTAIN RECORDS AS
REQUIRED AND KEEP THEM FOR AT LEAST 4 YEARS.
CONTRACTOR __________________________ TITLE __________________________
SIGNATURE ___________________________ DATE __________________________
POLLUTION PREVENTION PLAN (PPP)
1. SITE DESCRIPTION
A. CONSTRUCTION ACTIVITY
CONSTRUCTION LIMITS:
PROJECT DESCRIPTION:
B. MAJOR SOIL DISTURBING ACTIVITIES
Clearing, grubbing and earthwork activities associated with the construction.
C. TOTAL PROJECT AREA
+0.38 acres
D. TOTAL AREA TO BE DISTURBED
+0.33 acres
E. ESTIMATED DRAINAGE AREA SIZE
Outfall Area Receiving Waters
See Site Plans for Site Map information.
F. SITE MAPS
(1) STABILIZATION PRACTICES:
(2) STRUCTURAL PRACTICES:
C. OTHER CONTROLS
No construction waste material shall be buried on site.
(2) OFF SITE VEHICLE TRACKING:
All sanitary waste shall be collected from the portable units as necessary or as required by local regulations by a licensed sanitary waste management contractor.
(3) SANITARY WASTE:
(4) FERTILIZERS AND PESTICIDES:
A. CONSTRUCTION SEQUENCE AND CONTROLS IMPLEMENTATION
2. CONTROLS
B. EROSION AND SEDIMENT CONTROLS
(5) NON-STORM WATER DISCHARGE (INCLUDING SPILL REPORTING):
No non-stormwater discharges are anticipated.
Remarks: If contaminated soil or groundwater is encountered; a hazardous materials coordinator shall be contacted.
E. APPROVED STATE AND LOCAL PLANS
Bay County Development Order ERP Individual Permitting ACOE Wetland Permit
(1) WASTE DISPOSAL
Latitude
8. CONTRACTOR/SUBCONTRACTOR CERTIFICATION
The contractor shall be responsible for control, cleanup, and documentation of non storm water discharges. If contaminated soil or groundwater is encountered, contact the Florida Department of Environmental Protection.
5. NON STORM WATER DISCHARGES
A. The Contractor shall provide qualified personnel to inspect the following items at least once every 7 calendar days and within 24 hours of the end of a storm that is
0.25 inches or greater: points of discharge, disturbed site areas that have not been finally stabilized, material storage areas that are exposed to precipitation, structural controls, storm water management systems, and construction entrances.
Where sites have been finally stabilized, sites shall be inspected at least once every month. Contractor shall be responsible for keeping and maintaining updated records of inspections and rainfall in their office and on the construction site.
B. The Contractor shall provide the Florida Department of Environmental Protection, Northwest District a notification 48 hours prior to commencement of construction and shall submit the As-Built certifications and accompanying documentation to the Florida Department of Environmental Protection, Northwest District upon completion of the project.
The contractor is responsible for placement & maintenance of all erosion & sediment control structures (ESC). ESC's are to be constructed in all areas where potential runoff during construction will discharge off-site. ESC's include silt fence, hay bales, silt barriers, ect... and shall be placed as necessary in accordance with FDOT indexes 100-106.
7. ON-SITE / OFFSITE DISPOSAL OF EXCAVATED MATERIAL
The contractor is to store all excavated material on-site with proper Best Management
Practices taken into account (i.e. silt fencing around the excavated material to prevent offsite runoff). An acceptable alternate method is to dispose of all excavated material to a local municipality approved landfill. If alternate method is preferred, contractor is to submit disposal documentation to engineer and to the Florida Department of Environmental Protection, Northwest District.
It is unlawful for any person to dump, leave, or bury any solid waste on public or private property. Failure to dispose of solid waste as specified in Section 22-149 of Bay County Municipal Code of Ordinances is punishable under section 1-6.
1. 48 hours Prior to the commencement of construction the Contractor shall coordinate a Pre-Construction Meeting with the Owner and the Engineer of Record.
2. Install erosion control devices and construction entrance in accordance with the Erosion Control Plan.
3. Clear and demolish in accordance with erosion control plan.
4. Construct project per site, grading and utility plans.
5. Base and stabilize (sod) the disturbed areas.
6. Construct Landscaping per Owner. All other disturbed areas, not noted to be sodded, shall be seeded, mulched and fertilized. Grass seed will be planted using the following blend:
Bahia (Pensacola or Argentine) 30 Pounds / Acre
Bermuda 30 Pounds / Acre Temporary Seed 30 Pounds / Acre Total Seeding Rate 90 Pounds / Acre ***From April to September, use Brown-Top or Japanese Millet; From October to
March, use Annual Rye Grass.
***After Seeding, Approximately two inches (loose thickness) of Mulch shall be applied over the seeded area and cut into the soil.
7. Coordinate final closeout of the project with the Owner and Engineer of Record.
X Temporary grassing X Permanent planting, sodding, or seeding
Hay bales X Berms Sediment basins X Rock bedding at construction exit Sediment traps X RipRap Preformed Revetment Mat
Haul roads dampened for dust control X Loaded haul trucks to be covered with tarpaulin X Excess dirt on road removed daily X Stabilized construction entrance
Fertilizers and/or pesticides shall be applied according to manufacturers recommendations by a licensed or certified applicatior as directed by the project engineer.
+ 0.26 ACOn-Site Fanning Bayou
30° 16' 21.58" N 85° 38' 55.60" W
Clearing and grubbing project area.
***ALL ACTIVITIES PRIOR TO, DURING AND AFTER CONSTRUCTION ARE TO BE WITHIN THESE LIMITS.*** (North) - Groendyke Transport (East) - Mckenzie Road (South) - SRM Concrete (West) - Fanning Bayou
E. ESTIMATED DRAINAGE AREA SIZE
Longitude
INLET PROTECTION SYSTEM
PR. STAKED TURBIDITY BARRIER
TB TB TB TB TB
PR. CLEARING & GRUBBING AREA
ITB 26-31 McKenzie Boat Ramp Project 62 of 84
AutoCAD SHX Text
NORTH
AutoCAD SHX Text 1 inch = ft.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LEGEND
NTS
60'CONST. ASPHALT
± 1,259 SY
EX. HEADWALL
EX. 18"
DRAINAGE PIPE
EX. 18"
DRAINAGE PIPE
3.82
3.38 3.61 3.843.61
3.77 4.003.53
3.18 3.59 4.04
3.66
3.43
3.66 3.89
3.44
3.37
3.45
3.75
3.57 3.87
3.92 2.25
2.25
2.54
3.67
3.65
3.39
2.84 2.95 3.24
3.75
3.82
3.46
3.44
3.66 3.89
3.47
3.67
2.31
2.31
3.69
2.39
2.70
CONST. ± 85 TN OF RIP-RAP
MHWL 0.76'
CONST. 20'X40'
CONCRETE SLABS
CONST. ± 76 LF
WOODEN DOCK
MLWL -0.44'
EX. DRAINAGE INLET TOP
ADJUSTMENT TO MATCH FINISH
GRADE
SITE BENCHMARK
SET NAIL IN POWER POLE
ELEV. = 4.61
SITE BENCHMARK
SET NAIL IN POWER POLE
ELEV. = 4.66
RIGHT OF WAY
RIGHT OF WAY
EX. HEADWALL
EX. RETAINING WALL
G ra di ng
P la n G
E B ay C ou nt y B oa rd o f C ou nt y C om m is si on er s
W
1t h st re et
, P an am a
C ity
, F l
(8
)7
-6
C L
IE
N
T
IF
T
H
IS
L
IN
E D
O
ES
N O
T M
EA
SU
R E
O N
E
IN
C H
IN
LE
N G
TH
, T
H E
SC
AL
ES
O
N T
H
IS
D R
AW
IN
G A
R E
N O
T
VA
LI
D
1"
D
AT
E
C H
EC
KE
D
JO
B
N O
D R
AW
N
-0
SH
EE
T R
EV
IS
IO
N
M cK en zi e B oa t R am p
So ut hp or t, F
L
G
SA
/2
7/
G :\C iv il3
D Pr oj ec ts \2
\C
AD
_F in al \0
4- Pr oj ec tG ra di ng
.d w g;
J an ua ry
7,
- 4 :0
PM
PR
O
JE
C
T
N O
TI
C
E : T
H E
O
FF
IC
IA
L R
E C
O R
D O
F
TH
IS
S
H E
E T
IS
T
H E
E
LE
C
TR
O N
IC
F
IL
E
S
IG
N E
D A
N D
S E
A
LE
D U
N D
E R
R U
LE
1G
.0
, F .A
.C
G or te m ol le r E ng in ee ri ng , I nc
T ho m as
D ri ve Pa na m a C ity B ea ch
, F L
(8
9-
R eg is tr y N o.
B la ke
R . F ur be e, P
.E
P.
E
. L ic en se
N um be r
BR
F 6
PROPOSED BOAT RAMP
BOUNDARY LINE
PROPOSED GRADING AREA
PROPOSED DOCK
PROPOSED ASPHALT
ITB 26-31 McKenzie Boat Ramp Project 63 of 84
AutoCAD SHX Text
NORTH
AutoCAD SHX Text 1 inch = ft.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LEGEND
E levation
Station
PIER - ALIGNMENT B-B
-10
-10
5+49 5+60 5+80 6+00 6+20 6+40 6+60
5+49 5+60 5+80 6+00 6+20 6+40 6+60
PROPOSED ASPHALT
10" PILINGS ON 8' CENTER
SEE DETAILS S1-S2
MEAN HIGH
WATER LINE:
0.76'
6' WIDE DOCK
SEE DETAILS S1-S2
MEAN LOW WATER
LINE: -0.44'
4'
EXISTING GRADE
E levation
Station
BOAT RAMP - ALIGNMENT A-A
-10
-10
2+44 2+60 2+80 3+00 3+20 3+40
2+44 2+60 2+80 3+00 3+20 3+40
-2.8%
-15.2%
MHW
MEAN HIGH
WATER LEVEL
MLW
MEAN LOW
WATER LEVEL
PRE-CAST CONCRETE RAMP (PERMITTED
UNDER 0298623-002-003-EE/03 PERMIT).
ASPHALT RECONSTRUCTION (PERMITTED
UNDER 0298623-002-003-EE/03 PERMIT).
RAIL SYSTEM (PERMITTED UNDER
0298623-002-003-EE/03 PERMIT).
RIP-RAP (PERMITTED
UNDER SAJ-2009-03923)
EXISTING GRADE
B oa t R am p an d D oc k
Pr of ile
HORT.= 1":5'
VERT.= 1":4'
SCALE:
HORT.= 1":5'
VERT.= 1":4'
SCALE: G
E
B ay
C ou nt y
B oa rd o f C ou nt y
C om m is si on er s
W
1t h st re et , P an am a C ity , F l
(8
)7
-6
C L
IE
N
T
IF
T
H
IS
L
IN
E D
O
ES
N O
T M
EA
SU
R E
O N
E
IN
C H
IN
LE
N G
TH
, T
H E
SC
AL
ES
O
N T
H
IS
D R
AW
IN
G A
R E
N O
T
VA
LI
D
1"
D
AT
E
C H
EC
KE
D
JO
B
N O
D R
AW
N
-0
SH
EE
T R
EV
IS
IO
N
M cK en zi e B oa t R am p
So ut hp or t, F
L
G
SA
/2
7/
G :\C iv il3
D Pr oj ec ts \2
\C
AD
_F in al \0
5- Pr of ile s.
dw g;
J an ua ry
7,
- 4 :0
PM
PR
O
JE
C
T
N O
TI
C
E : T
H E
O
FF
IC
IA
L R
E C
O R
D O
F
TH
IS
S
H E
E T
IS
T
H E
E
LE
C
TR
O N
IC
F
IL
E
S
IG
N E
D A
N D
S E
A
LE
D U
N D
E R
R U
LE
1G
.0
, F .A
.C
G or te m ol le r E ng in ee ri ng , I nc
T ho m as
D ri ve Pa na m a C ity B ea ch
, F L
(8
9-
R eg is tr y N o.
B la ke
R . F ur be e, P
.E
P.
E
. L ic en se
N um be r
BR
F
ITB 26-31 McKenzie Boat Ramp Project 64 of 84
AutoCAD SHX Text
MHW
MLW
4'
15.2% Steel Strap
End Stop 90° Bend
W6x20 Beam Rail System
W6x20 Cross Member
8" Thick Pre-Cast Planks
16" Rail (End Stop) Depth
NTS
1"
2"
90°
Groove Tongue
#4 Rebar Epoxy Coated Bi-Directional
10'
30° finish angle of diagonal V-grooves
1:4 1:4
41'
10'
CROSS SECTION C-C
0.5 0.5
2" TYPE SP, TRAFFIC LEVEL C
OBG 6 - GRADED AGGREGATE BASE
12" STABILIZATION BASE
2" SP-9.5 Traffic Level C
OBG 6 - 8" Graded Aggregate Base
12" Stabilization Subgrade
2'
Existing Grade
RipRap
2' 1'
2'
6' Elev. 4.0 to HWL
2"X8"X5' Trimed to Fit Each Side
12" Dia. Piling 8' on Center
GeoSynthetic Fabric
2 Each 2"x10" stringers on Center
Precast Planks
LAUNCHING RAMP (PERMITTED
UNDER 0298623-002-003-EE/03 PERMIT)
WOODED DOCK (PERMITTED
UNDER 0298623-002-003-EE/03
PERMIT) SEE DETAIL SHEET S1-S22'
1'
PRECAST CONCRETE SLAB
NTS
NTS
W6x20 BEAM RAIL SYSTEM W/PRECAST PLANKS
NTS
V-GROOVE DETAIL
CROSS SECTION B-B
NTS
PAVEMENT DETAIL
NTS
C on st ru ct io n D et ai ls G
E B ay C ou nt y B oa rd o f C ou nt y C om m is si on er s
W
1t h st re et
, P an am a
C ity
, F l
(8
)7
-6
C L
IE
N
T
IF
T
H
IS
L
IN
E D
O
ES
N O
T M
EA
SU
R E
O N
E
IN
C H
IN
LE
N G
TH
, T
H E
SC
AL
ES
O
N T
H
IS
D R
AW
IN
G A
R E
N O
T
VA
LI
D
1"
D
AT
E
C H
EC
KE
D
JO
B
N O
D R
AW
N
-0
SH
EE
T R
EV
IS
IO
N
M cK en zi e B oa t R am p
So ut hp or t, F
L
G
SA
/2
7/
G :\C iv il3
D Pr oj ec ts \2
\C
AD
_F in al \0
6- D et ai ls .d w g;
J an ua ry
7,
- 4
:0
PM
PR
O
JE
C
T
N O
TI
C
E : T
H E
O
FF
IC
IA
L R
E C
O R
D O
F
TH
IS
S
H E
E T
IS
T
H E
E
LE
C
TR
O N
IC
F
IL
E
S
IG
N E
D A
N D
S E
A
LE
D U
N D
E R
R U
LE
1G
.0
, F .A
.C
G or te m ol le r E ng in ee ri ng , I nc
T ho m as
D ri ve Pa na m a C ity B ea ch
, F L
(8
9-
R eg is tr y N o.
B la ke
R . F ur be e, P
.E
P.
E
. L ic en se
N um be r
BR
F 8
ITB 26-31 McKenzie Boat Ramp Project 65 of 84
C on st ru ct io n D et ai ls G
E B ay C ou nt y B oa rd o f C ou nt y C om m is si on er s
W
1t h st re et
, P an am a
C ity
, F l
(8
)7
-6
C L
IE
N
T
IF
T
H
IS
L
IN
E D
O
ES
N O
T M
EA
SU
R E
O N
E
IN
C H
IN
LE
N G
TH
, T
H E
SC
AL
ES
O
N T
H
IS
D R
AW
IN
G A
R E
N O
T
VA
LI
D
1"
D
AT
E
C H
EC
KE
D
JO
B
N O
D R
AW
N
-0
SH
EE
T R
EV
IS
IO
N
M cK en zi e B oa t R am p
So ut hp or t, F
L
G
SA
/2
7/
G :\C iv il3
D Pr oj ec ts \2
\C
AD
_F in al \0
6- D et ai ls .d w g;
J an ua ry
7,
- 4
:0
PM
PR
O
JE
C
T
N O
TI
C
E : T
H E
O
FF
IC
IA
L R
E C
O R
D O
F
TH
IS
S
H E
E T
IS
T
H E
E
LE
C
TR
O N
IC
F
IL
E
S
IG
N E
D A
N D
S E
A
LE
D U
N D
E R
R U
LE
1G
.0
, F .A
.C
G or te m ol le r E ng in ee ri ng , I nc
T ho m as
D ri ve Pa na m a C ity B ea ch
, F L
(8
9-
R eg is tr y N o.
B la ke
R . F ur be e, P
.E
P.
E
. L ic en se
N um be r
BR
F 9
8" Precast Concrete Slabs
OBG 4 - 6" Graded Aggregate Base
6" Compacted Stabilization Sub-base
Reinforced Concrete Per Manufacturer Specs
Geosynthetic Fabric
W6 x 20 Rail (Typ.)
Geosynthetic Fabric
L= 20.0'2' 2'
Rip-Rap
2'
EXISTING GRADE
0.3*L
2'
2'
1'
2'
4'
GENERAL NOTES:
1 - FILTER FABRIC SHALL BE PER FDOT STANDARDS AND SPECIFICATIONS FOR
ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION, SECTION 985.
2 - STONE BEDDING SHALL BE PER FDOT STANDARD ANDSPECIFICATION FOR
ROAD AND BRIDGE CONDTRUCTION, LATEST EDITION, SECTION 530 AND PLACED
AT MINIMUM OF 6" IN DEPTH. MATERIALS SHALL BE EITHER NATURAL STONE
(SECTION 901-2) OR CRUSHED CONCRETE (SECTION 901.5).
3 - RIP RAP RUBBLE SHALL BE PER FDOT STANDARD AND SPECIFICATION FOR
ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION, SECTION 530.
EXISTING GRADE
2' 15.2%
2:1
RIP-RAP PREFORMED REVETMENT MAT
STONE BEDDING
GEOSYNTHERIC FABRIC
PRECAST BOAT RAMP SLAB
NTS
RIP-RAP MAT DETAIL
NTS
RIP-RAP BOTTOM MAT TIE TO
EXISTING GRADE DETAIL
NTS
ITB 26-31 McKenzie Boat Ramp Project 66 of 84
File details come from the government source that posted it. Updated .