About this file
This document is a Contract Data Requirements List (CDRL) for Inspection Arms, issued by the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal. The solicitation (W519TC26QA043) requires a contractor to provide detailed documentation for Hexagon Metrology Inspection Arms, including installation and preparation documentation, equipment identification, and pre-shipment testing reports.
Key submission requirements include: 1) Equipment characteristics documentation due 30 calendar days after contract award in Microsoft Excel format, 2) Installation documentation to be submitted electronically 60 days prior to equipment delivery, including drawings and schematics, and 3) A pre-shipment testing report due 10 calendar days before equipment delivery. All documents must be submitted electronically in formats such as PDF, DXF, or Microsoft Word to the Rock Island Arsenal, specifically to Drew Canada at TARA-LGC. The contract opportunity is for purchasing inspection arms in support of the Rock Island Arsenal Joint Manufacturing and Technology Center, with the government reserving the right to award no contract at all.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W519TC26QA043 0001 SF 30.pdf | ||
| RIPD E4000-26-3-12 Inspection Arms (002).docx | DOCX document | |
| Limiting_Competition_Under_250K_MANDATORY_Inspection Arm_signed_Redacted.pdf | ||
| W519TC26QA043.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| DD Form 1423-1, SEP 97 (EG) (Computer Generated) | PREVIOUS EDITIONS ARE OBSOLETE | Page | 1 | of | 17 | Pages |
| A. CONTRACT LINE ITEM NO. |
B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
Inspection Arms
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Equipment Characteristics
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
| a. | ADDRESSEE |
| Draft | |
| Final |
| Reg |
| Repro |
16. REMARKS
The contractor shall provide a copy of this information in either electronic or paper format, no later than 30-calendar-days after award of the contract. The contractor shall provide this information in electronic format using Microsoft Excel format.
The specific data required is:
Identify required info from LMP
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
Rock Island Arsenal
ATTN: TARA-LGC
Drew Canada 2744 Rodman Ave (B220-B-D28) Rock Island, IL 61299-6400
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
Tad D. Larson
H. DATE
04-Nov-2025
I. APPROVED BY
J. DATE
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| DD Form 1423-1, SEP 97 (EG) (Computer Generated) | PREVIOUS EDITIONS ARE OBSOLETE | Page | 2 | of | 17 | Pages |
| A. CONTRACT LINE ITEM NO. |
B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Installation Documentation List
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
| a. | ADDRESSEE |
| Draft | |
| Final |
| Reg |
| Repro |
16. REMARKS
The contractor shall provide a copy of this information in electronic format, a minimum of 60-calendar-days prior to delivery of equipment. The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
A plainly visible cover sheet shall be provided with the Installation and Preparation Documentation package listing drawings and schematics required for installation.
ATTN: TARA-LGC
Drew Canada
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
04-Nov-2025
I. APPROVED BY
J. DATE
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Equipment Identification
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
| a. | ADDRESSEE |
| Draft | |
| Final |
| Reg |
| Repro |
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This document shall consist of the make & model of the equipment with a complete list of standard features, optional features being installed in order to meet the specification, and a list of optional features available for field installation but not included. Each section shall be clearly identified.
Also included will be any technical data or brochures applicable to the equipment being provided.
ATTN: TARA-LGC
Drew Canada 2744 Rodman Ave (B220-B-D28)
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
04-Nov-2025
I. APPROVED BY
J. DATE
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Pre-Shipment Testing Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
SEE BLOCK 16
| a. | ADDRESSEE |
| Draft | |
| Final |
| Reg |
| Repro |
16. REMARKS
The contractor shall provide (1) copy of this information in electronic format no later than 10-calendar-days prior to delivery of the equipment. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
ATTN: TARA-LGC
Drew Canada
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
H. DATE
04-Nov-2025
I. APPROVED BY
J. DATE
File details come from the government source that posted it. Updated .