26-27-09 Attachment 2-Revised Bid Form-2027 Street Rehabilitation and Preservation.xlsx
XLSX spreadsheet 50 KB Posted
- Solicitation number
- 311-26-27-09
- Issued by
- Randolph County, Greensboro City, North Carolina
About this file
2027 Street Rehabilitation and Preservation Project - Revised Bid Form
This revised bid form is submitted by the City of Greenville Engineering and Right of Way Services Department for the 2027 Street Rehabilitation & Preservation Project in Greenville, North Carolina. The project encompasses street rehabilitation and preservation work including cold milling of asphalt pavements, pavement markings, signals, and related infrastructure improvements across multiple street segments within the city. The bid opening date is November 23, 2026, with a base contract time of 120 days. The base bid section includes 39 line items ranging from mobilization and various asphalt concrete courses to concrete curb and gutter installation, wheelchair ramp construction, pavement markings, and traffic control. Ten alternate bids are presented for specific street segments: Treybrooke Circle (5 days additional), E. 3rd Street (6 days), Wyneston Road (6 days), Jamestown Road (5 days), Placid Way (4 days), Darden Drive (7 days), E. 1st Street (7 days), and three micro-surface alternates for Rockport Drive (2 days), Lendire Way (2 days), and Adams Boulevard (3 days). Item quantities vary substantially, with asphalt surface course ranging from 290 to 5,806 tons depending on location, milling quantities from 2,100 to 49,933 square yards, and thermoplastic pavement marking quantities ranging from 68 to 4,575 linear feet across various applications.
The bid form requires bidders to provide unit prices for all line items, with total amounts calculated by multiplying unit prices by scheduled quantities. Currently, all unit price fields display zero dollars, indicating this is a template form requiring contractor completion. Several line items are marked with double asterisks and notes requiring unit price provision for items not included in the base bid, such as specific wheelchair ramp types and specialized markings in alternate bids. No pricing terms, set-asides, or funding source information is specified within the bid form itself. The form includes signature lines for contractor identification, license number, and date of submission, with submission required by the November 23, 2026 bid opening date. Questions regarding the project should be directed to John Paul Harrell, Construction Project Manager I, at 252.329.4887 or jharrell@greenvillenc.gov, and a non-mandatory pre-bid meeting was scheduled for November 5, 2026 at 2:00 p.m. at 1500 Beatty Street, Greenville, North Carolina.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 2027 Street Rehabilitation and Preservation Project
BID OPENING DATE: November 23rd, 2026
The unit prices noted herein shall include installing in place, complete and accepted.
| BASE BID – CONTRACT TIME: 120 DAYS |
| STREET REHABILITATION & PRESERVATION, COLD MILLING OF ASPHALT PAVEMENTS, PAVEMENT MARKINGS/SIGNALS |
| Item | Item | Scheduled | Unit | Unit Price | Amount | ||||||||||||
| No. | Description | Quantities | |||||||||||||||
| 1 | MOBILIZATION (5%) | 1 | LS | $ - 0 | 1 | MOBILIZATION (5%) | 1 | LS | OK | REDO | OK | OK | REDO | ||||
| 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 5,806 | TON | $ - 0 | 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 5,806 | TON | OK | OK | OK | OK | REDO | ||||
| 3 | ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C | 103 | TON | $ - 0 | 3 | ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C | 103 | TON | OK | REDO | OK | OK | REDO | ||||
| 4 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 1,358 | TON | $ - 0 | 4 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 1,358 | TON | OK | OK | OK | OK | REDO | ||||
| 5 | STREET MICRO SURFACING – TYPE II (DOUBLE APPLICATION) | 76,116 | SY | $ - 0 | 5 | STREET MICRO SURFACING – TYPE II (DOUBLE APPLICATION) | 76,116 | SY | OK | OK | OK | OK | REDO | ||||
| 6 | CRACK SEALING | 52,107 | SY | $ - 0 | 6 | CRACK SEALING | 52,107 | SY | OK | OK | OK | OK | REDO | ||||
| 7 | REJUVINATOR | 48,313 | SY | $ - 0 | 7 | REJUVINATOR | 48,313 | SY | OK | OK | OK | OK | REDO | ||||
| 8 | ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES | 14 | EA | $ - 0 | 8 | ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES | 14 | EA | OK | OK | OK | OK | REDO | 11 | |||
| 9 | ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS AND COVER | 25 | EA | $ - 0 | 9 | ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS AND COVER | 25 | EA | OK | OK | OK | OK | REDO | 19 | |||
| 10 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 1,543 | LF | $ - 0 | 0 | 10 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 1,543 | LF | OK | OK | OK | OK | REDO | |||
| 11 | REMOVAL OF EXISTING VALLEY GUTTER | 568 | LF | $ - 0 | 11 | REMOVAL OF EXISTING VALLEY GUTTER | 568 | LF | OK | OK | OK | OK | REDO | ||||
| 12 | 24” CONCRETE CURB AND GUTTER | 1,801 | LF | $ - 0 | 1361 | 12 | 24” CONCRETE CURB AND GUTTER | 1,801 | LF | OK | OK | OK | OK | REDO | 1361 | HC Ramps | |
| 13 | 30” CONCRETE CURB AND GUTTER | 182 | LF | $ - 0 | 13 | 30” CONCRETE CURB AND GUTTER | 182 | LF | OK | OK | OK | OK | REDO | ||||
| 14 | VALLEY GUTTER | 35 | CY | $ - 0 | 14 | VALLEY GUTTER | 35 | CY | OK | OK | OK | OK | REDO | ||||
| 15 | 4” THICK CONCRETE SIDEWALK | 120 | SY | $ - 0 | 0 | 15 | 4” THICK CONCRETE SIDEWALK | 120 | SY | OK | OK | OK | OK | REDO | 0 | HC Ramps | |
| 16 | REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS | 44 | EA | $ - 0 | 44 | 16 | REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS | 44 | EA | OK | OK | OK | OK | REDO | 18 | HC Ramps from Micro | |
| 17 | TYPE 1 MODIFIED CONCRETE WHEELCHAIR RAMP | 33 | EA | $ - 0 | 17 | TYPE 1 MODIFIED CONCRETE WHEELCHAIR RAMP | 33 | EA | OK | OK | OK | OK | REDO | ||||
| 18 | TYPE 3 CONCRETE WHEELCHAIR RAMP | 2 | EA | $ - 0 | 18 | TYPE 3 CONCRETE WHEELCHAIR RAMP | 2 | EA | OK | OK | OK | OK | REDO | ||||
| 19 | TYPE 3 MODIFIED CONCRETE WHEELCHAIR RAMP | 10 | EA | $ - 0 | 19 | TYPE 3 MODIFIED CONCRETE WHEELCHAIR RAMP | 10 | EA | OK | OK | OK | OK | REDO | ||||
| 20 | TYPE 4A CONCRETE WHEELCHAIR RAMP | 1 | EA | $ - 0 | 20 | TYPE 4A CONCRETE WHEELCHAIR RAMP | 1 | EA | OK | OK | OK | OK | REDO | ||||
| 21 | SEEDING AND MULCHING | 287 | SY | $ - 0 | 21 | SEEDING AND MULCHING | 287 | SY | OK | OK | OK | OK | REDO | ||||
| 22 | WORK ZONE TRAFFIC CONTROL | 1 | LS | $ - 0 | 22 | WORK ZONE TRAFFIC CONTROL | 1 | LS | OK | OK | OK | OK | REDO | ||||
| 23 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 49,933 | SY | $ - 0 | 23 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 49,933 | SY | OK | OK | OK | OK | REDO | ||||
| 24 | GEOTEXTILE FOR PAVEMENT STABILIZATION | 751 | SY | $ - 0 | 24 | GEOTEXTILE FOR PAVEMENT STABILIZATION | 751 | SY | OK | OK | OK | OK | REDO | ||||
| 25 | PROOF ROLLING | 29 | HR | $ - 0 | 25 | PROOF ROLLING | 29 | HR | OK | OK | OK | OK | REDO | ||||
| 26 | 4” THERMOPLASTIC WHITE LINE, 120 MILS | 1,070 | LF | $ - 0 | 26 | 4” THERMOPLASTIC WHITE LINE, 120 MILS | 1070 | LF | OK | OK | OK | OK | REDO | ||||
| 27 | 24” THERMOPLASTIC WHITE LINE, 120 MILS | 262 | LF | $ - 0 | 27 | 24” THERMOPLASTIC WHITE LINE, 120 MILS | 262 | LF | OK | OK | OK | OK | REDO | ||||
| 28 | 4” THERMOPLASTIC YELLOW LINE, 120 MILS | 2,704 | LF | $ - 0 | 28 | 4” THERMOPLASTIC YELLOW LINE, 120 MILS | 2704 | LF | OK | OK | OK | OK | REDO | ||||
| 29 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 11 | EA | $ - 0 | 29 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 11 | EA | OK | OK | OK | OK | REDO | ||||
| 30 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS | 1 | EA | $ - 0 | 30 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS | 1 | EA | OK | OK | OK | OK | REDO | 0 | |||
| 30a | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, BIKE SYMBOL | 4 | EA | $ - 0 | 30a | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, BIKE SYMBOL | 4 | EA | OK | OK | OK | OK | REDO | ||||
| 31 | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE | 1,070 | LF | $ - 0 | 31 | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE | 1070 | LF | OK | OK | OK | OK | REDO | ||||
| 32 | TEMPORARY PAINT PAVEMENT MARKING LINES, 24” WHITE | 262 | LF | $ - 0 | 32 | TEMPORARY PAINT PAVEMENT MARKING LINES, 24” WHITE | 262 | LF | OK | OK | OK | OK | REDO | ||||
| 33 | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” YELLOW | 2,704 | LF | $ - 0 | 33 | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” YELLOW | 2704 | LF | OK | OK | OK | OK | REDO | ||||
| 34 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 7 | EA | $ - 0 | 34 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 7 | EA | OK | OK | OK | OK | REDO | ||||
| 35 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS | 1 | EA | $ - 0 | 35 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS | 1 | EA | OK | OK | OK | OK | REDO | 0 | |||
| 35a | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, BIKE SYMBOL | 4 | EA | $ - 0 | 35a | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, BIKE SYMBOL | 4 | EA | OK | OK | OK | OK | REDO | ||||
| 36 | TREE REMOVAL (24"-48") | 3 | EA | $ - 0 | 36 | TREE REMOVAL (24"-48") | 3 | EA | OK | OK | OK | OK | REDO | ||||
| 37 | UNDERCUT (12" DEEP) | 485 | CY | $ - 0 | 37 | UNDERCUT (12" DEEP) | 485 | CY | OK | OK | OK | OK | REDO | 211 | Added from 13" Mill | ||
| 38 | SELECT MATERIAL, CLASS IV | 550 | TON | $ - 0 | 38 | SELECT MATERIAL, CLASS IV | 550 | TON | OK | OK | OK | OK | REDO | 136 | Added from ABC Base | ||
| 39 | CONCRETE DRIVEWAY APRON (6" THICK) | 75 | SY | $ - 0 | 39 | CONCRETE DRIVEWAY APRON (6" THICK) | 75 | SY | OK | OK | OK | OK | REDO |
BASE BID TOTAL: $ - 0
| ALTERNATE BID 1 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 5 DAYS |
| TREYBROOKE CIRCLE - W. 5TH ST. TO W. 5TH ST. |
| Item | Item | Scheduled | Unit | Unit Price | Amount | |||||||||||
| No. | Description | Quantities | ||||||||||||||
| 1 | MOBILIZATION (5%) | 1 | LS | $ - 0 | 1 | MOBILIZATION (5%) | 1 | LS | OK | OK | OK | OK | REDO | |||
| 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 1,048 | TON | $ - 0 | $ - 0 | 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 1,048 | TON | OK | OK | OK | OK | REDO | ||
| 3 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 123 | TON | $ - 0 | $ - 0 | 3 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 123 | TON | OK | OK | OK | OK | REDO | ||
| 4 | ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS AND COVER | 1 | EA | $ - 0 | $ - 0 | 4 | ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS AND COVER | 1 | EA | OK | OK | OK | OK | REDO | ||
| 5 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 78 | LF | $ - 0 | $ - 0 | 5 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 78 | LF | OK | OK | OK | OK | REDO | ||
| 6 | REMOVAL OF EXISTING VALLEY GUTTER | 126 | LF | $ - 0 | $ - 0 | 6 | REMOVAL OF EXISTING VALLEY GUTTER | 126 | LF | OK | OK | OK | OK | REDO | ||
| 7 | 24” CONCRETE CURB AND GUTTER | 98 | LF | $ - 0 | $ - 0 | 7 | 24” CONCRETE CURB AND GUTTER | 98 | LF | OK | OK | OK | OK | REDO | 78 | HC Ramp |
| 8 | VALLEY GUTTER | 7 | CY | $ - 0 | $ - 0 | 8 | VALLEY GUTTER | 7 | CY | OK | OK | OK | OK | REDO | ||
| 9 | SEEDING AND MULCHING | 17 | SY | $ - 0 | $ - 0 | 9 | SEEDING AND MULCHING | 17 | SY | OK | OK | OK | OK | REDO | ||
| 10 | WORK ZONE TRAFFIC CONTROL | 1 | LS | $ - 0 | 10 | WORK ZONE TRAFFIC CONTROL | 1 | LS | OK | OK | OK | OK | REDO | |||
| 11 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 9,527 | SY | $ - 0 | $ - 0 | 11 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 9,527 | SY | OK | OK | OK | OK | REDO | ||
| 12 | PROOF ROLLING | 3 | HR | $ - 0 | $ - 0 | 12 | PROOF ROLLING | 3 | HR | OK | OK | OK | OK | REDO | ||
| 13 | 4” THERMOPLASTIC WHITE LINE, 120 MILS | 68 | LF | $ - 0 | $ - 0 | 13 | 4” THERMOPLASTIC WHITE LINE, 120 MILS | 68 | LF | OK | OK | OK | OK | REDO | ||
| 14 | 24” THERMOPLASTIC WHITE LINE, 120 MILS | 20 | LF | $ - 0 | $ - 0 | 14 | 24” THERMOPLASTIC WHITE LINE, 120 MILS | 20 | LF | OK | OK | OK | OK | REDO | ||
| 15 | 4” THERMOPLASTIC YELLOW LINE, 120 MILS | 136 | LF | $ - 0 | $ - 0 | 15 | 4” THERMOPLASTIC YELLOW LINE, 120 MILS | 136 | LF | OK | OK | OK | OK | REDO | ||
| 16 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 2 | EA | $ - 0 | $ - 0 | 16 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 2 | EA | OK | OK | OK | OK | REDO | ||
| 16a | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS | 2 | EA | $ - 0 | $ - 0 | 16a | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS | 2 | EA | OK | OK | OK | OK | REDO | ||
| 17 | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE | 68 | LF | $ - 0 | $ - 0 | 17 | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE | 68 | LF | OK | OK | OK | OK | REDO | ||
| 18 | TEMPORARY PAINT PAVEMENT MARKING LINES, 24” WHITE | 20 | LF | $ - 0 | $ - 0 | 18 | TEMPORARY PAINT PAVEMENT MARKING LINES, 24” WHITE | 20 | LF | OK | OK | OK | OK | REDO | ||
| 19 | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” YELLOW | 136 | LF | $ - 0 | $ - 0 | 19 | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” YELLOW | 136 | LF | OK | OK | OK | OK | REDO | ||
| 20 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 4 | EA | $ - 0 | $ - 0 | 20 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 4 | EA | OK | OK | OK | OK | REDO |
ALTERNATE BID 1 TOTAL $ - 0
| ALTERNATE BID 2 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 6 DAYS |
| E. 3RD ST. - S. HARDING ST. TO S. MEADE ST. |
| Item | Item | Scheduled | Unit | Unit Price | Amount | |||||||||
| No. | Description | Quantities | ||||||||||||
| 1 | MOBILIZATION (5%) | 1 | LS | $ - 0 | 1 | MOBILIZATION (5%) | 1 | LS | OK | OK | OK | OK | REDO | |
| 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 290 | TON | $ - 0 | $ - 0 | 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 290 | TON | OK | OK | OK | OK | REDO |
| 3 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 158 | TON | $ - 0 | $ - 0 | 3 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 158 | TON | OK | OK | OK | OK | REDO |
| 4 | ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES | 2 | EA | $ - 0 | $ - 0 | 4 | ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES | 2 | EA | OK | OK | OK | OK | REDO |
| 5 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 310 | LF | $ - 0 | $ - 0 | 5 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 310 | LF | OK | OK | OK | OK | REDO |
| 6 | 30” CONCRETE CURB AND GUTTER | 310 | LF | $ - 0 | $ - 0 | 6 | 30” CONCRETE CURB AND GUTTER | 310 | LF | OK | OK | OK | OK | REDO |
| 7 | 4” THICK CONCRETE SIDEWALK | 9 | SY | $ - 0 | $ - 0 | 7 | 4” THICK CONCRETE SIDEWALK | 9 | SY | OK | OK | OK | OK | REDO |
| 8 | REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS | 2 | EA | $ - 0 | $ - 0 | 8 | REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS | 2 | EA | OK | OK | OK | OK | REDO |
| 9 | **TYPE 1A CONCRETE WHEELCHAIR RAMP | 1 | EA | $ - 0 | 9 | **TYPE 1A CONCRETE WHEELCHAIR RAMP | 1 | EA | OK | OK | OK | OK | REDO | |
| 10 | TYPE 3 CONCRETE WHEELCHAIR RAMP | 1 | EA | $ - 0 | $ - 0 | 10 | TYPE 3 CONCRETE WHEELCHAIR RAMP | 1 | EA | OK | OK | OK | OK | REDO |
| 11 | SEEDING AND MULCHING | 69 | SY | $ - 0 | $ - 0 | 11 | SEEDING AND MULCHING | 69 | SY | OK | OK | OK | OK | REDO |
| 12 | WORK ZONE TRAFFIC CONTROL | 1 | LS | $ - 0 | 12 | WORK ZONE TRAFFIC CONTROL | 1 | LS | OK | OK | OK | OK | REDO | |
| 13 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 2,617 | SY | $ - 0 | $ - 0 | 13 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 2,617 | SY | OK | OK | OK | OK | REDO |
| 14 | GEOTEXTILE FOR PAVEMENT STABILIZATION | 384 | SY | $ - 0 | $ - 0 | 14 | GEOTEXTILE FOR PAVEMENT STABILIZATION | 384 | SY | OK | OK | OK | OK | REDO |
| 15 | PROOF ROLLING | 2 | HR | $ - 0 | $ - 0 | 15 | PROOF ROLLING | 2 | HR | OK | OK | OK | OK | REDO |
| 16 | 4” THERMOPLASTIC WHITE LINE, 120 MILS | 100 | LF | $ - 0 | $ - 0 | 16 | 4” THERMOPLASTIC WHITE LINE, 120 MILS | 100 | LF | OK | OK | OK | OK | REDO |
| 16a | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE | 100 | LF | $ - 0 | $ - 0 | 16a | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE | 100 | LF | OK | OK | OK | OK | REDO |
| 17 | TREE REMOVAL (24" - 48") | 4 | EA | $ - 0 | $ - 0 | 17 | TREE REMOVAL (24" - 48") | 4 | EA | OK | OK | OK | OK | REDO |
| 18 | UNDERCUT (12" DEEP) | 130 | CY | $ - 0 | $ - 0 | 18 | UNDERCUT (12" DEEP) | 130 | CY | OK | OK | OK | OK | REDO |
| 19 | SELECT MATERIAL, CLASS IV | 187 | TON | $ - 0 | $ - 0 | 19 | SELECT MATERIAL, CLASS IV | 187 | TON | OK | OK | OK | OK | REDO |
| **Note: Provide unit price as this is not a base bid line item. | ||||||||||||||
| ALTERNATE BID 2 TOTAL | $ - 0 |
| ALTERNATE BID 3 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 6 DAYS |
| WYNESTON RD. - BREMERTON DR. TO BREMERTON DR. |
| Item | Item | Scheduled | Unit | Unit Price | Amount | |||||||||||
| No. | Description | Quantities | ||||||||||||||
| 1 | MOBILIZATION (5%) | 1 | LS | $ - 0 | 1 | MOBILIZATION (5%) | 1 | LS | OK | OK | OK | OK | REDO | |||
| 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 964 | TON | $ - 0 | $ - 0 | 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 964 | TON | OK | OK | OK | OK | REDO | ||
| 3 | ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C | 36 | TON | $ - 0 | $ - 0 | 3 | ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C | 36 | TON | OK | OK | OK | OK | REDO | ||
| 4 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 158 | TON | $ - 0 | $ - 0 | 4 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 158 | TON | OK | OK | OK | OK | REDO | 110 | Combined LI's |
| 5 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 72 | LF | $ - 0 | $ - 0 | 5 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 72 | LF | OK | OK | OK | OK | REDO | ||
| 6 | REMOVAL OF EXISTING VALLEY GUTTER | 12 | LF | $ - 0 | $ - 0 | 6 | REMOVAL OF EXISTING VALLEY GUTTER | 12 | LF | OK | OK | OK | OK | REDO | ||
| 7 | 24” CONCRETE CURB AND GUTTER | 72 | LF | $ - 0 | $ - 0 | 7 | 24” CONCRETE CURB AND GUTTER | 72 | LF | OK | OK | OK | OK | REDO | ||
| 8 | VALLEY GUTTER | 2 | CY | $ - 0 | $ - 0 | 8 | VALLEY GUTTER | 2 | CY | OK | OK | OK | OK | REDO | ||
| 9 | WORK ZONE TRAFFIC CONTROL | 1 | LS | $ - 0 | 9 | WORK ZONE TRAFFIC CONTROL | 1 | LS | OK | OK | OK | OK | REDO | |||
| 10 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 8,800 | SY | $ - 0 | $ - 0 | 10 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 8,800 | SY | OK | OK | OK | OK | REDO | ||
| 11 | PROOF ROLLING | 2 | HR | $ - 0 | $ - 0 | 11 | PROOF ROLLING | 2 | HR | OK | OK | OK | OK | REDO | ||
| 12 | UNDERCUT (12" DEEP) | 72 | CY | $ - 0 | $ - 0 | 12 | UNDERCUT (12" DEEP) | 72 | CY | OK | OK | OK | OK | REDO | ||
| 13 | SELECT MATERIAL, CLASS IV | 34 | TON | $ - 0 | $ - 0 | 13 | SELECT MATERIAL, CLASS IV | 34 | TON | OK | OK | OK | OK | REDO |
ALTERNATE BID 3 TOTAL $ - 0
| ALTERNATE BID 4 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 5 DAYS |
| JAMESTOWN RD. - WILLIAMSBURG DR. TO WESLEY RD. |
| Item | Item | Scheduled | Unit | Unit Price | Amount | |||||||||||
| No. | Description | Quantities | ||||||||||||||
| 1 | MOBILIZATION (5%) | 1 | LS | $ - 0 | 1 | MOBILIZATION (5%) | 1 | LS | OK | OK | OK | OK | REDO | |||
| 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 615 | TON | $ - 0 | $ - 0 | 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 615 | TON | OK | OK | OK | OK | REDO | ||
| 3 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 95 | TON | $ - 0 | $ - 0 | 3 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 95 | TON | OK | OK | OK | OK | REDO | ||
| 4 | ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES | 3 | EA | $ - 0 | $ - 0 | 4 | ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES | 3 | EA | OK | OK | OK | OK | REDO | 1 | Maps |
| 5 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 367 | LF | $ - 0 | $ - 0 | 5 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 367 | LF | OK | OK | OK | OK | REDO | ||
| 6 | 24” CONCRETE CURB AND GUTTER | 367 | LF | $ - 0 | $ - 0 | 6 | 24” CONCRETE CURB AND GUTTER | 367 | LF | OK | OK | OK | OK | REDO | ||
| 7 | SEEDING AND MULCHING | 82 | SY | $ - 0 | $ - 0 | 7 | SEEDING AND MULCHING | 82 | SY | OK | OK | OK | OK | REDO | ||
| 8 | WORK ZONE TRAFFIC CONTROL | 1 | LS | $ - 0 | 8 | WORK ZONE TRAFFIC CONTROL | 1 | LS | OK | OK | OK | OK | REDO | |||
| 9 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 5,555 | SY | $ - 0 | $ - 0 | 9 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 5,555 | SY | OK | OK | OK | OK | REDO | ||
| 10 | PROOF ROLLING | 2 | HR | $ - 0 | $ - 0 | 10 | PROOF ROLLING | 2 | HR | OK | OK | OK | OK | REDO |
ALTERNATE BID 4 TOTAL $ - 0
| ALTERNATE BID 5 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 4 DAYS |
| PLACID WY. - BELVEDERE DR. TO CRESTLINE BLVD. |
| Item | Item | Scheduled | Unit | Unit Price | Amount | |||||||||||
| No. | Description | Quantities | ||||||||||||||
| 1 | MOBILIZATION (5%) | 1 | LS | $ - 0 | 1 | MOBILIZATION (5%) | 1 | LS | OK | OK | OK | OK | REDO | |||
| 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 309 | TON | $ - 0 | $ - 0 | 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 309 | TON | OK | OK | OK | OK | REDO | ||
| 3 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 136 | TON | $ - 0 | $ - 0 | 3 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 136 | TON | OK | OK | OK | OK | REDO | ||
| 4 | ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES | 3 | EA | $ - 0 | $ - 0 | 4 | ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES | 3 | EA | OK | OK | OK | OK | REDO | 1 | Maps |
| 5 | ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS AND COVER | 3 | EA | $ - 0 | $ - 0 | 5 | ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS AND COVER | 3 | EA | OK | OK | OK | OK | REDO | 0 | Maps |
| 6 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 350 | LF | $ - 0 | $ - 0 | 6 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 350 | LF | OK | OK | OK | OK | REDO | ||
| 7 | REMOVAL OF EXISTING VALLEY GUTTER | 47 | LF | $ - 0 | $ - 0 | 7 | REMOVAL OF EXISTING VALLEY GUTTER | 47 | LF | OK | OK | OK | OK | REDO | ||
| 8 | 24” CONCRETE CURB AND GUTTER | 350 | LF | $ - 0 | $ - 0 | 8 | 24” CONCRETE CURB AND GUTTER | 350 | LF | OK | OK | OK | OK | REDO | ||
| 9 | VALLEY GUTTTER | 3 | CY | $ - 0 | $ - 0 | 9 | VALLEY GUTTTER | 3 | CY | OK | OK | OK | OK | REDO | ||
| 10 | SEEDING AND MULCHING | 78 | SY | $ - 0 | $ - 0 | 10 | SEEDING AND MULCHING | 78 | SY | OK | OK | OK | OK | REDO | ||
| 11 | WORK ZONE TRAFFIC CONTROL | 1 | LS | $ - 0 | 11 | WORK ZONE TRAFFIC CONTROL | 1 | LS | OK | OK | OK | OK | REDO | |||
| 12 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH (EDGE MILL) | 2,100 | SY | $ - 0 | $ - 0 | 12 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH (EDGE MILL) | 2,100 | SY | OK | OK | OK | OK | REDO | ||
| 13 | PROOF ROLLING | 2 | HR | $ - 0 | $ - 0 | 13 | PROOF ROLLING | 2 | HR | OK | OK | OK | OK | REDO | ||
| 14 | TREE REMOVAL (24" - 48") | 3 | EA | $ - 0 | $ - 0 | 14 | TREE REMOVAL (24" - 48") | 3 | EA | OK | OK | OK | OK | REDO | 1 | Cluster 201 |
ALTERNATE BID 5 TOTAL $ - 0
| ALTERNATE BID 6 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 7 DAYS |
| DARDEN DR. - W. 3RD ST. TO W. 5TH ST. |
| Item | Item | Scheduled | Unit | Unit Price | Amount | |||||||||||
| No. | Description | Quantities | ||||||||||||||
| 1 | MOBILIZATION (5%) | 1 | LS | $ - 0 | 1 | MOBILIZATION (5%) | 1 | LS | OK | OK | OK | OK | REDO | |||
| 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 664 | TON | $ - 0 | $ - 0 | 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 664 | TON | OK | OK | OK | OK | REDO | ||
| 3 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 144 | TON | $ - 0 | $ - 0 | 3 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 144 | TON | OK | OK | OK | OK | REDO | ||
| 4 | ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES | 2 | EA | $ - 0 | $ - 0 | 4 | ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES | 2 | EA | OK | OK | OK | OK | REDO | ||
| 5 | ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS AND COVER | 2 | EA | $ - 0 | $ - 0 | 5 | ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS AND COVER | 2 | EA | OK | OK | OK | OK | REDO | ||
| 6 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 158 | LF | $ - 0 | $ - 0 | 6 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 158 | LF | OK | OK | OK | OK | REDO | ||
| 7 | 24” CONCRETE CURB AND GUTTER | 258 | LF | $ - 0 | $ - 0 | 7 | 24” CONCRETE CURB AND GUTTER | 258 | LF | OK | OK | OK | OK | REDO | 158 | HC |
| 8 | 4” THICK CONCRETE SIDEWALK | 30 | SY | $ - 0 | $ - 0 | 8 | 4” THICK CONCRETE SIDEWALK | 30 | SY | OK | OK | OK | OK | REDO | 17 | HC |
| 9 | REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS | 7 | EA | $ - 0 | $ - 0 | 9 | REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS | 7 | EA | OK | OK | OK | OK | REDO | 11 | HC |
| 10 | TYPE 3 CONCRETE WHEELCHAIR RAMP | 6 | EA | $ - 0 | $ - 0 | 10 | TYPE 3 CONCRETE WHEELCHAIR RAMP | 6 | EA | OK | OK | OK | OK | REDO | ||
| 11 | TYPE 3M CONCRETE WHEELCHAIR RAMP | 2 | EA | $ - 0 | $ - 0 | 11 | TYPE 3M CONCRETE WHEELCHAIR RAMP | 2 | EA | OK | OK | OK | OK | REDO | ||
| 12 | **TYPE 4 CONCRETE WHEELCHAIR RAMP | 2 | EA | $ - 0 | 12 | **TYPE 4 CONCRETE WHEELCHAIR RAMP | 2 | EA | OK | OK | OK | OK | REDO | |||
| 13 | SEEDING AND MULCHING | 35 | SY | $ - 0 | $ - 0 | 13 | SEEDING AND MULCHING | 35 | SY | OK | OK | OK | OK | REDO | ||
| 14 | WORK ZONE TRAFFIC CONTROL | 1 | LS | $ - 0 | 14 | WORK ZONE TRAFFIC CONTROL | 1 | LS | OK | OK | OK | OK | REDO | |||
| 15 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 5,928 | SY | $ - 0 | $ - 0 | 15 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 5,928 | SY | OK | OK | OK | OK | REDO | ||
| 16 | PROOF ROLLING | 3 | HR | $ - 0 | $ - 0 | 16 | PROOF ROLLING | 3 | HR | OK | OK | OK | OK | REDO | ||
| 17 | **REMOVAL OF EXISTING SPEED HUMPS | 2 | EA | $ - 0 | 17 | **REMOVAL OF EXISTING SPEED HUMPS | 2 | EA | OK | OK | OK | OK | REDO | |||
| **Note: Provide unit price as this is not a base bid line item. | ||||||||||||||||
| ALTERNATE BID 6 TOTAL | $ - 0 |
| ALTERNATE BID 7 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 7 DAYS |
| E. 1ST ST. - COTANCHE ST. TO SUMMIT ST. |
| Item | Item | Scheduled | Unit | Unit Price | Amount | |||||||||||
| No. | Description | Quantities | ||||||||||||||
| 1 | MOBILIZATION (5%) | 1 | LS | $ - 0 | 1 | MOBILIZATION (5%) | 1 | LS | OK | OK | OK | OK | REDO | |||
| 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 1,010 | TON | $ - 0 | $ - 0 | 2 | ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B | 1,010 | TON | OK | OK | OK | OK | REDO | ||
| 3 | ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C | 394 | TON | $ - 0 | $ - 0 | 3 | ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C | 394 | TON | OK | OK | OK | OK | REDO | ||
| 4 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 619 | TON | $ - 0 | $ - 0 | 4 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 619 | TON | OK | OK | OK | OK | REDO | ||
| 5 | ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES | 10 | EA | $ - 0 | $ - 0 | 5 | ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES | 10 | EA | OK | OK | OK | OK | REDO | ||
| 6 | ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS AND COVER | 6 | EA | $ - 0 | $ - 0 | 6 | ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS AND COVER | 6 | EA | OK | OK | OK | OK | REDO | ||
| 7 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 173 | LF | $ - 0 | $ - 0 | 7 | REMOVAL OF EXISTING CONCRETE CURB AND GUTTER | 173 | LF | OK | OK | OK | OK | REDO | ||
| 8 | REMOVAL OF EXISTING VALLEY GUTTER | 85 | LF | $ - 0 | $ - 0 | 8 | REMOVAL OF EXISTING VALLEY GUTTER | 85 | LF | OK | OK | OK | OK | REDO | ||
| 9 | 30” CONCRETE CURB AND GUTTER | 200 | LF | $ - 0 | $ - 0 | 9 | 30” CONCRETE CURB AND GUTTER | 200 | LF | OK | OK | OK | OK | REDO | 30 | HC |
| 10 | VALLEY GUTTTER | 5 | CY | $ - 0 | $ - 0 | 10 | VALLEY GUTTTER | 5 | CY | OK | OK | OK | OK | REDO | ||
| 11 | 4” THICK CONCRETE SIDEWALK | 11 | SY | $ - 0 | $ - 0 | 11 | 4” THICK CONCRETE SIDEWALK | 11 | SY | OK | OK | OK | OK | REDO | 0 | HC |
| 12 | REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS | 4 | EA | $ - 0 | $ - 0 | 12 | REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS | 4 | EA | OK | OK | OK | OK | REDO | 6 | HC |
| 13 | **TYPE 1 CONCRETE WHEELCHAIR RAMP | 1 | EA | $ - 0 | 13 | **TYPE 1 CONCRETE WHEELCHAIR RAMP | 1 | EA | OK | OK | OK | OK | REDO | |||
| 14 | TYPE 1 MODIFIED CONCRETE WHEELCHAIR RAMP | 1 | EA | $ - 0 | $ - 0 | 14 | TYPE 1 MODIFIED CONCRETE WHEELCHAIR RAMP | 1 | EA | OK | OK | OK | OK | REDO | ||
| 15 | TYPE 3 CONCRETE WHEELCHAIR RAMP | 1 | EA | $ - 0 | $ - 0 | 15 | TYPE 3 CONCRETE WHEELCHAIR RAMP | 1 | EA | OK | OK | OK | OK | REDO | ||
| 16 | **TYPE 5A CONCRETE WHEELCHAIR RAMP | 1 | EA | $ - 0 | 16 | **TYPE 5A CONCRETE WHEELCHAIR RAMP | 1 | EA | OK | OK | OK | OK | REDO | |||
| 17 | WORK ZONE TRAFFIC CONTROL | 1 | LS | $ - 0 | 17 | WORK ZONE TRAFFIC CONTROL | 1 | LS | OK | OK | OK | OK | REDO | |||
| 18 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 5,600 | SY | $ - 0 | $ - 0 | 18 | MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH | 5,600 | SY | OK | OK | OK | OK | REDO | ||
| 19 | GEOTEXTILE FOR PAVEMENT STABILIZATION | 2,300 | SY | $ - 0 | $ - 0 | 19 | GEOTEXTILE FOR PAVEMENT STABILIZATION | 2,300 | SY | OK | OK | OK | OK | REDO | ||
| 20 | PROOF ROLLING | 3 | HR | $ - 0 | $ - 0 | 20 | PROOF ROLLING | 3 | HR | OK | OK | OK | OK | REDO | ||
| 21 | UNDERCUT (12" DEEP) | 770 | CY | $ - 0 | $ - 0 | 21 | UNDERCUT (12" DEEP) | 770 | CY | OK | OK | OK | OK | REDO | ||
| 22 | SELECT MATERIAL, CLASS IV | 500 | TON | $ - 0 | $ - 0 | 22 | SELECT MATERIAL, CLASS IV | 500 | TON | OK | OK | OK | OK | REDO | ||
| 23 | **6" PORTLAND CEMENT CONCRETE PAVEMENT, MISC. (W/O DOWESL) | 21 | SY | $ - 0 | 23 | **6" PORTLAND CEMENT CONCRETE PAVEMENT, MISC. (W/O DOWESL) | 21 | SY | OK | OK | OK | OK | REDO | |||
| 24 | 4” THERMOPLASTIC WHITE LINE, 120 MILS | 4,575 | LF | $ - 0 | $ - 0 | 24 | 4” THERMOPLASTIC WHITE LINE, 120 MILS | 4575 | LF | OK | OK | OK | OK | REDO | ||
| 25 | **12” THERMOPLASTIC WHITE LINE, 120 MILS | 110 | LF | $ - 0 | 25 | **12” THERMOPLASTIC WHITE LINE, 120 MILS | 110 | LF | OK | OK | OK | OK | REDO | |||
| 26 | 24” THERMOPLASTIC WHITE LINE, 120 MILS | 100 | LF | $ - 0 | $ - 0 | 26 | 24” THERMOPLASTIC WHITE LINE, 120 MILS | 100 | LF | OK | OK | OK | OK | REDO | ||
| 27 | 4” THERMOPLASTIC YELLOW LINE, 120 MILS | 5,000 | LF | $ - 0 | $ - 0 | 27 | 4” THERMOPLASTIC YELLOW LINE, 120 MILS | 5000 | LF | OK | OK | OK | OK | REDO | ||
| 28 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 2 | EA | $ - 0 | $ - 0 | 28 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 2 | EA | OK | OK | OK | OK | REDO | ||
| 29 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, BIKE SYMBOL | 10 | EA | $ - 0 | $ - 0 | 29 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, BIKE SYMBOL | 10 | EA | OK | OK | OK | OK | REDO | ||
| 30 | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE | 4,575 | LF | $ - 0 | $ - 0 | 30 | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE | 4575 | LF | OK | OK | OK | OK | REDO | ||
| 31 | **TEMPORARY PAINT PAVEMENT MARKING LINES, 12” WHITE | 110 | LF | $ - 0 | 31 | **TEMPORARY PAINT PAVEMENT MARKING LINES, 12” WHITE | 110 | LF | OK | OK | OK | OK | REDO | |||
| 32 | TEMPORARY PAINT PAVEMENT MARKING LINES, 24” WHITE | 100 | LF | $ - 0 | $ - 0 | 32 | TEMPORARY PAINT PAVEMENT MARKING LINES, 24” WHITE | 100 | LF | OK | OK | OK | OK | REDO | ||
| 33 | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” YELLOW | 5,000 | LF | $ - 0 | $ - 0 | 33 | TEMPORARY PAINT PAVEMENT MARKING LINES, 4” YELLOW | 5000 | LF | OK | OK | OK | OK | REDO | ||
| 34 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 2 | EA | $ - 0 | $ - 0 | 34 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 2 | EA | OK | OK | OK | OK | REDO | ||
| 35 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, BIKE SYMBOL | 10 | EA | $ - 0 | $ - 0 | 35 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, BIKE SYMBOL | 10 | EA | OK | OK | OK | OK | REDO | ||
| **Note: Provide unit price as this is not a base bid line item. | Add Unit Price Description. Need maps of the specific areas. | |||||||||||||||
| ALTERNATE BID 7 TOTAL | $ - 0 |
| ALTERNATE BID 8 (MICRO-SURFACE) – ADDITIONAL CONTRACT TIME: 2 DAYS |
| ROCKPORT DR. - ALLEN RD. TO STREET END. |
| Item | Item | Scheduled | Unit | Unit Price | Amount | |||||||||
| No. | Description | Quantities | ||||||||||||
| 1 | MOBILIZATION (5%) | 1 | LS | $ - 0 | 1 | MOBILIZATION (5%) | 1 | LS | OK | OK | OK | OK | REDO | |
| 2 | STREET MICRO-SURFACING - TYPE II (DOUBLE APPLICATION) | 1,508 | SY | $ - 0 | $ - 0 | 2 | STREET MICRO-SURFACING - TYPE II (DOUBLE APPLICATION) | 1,508 | SY | OK | OK | OK | OK | REDO |
| 3 | 24” CONCRETE CURB AND GUTTER | 20 | LF | $ - 0 | $ - 0 | 3 | 24” CONCRETE CURB AND GUTTER | 20 | LF | OK | OK | OK | OK | REDO |
| 4 | 4” THICK CONCRETE SIDEWALK | 5.5 | SY | $ - 0 | $ - 0 | 4 | 4” THICK CONCRETE SIDEWALK | 5.5 | SY | OK | OK | OK | OK | REDO |
| 5 | REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS | 2 | EA | $ - 0 | $ - 0 | 5 | REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS | 2 | EA | OK | OK | OK | OK | REDO |
| 6 | TYPE 1 MODIFIED CONCRETE WHEELCHAIR RAMP | 2 | EA | $ - 0 | $ - 0 | 6 | TYPE 1 MODIFIED CONCRETE WHEELCHAIR RAMP | 2 | EA | OK | OK | OK | OK | REDO |
| 7 | WORK ZONE TRAFFIC CONTROL | 1 | LS | $ - 0 | 7 | WORK ZONE TRAFFIC CONTROL | 1 | LS | OK | OK | OK | OK | REDO |
ALTERNATE BID 8 (MICRO) TOTAL $ - 0
| ALTERNATE BID 9 (MICRO-SURFACE) – ADDITIONAL CONTRACT TIME: 2 DAYS |
| LENDIRE WY. - ROCKPORT DR. TO STREET END. |
| Item | Item | Scheduled | Unit | Unit Price | Amount | |||||||||
| No. | Description | Quantities | ||||||||||||
| 1 | MOBILIZATION (5%) | 1 | LS | $ - 0 | 1 | MOBILIZATION (5%) | 1 | LS | OK | OK | OK | OK | REDO | |
| 2 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 1.5 | TON | $ - 0 | $ - 0 | 2 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 1.5 | TON | OK | OK | OK | OK | REDO |
| 3 | STREET MICRO-SURFACING - TYPE II (DOUBLE APPLICATION) | 300 | SY | $ - 0 | $ - 0 | 3 | STREET MICRO-SURFACING - TYPE II (DOUBLE APPLICATION) | 300 | SY | OK | OK | OK | OK | REDO |
| 4 | WORK ZONE TRAFFIC CONTROL | 1 | LS | $ - 0 | 4 | WORK ZONE TRAFFIC CONTROL | 1 | LS | OK | OK | OK | OK | REDO |
ALTERNATE BID 9 (MICRO) TOTAL $ - 0
| ALTERNATE BID 10 (MICRO-SURFACE) – ADDITIONAL CONTRACT TIME: 3 DAYS |
| ADAMS BLVD. - LAURA LN. TO SE. GREENVILLE BLVD. |
| Item | Item | Scheduled | Unit | Unit Price | Amount | |||||||||
| No. | Description | Quantities | ||||||||||||
| 1 | MOBILIZATION (5%) | 1 | LS | $ - 0 | 1 | MOBILIZATION (5%) | 1 | LS | OK | OK | OK | OK | REDO | |
| 2 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 3 | TON | $ - 0 | $ - 0 | 2 | ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 | 3 | TON | OK | OK | OK | OK | REDO |
| 3 | STREET MICRO-SURFACING - TYPE II (DOUBLE APPLICATION) | 3,032 | SY | $ - 0 | $ - 0 | 3 | STREET MICRO-SURFACING - TYPE II (DOUBLE APPLICATION) | 3,032 | SY | OK | OK | OK | OK | REDO |
| 4 | WORK ZONE TRAFFIC CONTROL | 1 | LS | $ - 0 | 4 | WORK ZONE TRAFFIC CONTROL | 1 | LS | OK | OK | OK | OK | REDO | |
| 5 | 4” THERMOPLASTIC WHITE LINE, 120 MILS | 81 | LF | $ - 0 | $ - 0 | 5 | 4” THERMOPLASTIC WHITE LINE, 120 MILS | 81 | LF | OK | OK | OK | OK | REDO |
| 6 | 24” THERMOPLASTIC WHITE LINE, 120 MILS | 20 | LF | $ - 0 | $ - 0 | 6 | 24” THERMOPLASTIC WHITE LINE, 120 MILS | 20 | LF | OK | OK | OK | OK | REDO |
| 7 | 4” THERMOPLASTIC YELLOW LINE, 120 MILS | 290 | LF | $ - 0 | $ - 0 | 7 | 4” THERMOPLASTIC YELLOW LINE, 120 MILS | 290 | LF | OK | OK | OK | OK | REDO |
| 8 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 2 | EA | $ - 0 | $ - 0 | 8 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 2 | EA | OK | OK | OK | OK | REDO |
| 9 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS | 2 | EA | $ - 0 | $ - 0 | 9 | THERMOPLASTIC PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS | 2 | EA | OK | OK | OK | OK | REDO |
| 10 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 2 | EA | $ - 0 | $ - 0 | 10 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN) | 2 | EA | OK | OK | OK | OK | REDO |
| 11 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS | 2 | EA | $ - 0 | $ - 0 | 11 | TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS | 2 | EA | OK | OK | OK | OK | REDO |
ALTERNATE BID 10 (MICRO) TOTAL $ - 0
| CONTRACTOR: _______________________________________ |
| LICENSE: _______________________________________ |
| SIGNATURE: _____________________________________ |
| DATE: __________________________________________ |