Benchtop Reconfigurable Automatic Tester (BRAT)
Solicitation number
FA8533-25-R-BRAT
Issued by

About this file

This Performance Work Statement (PWS) details repair and calibration requirements for Benchtop Reconfigurable Automatic Test (BRAT) Systems for the Department of the Air Force Materiel Command at Robins Air Force Base. The contract involves repairing and maintaining specific test equipment and modules, with key performance objectives including a 85% on-time delivery requirement for requisitions and maintaining product quality deficiency reports below 5% of delivered assets. The government will provide government-furnished property (GFP), including test equipment and materials, which the contractor must track, maintain, and return in serviceable condition.

The contract covers repair and calibration of specific BRAT system components, including modules like local oscillators, signal generators, RF sections, oscilloscope modules, and various timing and interface modules. Extended repair times are specified for complex components, ranging from 60 to 90 days for specific items. The contractor must use electronic systems like Multi-user ECP Automated Review System (MEARS) for data delivery and comply with specific government protocols for property transfer and reporting. Advanced Testing Technologies Inc. (ATTI) is identified as the original equipment manufacturer with proprietary rights to the technical data.

View the file

Other files

File Type Posted
BRAT - Request for Information (8 Jul 2025).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance-based Work Statement (PWS) Addendum For Benchtop Reconfigurable Automatic Test (BRAT) Systems TRU Repair and Calibration 02 July 2025 Purchase Request: F3QCCL-26-30041 GSA Contract: GS-07F-211AA

Assessment Management. This section describes oversight of Contractor performance.

a. Services Summary:

Performance Objective
Government Services Administration (GSA) Reference
Performance Threshold
Method of Surveillance
Repair Turn Around Time (TAT)
ATTI 2022 GSA Catalog Price List Appendix C page C3, Delivery schedule table, extended repair table
85% of the requisitions in Common Maintenance Activity System (CMAS) shall be delivered on-time for the task order Period of Performance (PoP). Remaining 15% shall be delivered within 20 calendar days of the original delivery date
Surveillance of Trouble Report (TR) activity via email and Contractor reports conducted quarterly by COR(s) and reconciled for CPARS reporting.

Surveillance documented, at a minimum, quarterly by COR(s) in the PAR.

Serviceable Asset
Appendix C page C2, C3
Validated Product Quality Deficiency Reports (PQDRs) shall not exceed 5% of delivered assets for the task order PoP.
Surveillance and validation of QDRs conducted quarterly by COR(s) and reconciled for CPARS reporting.

Surveillance documented, at a minimum, quarterly by COR(s) in the PAR.

b. Government-Furnished Property (GFP):

1. The Government will provide the Contractor the use of the GFP identified in Tables 1 thru Table 3 of this Task Order. By definition, GFP includes both Government-Furnished Equipment (GFE) (end item testers) and Government-Furnished Material (GFM) (repairable and consumable material furnished by the Government). These assets will remain the property of the Government, and ownership will not pass to the Contractor. For this contract, all GFP will be considered to be delivered in serviceable condition with the exception of GFM identified in Table 3. With the exception of the Portable Automatic Test Equipment Calibrator (PATEC) (See PATEC section), the Contractor shall return loaned agency-peculiar property in the same condition (less normal wear and tear) as when received and shall be liable for any expense involved in restoring the property to such condition. The Contractor shall not be required to maintain up to date calibration certificates for any GFM, identified in Table 3, which is not used in the performance of this effort.

1.1 The Contractor shall electronically deliver all contractual data using the Government-controlled method of delivery, Multi-user ECP Automated Review System (MEARS). The contractor shall deliver an inventory report of all GFP items on this contract in accordance with CDRL A001. The Contractor shall work with the government to ensure that an adequate number of Contractor personnel obtain and possess Public Key Infrastructure (PKI) certification from an accepted Government source. The Contractor shall be receptive to the training offered by the Government on the MEARS system. The Contractor shall prepare, maintain, and track the contract data status, schedule and ensure timely data deliveries. An alternate method of deliver when MEARS is down for maintenance will be the DISA application, known as DOD SAFE. It will be available to all DOD Common Access Card (CAC) holders or Contractor personnel whom possess Public Key Infrastructure (PKI) certification from an accepted Government source. (A001, DI-MGMT-80259/T).

2. Transfers of Government loaned property shall be documented by a modification to the gaining contract. The Contractor shall not transfer Government loaned property to gaining contracts without written notification to the Source of Supply-Loan Control Officer (SOS-LCO) and BRAT Program Office (BPO) through the Administrative Contracting Officer (ACO). If it is a physical transfer of property to a location assigned a different Department of Defense Activity Address Code (DoDAAC), the losing Contractor shall furnish a Department of Defense (DD) Form 1149, Requisition and Invoice/Shipping Document, to the SOS-LCO and BPO through the ACO upon transfer transaction.

3. Return of Loaned Property: When the Government loaned property is no longer required for the performance of this contract, the Contractor shall, in writing, immediately request disposition instructions from the SOS-LCO for GFE and BPO for GFM through the ACO. At the end of the loan period, the Contractor shall comply with the disposition instructions provided to the ACO by the SOS-LCO or BPO.

4. Contractor Marking Instructions for Return of Government Loaned Property: The Contractor shall return Government loaned property on a DD Form 1149 or DD 1348, Transportation Control and Movement Document. The Contractor shall use the same document number to return the GFE property as was used during the initial shipment to the Contractor. The Contractor shall annotate the shipping document to indicate “Return From Loan”, Contract Number, and assigned Contract Line Item Number if applicable.

5. The contractor shall inform the Government Integrated Product Team (IPT) Program Manager and Procuring Contracting Officer (PCO) in contractor format of all GFE/GFM BRAT condemnations in contractor format.

2. PATEC Asset Calibration and Repair:

Assets from the PATEC GFE tester (Reference Table 1) or the Government provided replacements shall be maintained in calibrated condition for the duration of this effort, following the process established and followed under contract FA8517-05-C-0006 per the Memorandum of Agreement (MOA) with McGuire Air Force Base (AFB) Precision Measurement Equipment Laboratory (PMEL). For PATEC sustainment/repair issues that may arise, the Contractor shall notify Air Force Metrology and Calibration Program Office AFMETCAL Warner Robins-Air Logistics Center (Attn: Paul Najdowski 740-788-5136) and ATS program Office (Attn: Captain Tyler Davenport 478-222-2252) for resolution. The Government will provide the parts necessary to sustain the PATEC.

Table 1 GFE Test Equipment Provided for Repair and Testing

NSN
P/N
TO
Station Configuration
Qty. Provided
6625-01-495-6672KV
RF405J s/n100 with core R405B-02-03-04-05-06 s/n100
33D7-3-439-1
RF405J
1
6625-01-154-5040
PATECCORE
N/A
PATEC
1

Table 2 Other GFE Equipment Provided for Repair and Testing

Description
Part No.
Manufacturer PN
QTY
High Voltage Assembly (HVA) Interface Test Adapter (ITA)
96648328-30
96648328-30
2

Table 3 GFM (Spares)

Description
Part No.
Manufacturer PN
QTY
BRAT System Controller
07040441-10
07040441-10
1
BRAT Digital Multimeter
07040446-10
07040446-10
1
BRAT Digital Oscilloscope
07040447-10
07040447-10
1
BRAT Arbitrary Function Generator
07040448-10
07040448-10
1
MMS Digitizing Oscilloscope
07040450-10
07040450-10
1
Modular Synthesized Signal Generator
07040308-10
07040308-10
1
Dual/Single Channel Peak Power Meter w/Sensors
07040438-10
07040438-10
1
MMS Spectrum Analyzer
07040442-10
07040442-10
1
BRAT VXI Universal Counter Timer
07040449-10
07040449-10
1
BRAT Synthesized Function/Sweep Generator
07040453-10
07040453-10
1

Table 4 Items Requiring Extended Repair Times

ATTI P/N
Noun
TAT in Days
Self -Test
Calibration Verification
Manual Bench Tests
93000151-01
LOCAL OSCILLATOR
60
X
X
93000156-03
SYNTHESIZED SIGNAL GENERATOR
60
X
X
93000172-01
RF SECTION (100Hz-22GHz)
60
X
X
93000284-01
Digitizing Oscilloscope Module
60
X
X
94000833-01
Frequency Extension Module
60
X
X
94101130-01
Rack Mount Phase Noise

Measurement System

90
X
X
96000001-01
50 MHz Digital Interface Timing Module
90

X

96000001-03
50 MHz Timing/Control Module
90

X

96000002-01
50 MHz Timing/Control Module
90

X

96000007-03
Pattern I/O Module, Multi- Level Voltage
90

X

96000012-01
32 Channel Differential ECL I/O Module
90

X

96000013-01
Timing Module Extension Card (dual)
90

X

96000013-03
Timing Module Extension Card (single)
90

X

96000014-01
High Power Mainframe 6 Slots (Racal)
90

X

96000014-03
High Power Mainframe 13 Slots (Racal)
90

X

96000015-03
Current Sharing Power Supply (Rodelco)
90

X

96000016-01
VXI-MXI-2 Kit
90

X

96000017-01
VXI-MXI-2 Extender
90

X

96000025-01
PCI-MXI-2 Card
90

X

3. Trouble Report Handling:

At the discretion of the designated Government Contracting Officer’s Representative (COR), Trouble Reports (TRs) and TR responses will be electronically transmitted by e-mail and by other means that may include fax transmittal or telephone as appropriate to and from the Contractor.