File Summary: Addendum #1 to 2027 Street Rehabilitation and Preservation Project
This addendum modifies the bid documents for the 2027 Street Rehabilitation and Preservation Project issued by the City of Greenville Engineering and Right of Way Services Department in North Carolina. The project encompasses street rehabilitation work including full and edge milling of approximately 52,663 square yards of existing asphalt pavement, placement of approximately 5,806 tons of Asphalt Concrete Surface Course Type S 9.5B, 103 tons of Asphalt Concrete Intermediate Course Type I19.0C, 1,358 tons of asphalt concrete base repairs and patching, ADA improvements, curb and gutter repairs, and utility adjustments. Street preservation work includes micro surfacing of 76,116 square yards, rejuvenation of 48,313 square yards, and crack sealing of 52,107 square yards. The project also includes thermoplastic and temporary pavement markings and tree removal. The base bid contract time is 120 calendar days with potential additional contract time ranging from 2 to 7 days depending on awarded alternates. Bid opening date is November 23, 2026, at 2:00 p.m., with an anticipated Notice to Proceed in mid to late March. The pre-bid meeting was held November 5, 2026, with a question submission deadline of November 13, 2026.
The addendum clarifies that 2024 NCDOT Standard Design and Detail specifications will apply with specific exceptions, working hours are 8:00 a.m. to 5:00 p.m. Monday through Friday unless approved otherwise, and 4" base patching applies to all identified streets. Contractors must provide date and time-stamped photographs of "No Parking" signs posted 48 hours in advance of work. No adjustments are permitted for asphalt binder or fuel costs. The addendum provides revised bid quantities for line items including milling, thermoplastic markings, and temporary paint markings for the base bid and ten alternate bids. No minority, women-owned, or disadvantaged business set-asides are required. A 5 percent bid bond is required, along with performance and payment bonds. Contract award will be made to the lowest responsive, responsible bidder based on the base bid total, with additional alternates awarded if funds remain after base bid completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-27-09 Rehabilitation_Preservation_Contract.pdf | ||
| 26-27-09 Attachment 2-Revised Bid Form-2027 Street Rehabilitation and Preservation.xlsx | XLSX spreadsheet | |
| 26-27-09 Bid Form-2027 Street Rehabilitation and Preservation.XLSX | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
To: All Interested Bidders and Plan Holders
From: JP Harrell, Construction Project Manager I
RE: 2027 Street Rehabilitation and Preservation Project, ENG-2027-001 Addendum #1
Date: November 18, 2026
The following items clarify, add to, delete from and/or otherwise change and supersede information previously issued to you in the Bid Documents for the above-referenced project. As such, said items shall be considered part of the contract and receipt of this addendum shall be acknowledged appropriately in the bid package. Please review the following items carefully and adjust your proposal accordingly.
• Pre-Bid Minutes/Clarifications/Follow-up:
1. Pre-bid minutes and any requests for information at the Pre-Bid Meeting have been included below in
Attachment 1. 11/13/2026 was the cut-off date for submitted questions after the Pre-Bid Meeting.
2. City of Greenville clarified that the 2024 NCDOT Standard Design and Detail will be used for this contract, excepting the following:
Line Item 2, Asphalt Concrete Surface Course, Type S9.5B will be placed in one 2” lift.
There will be no adjustments for Asphalt Binder for Plant Mix or fuel in this contract.
3. Working hours were identified as 8:00 am – 5:00 pm, Monday – Friday. Any work outside of this time frame requires approval by the Engineering and Right of Way Services Department.
4. 4” Base Patching applies to all streets as identified in the contract and/or Addendum #1.
5. Clarification was given that the contractor is required to provide date/time stamped pictures of all “NO
PARKING SIGNS” posted 48 hours in advance of intended work starting.
6. All areas that require 4” Base Patching on Micro-Surfacing Streets, will be marked by City of Greenville
Staff.
7. If funds remain in the contract after awarded work is complete, City may add the work of some or all
Alternates as funds allow.
• Changes/Additions to Bid List and Specifications:
1. Changes to the Base Bid are as follows. See revised Bid Form in Attachment 2
a. Make the following updates in the “Schedule of Quantities For Bid” table below:
Item Item Scheduled Unit Unit Price Amount No. Description Quantities
23 MILLING ASPHALT PAVEMENT, 1” TO 3”
DEPTH
52,663
49,933 SY
2027 Street Rehabilitation and Preservation Project, ENG-2027-001 - Addendum #1 November 18, 2026
26 4” THERMOPLASTIC WHITE LINE, 120
MILS
1,070 LF
27 24” THERMOPLASTIC WHITE LINE, 120
MILS
262 LF
28 4” THERMOPLASTIC YELLOW LINE, 120
MILS
2,704 LF
THERMOPLASTIC PAVEMENT MARKING
SYMBOLS, ARROWS (STRAIGHT OR
TURN)
11 EA
30a THERMOPLASTIC PAVEMENT MARKING
SYMBOLS, BIKE SYMBOL 4 EA
31 TEMPORARY PAINT PAVEMENT
MARKING LINES, 4” WHITE
1,070 LF
32 TEMPORARY PAINT PAVEMENT
MARKING LINES, 24” WHITE
262 LF
33 TEMPORARY PAINT PAVEMENT
MARKING LINES, 4” YELLOW
2,704 LF
TEMPORARY PAINT PAVEMENT
MARKING SYMBOLS, ARROWS
(STRAIGHT OR TURN)
7 EA
35a TEMPORARY PAINT PAVEMENT
MARKING SYMBOLS, BIKE SYMBOL 4 EA
2. Changes to the Alternate Bids are as follows:
a. Make the following changes to ““Alternate Bid 1-Treybrooke Circle”:
Line Item (THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN), unit will change from 4 EA to 2 EA.
Add Line Item (THERMOPLASTIC PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS) quantity will be 2 EA.
b. Make the following changes to “Alternate Bid 2-E. 3rd Street”:
Line Item (4” THERMOPLASTIC WHITE LINE, 120 MILS), unit will change from 75 LF to
100 LF.
Add Line Item (TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE) quantity will be 100 LF.
c. Make the following changes to ““Alternate Bid 7-E. 1st Street”:
Add Line Item (4” THERMOPLASTIC WHITE LINE, 120 MILS) quantity will be 4,575 LF.
Add Line Item (12” THERMOPLASTIC WHITE LINE, 120 MILS) quantity will be 110 LF.
Add Line Item (24” THERMOPLASTIC WHITE LINE, 120 MILS) quantity will be 100 LF.
Add Line Item (4” THERMOPLASTIC YELLOW LINE, 120 MILS) quantity will be 5,000 LF.
Add Line Item (THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS
(STRAIGHT OR TURN) quantity will be 2 EA.
November 18, 2026
Add Line Item (THERMOPLASTIC PAVEMENT MARKING SYMBOLS, BIKE SYMBOL) quantity will be 10 EA.
Add Line Item (TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE) quantity will be 4,575 LF.
Add Line Item (TEMPORARY PAINT PAVEMENT MARKING LINES, 12” WHITE) quantity will be 110 LF.
Add Line Item (TEMPORARY PAINT PAVEMENT MARKING LINES, 24” WHITE) quantity will be 100 LF.
Add Line Item (TEMPORARY PAINT PAVEMENT MARKING LINES, 4” YELLOW) quantity will be 5,000 LF.
Add Line Item (TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR TURN)) quantity will be 2 EA.
Add Line Item (TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, BIKE SYMBOL) quantity will be 10 EA.
d. Make the following changes to ““Alternate Bid 10-Adams Blvd.”:
Line Item (THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT
OR TURN), unit will change from 4 EA to 2 EA.
Add Line Item (THERMOPLASTIC PAVEMENT MARKING SYMBOLS, COMBINATION
ARROWS) quantity will be 2 EA.
Add Line Item (TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS
(STRAIGHT OR TURN) quantity will be 2 EA.
Add Line Item (TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS) quantity will be 2 EA.
3. Make the following updates to the “Street Listing/Estimates for Asphalt and Milling-Base Bid” table:
STREET LISTING/ESTIMATES FOR ASPHALT AND MILLLING – BASE BID
*Streets marked by asterisk will be milled with 7’ Edge Milling
Street Name From To Milling (SY) Estimated 4” Base Repair (Tons)
Resurfacing (Tons)
Thickness (inches)
COMPTON
RD.
STREET
END
PH. LINE E. OF
SALEM ST.
PH. LINE S. OF
SALEM ST.
6,100 3,370 50 371 2
• Request for Additional Information:
1. Questions From Bidders:
a. Q: Do the speed cushions need to be removed and replaced on the roads that are having micro surface and rejuvenator applied? If so, is this incidental or will there be a pay items for this?
A: No. Speed cushions can remain in place for both of these operations.
November 18, 2026
b. Q: Alt #3-Wyneston will there be a pay item for the removal and replacement of the speed cushions or will this be incidental?
A: No. At this time, either City forces or a separate contractor will handle removing and replacing the existing speed cushions.
c. Q: Alt 6- is the curb removal and replacement quantity correct, removal is 158 LF and replacement is 258
LF.
A: Yes. The quantity difference is primarily due to converting existing curb ramp wipe-downs into new curb and gutter (C/G) sections. When an existing wheelchair ramp is removed, any associated curb wipe-downs are included in the ramp removal. If the proposed NCDOT directional ramp does not require those wipe-downs, new 24-inch C/G must be installed where they previously existed and will be paid for separately by the linear foot.
d. Q: Which base bid streets will I190.0C be used?
A: Estimated base bid quantities for I19.0C are as follows: Maryland Drive – 66 Tons; Kent Road
– 37 Tons. Lift depth is 3”.
Any questions regarding this Addendum should be directed to JP Harrell at 252-329-4887 or email at jharrell@greenvillenc.gov.
ec: Lisa Kirby, PE, Director of Engineering Lynn Raynor, PE, Civil Engineer III
Attachment 1
To: Pre-Bid Conference Attendees and Plan Holders
From: J.P. Harrell City of Greenville Engineering Department
Subject: 2027 Street Rehabilitation and Preservation Project, Pre-bid Minutes
Date: November 6, 2026
On Thursday, November 5, 2026, at 2:00 p.m., a Pre-bid conference for the referenced project was held in the main conference room at 1500 Beatty Street Greenville NC, 27834. Those in attendance were as follows:
Rodney Cole – ST Wooten Jacob Thomaston – Fred Smith Company Ryan Holton – Barnhill Contracting Emma Elliot – Browe Construction Justin Petteway – Garris Grading and Paving Lynn Raynor – COG JP Harrell – COG
MEETING ITEMS:
1. Welcome
a. Attendance Sheet
b. Pre-bid conference not mandatory
c. Introduction
2. Legal Requirements
a. Bonds/Insurance Certificates – Bid Bond, Payment/Performance Bonds/Insurance Certificate
b. 5% Bid Bond Required submittal with Bid
c. No MWBE Requirements
3. Project Data
a. The Street Rehabilitation work will consist of full & edge milling of approximately 52,663 square yards of existing asphalt pavement, placing approximately 5,806 tons of Asphalt Concrete Surface Course, Type S 9.5B, 103 tons of Asphalt Concrete Intermediate Course, Type I19.0C, 1,358 tons of Asphalt Concrete Base repairs/patching, ADA improvements, curb and gutter repairs, and making necessary adjustments to valves and manholes. The Street Preservation work will consist of Micro Surfacing 76,116 square yards, Rejuvenating 48,313 square yards, and Crack Sealing 52,107 square yards of City of Greenville roads. The Project also includes the placement of thermoplastic & temporary pavement markings on several streets as well as tree removal. The Contractor will install improvements on City of Greenville and will be subject to NCDOT associated standards and specifications. Base Bid Contract Time will be 120 days.
b. Liquidated Damages - $1,400/day.
c. Bid Form – per Instructions to Bidders, paragraph 12.3, all Line Items with the same description in either the Base Bid or any Alternates must use the same unit price in all instances. Work Zone Traffic Control and Mobilization will be the only exception to this requirement.
d. Contract Award – Lowest responsive responsible bidder based on the Base Bid Total.
Lowest bidder will be required to provide references and financial records, which the City will check prior to moving forward with award. See page IB-1, paragraph (3) in the Instructions to Bidders. Award of Alternates, if any, will be based upon available budget
e. Contract Completion Time is as follows:
Base Bid – 120 Calendar Days Total Contract Completion Time will be dependent upon if alternates are awarded. Please note 30 days will be added from contract completion date for punchlist items.
Potential Additional Contract Completion Time (if awarded)
1. Alternate Bid 1 – 5 Calendar Days
2. Alternate Bid 2 – 6 Calendar Days
3. Alternate Bid 3 – 6 Calendar Days
4. Alternate Bid 4 – 5 Calendar Days
5. Alternate Bid 5 – 4 Calendar Days
6. Alternate Bid 6 – 7 Calendar Days
7. Alternate Bid 7 – 7 Calendar Days
8. Alternate Bid 8 – 2 Calendar Days
9. Alternate Bid 9 – 2 Calendar Days
10. Alternate Bid 10 – 3 Calendar Days
f. Contractor is responsible for any necessary surveying, including documentation of existing pavement markings prior to obliteration
g. Working Hours:
Normal Working Hours are 8am-5pm. Bidders should bid the project for all work to be completed during these times due to the proximity to residences, except as noted below.
Must get Engineers approval for any time outside of normal working hours & days.
Engineer will have the ability to change working hours depending on location of work and/or any special circumstances.
h. Asphalt Concrete Base Repairs/Patching – Some areas will be marked/repaired prior to preservation treatments; some will be assessed after being milled and/or proof rolled.
i. Micro Paving:
Will be Type II – Double Application 4” Base Patching – Fifteen (15) streets require base patching prior to micro surface operations.
Crack Seal – Fourteen (14) streets require crack sealing prior to micro surface operations.
Milling – Any thermoplastic on roads will need to be milled prior to micro surface being applied. This work will be incidental to the contract work.
j. PSP - 1: Locations to be Resurfaced Before July 31st
Reference table located in the Project Special Provisions. This includes all associated work.
Includes one (1) Mill and Fill location.
All Micro Surface Locations.
All Crack Seal Locations.
k. PSP – 2: On-Street Parking Contractor is required to provide pictures with date/time stamp minimum 48 hours ahead of intended work. These pictures are required proof for any necessary towing.
Parking Enforcement uses a free phone app that date/time stamps said pictures.
See PSP for further information on required locations of signs.
Contact the City of Greenville for contractor parking passes for streets that have permitted on street parking.
l. PSP – 3: Traffic Control
The Contractor at the pre-construction conference shall submit a complete Traffic Control Plan for each multi-lane street being resurfaced, milled or striped.
Failure to provide, implement and maintain the approved Traffic Control Plan as described above will result in an immediate verbal “Stop Work” order from the Director of Engineering and Right of Way Services or designee with no work continuing until necessary corrective measures have been performed.
Traffic Control – reasonable access to residences and businesses must be maintained. Contractor will be required to provide traffic control plan/construction phasing for each street being resurfaced at the time of the pre-construction meeting.
m. PSP – 6: Work Schedule For daytime operations, any placement of asphalt not started prior to 1:00 PM shall be suspended for the day. The intention of this PSP is to limit joints and to ensure that paving on a given street is completed the same day within Normal Working Hours.
Scheduled daily operations canceled by the CONTRACTOR and/or their subcontractor, resulting in overstaffing by the contract inspection firm, will be at the expense of the CONTRACTOR and deducted from the next pay application at the loaded hourly rate which is anticipated to range from $125 to $150 per hour for each Inspector. Weather related delays or cancelations will be exempt from this stipulation. Deviations from the agreed schedule will require re-notification of the public.
n. PSP – 7: Public Relations Contractor shall place “door knockers” at affected residences and businesses at least 24 hours in advance of paving operations.
City of Greenville will provide “door knocker” templates with QR Codes for the given construction operation (mill/fill, crack seal, micro, and rejuvenator)
Door knockers shall not be placed inside of mailboxes per the United States Postal Service.
o. PSP – 10: Casting Adjustments A 10’ straightedge shall be placed across all castings by the Contractor parallel to and perpendicular to the centerline of the final surface course after finish rolling has been completed. Any casting which exceeds 1/8” (one eighth inch) variation from the surface being tested from the edge of the 10’ straightedge to any one or more contact points of the adjusted casting shall be reset to finished grade by the Contractor at no cost to the City.
New castings required from GUC for MH’s and valves unless specified on the map that existing castings can be utilized.
p. PSP – 11: Mix Design and Job Mix Formula If Recycled Asphalt Pavement (RAP) and Recycled Asphalt Shingles (RAS) is to be proposed as part of the mix, the Contractor is allowed to use up to a maximum of 15% (RAP) and (RAS) by weight of the total recycled mixture and must comply with Article 610-3 of the North Carolina Department of Transportation Standard Specifications for Roads and Structures.
No adjustments for Asphalt Binder or fuel in this contract.
q. PSP 14 - Pavement Markings
For all multi-lane facilities, at the end of each day’s operation the contractor shall provide temporary paint pavement markings to facilitate normal traffic operations after milling or Rehabilitation & Preservation has obliterated existing markings.
This work shall be paid according to the bid form temporary paint line items.
r. PSP 26 – Pedestrian Detours Prior to shutting down sidewalks, contractor shall provide a pedestrian detour plan which shall be reviewed and approved by City of Greenville Traffic Division. A minimum of one week review time is required.
s. An addendum will be sent out with pre-bid minutes and any requests for information received.
11/13/2026 will be cut off date for submittal of questions. An addendum will be sent out by November 18, 2026, with all questions answered.
t. Bid date – Monday, November 23, 2026, at 2:00 PM, 1500 Beatty St. Be sure to include all required documents with bids. (Bid Form, Bid Security, Non-Collusion Affidavit, etc.)
u. The anticipated NTP for the subject project will be set around mid to late March.
4. Contact – JP Harrell, Construction Project Manager I, 252-329-4887, JHarrell@greenvillenc.gov Wanda House, Financial Services Manager, 252-329-4862, whouse@greenvillenc.gov
5. Questions:
Q. Are new MH and valve castings still provided by GUC?
A. Yes, contact information will be provided at the precon so pick up from their facility can be arranged.
Q. How will stumps be left after trees have been removed?
A. Stumps will need to be ground down, chips removed, dressed up with good topsoil, and seeded/strawed. See unit price description for “Select Tree Removal”.
COG noted that we are working with property owners to secure access to their property in order to remove certain trees; however, the quantity of trees set for removal may go down if property owners do not allow access to their property.
Attachment 2
2027 Street Rehabilitation and Preservation Project
BID OPENING DATE: November 23rd, 2026
The unit prices noted herein shall include installing in place, complete and accepted.
BASE BID – CONTRACT TIME: 120 DAYS
STREET REHABILITATION & PRESERVATION, COLD MILLING OF ASPHALT PAVEMENTS, PAVEMENT MARKINGS/SIGNALS
Item Item Scheduled Unit Unit Price Amount
No. Description Quantities
1 MOBILIZATION (5%) 1 LS -$
2 ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B 5,806 TON -$
3 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C 103 TON -$
4 ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 1,358 TON -$
5 STREET MICRO SURFACING – TYPE II (DOUBLE APPLICATION) 76,116 SY -$
6 CRACK SEALING 52,107 SY -$
7 REJUVINATOR 48,313 SY -$
8 ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES 14 EA -$
ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS
AND COVER 25 EA
10 REMOVAL OF EXISTING CONCRETE CURB AND GUTTER 1,543 LF -$
11 REMOVAL OF EXISTING VALLEY GUTTER 568 LF -$
12 24” CONCRETE CURB AND GUTTER 1,801 LF -$
13 30” CONCRETE CURB AND GUTTER 182 LF -$
14 VALLEY GUTTER 35 CY -$
15 4” THICK CONCRETE SIDEWALK 120 SY -$
16 REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS 44 EA -$
17 TYPE 1 MODIFIED CONCRETE WHEELCHAIR RAMP 33 EA -$
18 TYPE 3 CONCRETE WHEELCHAIR RAMP 2 EA -$
19 TYPE 3 MODIFIED CONCRETE WHEELCHAIR RAMP 10 EA -$
20 TYPE 4A CONCRETE WHEELCHAIR RAMP 1 EA -$
21 SEEDING AND MULCHING 287 SY -$
22 WORK ZONE TRAFFIC CONTROL 1 LS -$
23 MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH 49,933 SY -$
24 GEOTEXTILE FOR PAVEMENT STABILIZATION 751 SY -$
25 PROOF ROLLING 29 HR -$
26 4” THERMOPLASTIC WHITE LINE, 120 MILS 1,070 LF -$
27 24” THERMOPLASTIC WHITE LINE, 120 MILS 262 LF -$
28 4” THERMOPLASTIC YELLOW LINE, 120 MILS 2,704 LF -$
THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR
TURN)
11 EA
30 THERMOPLASTIC PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS 1 EA
30a THERMOPLASTIC PAVEMENT MARKING SYMBOLS, BIKE SYMBOL 4 EA -$
31 TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE 1,070 LF -$
32 TEMPORARY PAINT PAVEMENT MARKING LINES, 24” WHITE 262 LF
33 TEMPORARY PAINT PAVEMENT MARKING LINES, 4” YELLOW 2,704 LF
TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT
OR TURN)
7 EA
TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, COMBINATION
ARROWS
1 EA
35a TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, BIKE SYMBOL 4 EA
36 TREE REMOVAL (24"-48") 3 EA -$
37 UNDERCUT (12" DEEP) 485 CY -$
38 SELECT MATERIAL, CLASS IV 550 TON -$
39 CONCRETE DRIVEWAY APRON (6" THICK) 75 SY -$
BASE BID TOTAL: -$
ALTERNATE BID 1 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 5 DAYS
TREYBROOKE CIRCLE - W. 5TH ST. TO W. 5TH ST.
Item Item Scheduled Unit Unit Price Amount
No. Description Quantities
1 MOBILIZATION (5%) 1 LS -$
2 ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B 1,048 TON -$ -$
3 ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 123 TON -$ -$
ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS
AND COVER 1 EA -$
5 REMOVAL OF EXISTING CONCRETE CURB AND GUTTER 78 LF -$ -$
6 REMOVAL OF EXISTING VALLEY GUTTER 126 LF -$ -$
7 24” CONCRETE CURB AND GUTTER 98 LF -$ -$
8 VALLEY GUTTER 7 CY -$ -$
9 SEEDING AND MULCHING 17 SY -$ -$
10 WORK ZONE TRAFFIC CONTROL 1 LS -$
11 MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH 9,527 SY -$ -$
12 PROOF ROLLING 3 HR -$ -$
13 4” THERMOPLASTIC WHITE LINE, 120 MILS 68 LF -$ -$
14 24” THERMOPLASTIC WHITE LINE, 120 MILS 20 LF -$ -$
15 4” THERMOPLASTIC YELLOW LINE, 120 MILS 136 LF -$ -$
THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR
TURN)
2 EA -$
16a THERMOPLASTIC PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS 2 EA -$
17 TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE 68 LF -$ -$
18 TEMPORARY PAINT PAVEMENT MARKING LINES, 24” WHITE 20 LF -$ -$
19 TEMPORARY PAINT PAVEMENT MARKING LINES, 4” YELLOW 136 LF -$ -$
TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT
OR TURN)
4 EA -$
ALTERNATE BID 1 TOTAL -$
ALTERNATE BID 2 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 6 DAYS
E. 3RD ST. - S. HARDING ST. TO S. MEADE ST.
Item Item Scheduled Unit Unit Price Amount
No. Description Quantities
1 MOBILIZATION (5%) 1 LS -$
2 ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B 290 TON -$ -$
3 ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 158 TON -$ -$
4 ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES 2 EA -$ -$
5 REMOVAL OF EXISTING CONCRETE CURB AND GUTTER 310 LF -$ -$
6 30” CONCRETE CURB AND GUTTER 310 LF -$ -$
7 4” THICK CONCRETE SIDEWALK 9 SY -$ -$
8 REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS 2 EA -$ -$
9 **TYPE 1A CONCRETE WHEELCHAIR RAMP 1 EA -$
10 TYPE 3 CONCRETE WHEELCHAIR RAMP 1 EA -$ -$
11 SEEDING AND MULCHING 69 SY -$ -$
12 WORK ZONE TRAFFIC CONTROL 1 LS -$
13 MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH 2,617 SY -$ -$
14 GEOTEXTILE FOR PAVEMENT STABILIZATION 384 SY -$ -$
15 PROOF ROLLING 2 HR -$ -$
16 4” THERMOPLASTIC WHITE LINE, 120 MILS 100 LF -$ -$
16a TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE 100 LF -$ -$
17 TREE REMOVAL (24" - 48") 4 EA -$ -$
18 UNDERCUT (12" DEEP) 130 CY -$ -$
19 SELECT MATERIAL, CLASS IV 187 TON -$ -$
**Note: Provide unit price as this is not a base bid line item.
ALTERNATE BID 2 TOTAL -$
ALTERNATE BID 3 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 6 DAYS
WYNESTON RD. - BREMERTON DR. TO BREMERTON DR.
Item Item Scheduled Unit Unit Price Amount
No. Description Quantities
1 MOBILIZATION (5%) 1 LS -$
2 ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B 964 TON -$ -$
3 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C 36 TON -$ -$
4 ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 158 TON -$ -$
5 REMOVAL OF EXISTING CONCRETE CURB AND GUTTER 72 LF -$ -$
6 REMOVAL OF EXISTING VALLEY GUTTER 12 LF -$ -$
7 24” CONCRETE CURB AND GUTTER 72 LF -$ -$
8 VALLEY GUTTER 2 CY -$ -$
9 WORK ZONE TRAFFIC CONTROL 1 LS -$
10 MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH 8,800 SY -$ -$
11 PROOF ROLLING 2 HR -$ -$
12 UNDERCUT (12" DEEP) 72 CY -$ -$
13 SELECT MATERIAL, CLASS IV 34 TON -$ -$
ALTERNATE BID 3 TOTAL -$
ALTERNATE BID 4 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 5 DAYS
JAMESTOWN RD. - WILLIAMSBURG DR. TO WESLEY RD.
Item Item Scheduled Unit Unit Price Amount
No. Description Quantities
1 MOBILIZATION (5%) 1 LS -$
2 ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B 615 TON -$ -$
3 ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 95 TON -$ -$
4 ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES 3 EA -$ -$
5 REMOVAL OF EXISTING CONCRETE CURB AND GUTTER 367 LF -$ -$
6 24” CONCRETE CURB AND GUTTER 367 LF -$ -$
7 SEEDING AND MULCHING 82 SY -$ -$
8 WORK ZONE TRAFFIC CONTROL 1 LS -$
9 MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH 5,555 SY -$ -$
10 PROOF ROLLING 2 HR -$ -$
ALTERNATE BID 4 TOTAL -$
ALTERNATE BID 5 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 4 DAYS
PLACID WY. - BELVEDERE DR. TO CRESTLINE BLVD.
Item Item Scheduled Unit Unit Price Amount
No. Description Quantities
1 MOBILIZATION (5%) 1 LS -$
2 ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B 309 TON -$ -$
3 ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 136 TON -$ -$
4 ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES 3 EA -$ -$
ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS
AND COVER 3 EA -$
6 REMOVAL OF EXISTING CONCRETE CURB AND GUTTER 350 LF -$ -$
7 REMOVAL OF EXISTING VALLEY GUTTER 47 LF -$ -$
8 24” CONCRETE CURB AND GUTTER 350 LF -$ -$
9 VALLEY GUTTTER 3 CY -$ -$
10 SEEDING AND MULCHING 78 SY -$ -$
11 WORK ZONE TRAFFIC CONTROL 1 LS -$
12 MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH (EDGE MILL) 2,100 SY -$ -$
13 PROOF ROLLING 2 HR -$ -$
14 TREE REMOVAL (24" - 48") 3 EA -$ -$
ALTERNATE BID 5 TOTAL -$
ALTERNATE BID 6 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 7 DAYS
DARDEN DR. - W. 3RD ST. TO W. 5TH ST.
Item Item Scheduled Unit Unit Price Amount
No. Description Quantities
1 MOBILIZATION (5%) 1 LS -$
2 ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B 664 TON -$ -$
3 ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 144 TON -$ -$
4 ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES 2 EA -$ -$
ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS
AND COVER
2 EA -$
6 REMOVAL OF EXISTING CONCRETE CURB AND GUTTER 158 LF -$ -$
7 24” CONCRETE CURB AND GUTTER 258 LF -$ -$
8 4” THICK CONCRETE SIDEWALK 30 SY -$ -$
9 REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS 7 EA -$ -$
10 TYPE 3 CONCRETE WHEELCHAIR RAMP 6 EA -$ -$
11 TYPE 3M CONCRETE WHEELCHAIR RAMP 2 EA -$ -$
12 **TYPE 4 CONCRETE WHEELCHAIR RAMP 2 EA -$
13 SEEDING AND MULCHING 35 SY -$ -$
14 WORK ZONE TRAFFIC CONTROL 1 LS -$
15 MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH 5,928 SY -$ -$
16 PROOF ROLLING 3 HR -$ -$
17 **REMOVAL OF EXISTING SPEED HUMPS 2 EA -$
**Note: Provide unit price as this is not a base bid line item.
ALTERNATE BID 6 TOTAL -$
ALTERNATE BID 7 (MILL & FILL) – ADDITIONAL CONTRACT TIME: 7 DAYS
E. 1ST ST. - COTANCHE ST. TO SUMMIT ST.
Item Item Scheduled Unit Unit Price Amount
No. Description Quantities
1 MOBILIZATION (5%) 1 LS -$
2 ASPHALT CONCRETE SURFACE COURSE, TYPE S 9.5B 1,010 TON -$ -$
3 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C 394 TON -$ -$
4 ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 619 TON -$ -$
5 ADJUST/REPLACE EXISTING WATER/GAS VALVE BOXES 10 EA -$ -$
ADJUST/REPLACE EXISTING STORM DRAIN/SANITARY SEWER CASTINGS
AND COVER 6 EA -$
7 REMOVAL OF EXISTING CONCRETE CURB AND GUTTER 173 LF -$ -$
8 REMOVAL OF EXISTING VALLEY GUTTER 85 LF -$ -$
9 30” CONCRETE CURB AND GUTTER 200 LF -$ -$
10 VALLEY GUTTTER 5 CY -$ -$
11 4” THICK CONCRETE SIDEWALK 11 SY -$ -$
12 REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS 4 EA -$ -$
13 **TYPE 1 CONCRETE WHEELCHAIR RAMP 1 EA -$
14 TYPE 1 MODIFIED CONCRETE WHEELCHAIR RAMP 1 EA -$ -$
15 TYPE 3 CONCRETE WHEELCHAIR RAMP 1 EA -$ -$
16 **TYPE 5A CONCRETE WHEELCHAIR RAMP 1 EA -$
17 WORK ZONE TRAFFIC CONTROL 1 LS -$
18 MILLING ASPHALT PAVEMENT, 1” to 3” DEPTH 5,600 SY -$ -$
19 GEOTEXTILE FOR PAVEMENT STABILIZATION 2,300 SY -$ -$
20 PROOF ROLLING 3 HR -$ -$
21 UNDERCUT (12" DEEP) 770 CY -$ -$
22 SELECT MATERIAL, CLASS IV 500 TON -$ -$
23 **6" PORTLAND CEMENT CONCRETE PAVEMENT, MISC. (W/O DOWESL) 21 SY -$
24 4” THERMOPLASTIC WHITE LINE, 120 MILS 4,575 LF -$ -$
25 **12” THERMOPLASTIC WHITE LINE, 120 MILS 110 LF -$
26 24” THERMOPLASTIC WHITE LINE, 120 MILS 100 LF -$ -$
27 4” THERMOPLASTIC YELLOW LINE, 120 MILS 5,000 LF -$ -$
THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR
TURN)
2 EA -$
29 THERMOPLASTIC PAVEMENT MARKING SYMBOLS, BIKE SYMBOL 10 EA -$ -$
30 TEMPORARY PAINT PAVEMENT MARKING LINES, 4” WHITE 4,575 LF -$ -$
31 **TEMPORARY PAINT PAVEMENT MARKING LINES, 12” WHITE 110 LF -$
32 TEMPORARY PAINT PAVEMENT MARKING LINES, 24” WHITE 100 LF -$ -$
33 TEMPORARY PAINT PAVEMENT MARKING LINES, 4” YELLOW 5,000 LF -$ -$
TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT
OR TURN)
2 EA -$
35 TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, BIKE SYMBOL 10 EA -$ -$
**Note: Provide unit price as this is not a base bid line item.
ALTERNATE BID 7 TOTAL -$
ALTERNATE BID 8 (MICRO-SURFACE) – ADDITIONAL CONTRACT TIME: 2 DAYS
ROCKPORT DR. - ALLEN RD. TO STREET END.
Item Item Scheduled Unit Unit Price Amount No. Description Quantities
1 MOBILIZATION (5%) 1 LS -$
2 STREET MICRO-SURFACING - TYPE II (DOUBLE APPLICATION) 1,508 SY -$ -$
3 24” CONCRETE CURB AND GUTTER 20 LF -$ -$
4 4” THICK CONCRETE SIDEWALK 5.5 SY -$ -$
5 REMOVAL OF EXISTNG CONCRETE WHEELCHAIR RAMPS 2 EA -$ -$
6 TYPE 1 MODIFIED CONCRETE WHEELCHAIR RAMP 2 EA -$ -$
7 WORK ZONE TRAFFIC CONTROL 1 LS -$
ALTERNATE BID 8 (MICRO) TOTAL -$
ALTERNATE BID 9 (MICRO-SURFACE) – ADDITIONAL CONTRACT TIME: 2 DAYS
LENDIRE WY. - ROCKPORT DR. TO STREET END.
Item Item Scheduled Unit Unit Price Amount No. Description Quantities
1 MOBILIZATION (5%) 1 LS -$
2 ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 1.5 TON -$ -$
3 STREET MICRO-SURFACING - TYPE II (DOUBLE APPLICATION) 300 SY -$ -$
4 WORK ZONE TRAFFIC CONTROL 1 LS -$
ALTERNATE BID 9 (MICRO) TOTAL -$
ALTERNATE BID 10 (MICRO-SURFACE) – ADDITIONAL CONTRACT TIME: 3 DAYS
ADAMS BLVD. - LAURA LN. TO SE. GREENVILLE BLVD.
Item Item Scheduled Unit Unit Price Amount No. Description Quantities
1 MOBILIZATION (5%) 1 LS -$
2 ASPHALT PLANT MIX, PAVEMENT REPAIR, 4” DEEP, TYPE B 25.0 3 TON -$ -$
3 STREET MICRO-SURFACING - TYPE II (DOUBLE APPLICATION) 3,032 SY -$ -$
4 WORK ZONE TRAFFIC CONTROL 1 LS -$
5 4” THERMOPLASTIC WHITE LINE, 120 MILS 81 LF -$ -$
6 24” THERMOPLASTIC WHITE LINE, 120 MILS 20 LF -$ -$
7 4” THERMOPLASTIC YELLOW LINE, 120 MILS 290 LF -$ -$
THERMOPLASTIC PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT OR
TURN)
2 EA -$
9 THERMOPLASTIC PAVEMENT MARKING SYMBOLS, COMBINATION ARROWS 2 EA -$
TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, ARROWS (STRAIGHT
OR TURN)
2 EA -$
TEMPORARY PAINT PAVEMENT MARKING SYMBOLS, COMBINATION
ARROWS
2 EA -$
ALTERNATE BID 10 (MICRO) TOTAL -$
CONTRACTOR: _______________________________________
LICENSE: _______________________________________
SIGNATURE: _____________________________________
DATE: __________________________________________
| Addendum 1-2027 Street Rehabilitation and Preservation Project.pdf |
| Attachment 1-Meeting Minutes-2027 Rehabilitation and Preservation Project Pre-Bid Meeting.pdf |
| Meeting Minutes-2027 Rehabilitation and Preservation Project.pdf |
| DOC110626-11062026093050.pdf |
| Addendum 1-2027 Street Rehabilitation and Preservation Project |
| Attachment 2-Revised Bid Form-2027 Street Rehabilitation and Preservation Project.pdf |
File details come from the government source that posted it. Updated .