26-309-008 CONTRACT BOOK.pdf
PDF 35 MB Posted
- Solicitation number
- 26-309-008
- Issued by
- Suffolk County, Massachusetts
About this file
Contract Book Summary: 26-309-008
This is a sewerage works improvement contract book prepared by the Boston Water and Sewer Commission's Engineering Design Department for the separation of sanitary house laterals connected to storm drains throughout various areas of Boston. The work involves reconnecting approximately 75 sanitary sewer laterals to the sanitary sewer system and disconnecting or capping their connections to storm drains, performed on an as-needed basis over a three-year period. Bidders must submit sealed proposals by Thursday, September 17, 2026, at 10:00 AM to the Commission's Procurement Department at 980 Harrison Avenue, Boston, Massachusetts 02119. Pre-bid site visits and examinations of contract documents are required of all bidders prior to submission. The contract will be awarded within thirty days (excluding weekends and holidays) following bid opening to the lowest responsible and eligible bidder. The specified time for completion is 1,096 working days from the date of order to commence work. The project encompasses multiple line items including excavation, gravel placement, concrete work, sewer and drain pipe laying in various sizes (8-18 inches), manhole installation, paving, and televised inspection of conduits up to 60 inches.
Bidders must submit a bid deposit equal to 5% of the total bid amount and, upon contract award, provide performance and payment bonds each equal to 100% of the contract price. Liquidated damages of $750.00 per calendar day apply for failure to meet completion deadlines. The contract includes a price adjustment clause for diesel fuel, gasoline, liquid asphalt, and Portland cement based on monthly Massachusetts Department of Transportation pricing, with adjustments made only when monthly variance exceeds plus or minus 5%. Contractors must comply with minority employee utilization requirements (minimum percentages to be determined), utilize certified minority-owned business enterprises (MBEs) for not less than 9.0% of bid cost and women-owned business enterprises (WBEs) for not less than 6.0% of bid cost, and comply with prevailing wage requirements as set by the Department of Labor Standards. Additional requirements include compliance with special duty police provisions, CDL drug and alcohol testing, large vehicle safety devices, state tax compliance certification, and adherence to all Massachusetts labor laws regarding wages, hours, and working conditions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL, CONTRACT
AND SPECIFICATIONS
CONTRACT NO. 26-309-008
FOR
SEPARATION OF SANITARY HOUSE LATERALS
CONNECTED TO STORM DRAINS
IN
VARIOUS AREAS OF THE CITY OF BOSTON
BOSTON WATER AND SEWER COMMISSION
ENGINEERING: DESIGN DEPARTMENT
980 HARRISON AVENUE, BOSTON, MASSACHUSETTS 02119
i
TABLE OF CONTENTS
ITEM
Purchasing Department Bid Information 1
Information for Bidders 2
IB.1 General Description and Location of Work 2
IB.2 Bidding Information 2
IB.3 Use and Calculation of Unit Prices 5
IB.4 Permits and Fees to be Responsibility of Commission 5
IB.5 Substitution of Equal Items for Specified Items 6
IB.6 Determination of Equality 6
IB.7 Retail Sales Act Exemption 7
IB.8 Special Duty Police 7
IB.9 Time for Commencement and Completion of Work 8
IB.10 Minority Employee Utilization Requirement 7
IB.11 Minority Business Enterprise/Women Business Enterprise
Requirements 8
IB.12 CDL Drug and Alcohol Testing Requirements 9
IB.13 Price Adjustment – Diesel Fuel; Gasoline and Liquid
Asphalt and Portland 10
IB.14 Large Vehicle Protective Devices, Convex
Mirrors, Convex Cross-Over Mirrors and Safety
Devices Compliance 12
IB.15 State Tax Compliance Certificate – Article XXIV 13
Proposal and Contract 14
I. Proposal 14
1.1 Interested Persons 14
1.2 Execution and Delivery of Contract, Performance Bond
and Payment Bond 14
1.3 Bid Deposit 15
1.4 Documents Included in Contract 16
1.4.1 Labor 16
1.5 Time of the Essence, Liquidated Damages 16
1.6 Contract Price 17
1.7 Bidder's Certification Statement 18
1.8 Bidder's M/WBE Certification Statement 18
Identification of Bidder 19 ii
Certificate of Authority 21
II. Contract 22
Article I - The Contract Documents 22
Article II - The Work 23
Article III - The Contract Price 23
Article IV - Payment of the Contract Sum 23
4.1 Progress Payments 23
4.2 Final Payments 24
Article V– Obligation of Contractor to Perform 24
5.1 Responsibility of Contractor for Errors;
Indemnification by Contractor 24
5.1.1 Indemnification 25
5.2 Performance in Accordance with Specifications 27
5.3 Change Orders 24
5.4 Variation in Specified Amounts of Materials 28
5.5 Claims for Loss, Damage, Extra Cost or Injury
and Extensions of Time 29
5.6 Materially Different Subsurface and Latent
Physical Conditions 29
5.7 Full Compliance with Specifications 30
5.8 Function of Commission Engineers 30
5.9 Employment of Commission Personnel 31
Article VI-Authority of Executive Director 27
6.1 Contract Interpretation 31
6.2 Duties and Authority of Commission Engineers 32
and Inspectors
6.3 Access to Construction Site 32
6.4 Inspection of Off-Site Materials 33
6.5 Supervision by Contractor 33
Article VII- Requirements of Department of Labor
And Industries and MCAD 34
7.1 Compliance with Labor Laws 34
7.2 Employment Preference 34
iii
7.3 Maximum Hours 35
7.4 Minimum Wage Rates 35
7.5 Payment of Health and Welfare Wage Rates 35
Article VIII- Minority Participation 35
8.1 Definitions 35
8.2 Minority Employee Utilization (Labor) 36
Article IX – Residents Job Policy 40
9.1 Definitions 40
9.2 General Policy Statement 41
9.3 The BWSC Residents Job Policy 41
9.4 Organizational Procedures 41
Article X – Utilization of Minority-Owned Business
Enterprises and Women-Owned Business Enterprises 43
10.1 Definitions 43
10.2 Goals 44
10.3 Indemnification of M/WBEs 44
10.4 Material Breach 45
10.5 Waiver of Modification 46
Article XI- Department of Telecommunications and Energy
Department of Labor and Industries 46
11.1 Transportation Charges 46
Article XII – Subcontractors 47
12.1 Payment of Subcontractors 47
12.2 Payment for Labor and Materials by Contractor 49
Article XIII – Insurance 50
13.1 Liability Insurance 50
13.2 Workman’s Compensation and Employer’s Liability Insurance 51
13.3 Certificate of Compliance 51
13.4 Effect of Failure to Continue Insurance in Force 52
13.5 Authorized Insurers 52
13.6 Identification of Insurance Carrier 52
iv
Article XIV- Satisfactory Performance; Remedy for
Defective Work 52
14.1 Defective and Unauthorized Work 52
14.2 Termination by the Commission for Cause 53
14.3 Payment Following Termination 54
Article XV – Final Inspection and Acceptance;
Method of Payment 54
15.1 Final Inspection 54
15.2 Unacceptable Performance 54
15.3 Satisfactory Performance 55
15.4 Final Estimate 55
Article XVI – Discharge of Bonds 56
Article XVII – Liability Under Contract 56
17.1 General Release and Discharge by Contractors 56
17.2 Acts of God 56
Article XVIII – Record Keeping, Internal Accounting Controls, Financial Statement – M.G.L., CH.30, Section 39R 57
18.1 Record Keeping 57
18.2 Examination of Records 57
18.3 Change in Record Keeping 57
18.4 Filing Requirements 58
18.5 Financial Statements 58
18.6 Statement of Management 58
18.7 Public Accountant’s Statement 58
18.8 Filing Financial Statement 59
Article XIX – Right to Know Act 59
Article XX - Compliance with Laws 59
Article XXI- Provisions Required by Law Deemed Inserted 59
Article XXII – CDL License Requirement 60
Article XXIII – Authority of the Commission 60
Article XXIV – State Tax Compliance Certificate 61 v
Performance Bond 54
Payment Bond 56
Certificate 58
General Conditions
GC.1 Definitions GC-2
GC.2 Abbreviations GC-3
GC.3 Time for Commencement and Completion of Work GC-4
GC.4 Interpretation of Specifications GC-4
GC.5 Project Meetings GC-4
GC.6 Construction Schedule and Order of Work GC-4
GC.7 Submittals GC-5
GC.8 Pipe Locations GC-6
GC.9 Lines, Grades and Measurements GC-6
GC.10 Responsibility for Materials GC-7
GC.11 Non-Interference with Other Work GC-7
GC.12 Changes in Work and Extras GC-7
GC.13 Orderly and Competent Employees GC-8
GC.14 Employ Sufficient Labor and Equipment GC-8
GC.15 Work to Conform GC-8
GC.16 Traffic Control GC-9
GC.17 Precautions and Restoration of Property GC-11
GC.18 Emergency Street Openings GC-11
GC.19 Sanitary Regulations GC-11
GC.20 Compliance with Laws GC-12
GC.21 Cleaning Up GC-12
GC.22 Standard Drawings GC-12
GC.23 Excess Paving Deductions GC-12
GC.24 Periodic Payments GC-13
GC.25 By-pass System GC-13
GC.26 Maintenance Period of Roadway Surface GC-13
GC.27 Daily Scheduling of Work GC-14
GC.28 Contractor's Emergency Contact and Response
Requirements GC-14
GC.29 BWSC Project Sign Requirements GC-15
GC.30 Winter Work Shut Down GC-15
GC.31 Utility Company Notifications GC-16
GC.32 Use of BWSC Hydrants GC-17
GC.33 Pavingstones and Cobblestones GC-17
GC.34 Liquidated Damages GC-17
GC.35 Noise Control GC-18
GC.36 BPWD Requirements GC-18
GC.37 ADA Requirements GC-18
GC.38 Delays in Obtaining Permits GC-19 vi
GC.39 Post Hydrants Supplied by Commission GC-19
GC.40 BPWD Construction Sign Requirements GC-19
GC.41 Edgestone GC-20
GC.42 Sidewalks GC-20
GC.43 Temporary By-Pass/Flow Diversion of
Sewers/Storm Drains GC-21
GC.44 Bid Items for Sewer and Drain Pipe GC-22
GC.45 Don’t Dump Signs GC-22
GC.46 Method of Cutting Pavement GC-22
GC.47 Work Outside of Permitted Time GC-23
GC.48 Lead Free Products GC-23
9/23/2014 vii
Special Conditions
SC.1 Location and General Description of Work SC-1
SC.2 Contractor’s Response Requirements SC-2
SC.3 Time for Commencement and Completion of Work SC-3
SC.4 Boston Transportation Department Requirements SC-3
SC.5 Boston Public Works Department Regulations SC-3
SC.6 Dig Safe Notifications SC-3
SC.7 Connections to Sanitary Sewer SC-3
SC.8 Trench Support SC-4
SC.9 Below Grade Excavation SC-4
SC.10 Wood Sheathing of Excavations SC-4
SC.11 Permits SC-4
SC.12 Location of Laterals SC-4
SC.13 Items TV-1 - TV-5, Clean and Televise Conduit SC-5
Sizes 8” and Greater
SC.14 Limitation on Item A1-1, Miscellaneous Trench SC-5
Excavation
SC.15 Restoration of Private Lands SC-5
SC.16 Shop Drawings SC-6
SC.17 ADA Requirements SC-6
SC.18 Item D1-06, Minor Drain SC-6
SC.19 Work Beyond the Scope of this Contract SC-7
SC.20 Laying of PVC Sewer and Drain Pipe SC-7
SC.21 Parallel Sewers SC-7
SC.22 Minority-Owned Business Enterprise (MBE) and SC-7
Women-Owned Business Enterprise (WBE) Participation
SC.23 Boston Public Works Department Sign Requirements SC-8
SC.24 Question Submissions SC-8
SC.25 Price Adjustment SC-8
III. Specifications
DS Description of Sewerage Works DS-1
A1 Excavation and Backfill A1-1 to A1-8
A2 Gravel A2-1 to A2-2
A3 Screened Gravel A3-1 to A3-2
A5 Concrete Sand A5-1 to A5-3
A7.1 Wood Sheathing of Excavations A7.1-1 to A7.1-2
A7.2 Trench Support System A7.2-1 to A7.2-2
A8 Decking A8-1
A10 Controlled Density Fill A10-1 to A10-5
B1 Bituminous Concrete Paving B1-1 to B1-7
B6 Reset Edgestone B6-1 to B6-3
D1 Sewer and Drain Pipe D1-1 to D1-21
D2 Manholes and Catch Basins D2-1 to D2-10 viii
D3 Raise/Adjust Sewer or Drain Castings D3-1 to D3-3
D4 Cement Concrete D4-1 to D4-3
D4-02Cement Concrete Sidewalks D4-02-1 to D4-02-5
L1 Landscaping L1-1
P1 Special Duty Police P1-1 to P1-2
T1 Temporary Traffic Management T1-1 to T1-7
TV1 Television Inspection of Sewers TV1-1 to TV1-8 and Drains
Appendices
SEWERAGE WORKS IMPROVEMENTS
CONTRACT NO. 26-309-008
BOSTON WATER AND SEWER COMMISSION
PROCUREMENT DEPARTMENT
BID INFORMATION
(Not to be filled in by Contractor)
Day, Date and Time of Bid Opening... Thursday September 17th,2026 at 10:00 AM
Amount of Bid Bond or Certified Check...5% of Total Bid Amount
Amount of Surety (Performance Bond)... 100% of Total Contract Price
Specified Time of Completion ... Within 1096 working days from
Date of Order to Commence Work
Total Amount of Bid... $
INFORMATION FOR BIDDERS
IB.1 General Description and Location of Work
IB.2 Bidding Information
IB.3 Use and Calculation of Unit Prices
IB.4 Permits and Fees
IB.5 Substitution of Equal Items for Specified Items
IB.6 Determination of Equality
IB.7 Retail Sales Act Exemption
IB.8 Special Duty Police
IB.9 Time of Commencement and Completion of Work
IB.10 Minority Employee Utilization Requirement
IB.11 MBE/WBE Requirements
IB.12 CDL Drug and Alcohol Testing Requirements
IB.13 Price Adjustment – Diesel Fuel; Gasoline; Liquid Asphalt and Portland Cement
IB.14 Large Vehicle Protective Devices, Convex Mirrors, Convex
Cross-Over Mirrors and Safety Devices Compliance
IB.15 State Tax Compliance Certificate
IB.1 GENERAL DESCRIPTION AND LOCATION OF WORK
The location and general description of work is listed in the Special
Conditions, Page SC.-2.
IB.2 BIDDING INFORMATION
The Boston Water and Sewer Commission, hereinafter designated as “the
Commission", 3rd floor, 980 Harrison Avenue, Boston, Massachusetts 02119 invites proposals for the doing of the work described in the contract and specifications annexed hereto (the "Contract").
The Information to Bidders, plans and specifications found online at the Commission’s website does not constitute on online bid and should not be submitted electronically or by facsimile. Proposals shall be submitted, in writing, to the Commission at the above address, on the accompanying forms. The proposal shall be properly filled out, with all pages intact, signed, enclosed in a sealed bid envelope, sealed and plainly marked with a descriptive title of the work to be done. The
Proposal shall be filed in the office of the Procurement Department of the Commission prior to the time designated in the advertisement for the opening of proposals.
A bid deposit in the form of a bid bond, or a certified check drawn on, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the order of the "Boston Water and Sewer
Commission" in the sum specified in the advertisement shall accompany the copy of the proposal filed with the Commission. The bid deposit shall be submitted in a separate sealed envelope stapled to the sealed envelope containing the proposal. The bid deposit shall become and be the property of the Commission as liquidated damages if, after a proposal is accepted, the bidder shall fail to execute the Contract annexed hereto in accordance with the terms of this proposal and the
Contract annexed hereto, and to furnish a performance bond and a labor and materials or payment bond as provided in the Contract within five days, excluding Saturdays, Sundays and legal holidays, after notice of such acceptance is mailed or delivered to him. Provided however that the amount of the bid deposit that becomes property of the Commission shall not exceed the difference between the bid price of such general bidder and the bid price of the next lowest responsible and eligible bidder.
The Contract shall be awarded within thirty (30) days, Saturdays, Sundays and legal holidays excluded, after the opening of the proposals provided; however, that 1) the Contractor's bid is approved by Boston
Water and Sewer Commissioners or 2) if the award of the Contract requires the approval of an officer, board or agency of the Federal government, the award shall be made within thirty (30) days, Saturdays, Sundays and legal holidays excluded, after such approval.
The Contract shall be awarded to the lowest responsible and eligible bidder complying with the conditions and requirements provided in this
Information for Bidders and the other bid documents. The successful bidder will be notified in writing that his bid has been accepted and that he has been awarded the contract. The successful bidder shall execute the contract and furnish the required bonds, and any other documents required in the Proposal and Contract, at the offices of the
Commission, if requested within five days, Saturdays and Sundays and legal holidays excluded, after presentation of the contract to him or notice to him that the contract is ready for execution. If the bidder selected fails to execute the contract, and furnish the required bonds, or any other documents required in the Proposal and Contract, the award will be made to the next lowest responsible and eligible bidder.
All bid deposits, except those of the three lowest responsible and eligible bidders, shall be returned within five (5) calendar days, Saturdays, Sundays and legal holidays excluded, after the opening of the proposals. The remaining bid deposits shall be returned upon the execution and delivery of the Contract.
Before submitting his proposal each bidder shall (a) thoroughly examine the contract documents, video tapes, and other reports prepared during design (b) visit the site to fully familiarize himself with local conditions that may in any manner affect cost, progress or performance of the work, and (c) fully familiarize himself with federal, state and local laws and ordinances, rules and regulations that may in any manner affect cost, progress or performance of the work. Failure of a bidder to fully acquaint himself with all contract requirements and statutory regulations, and to examine the site in detail shall not relieve the bidder from any obligation to perform the work at his bid price. The submission of a bid shall constitute a representation by the bidder that he has complied with every requirement of this section and that the contract documents are sufficient in scope and detail to complete performance of the work of this contract.
At a preconstruction meeting, the bidder will be required to furnish without expense to the Commission, a complete statement of the origin, composition and manufacture of any or all materials proposed to be used in the construction of the work, which may include samples, which samples may be subjected to the tests required by the Commission to determine their quality and fitness for the work.
Each bidder shall promptly notify the Chief Engineer of the Commission in writing of any ambiguity, inconsistency, or error they may discover upon examination of the contract documents, the site or other local conditions. All questions as to the interpretation of the plans and specifications shall be submitted in writing to the Chief Engineer and written answers to such questions will be sent by the Chief Engineer to every individual or firm on record as having taken a set of specifications. No questions will be answered unless received at least ten (10) calendar days prior to the expiration of the time set for filing bids. Oral clarifications or interpretations will be of no legal effect. The Commission will not be responsible for, and no bidder may rely upon or use as a basis of a claim against the
Commission, any information, explanation or interpretation of the contract documents rendered in any fashion except as provided above.
All proposals shall also be accompanied by evidence satisfactory to the
Executive Director that the bidder has the ability and experience in the class of work required to perform the Contract, and that he has sufficient capital and plant to enable him to perform the same successfully, and to complete it within the time named in the contract.
It is the policy of the Commission not to award the attached contract to any bidder who does not furnish such evidence. The Commission reserves the right to reject the bid of any bidder when its investigation raises any significant doubt as to the bidder's competency, responsibility, experience or capacity to successfully complete the project within contract requirements.
The Commission reserves the right to reject any or all proposals if it be in the public interest to do so. Every proposal which is not accompanied by the required bid deposit, or which otherwise does not conform to statutory bid requirements, or which is on a form not fully completed, or which is conditional, incomplete or obscure, or which contains any additions unless requested, shall be considered invalid, and the Commission shall reject any such bid. In addition, the
Commission may consider as informal and may reject any proposal which is not prepared and submitted in accordance with all requirements of the bid documents or which contains erasures, alterations, additions, errors or irregularities of any kind, or which contains proposed prices for any class or item of work which are, in the Commission's judgment, substantially less or more than the actual cost to complete the work;
provided, however, the Commission reserves the right to waive any and all informalities as to form. Matters of substance shall not be waived. The determination of the Commission in this regard is final.
IB.3 USE AND CALCULATION OF UNIT PRICES
Every bidder shall submit his proposal using the form which constitutes
Part I of the attached Proposal and Contract. The bidder shall supply a contract price, in both words and figures, and shall specify a unit price, in both words and figures, for each item for which a quantity is given, and shall also show the products of the respective unit prices and quantities written in figures in the column provided for that purpose, and the total amount of the proposal obtained by adding the amounts of the several items.
All words and figures shall be in ink. In case of a discrepancy between the prices written in words and those written in figures, the written words shall govern. In the event there is a discrepancy between the unit prices and the total sum of all the items, the unit prices shall govern. Failure to bid on each and every item may lead to the rejection of the proposal.
IB.4 PERMITS AND FEES TO BE RESPONSIBILITY OF COMMISSION
The Commission shall have the responsibility for obtaining all permits from the City of Boston and any Department thereof and for paying all fees, which may be required in connection with the work to be performed pursuant to this Contract. The contract price shall not include the cost of any such permits issued by the City of Boston or fees or bonds payable thereto. It shall be the responsibility of the Contractor to advise the Commission in a timely manner, a minimum of fifteen working days prior to start date, of the need for permits, the date as of which permits are needed, their duration, and all other necessary information. There will be no additional payment for delays caused by the inability of the Commission to obtain permits. The Contractor is required to keep a copy of all permits on each job site.
Permits issued by the City of Boston are issued on terms and conditions upon which the Contractor herein agrees to comply, and to indemnify and defend Commission for any claim based upon the Contractor’s failure to do so.
IB.5 SUBSTITUTION OF EQUAL ITEMS FOR SPECIFIED ITEMS
Except where otherwise specifically provided in the specifications, due to the proprietary nature of a particular item of material or for any other sound reason in the public interest, a Contractor shall be permitted to substitute an item of material for any item of material named or described in this Contract, or in the specifications, plans, addenda, or other documents incorporated in and made a part of the
Contract, provided that such substituted item of material shall be considered equal, by the Commission, to the item of material so-named or described. The word "material" as used herein shall mean and include any article, assembly or system, or any component part thereof.
The Commission shall consider any item of material equal to the item of material named or described in this Contract if (1)it is at least equal in quality, durability, appearance, strength and design, (2) it will perform at least equally the function imposed by the general design for the work to be performed pursuant hereto, and (3) it performs substantially, even with deviations, to the detailed requirements for such named items in the specifications attached to the contract.
IB.6 DETERMINATION OF EQUALITY
The Bidder selected as the general contractor is required to submit to the Executive Director for consideration as to its equality, a written notice containing the name and full particulars, pertaining to any item
(or items) of material other than the specific or specifics named or described therefore in the Contract or in documents incorporated in and made part thereof in advance of the time of its incorporation in the work to be performed pursuant to the Contract by submitting the aforesaid written notice to the Executive Director, immediately following the execution of the Contract by the Commission. An item shall be considered equal to the item so named or described if (1) it is at least equal in quality, durability, appearance, strength and design, (2) it will perform at least equally the function imposed by the general design for the public work being contracted for or the material being purchased and (3) it conforms substantially, even with deviations, to the detailed requirements for the item in the said specifications.
Forthwith upon receipt of such written notice, the Executive Director, or designee, shall conduct or cause to be conducted a reasonable investigation to determine whether the item (or items) in question shall be considered equal to the item(s) named or described therefore in the Contract or in the documents incorporated in and made a part of the Contract. Upon conclusion of the investigation, the Executive
Director, or designee, shall, in writing, promptly advise the contractor that the item(s) of material in question is, or is not, considered the equal of the item(s) of material or described as aforesaid, and that said item(s) of material may, or may not, be incorporated in the work to be performed pursuant to the Contract. If a substitute/alternate item is allowed and is less expensive than the item originally proposed, upon the request of the Chief Engineer, a credit shall be given to the Commission.
In no case may an item other than that specifically described in the
Contract be incorporated into work to be performed pursuant to the
Contract unless the Executive Director shall consider the item as the equal of the item so named or described, as provided by law.
IB.7 RETAIL SALES ACT EXEMPTION
The exemption certificate number assigned to the Commission by the
Commissioner of Corporations and Taxation under Section 6, Chapter 14 of the Act of 1966 commonly referred to as the Retail Sales Act is E-
042-621-990.
IB.8 SPECIAL DUTY POLICE
The Executive Director shall require the selected bidder to maintain at the expense of the selected bidder such police officers on special duty
(outside their regular tour of duty) as the Police Commissioner or his designee may deem necessary to avoid, so far as reasonably possible, danger to the safety of persons and substantial interference with the free circulation of traffic. This clause shall not prohibit reimbursement of the selected bidder for such expenses if a Contract between such person and the City or any other person provides for such reimbursement.
The selected bidder is required to carry in its bid the items for special duty police at the rates set by the City of Boston or
Commonwealth of Massachusetts for the estimated quantities. The
Commission does not guarantee the estimated quantities for each special duty police item. The selected bidder will be reimbursed only for those items and will not be entitled to overhead, administrative costs or profits associated with said reimbursement.
IB.9 TIME FOR COMMENCEMENT AND COMPLETION OF WORK
See Special Conditions, Page SC-2.
IB. 10 MINORITY EMPLOYEE UTILIZATION REQUIREMENT
No bid for the award of this project will be considered acceptable unless the Contractor agrees to comply fully with the provisions of
Article VIII, Minority Participation, of the Contract.
Included with the Contract Documents, Appendices, are copies of the
Contractor’s Certification Statement, Minority Employee Participation and the Minority Employee Weekly Utilization Report.
By signing this proposal the Contractor understands, acknowledges and agrees to the terms and conditions of this Section, Section 1.7 and
Article VIII of the Contract.
The Minority Employee Weekly Utilization Reports shall be submitted in accordance with section 8.2(d)(ii) and 8.2(d)(iii) of the Contract.
Failure to comply with the Minority Employee Utilization Requirements may result in imposition of sanctions set forth in section 8.2(f) and
(g) of the Contract.
No bid for the award of this project will be considered acceptable
Article IX, Residents Job Policy, of the Contract.
Included with the Contract Documents, Appendices, are copies of the
Contractor’s Certification Statement, Residents Job Policy and the
Boston Resident Employee Weekly Utilization Report. By signing this proposal the Contractor understands, acknowledges and agrees to the terms and conditions of this section and Article IX of the Contract.
The Boston Resident Employee Utilization Report shall be submitted in accordance with Section 9.4.C ii of the Contract. Failure to comply with the Boston Resident Employee Utilization Requirements may result in imposition of sanctions as set forth in the Contract.
IB.11 MINORITY BUSINESS ENTERPRISE/WOMEN BUSINESS ENTERPRISE
REQUIREMENTS
No bid for the award of this contract will be considered acceptable
Article X of the Contract, Utilization of Minority-Owned Business
Enterprises and Women-Owned Business Enterprises.
Included with the Contract Documents, Appendices, are copies of forms relating to the Utilization of Minority Business Enterprises and Women
Business Enterprises (MBEs and WBEs). Form BWSC-M/WBE-001 is a Notice to Contractors regarding the Commission M/WBE requirements which the
Contractor must sign as part of the Contract Documents, and Form BWSC-
M/WBE-002 is a report on the use of M/WBEs which the Contractor must file on a monthly basis with the Commission. By signing this proposal, the Contractor understands, acknowledges and agrees to the terms and conditions of this section, section 1.8 and Article X of the Contract.
The Contractor shall submit each month a breakdown of MBE and WBEs used in the current project, as set forth in the forms identified as “BWSC-
M/WBE-001 and BWSC-M/WBE-002”. These reporting forms can be found in the APPENDICES Section of this contract. Pay estimates will not be processed for payment unless contractors comply with this reporting requirement.
By signing this proposal, the Contractor understands, acknowledges and agrees to utilize certified minority-owned business enterprises as defined in Article X for not less than 9.0% of the cost of the bid, and certified women-owned business enterprises as defined in Article X for not less than 6.0% of the cost of the bid. If the Contractor wishes to have the provisions of Article X waived or modified, the Contractor shall apply to the Commission's Director of Organizational Diversity ten (10) calendar days prior to bid opening for a determination of waiver or of modification in accordance with Article X. The Director of
Organizational Diversity will render a decision on the application for waiver or modification five (5) calendar days prior to bid opening.
IB.12 CDL DRUG AND ALCOHOL TESTING COMPLIANCE
No bid for the award of this contract will be deemed acceptable unless the undersigned has provided assurance to the Commission that he is in compliance with applicable federal regulations for drug and alcohol testing when services involving the following are provided:
the driving of commercial vehicles with a gross vehicle weight of more than 26,000 pounds (inclusive of a towed unit with a gross vehicle weight of over the 10,000 pounds) the transportation of hazardous material in a quantity requiring "placarding"; or vehicles rated to carry more than 15 passengers, including the driver. In addition, the undersigned must assure the Commission that all proposed subcontractors providing like services are in compliance. Assurance of compliance must be satisfactory to the Commission.
IB. 13 PRICE ADJUSTMENT – DIESEL FUEL; GASOLINE AND LIQUID
ASPHALT AND PORTLAND CEMENT
Pursuant to Chapter 150 of the Acts of 2013 and M.G.L. Chapter 30, section 38A this contract contains a price adjustment clause that will provide for either additional compensation to the Contractor or repayment to the Commission, depending on an increase or a decrease in the average price of Diesel Fuel; Gasoline; Liquid Asphalt and Portland
Cement Contained in Cast-in Place Cement.
The Base Price will be the price as indicated in the Massachusetts
Department of Transportation Highway Department web site
(https://www.mass.gov/massdot-contract-price-adjustments), incorporated herein by reference, for the month in which the contract was advertised, which includes state tax.
The Period Price will be the average of prices charged to the State, including state tax for the bulk purchases made during each month as indicated on the Massachusetts Department of Transportation Highway
Department web site (https://www.mass.gov/massdot-contract-price-adjustments), incorporated herein by reference.
A price adjustment will be made on a monthly basis but only when the monthly cost change or variance between the Base Price and Period Price exceeds plus or minus five percent (5%). The complete adjustment will be paid in all cases with no deduction of the 5% from either upward or downward price adjustments.
The Contractor will be compensated through monthly payments after the work has been performed using the monthly period price for the month during which the work was performed. The set price Payment Items F8-2, F8-3, F8-4, F8-5, will be used as necessary to generate the appropriate adjustment(s). The Unit Quantity(s) will be adjusted to provide the appropriate total amount.
The Commission will be compensated from retainage.
No price adjustments will be allowed beyond the Completion date of this
Contract unless there is an approved extension of time.
Diesel Fuel and Gasoline
Diesel Fuel – Base Price: $4.372/gal (August 2026)(including State Tax)
Gasoline – Base Price: $3.335/gal (August 2026) (including State Tax)
The price adjustment will be based on the Period Price of Gasoline and
Diesel Fuel for each monthly period as it appears on the Massachusetts
Department of Transportation (MassDot) website
(https://www.mass.gov/massdot-contract-price-adjustments)
The price adjustment only applies to actual fuel usage during each month for site dedicated equipment requiring gasoline or diesel fuel including but not limited to construction equipment, trucks and bypass pumps. It shall not include transportation, idling or other charges.
The price adjustment will be determined by multiplying the number of gallons used during the applicable monthly period times the difference between the Base Price and the Period Price of Diesel Fuel or Gasoline.
The Contractor shall supply to the Commission, on a monthly basis, the certified fuel usage for each vehicle or piece of equipment.
Liquid Asphalt
Liquid Asphalt – Base Price: $712.50/ton (August 2026)
The price adjustment will apply only to the following items:
Item B1-1 Temporary Paving Boston Streets S.Y.
Item B1-2 Permanent Trench Repair in Boston Streets S.Y.
Item B1-3 Permanent Trench Repair DCR Streets S.Y.
Item B1-3A Temporary Pavement DCR Streets S.Y.
Item B1-4 Permanent Pavement State Highway S.Y.
Item B1-5 Bituminous Concrete Overlay Paving S.Y.
The price adjustment will be based on the New Asphalt Period Price as it appears on the Massachusetts Department of Transportation Highway
Department site (https://www.mass.gov/massdot-contract-price-adjustments), incorporated herein by reference.
The price adjustment only applies to the actual virgin liquid asphalt content in the mixture placed in accordance with the Commission’s specifications. It shall not include transportation or other charges.
The price adjustment will be determined by multiplying the number of tons of hot mix asphalt mixture placed during each monthly period times the liquid asphalt content percentage times the difference between the
Base Price and the Period Price for Liquid Asphalt.
Portland Cement Contained in Cast-in-Place Concrete
Portland Cement Contained in Case-Place-Concrete – Base Price:
$452.13/ton (August 2026)
This provision applies to all projects using greater than 100 Cubic
Yards of Portland Cement concrete containing Portland Cement. The
Price adjustment will apply only to the following items:
Item D4-02A Cement Concrete Sidewalks S.F.
Item D5-10 Plain Concrete C.Y.
Item D5-11 Reinforced Concrete C.Y.
The price adjustment will be based on the variance in price for the
Portland Cement Component only from the Base Price to the Period Price.
The price adjustment applies only to the actual Portland Cement content in the mix placed on the job in accordance with the specifications. No adjustments will be made for any cement replacement materials such as fly ash or ground granulated blast furnace slag. It shall not include transportation or other charges.
The price adjustment for Portland Cement concrete mixes will be paid for per cubic yard under this item. It will be determined by multiplying the number of cubic yards of Portland Cement concrete placed during each monthly period times the Portland Cement content percentage times the difference between the Base Price and Period price of Portland Cement.
Note: For items that are not paid on a per cubic yard basis the Price
Adjustment will be calculated per cubic yard from the actual volume used based on information submitted to or gathered by the Commission.
IB. 14 LARGE VEHICLE PROTECTIVE DEVICES, CONVEX MIRRORS, CONVEX
CROSS-OVER MIRRORS AND SAFETY DEVICES
No bid for the award of this contract will be deemed acceptable unless the undersigned bidder has provided assurance to the Commission that he/she is in compliance with the requirements of City of Boston Code, Ordinance Chapter IV, Sections 4-8 which requires vendors to safeguard unprotected road users. See Appendices, which contain a copy of the
City of Boston Ordinance and the City of Boston Inspectional Services
Department Commissioner’s Bulletin setting forth relevant guidelines.
In addition, the undersigned bidder must assure the Commission that all proposed subcontractors are in compliance with this provision.
Assurance of compliance must be satisfactory to the Commission.
IB. 15 STATE TAX COMPLIANCE CERTIFICATE – ARTICLE XXIV
No bid for award of this contract will be deemed acceptable unless the bidder signs the State Tax Compliance Certificate found in Article XXIV on Page 53 of the contract and submits it with its bid.
The terms and conditions of this Notice to Bidders are hereby made a part of and incorporated in the Proposal and Contract attached hereto.
Date:_____________ __________________________________
Henry F. Vitale
Executive Director
PROPOSAL AND CONTRACT
I
This Proposal and Contract consists of three parts:
Part I (the "Proposal"), a proposal submitted to the Boston Water and
Sewer Commission by the Bidder whose name is set forth below to perform the work identified below, pursuant to the terms and conditions of this
Proposal and Contract; Part II, the general contract terms and Part
III, the specifications, plans, and addenda relating to the work proposed to be performed hereto.
I. Proposal
The undersigned bidder proposes to perform all sewerage related works associated with reconnecting approximately 75 sanitary sewer laterals to the sanitary sewer system and all other associated works as directed by the Engineer or specified in the specifications.
1.1 Interested Persons
The undersigned, declares that it is the only person interested in this
Proposal, or in any Contract which be made under it, or in any expected profits to arise therefrom that this proposal is made in good faith without fraud, collusion, or connection of any kind with any other bidder for the same work, that it is bidding in its own behalf without connection or obligation to any undisclosed person, and that no other person has any interest in the profits of the general Contract; that it has carefully examined the Contract and Specifications and informed himself fully in regard to all conditions pertaining to the work and the place where it is to be done; that it has made its own examinations and estimates and from them makes this Proposal; and that it understands and agrees to all the reporting requirements in the
Contract.
1.2 Execution and Delivery of Contract, Performance Bond, and
Payment Bond
The undersigned proposes and agrees that if, within thirty days, Saturdays, Sundays, and legal holidays excluded, after the opening of the proposal, or, if the award requires federal approval, within thirty days, Saturdays, Sundays and legal holidays excluded, after such approval, notice that this Proposal will be accepted for the Commission shall be mailed to it at the business address given below, or shall be delivered to it, it shall within five (5) succeeding days excluding
Saturdays, Sundays and legal holidays, after the date of such mailing or delivery, whichever is later, deliver to the office of the Executive
Director of the Commission (the "Executive Director"), the Contract, accompanied by (i) a Performance Bond, in the form appearing herein as
Exhibit "A" to Part II of the Proposal and Contract, for the full amount of the Contract Price (ii) a Payment Bond, in the form appearing herein as Exhibit "B" to Part II of the Proposal and Contract for the full amount of the Contract Price (such Performance Bond and Payment
Bond being herein collectively referred to as the "Bonds"), (iii) the certificate as to proper corporate authorization in the form appearing herein as Exhibit "C" to Part II of the Proposal and Contract, and (iv) such other documentation, including but not limited to the documents required to comply with the requirements of Articles VIII, IX and X of the Contract, as may be requested by the Commission at the time of notification of acceptance by the Commission, all properly executed in their respective forms.
Performance Bonds and Payment Bonds shall be (a) in a form satisfactory to the Commission and (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Commission.
Place of Business in Massachusetts of Surety Company is
Street Address City Zip Code
Contact Person:____________________ Telephone No.:___________
1.3 Bid Deposit
The undersigned Bidder agrees that the certified check for_______________________________dollars ( ), or Bid
Bond, payable to the Commission, and deposited herewith, is the property of the Commission, and the maximum amount thereof is the amount of the damages which the Commission will sustain by failure of the undersigned Bidder to carry out the Proposal, but if this Proposal is not accepted, or if notice is mailed or delivered and the undersigned executes and delivers said Contract and Bonds as aforesaid, the check, or its amount, is to be paid to him on receipt therefore.
Such bid deposit shall be in an amount not less than five percent of the value of the bid. A Bid Bond shall be (a) in a form satisfactory to the Commission, (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Commission and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid.
Place of Business in Massachusetts of Surety Company is
Street Address City Zip Code
Contact Person:____________________ Telephone No.:___________
1.4 Documents Included in Contract
The undersigned Bidder agrees to be bound by the detailed specifications constituting Part III of this Proposal and Contract, all exhibits, appendices, schedules, attachments and plans which accompany the same, each of which shall be deemed supplementary to the other and in case of any item not being specifically mentioned in detail and yet shown on the plan or conversely, the necessary work or materials shall be supplied and installed to the satisfaction of the Executive
Director.
1.4.1 Labor
The undersigned Bidder hereby certifies that he is able to furnish labor that can work in harmony with all elements of labor employed or to be employed in the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and
Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee.
1.5 Time of the Essence, Liquidated Damages
The undersigned Bidder hereby offers to provide all necessary machinery, tools and apparatus and to do all the work, and furnish all the materials called for by said specifications in the manner and time herein prescribed and according to the requirements of the Executive
Director, including all the incidental work, and to complete the work within the time specified.
Delay in completion of the work required under this Contact will cause interference with the Commission's construction schedules, will result in increased costs including, but not limited to, planning, engineering, police and inspection costs and will cause other tangible and intangible losses. If the Contractor fails to complete the work within the stipulated time, the Contractor and his sureties shall be liable for and shall pay the Commission the sum of $750.00 as fixed, agreed and liquidated damage for each calendar day of delay after the date stipulated in this Contract. Such damages have been fixed and agreed on because of the impracticability and extreme difficulty of fixing and ascertaining the actual damages the Commission would sustain in the event of delayed completion. The Commission is authorized to deduct out of the monies, which may be due to the Contractor under this
Contract the liquidated damages referred to in this section.
The Commission's right to recover liquidated damages is for consequential damages and is not a substitute for any right of recovery for additional costs incurred to complete the work should the contractor fail to do so.
1.6 Contract Price
The undersigned Bidder proposes to perform the work specified in this
Proposal and Contract for a contract price of ________________________ dollars. (___________________), which amount consists of the specified items beginning on Page 14A-1:
1.7 Bidder's Certification Statement
The undersigned bidder does hereby certify, pursuant to the Invitation for Proposals to perform this contract by and between the undersigned and the Boston Water and Sewer Commission, (the "Contract") as follows:
1. The undersigned has read Article VIII of the contract regarding the requirements with respect to the use of Minority Employees in the performance of the Contract; and
2. The undersigned understands that failure to comply with the provisions of the Contract set forth in said Article VIII may subject the undersigned to the sanctions set forth in Article
VIII, Section 8.2 (f) and (g) of the Contract.
The undersigned further certifies that within seven (7) days prior to the pre-construction meeting described in Section 8.2(c)(iii) of this
Contract, the Contractor shall send to the Contract Compliance Officer a list of persons who are presently employed and their job classification or will be employed by the undersigned in the
BID PAGES
26-309-008 SEPARATION OF HOUSE SANITARY
LATERALS
Project Number : 26-309-008 Bid Number : 26-309-008
ITEM QUANTITY
ITEM WITH UNIT BID PRICE WRITTEN IN
WORDS
UNIT PRICE
DOLLARS
CENTS
TOTAL
DOLLARS
TOTAL
CENTS
A1-1
140.00 cy
MISC. TRENCH EXCAVATION
A1-2
30.00 cy
BELOW GRADE EXCAVATION
A1-3
30.00 cy
ROCK EXCAVATION
A1-4
30.00 lf
RAILS AND WOOD TIES
A10-1
40.00 cy
CONTROLLED DENSITY FILL (F+E)
A2-1
2,100.00 cy
GRAVEL
A3-1
350.00 cy
SCREENED GRAVEL
A5-1
30.00 cy
CONCRETE SAND
A7-1
1,700.00 sf
SHEATHING - LEFT IN PLACE
A7-2.1
75.00 ea
TRENCH SUPPORT
B1-1
1,200.00 sy
TEMPORARY PAVING
SUBTOTAL
Page 1 of 7 Date: 8/18/2026
LATERALS
Project Number : 26-309-008 Bid Number : 26-309-008
ITEM QUANTITY
ITEM WITH UNIT BID PRICE WRITTEN IN
WORDS
UNIT PRICE
DOLLARS
CENTS
TOTAL
DOLLARS
TOTAL
CENTS
B1-2
50.00 sy
PERM. TRENCH REP. - BOSTON
B1-5
40.00 sy
BIT. CONC. OVERLAY PAVING
B6-1
120.00 lf
RESET EDGESTONE
D1-04
100.00 vf
CHIMNEY CONNECTION
D1-06
1,750.00 lf
MINOR DRAIN
D1-08P
80.00 lf
LAY 8" PVC SEWER / DRAIN
D1-10P
120.00 lf
LAY 10" PVC SEWER / DRAIN
D1-12P
80.00 lf
LAY 12" PVC SEWER / DRAIN
D1-15P
60.00 lf
LAY 15" PVC SEWER / DRAIN
D1-18P
30.00 lf
LAY 18" PVC SEWER/DRAIN
D2-01
3.00 ea
MANHOLE BASE
Page 2 of 7 Date: 8/18/2026
LATERALS
Project Number : 26-309-008 Bid Number : 26-309-008
ITEM QUANTITY
ITEM WITH UNIT BID PRICE WRITTEN IN
WORDS
UNIT PRICE
DOLLARS
CENTS
TOTAL
DOLLARS
TOTAL
CENTS
D2-02
40.00 vf
MANHOLE WALLS
D2-03
3.00 ea
MANHOLE FRAME WITH COVER
D2-07
30.00 vf
BRICKWORK IN EX. STRUCT.
D3-1
5.00 ea
RAISE SEWER / DRAIN CASTING
Three Hundred and Sixty-Five Dollars and 00/100
$365 $1,825
D4-01
10.00 cy
CEMENT CONCRETE
D4-02A
1,200.00 sf
CEMENT CONC. SIDEWALK [6IN]
Fifteen Dollars and 00/100 $15 $18,000
F8-2
400.00 ea
DIESEL FUEL PRICE ADJUSTMENT
Ten Dollars and 00/100 $10 $4,000
F8-3
240.00 ea
GASOLINE FUEL PRICE ADJ.
Ten Dollars and 00/100 $10 $2,400
F8-4
200.00 ea
LIQUID ASPHALT PRICE ADJ.
Ten Dollars and 00/100 $10 $2,000
F8-5
200.00 ea
PORTLAND CEMENT PRICE ADJ.
Ten Dollars and 00/100 $10 $2,000
L1-2
100.00 sy
LANDSCAPING
Fifty Dollars and 00/100 $50 $5,000
Page 3 of 7 Date: 8/18/2026
LATERALS
Project Number : 26-309-008 Bid Number : 26-309-008
ITEM QUANTITY
ITEM WITH UNIT BID PRICE WRITTEN IN
WORDS
UNIT PRICE
DOLLARS
CENTS
TOTAL
DOLLARS
TOTAL
CENTS
P1-1
1,000.00 hr
SPEC. DUTY BOSTON POLICE
Sixty-Six Dollars and 00/100 $66 $66,000
P1-1R
120.00 hr
SPEC. DUTY BOSTON POLICE, R.L.
Ninety-Five Dollars and Forty-Nine Cents
$95 49 $11,458 80
P1-2
480.00 hr
SPEC. DUTY POLICE SERG.
Seventy-Three Dollars and Seventy Cents
$73 70 $35,376
P1-2R
120.00 hr
SPEC. DUTY POLICE SERG., R.L.
One Hundred and Ten Dollars and Twenty-Eight Cents
$110 28 $13,233 60
P1-3
80.00 hr
SPECIAL DUTY STATE POLICE
Sixty-One Dollars and Eighty-Eight Cents
$61 88 $4,950 40
P1-4
40.00 hr
STATE POLICE TIME & A 1/2
Ninety-Two Dollars and Eighty-Two Cents
$92 82 $3,712 80
P1-5
80.00 hr
SPEC. DUTY POLICE LT.
Seventy-Eight Dollars and Ten Cents $78 10 $6,248
P1-5R
40.00 hr
SPEC. DUTY POLICE LT., R.L.
One Hundred and Twenty-Four Dollars and Eleven Cents
$124 11 $4,964 40
P1-6
40.00 hr
SPEC. DUTY POLICE CAPT.
Eighty-Nine Dollars and Ten Cents $89 10 $3,564
P1-6R
16.00 hr
SPEC. DUTY POLICE CAPT., R.L.
One Hundred and Forty-Three Dollars and Thirty-Six Cents
$143 36 $2,293 76
Page 4 of 7 Date: 8/18/2026
LATERALS
Project Number : 26-309-008 Bid Number : 26-309-008
ITEM QUANTITY
ITEM WITH UNIT BID PRICE WRITTEN IN
WORDS
UNIT PRICE
DOLLARS
CENTS
TOTAL
DOLLARS
TOTAL
CENTS
T1-01
30.00 lf
2" PVC CONDUIT
T1-02
30.00 lf
3" PVC CONDUIT
T1-02A
30.00 lf
4" PVC CONDUIT
T1-03
60.00 lf
TRAFFIC SIGNAL CABLE
T1-04
60.00 lf
LOOP DET. LEAD-IN CABLE
T1-05
60.00 lf
INTERCONNECT CABLE
T1-06
60.00 lf
WIRE LOOP INST IN RDWY.
T1-08A
60.00 sf
12" WHITE THERMO. REFL. LINE
T1-08B
60.00 sf
PAVE. ARROW/LEGEND-WHITE
T1-08C
60.00 sf
BICYCLE SYMBOL
T1-10A
60.00 lf
4" WHITE THERMO. REFL. LINE
Page 5 of 7 Date: 8/18/2026
LATERALS
Project Number : 26-309-008 Bid Number : 26-309-008
ITEM QUANTITY
ITEM WITH UNIT BID PRICE WRITTEN IN
WORDS
UNIT PRICE
DOLLARS
CENTS
TOTAL
DOLLARS
TOTAL
CENTS
T1-11A
60.00 lf
4" YELLOW THERMO. REFL. LINE
TV-1
7,500.00 ft
CL&TV CONDUIT = > 8" < 18"
TV-2
2,500.00 ft
CL&TV CONDUIT = > 18" < 30"
TV-3
1,500.00 lf
CL&TV CONDUIT = > 30" < 48"
TV-4
400.00 lf
CL&TV CONDUIT = > 48" < 60"
TV-5
400.00 lf
CL&TV CONDUIT = > 60"
Page 6 of 7 Date: 8/18/2026
LATERALS
SUMMARY COSTS
SUBTOTAL PAGE 14A-- 1 $___________________________
SUBTOTAL PAGE 14A-- 2 $___________________________
SUBTOTAL PAGE 14A-- 3 $___________________________
SUBTOTAL PAGE 14A-- 4 $___________________________
SUBTOTAL PAGE 14A-- 5 $___________________________
SUBTOTAL PAGE 14A-- 6 $___________________________
GRAND TOTAL $___________________________
Page 7 of 7 Date: 8/18/2026 performance of the Contract in order to comply with the provisions of
Article VIII of the Contract.
1.8 Bidder's M/WBE Certification Statement
The undersigned Bidder does hereby certify as follows:
1. The undersigned has read Article X of the Contract regarding the requirement to utilize minority-owned and women-owned business enterprises (M/WBEs) in the performance of this Contract;
2. The undersigned understands that failure to comply with the requirements of Article X constitutes a material breach of the
Contract;
3. The undersigned certifies that Bidder will submit with his bid the names of M/WBEs that he will utilize in the performance of this
Contract, and the tasks that said M/WBEs will perform and/or the materials they will supply. In the alternative, if the undersigned wishes to have the provisions of Article X waived or modified, the
Contractor shall apply, in writing, to the Commission's Director of
Organizational Diversity ten (10) days prior to bid opening. The undersigned understands that he must demonstrate that he has…